Attach 2_ Salient Characteristics.pdf
PDF 79 KB Posted
- Attached to
- 113th MXS Sanding Booth Federal contract opportunity
- Solicitation number
- W50S6W20Q6006
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sanding Booth Site Visit Picture.docx | DOCX document | |
| Attach 1_Statement of Work-Sanding Booth Rev.18 Aug.docx | DOCX document | |
| RFQ_Questions and Answers_Sanding Booth.docx | DOCX document | |
| Attach 3_Quote Sheet.pdf | ||
| Attach 1_Statement of Work-Sanding Booth 28 Apr.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salient Characteristics 113th MXG Sanding Booth
The sanding booth shall meet, at a minimum, the following specifications and salient characteristics:
- Must be 14’0” Wide x 9’0” High x 24’0” Deep (Sanding Booth)
- Must have a booth support structure consisting of structural steel “I” beam with trouble-free bolt together assembly.
- Must not have external exhaust that requires roof penetration.
- Must have 24” Direct Drive Plug Type Exhaust Fan
- Must have 10 hp Heavy Duty Totally Enclosed Fan Cooled Motor.
- Must have 15 ea. High efficiency durable cartridge filters with a 99.8% rating, at 5 microns
- Must have cartridge filters that are held in place with a crank lever operating mechanism.
-Must have 2 ea. DCM-7-H Cartridge Module(s) (8,960 SCFM per module x 2 modules = 17,920 total SCFM).
- Must have 10 ea. LED light fixtures, inside access 48" 4-tube, 265 mA, 32-watt T8 ballast, dual voltage-120/277 with 85% color corrected tubes included.
- Must have Booth Acoustical Liner to reduce decibels inside and out of booth.
- Must have Air Shower – 4’ wide x 10’ high x 4’6” deep
- Must have Changing Room – 6’ wide x 8’ high x 9’ long
- Changing room and Air Shower must have Blower and motor, LED light, Controls, and a Total of (2) doors w/magnetic interlocks
- Must have Pre-wired electrical control panel (480v. 3ph. 3 wire) featuring single point power connection for quick and easy wiring to the line side of the main disconnecting device with NEMA-12 rated enclosure. Includes:
Motor starter(s) Circuit protection Transformer (if required) Adjustable sequential control board for cleaning of cartridge filters Photohelic gauge Start or stop buttons Light switch Door mounted disconnect switch Pilot Lights
Visual indicators for all operating functions running and pulsations as well as identifying plugged cartridge filters.
Each Control panel is designed for a single point wiring feeder connection with breaker.
All wires pre-numbered for easy identification.
Redundant filter monitoring system that serves as the Continuous Monitoring Device (CMD). This system is to be interlocked to shut down process, system fan and illuminate alarm light should the redundant filter system show an increased pressure drop
- Must have 1 set Solid, Bi-Fold-type product exit door (8’ wide x 9’ high).
- Must have 1 set Filtered, Bi-Fold-type product entry door (8’ wide x 9’ high).Doors will be 2” tube framed and single skinned with 18 ga. sheet steel
- Must have 2 ea. Personnel access doors with panic latch (3’0” W x 7’0”H) with 18” x 24” clear tempered glass observation windows. (Note, one door is only for emergency exit).
- Must have fire suppression conforming to the National Fire Protection Association’s standard #17 and will conform with the requirements of local and state Authorities having Jurisdiction.
- Must include anchoring of sanding booth to customer supplied slab.
- Must include clean-up of equipment and working area in which the installation was performed.
- Must include all conduit, wiring, and construction supplies for hook-up to existing building electrical boxes.
- Must include start-up and booth balancing.
- Must have training of customer personnel on operation and maintenance of quoted equipment
- Must include 1-year warranty
- Must include instruction manual
File details come from the government source that posted it. Updated .