| File | Type | Posted |
|---|---|---|
| W15QKN-20-Q-0043 (6-24-20).pdf | ||
| CDRL_A002_NDA_KrussDropShapeAnalyzer.pdf | ||
| Attachment 0003 - Non-Disclosure and Non-Use Agreement.doc | DOC document | |
| CDRL_A004_InstructionManual_Analyzer.pdf | ||
| CDRL_A003_Accident _KrussDropShapeAnalyzer.pdf | ||
| W15QKN-20-Q-0043.pdf | ||
| Attachment 0001 - Quality Assurance Requirements.pdf | ||
| Attachment 0004 - LPTA Evaluation Criteria.docx | DOCX document | |
| CDRL_A001_SecurityTraining_KrussDropShapeAnalyzer.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP) for Kruss Drop Shape Analyzer
| Performance Requirements |
| Performance |
Measure Performance Standard
Acceptable Performance Level
(APL)
Method of Surveillance Compliance (Exceeded, Met or Partially Met)
| 4.2.1 Requirements |
| Quality |
Completeness
Cost Contractor shall be knowledgeable in the repair and maintenance in all types of modern machine tools and show certifications of manufacturer specific training and/or experience of the responsible employees.
Formal quotes shall be provided in accordance with the RFP.
Satisfactory completion of all tasks within or below the estimated cost.
Materials shall be available within a 110 mile radius of Picatinny, NJ.
Training certs for mechanical and electrical personnel
No deviation
No cost overages.
Not to exceed 120 miles 100% inspection by COR and technical POC. Review of final payment voucher.
5.2, 5.4, 5.8 Mandatory Training AT Level 1, iWATCH, and OPSEC Training
CDRL A001
Completeness
| Report from the contractor 7 days after contract award and annually thereafter. |
| 100% compliance |
| Received and tracked by COR |
8.
Accident/ Incident Report
CDRL B003
Completeness
| Contractor shall submit completed Accident/Incident reports immediately or within 3 calendar days of any incident. |
| 100% compliance |
| Received and tracked by COR |
9.
Non-Disclosure Agreements
CDRL A002
| Completeness |
| Contractor shall submit signed Non-Disclosure agreements within 10 days of contract award |
| 100% compliance |
| Received and tracked by COR |
Installation access & security policies/ procedures
| Completeness |
| Contractor shall report all incident reporting. As received. |
COR in coordination with the installation & organization operations office.
| 100% compliance |
| Received and tracked by COR |