Attach 3 - PERI HVAC Briefing Photos_5.6.20.pdf
PDF 18 MB Posted
- Attached to
- PERI - HVAC REPLACEMENT Federal contract opportunity
- Solicitation number
- 140P6220R0005
About this file
This presolicitation notice provides details for the HVAC replacement project at the Pea Ridge National Military Park Visitor Center. The project scope includes installing spray foam insulation, replacing the air-cooled chiller, boilers, and controls, and adding humidifiers and a ductless split system. The contract is a firm-fixed-price construction contract estimated between $250,000-$500,000 to be awarded in September 2020. The performance period is 180 days from notice to proceed. The solicitation will be issued on SAM.gov under number 140P6220R0005. The NAICS code is 238220 and it is set aside for HUBZone small businesses. Questions are due by August 13 and proposals by September 3. The low price technically acceptable source selection will be used. Offerors must be registered in SAM and have a UEI number, completed Reps & Certs, and be represented as a HUBZone business when submitting the proposal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach 1 - PERI Project Manual.pdf | ||
| Attach 2 - PERI HVAC Drawings Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pea Ridge National Military Park Garfield, AR
Replace Visitor Center HVAC System
PHOTOGRAPH
REFERENCE GUIDE
NATIONAL PARK SERVICE
May 6, 2020
DNWilson Typewritten Text
***Photographs included for additional contractor reference information only. Note that existing chiller identified in Ref. Demo Notes on Sheet M001 of drawings has already been removed and is not Contractor responsibility. All other drawings and specification requirements apply and are Contractor responsibility.***
Polygonal Line
DNWilson Polygonal Line
DNWilson Typewritten Text Contractor Parking
DNWilson Typewritten Text Contractor Parking
DNWilson Callout Temporary Equipment and Material Storage Available in Maintenance Shop
DNWilson Typewritten Text
NORTH
Line
KDPippin Text Box Southeast (front) Visitor Center elevation looking at access hatch on the roof. Hatch opens from inside above the air handler.
KDPippin Text Box Rear entrance of building looking east. Area of temporary storage and staging as well as the chiller and the mini split condenser locations. Reference G00, M001, M101, E001
KDPippin Line
KDPippin Line
KDPippin Line
DNWilson Text Box Exhaust Fan EF-1 Location (approx) M102, E101 kschluckebier
Do not store material, drive or otherwise distrurb under tree drip lines, typ. West end of building outside fence looking northeast. Refernce G00
KDPippin Text Box Rear of building chiller location looking northeast from gate. Rental chiller currently located adjacent to permanent chiller location. M001, M101,E001.
*Note that existing chiller identified in Ref. Demo Notes on Sheet M001 has already been removed and is not Contractor responsibility.
DNWilson Line
Rear of building looking east at rental chiller. Rental chiller to be removed by rental company.
Connection of rental chiller. Flex lines will be removed with chiller.
Text Box Back of building looking south next to fence at existing chiller pad and connections. Transformer and flex hoses are part of rental chiller agreement and will be removed by rental company. Contractor to remove existing concrete pad and pour new chiller pad per new chiller requirements. Reference M001, M101,E001, M401, M201,M501
*Note that existing chiller identified in Ref. Demo Notes on Sheet M001 has already been removed and is not Contractor responsibility.
KDPippin Text Box Back of building looking east by chiller pad. Existing chiller connections.
Reference M001, M101, M401, M201,M501,E001, E101
Back of building at chiller pad looking northeast. Existing electrical disconnect box. Black cable to be removed with rental chiller. Reference M001,M101, M201, M401,M501, E001, E101 *Note that existing chiller identified in Ref. Demo Notes on Sheet M001 has already been removed and is not Contractor responsibility.
KDPippin Line
KDPippin
Back of building looking east at existing Internet Technology (I.T.) room split system condenser. Existing chiller piping penetrations on left of picture. Reference M001, M101, M401, M201,M501, E001, E101
Back of building looking south east at I.T. room unit connections.
Reference M001, M101,M401, M201,M501, E001, E101
KDPippin Text Box Back of building IT room unit connections.
Reference M001, M101, M401, M201,M501, E001, E101
Back of building chiller piping entering building on left IT room connections on right.
Reference M001,M101,M401, M201,M501, E001, E101
KDPippin Text Box Rear of building looking north at double entrance doors to Mechanical Room.
I.T. Room exterior condenser to left of wall.
Pages 9-19 reference M001, M201, E001, E101 Mechanical room double doorway looking north.
Chilled water pumps
KDPippin Line
KDPippin Line
KDPippin Typewritten Text Large additive tank
KDPippin Typewritten Text Small additive tank
KDPippin Typewritten Text IT room line set
KDPippin Line
DNWilson Line
DNWilson
LP-3
Chiller pumps looking north from doorway. Electrical panel looking west inside doorway.
