Attachment 0003 Evaluation Criteria.pdf

PDF 126 KB Posted

Attached to
LATHE SPEED Federal contract opportunity
Solicitation number
W519TC23Q2185
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to LATHE SPEED, newest first.
File Type Posted
Attachment 0001 RIPD E4000-20-9-01.pdf PDF
23Q2185.pdf PDF
Attachment 0002 Performance Work Statement for Speed Increasers.pdf PDF
Attachment 0004 Quality Assurance Surveillance Plan.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROCK ISLAND ARSENAL DATE: 16-Mar-23

PROJECT: EVALUATION CRITERIA

REBUILD OF SPEED INCREASERS

1. EXPERIENCE

In the regular course of its business for a period of at least 3-yrs preceding this solicitation, the contractor of this service shall have previously supplied or offered for contracting this type of service to industry for other than its own use. At least one of the following shall be provided as evidence:

1.1.1 PUBLISHED DATA: Each bidder shall provide a brochure, catalog, or published data describing the services offered.

1.1.2 REFERENCES: Each bidder shall provide contact information (including at least Company Name, Contact Name, Contact Telephone Number, and a description of the services provided the contact purchased) for minimum of (3) projects of similar scope and scale. For projects to be considered similar means that it must have a Scope within 20% smaller than the volume of the requested area or larger,

2. TECHNICAL

Each bidder shall submit a package containing the following information. Failure to provide all the data required with the package may result in a bidder being considered unresponsive and eliminated from further consideration.

2.1 Compliance Statement

Each bidder shall provide a statement of compliance. It shall be a copy of the purchase description. At the end of each and every paragraph the vendor shall type or write exactly either “COMPLY” or “NON-COMPLY”. Other formats will not be considered acceptable. If “NON- COMPLY” is written, a brief description of the non-compliance is required.

1. Experience
2. TECHNICAL
2.1 Compliance Statement

File details come from the government source that posted it. Updated .