Attach 2 - Performance Work Statement_B7514.pdf
PDF 565 KB Posted
- Attached to
- Flooring Replacement and Installation B7514 Federal contract opportunity
- Solicitation number
- FA487724QA093
About this file
This performance work statement outlines carpet replacement and installation services required at Building 7514 on Davis-Monthan Air Force Base in Arizona. The contractor will be responsible for removing existing carpeting totaling approximately 6000 square feet, inspecting and preparing the subfloor, and installing new high-traffic carpet and rubber cove base. The contractor must provide all necessary labor, equipment, materials and dispose of waste properly. Specific requirements include removing and disposing of old carpet and adhesive, inspecting and repairing subfloors as needed, cleaning and leveling subfloors, installing new carpet and cove base, and coordinating all work with the contracting point of contact. The performance period is not specified.
The related federal contract opportunity is a solicitation from the Air Force seeking proposals for the carpet replacement and installation services defined in the performance work statement for Building 7514. Offerors must adhere to all security, safety, environmental and other installation requirements detailed in the performance work statement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q and A template_QA093 v2.pdf | ||
| Attach 1-CLIN_Pricing_Schedule_QA093X1.pdf | ||
| Attach 2 - Performance Work Statement B7514v.2.pdf | ||
| COMBO_Solicitation - B7514 Carpet Removal and Replacement V.2.pdf | ||
| COMBO_Solicitation - B7514 Carpet Removal and Replacement Mod 1.pdf | ||
| COMBO_Solicitation - B7514 Carpet Removal and Replacement.pdf | ||
| Attach 5 - Wage Determination_15-5473.pdf | ||
| Attach 3 - Floor Plan.pdf | ||
| Attach 4 - Tier 1 Contractor POCs.pdf | ||
| Attach 1-CLIN_Pricing_Schedule_QA093.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Command Section Carpet Replacement
309th Aerospace Maintenance and Regeneration Group (309 AMARG) at
Davis-Monthan AFB, AZ 85707
Requirement
Lifting and moving of office furnishings, remove carpet and rubber cove, clean and prepare subflooring, install high traffic carpet flooring, and rubber cove. Following the Carpet Purchase Agreement Tile the following carpet color of, Mannington Commercial Husk, Woad (35342) or similar.
https://www.manningtoncommercial.com/products/carpet/broadloom/husk/?color=8d4aea84-07a7-472a-ab96- 79cee9c64e81
1.0. Description of Services. The contractor will be responsible for the complete removal and replacement of the existing carpeting with new high traffic carpet material and cove base in building 7514 (CC) in AMARG. The estimated area to be replaced is 6000 sq. ft. All work will be in accordance to manufactures and local standards.
1.1. Services. The contractor shall provide all necessary labor, equipment, parts and material to lift without disassembling or removing system furniture and free-standing furniture, remove existing carpet and adhesive, inspect and repair subflooring, install new flooring and install new rubber cove base.
Includes but not limited to:
• Remove the existing carpet from entire noted areas.
• Dispose of old carpet and associated waste materials.
• Inspect the subfloor for damages, moisture and irregularities.
• Repair damaged subfloor, if necessary.
• Clean and level subfloor for installation.
• Install new carpet.
• Install new cove base.
1.1.1. Ensure any permits, manifests, environmental requirements, fall protection, safety concerns, etc. are accomplished prior to work.
1.1.2. Asbestos toxicity report available upon request. Subflooring is concrete.
1.1.3. Work Site Preparation. Prior to commencing any work, the contractor shall coordinate the date and time and any set-up with the Project Point of Contact (POC).
1.1.4. Manual and/or Warrantee Documents. Upon completion the contractor shall provide the Project POC with two copies of all necessary maintenance manual or warrantee documents to be distributed as necessary.
Contractor will also provide copies of all permits, weight tickets, shipping manifests, etc. upon completion of project.
1.1.5 Point of Contact Government 309th AMARG POC is Brandon Benberry Office 228-2243 and Cell 805-550- 1469. (Alternate Joe Chacon 228-8496 or Cell: 520-241-9154).
1.2. General Information
1.2.1. Contract Manager. The contractor shall provide an on-site foreman who shall be responsible for contract performance and can act for the contractor on all matters relating to daily operation of the contract. The contract manager must be able to read, write, speak, and understand English fluently. The contract manager shall have a minimum of three years’ experience in work related to that being performed.
1.2.2. Contractor Employee Restrictions. The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
1.2.3. Conflict of Interest. The contractor shall not employ any individual who is an employee of the United States Government if the employment of that individual would create a conflict of interest, nor shall the contractor employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval of the employment in accordance with DODD 5500-7, Standards of Conduct.
In addition, the contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in AFI 64-106, Air Force Industrial Labor Relations Activities.
1.2.4. Government Hours of Operation. The official hours of operation at Davis-Monthan AFB are 7:00 a.m. – 4:30 p.m., Monday through Friday, excluding holidays. Normal duty hours for sponsoring unit, 355th Civil Engineer Squadron, are 7:00 a.m. - 3:30 p.m.