KDPippin Typewritten Text Chilled water pump
KDPippin Typewritten Text Chilled water pump
KDPippin Typewritten Text Additive tank
KDPippin Typewritten Text Chilled water pump disconnects
KDPippin
Electric panel with some HVAC circuits
' t, I l! \
C
04./ 10/2020
.- �-f.,;,..
Mechanical room layout looking from hall door to the north west
KDPippin Typewritten Text Glycol/additive tank
KDPippin Typewritten Text Main breaker panel
KDPippin Typewritten Text Chilled water pumps
KDPippin Typewritten Text Location of new chilled water buffer tank
KDPippin Typewritten Text boiler pumps
KDPippin Typewritten Text Door to back of building
KDPippin Line
DNWilson Typewritten Text Glycol Additive Tank
DNWilson
Mechanical room looking west from hall door.
LP-2LP-3
Mechanical room looking northwest from hall door.
LP-2 breaker box west wall
KDPippin Typewritten Text Main breakers
KDPippin Typewritten Text Expansion tank
KDPippin Line
KDPippin Typewritten Text Boiler Pump
KDPippin Typewritten Text Chilled Water Pump
DNWilson Line
DNWilson Typewritten Text
LP-2
DNWilson Typewritten Text Main Disconnect
DNWilson
MDP
Mechanical room looking at north wall
Text Box Main breaker panel
KDPippin Typewritten Text Main Disconnect For all of the building
KDPippin Typewritten Text Main breaker panel - MDP
KDPippin Typewritten Text Expansion tank
North wall boiler piping and expantion tank , boiler pumps and disconnects.
Typewritten Text Hot water pumps
KDPippin Line
KDPippin Line
KDPippin Typewritten Text Boiler #1
KDPippin Typewritten Text Hot water pumps
KDPippin Typewritten Text Additive tank
KDPippin Typewritten Text Expansion tank
DNWilson Typewritten Text
MDP
DNWilson Line
Mechanical room looking northeast at boilers
Typewritten Text Boiler #1
KDPippin Typewritten Text Boiler #2
KDPippin
Boiler #3
Behind boilers looking at boiler water controls and control box on east wall.
Typewritten Text Control System Connection
I \ .
IT room line set - west wall.
Mechanical room west wall LP-3 breaker box
KDPippin Typewritten Text IT Room Line Set
KDPippin Line
DNWilson Line
DNWilson
Looking southwest from hallway outside of mechanical room.
EEast Wall Control Panel Behind Boilers
KDPippin Typewritten Text Control system connections
KDPippin Typewritten Text IT room
KDPippin Typewritten Text Mechanical room
KDPippin Line
KDPippin Typewritten Text West Exit Door to Chiller Area and Staff Parking
Reference E001, E101
IT room looking at west wall
IT room looking at southwest corner
KDPippin Typewritten Text IT Room Indoor Liebert Unit
KDPippin Typewritten Text IT room control and Disconnect
KDPippin Typewritten Text Door to Hall
KDPippin Line
KDPippin Typewritten Text Water supply Drain
Line set
Typewritten Text
KDPippin Line
KDPippin Line
Looking east down hallway from outside mechanical room
KDPippin Typewritten Text Mechanical Room
KDPippin Typewritten Text Passage To Lobby
KDPippin Line
DNWilson Typewritten Text IT Room - Facing North Computer for Control System
Hallway looking west
Typewritten Text Wireless Thermostat (Typ.)
Front Desk/Lobby 102
Passage 109 Looking West To Mech Room
DNWilson Line
Looking east from Passage 109 to Lobby
Looking east at back door
KDPippin Typewritten Text VC Museum Lobby
KDPippin Typewritten Text Attic Access
KDPippin Line
KDPippin Typewritten Text Hallway and mechanical room
KDPippin Line
KDPippin Typewritten Text Front door
KDPippin Line
KDPippin Typewritten Text Attic acces
KDPippin Typewritten Text Northeast exit
KDPippin Line
KDPippin Line
KDPippin Typewritten Text Lobby
KDPippin Line
View Area
Line
DNWilson Typewritten Text
DNWilson Cross-Out
DNWilson
Foyer 100
Looking south from back door Foyer 100
Looking west from back door of building outside Foyer 100
KDPippin Typewritten Text North exit door
KDPippin Typewritten Text Attic acces
KDPippin Line
KDPippin Line
KDPippin Typewritten Text Lobby
KDPippin Line
KDPippin Typewritten Text Rental Chiller
KDPippin Typewritten Text Propane tanks
KDPippin Typewritten Text North exit door
DNWilson Line
DNWilson Line
Looking southwest from north exit at Foyer 100
KDPippin Text Box Propane entrance to building looking south at north exterior of building.
KDPippin Typewritten Text Attic access
Auditorium (Assembly 103)looking south along east wall
Stairs to attic looking west
KDPippin Typewritten Text Attic access
DNWilson Line
DNWilson Typewritten Text
UPSTAIRS
CAUTION
E
LADDER FOR
MERGENCY USE
ONLY
Attic access looking north in auditorium (Assembly 103)
KDPippin Typewritten Text Attic access narrow opening
KDPippin Line
DNWilson Typewritten Text Projection Room Entrance Door to Attic Access
Reference M001 - Ref Demo Note 4;
E001-Ref Demo Note D1 Facing North
Reference M001 - Ref Demo Note4 E001-Ref Demo Note D1 facing north
KDPippin Typewritten Text Attic Access Door - Short Height Approx 48"
KDPippin Typewritten Text Existing museum humidifier H-1(E)
KDPippin Typewritten Text Existing museum humidifier H-1(E)
DNWilson Typewritten Text Steps
DNWilson Typewritten Text Variable Frequency Drive to Remain
DNWilson Typewritten Text Attic Access Door Short Height 48" (approx)
--+----------------1-------
SCH:MM::R
c....,.-----
!NORTH!
h.,/=IR ee
EVl s=a s eo a,,c l
,-,-1i
PREPAREo '"TE �rrw. JLF
§B@eoj 01/03/2020
DAT£
ATTIC PLAN
PEA RIDGE NATIONAL �IUTARY PARK
15930 EAST US-62
GARFIELD, AR 72732
Attic Sections 1-4 Identified for Photograph Reference
Reference M001 Ref Note 4;
E001 - Ref Demo Note D1 Looking north
KDPippin Typewritten Text Variable frequency drive for air handler to remain
KDPippin Typewritten Text Attic Access Door Approx 48" High
KDPippin Typewritten Text Humidifier H-1(E)
Attic Access Door Facing North toward Attic Section 1
Humidifier connection for museum facing east inside attic Reference M001, E001
KDPippin Typewritten Text VAV-11(E) and humidifier connection for museum Facing East Attic Section 1
KDPippin Typewritten Text Drain line
DNWilson
Drain
Supply Duct
KDPippin Typewritten Text Attic door -downstairs
KDPippin Typewritten Text Insulate bottom side of roof deck above Attic Section 1 of attic - See A101 - Note 1
KDPippin Typewritten Text Attic Section 1 Facing East
DNWilson Line
DNWilson Typewritten Text *Note locations for spray foam insulation A101
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Line
Insulate bottom side of roof deck above theater.
See A101 - Note 2 Attic Section 1
KDPippin Typewritten Text Roof deck to be insulated
KDPippin Typewritten Text Chilled water lines
KDPippin Typewritten Text Humidifier water supply line
KDPippin Typewritten Text Second part of attic
KDPippin Typewritten Text Attic Section 1 Facing East toward projection room and access door
KDPippin Line
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Typewritten Text *Note locations for spray foam insulation A101
DNWilson Typewritten Text *Note locations for spray foam insulation A101
DNWilson Line
Air handler AHU-1(E) Reference M001, M102, M201 Attic Section 2 Facing South
KDPippin Typewritten Text Supply
DNWilson Line
DNWilson Typewritten Text Air Handler
DNWilson Line
DNWilson Typewritten Text Return
DNWilson Typewritten Text *Note locations for spray foam insulation A101
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Typewritten Text Attic Section 2 Facing Southwest Reference M001, M102, M201
Reference M102, M201, E101 looking west Attic Section 2
KDPippin Typewritten Text Control Box
KDPippin Typewritten Text Control Box Attic Section 2
DNWilson Typewritten Text New Humidifier Location H-2 (approximate)
DNWilson Line
DNWilson Typewritten Text Supply
DNWilson Line
Control Box Attic Section 2
KDPippin Typewritten Text Air Handler
AHU-1
KDPippin Typewritten Text Attic door/ Attic exit
KDPippin Line
DNWilson Typewritten Text Supply Duct
DNWilson Typewritten Text North Side of AHU-1 Attic Section 2 Facing East toward Attic Section 1
DNWilson Typewritten Text New H-1 Location at wall behind duct (approx) See M102
Air Handler
AHU-1
Existing blown cellulose insulation over fiberglass bats.
DNWilson Line
DNWilson Typewritten Text Air Handler
AHU-1
Attic Section 2
DNWilson Typewritten Text
Facing South
Air Handler AHU-1
KDPippin Typewritten Text Underside of roof deck to insulate
DNWilson Line
DNWilson Line
DNWilson Typewritten Text Reference A101, A102 Looking east
DNWilson Typewritten Text Attic Section 2 Upper Level *Note locations for spray foam insulation A101
DNWilson Line
DNWilson Typewritten Text Attic Section 2
East Side of Air Handler
Access to upper lever of attic
KDPippin Line
*Note locations for spray foam insulation A101
DNWilson Typewritten Text Attic Section 2 Facing North *Note locations for spray foam insulation A101
DNWilson Typewritten Text Attic Section 2 Upper Level Facing West
Roof deck to be insulated
Outside Air Duct -see louver in exterior south elevation picture
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Typewritten Text Attic Section 2 Upper Level Facing South *Note Spray Foam insulation locations A101
DNWilson Typewritten Text Attic Section 2 Upper Level Facing East *Note Locations for spray foam insulation A101
Side wall to insulate
KDPippin Typewritten Text Roof Deck to be insulated
Access to Section 3 of attic
Line
DNWilson Typewritten Text Attic Section 2 Upper Level Facing West *Note locations for spray foam insulation A101
DNWilson Typewritten Text Attic Section 2 facing west toward Section 3 access opening
Roof deck to insulate
Entrance to Attic Section 3
DNWilson Typewritten Text *Note spray foam insulation locations A101
DNWilson Line
DNWilson Line
DNWilson Typewritten Text *Note locations for spray foam insulation A101
DNWilson Typewritten Text Insulate bottom of roof deck
DNWilson Line
DNWilson Line
DNWilson Typewritten Text
VAV-8
DNWilson Typewritten Text Attic Section 3 Facing South
DNWilson
VAV-6
Access to Attic Section 4 Facing West
KDPippin Line
KDPippin Typewritten Text
DNWilson Typewritten Text Insulate bottom of roof deck *Note spray foam insulation locations A101
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Typewritten Text Attic Section 4 Facing Southwest
DNWilson Typewritten Text
VAV-2
DNWilson
VAV-1
Roof deck to insulate in west section of attic
DNWilson Line
DNWilson Line
DNWilson Typewritten Text Attic Section 4 Facing South
DNWilson Typewritten Text *Note spray foam locations A101
DNWilson Typewritten Text Attic Section 4 Facing East A101, A102
Attic Section 4 Facing North (Inside Doorway) A101, A102
Attic Section 4
A101, A102
DNWilson Typewritten Text Exhaust Fan Location EF-1 (Approximate) M102
Attic Section 4 Looking west Reference A101, A102
Boiler vent pipes in west section of attic above mechanical room
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Typewritten Text Exhaust Fan EF-1 Location (approximate) See M102
DNWilson Line
DNWilson Typewritten Text Attic Section 4 Facing North Reference A101, A102, M501
Attic Section 3 Looking South Cellulose Over Bat Insulation
DNWilson Typewritten Text Attic Section 4 Looking East Toward Section 3
Cellulose Insulation
Attic Section 3 Upper Level
Attic Section 3 Facing Section 2 along Supply Air Duct From AHU-1 Facing East
KDPippin Typewritten Text Attic Section 3 Facing Upper level of Section 2 Facing East Reference A101, A102 *Note locations for spray foam insulation A101
DNWilson Typewritten Text Attic Section 3 Facing North A101, A102
Attic Section 2 Facing Southeast Looking Under Return at Theatre Wall
KDPippin Typewritten Text Roof Hatch over Air Handler Attich Section 2
KDPippin Typewritten Text Upper Level Attic Section 2 Roof Hatch over Air Handler
Insulate Bottom of Side of Exposed Roof Deck A101
DNWilson Line
DNWilson Line
DNWilson Typewritten Text Roof Hatch over Air Hanler
DNWilson Line
DNWilson Typewritten Text Air Handler
AHU-1
Attic Section 2
Attic Section 1 Upper Level Bottom side roof and int. side of ext. walls to be insulated A101; Facing North
KDPippin Typewritten Text Upper Level Attic Section 1 Bottom side roof and int. side of ext. walls to be insulated A101; Facing North
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Line
DNWilson Line
Boiler Vents Exiting Mechanical Room Roof - North Building Elevation Reference M001, M501
Roof hatch
KDPippin Line
DNWilson Typewritten Text Outside Air Louver
DNWilson Line
DNWilson Typewritten Text South Visitor Center Elevation and Visitor Entrance
| PERI Photograph Site Visit Cover Page.pdf |
| PERI Aerial.pdf |
| PERI HVAC Site Visit Photos_5.6.20.pdf |
| PERI-HVAC-SiteVisit-PhotoWalk with descriptions.pdf |
| PERI Attic Plan Sections 1-4.pdf |
| PERI Attic Plan Sections A101.pdf |
File details come from the government source that posted it. Updated .