1.2.4.1 Gate Hours of Operations. Swan Inspection Gate hours are 6:00 a.m. – 6:00 p.m. for commercial vehicles, Monday through Friday, excluding holidays. Craycroft Gate and visitor’s center is open 24/7. AMARG North Wilmot Gate hours are 5:00 a.m. – 5:00 p.m. for all contractors, Monday through Friday, excluding holidays.
Access to AMARG outside normal duty hours requires prior arrangements with POC for escorting access.
1.2.4.2. Contractor Performance Hours. The contractor is not restricted to perform services within the above hours of operation; however, the contractor is advised that performance outside those hours will require advance coordination with COR and affected installation agencies. The contractor shall provide COR two days advance notice of their intent to perform services outside of the hours of operation above. The contractor is further advised that the 309th Aerospace Maintenance and Regeneration Group (309 AMARG) is closed weekends and federal holidays.
1.2.4.3. Recognized Federal Holidays. The following federal holidays are observed at Davis-Monthan AFB.
New Year’s Day Labor Day Martin Luther King's Birthday Columbus Day Presidents’ Day Veterans’ Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day
1.2.5. Fire Prevention and Safety. Contractor employees shall comply with DMAFB Fire Protection Program, Air Force Occupational Safety & Health (OSHA), Air Force Occupational Safety, and the Fire Prevention and Health Program. Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the contractor, and the government will assume no liability or responsibility for the contractor’s compliance or noncompliance with such responsibilities.
1.2.5.1. Safety Equipment. The contractor is responsible for providing all safety equipment for contractor employees. Contractor employees shall always use proper safety equipment during the performance of this contract and shall perform all tasks in a safe manner. The Government has the right to terminate cleanings if the contractor is practicing unsafe work practices or lacks proper safety equipment, at no cost to the Government.
The Government may also terminate cleanings if unsafe weather conditions exist during the cleanings.
1.2.6. Environmental Protection Compliance. The contractor shall comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations/requirements change during the term of the contract, the contractor shall comply with such law/regulation as changed. The contractor is responsible for any penalties, fines, etc. resulting from violations.
The contractor shall immediately notify the CO and COR when violations occur and cooperate fully with fire department personnel and Government investigators.
1.2.7. Work Areas. The contractor shall always keep work areas free from accumulations of waste material, rubbish, tools, scaffolding, equipment, and materials. Upon completion of the job or when away from the work site, the contractor shall leave the work area and premises in a clean, neat, safe, and workmanlike condition. The contractor is responsible for removal and proper disposal of all job-related waste material at a permitted site.
1.2.8. Inspection of Services. The contractor’s work shall be subject to inspection at any time. The presence or absence of the inspector shall not relieve the contractor from strict compliance with the requirements of the PWS, nor shall the presence of an inspector relieve the contractor from any deficiency that may be noted during the final inspection. Upon completion of work in each building, the contractor shall notify the COR and a joint inspection shall be made with the contractor.
1.2.9. Smoking in Air Force Facilities. Contractors are advised that the Air Force has placed restrictions on the smoking of tobacco products in Air Force facilities. AFI 40-102, Tobacco Use in the Air Force, outlines the procedures used by the commander to control smoking in our facilities. Contractor employees and visitors are subject to the same restrictions as Government personnel. Smoking is permitted only in designated smoking areas.
1.2.10. Utilities. The Government will provide water and electricity inside of facilities; however, the contractor is responsible for outside and roof lighting of the facilities.
1.2.10.1. Conservation of Utilities. The contractor shall practice utility conservation and is responsible for operating under conditions that prevent the waste of utilities.
1.2.11. Emergency Services. The Government will provide security forces services (call 228-7777 for emergencies only), and fire protection services (call 228-7777). There are no emergency medical services available on DMAFB, therefore the contractor should call 911 for medical emergencies. If the contractor calls 911 from a Government phone, the contractor must tell the operator that they are calling from DMAFB.
1.3. Security Requirements
1.3.1. Identification Badges. The contractor shall obtain identification badges for all employees requiring access to DMAFB. Applications for ID badges must be submitted to the contract administrator. Applicants may obtain ID badges from the Security Forces Pass and Badge Section, at the Craycroft Visitor Center, Davis- Monthan AFB, during the hours of 7:00 a.m. to 4:00 p.m., Monday through Friday. AMARG badges will be based on project type. Badges are nontransferable once issued. EAL badges will be received at the start of each workday and returned at the end of each workday. Contractor’s badges will be received at the start of the project and returned at the end of the project. Misuse of AMARG badges will result in immediate debarment from AMARG and potential loss of DM privileges.
1.3.2. Listings of Employees. Upon contract award the contractor shall provide a listing of contractor employees that will perform services on DMAFB to the COR, so security checks can be performed. The list shall include contractor employee’s first and last name, date of birth, social security number, driver’s license number and state of issue. The contractor shall submit an updated listing to COR when an employee's status or information changes.
Listing shall be provided a minimum of 2 weeks prior to period of performance. AMARG listing shall include contactor employee’s name as it appears on the driver’s license, company name, and contact phone number.
1.3.4. Traffic Laws. Contractor employees shall comply with all DMAFB traffic regulations. Contractor employees are subject to random vehicle speed control checks. Contractor personnel cited for speeding on the installation may suffer loss of base driving privileges and debarment from the base. The use of cell phones is prohibited while driving on DMAFB, unless the phone is hands free phone. Seat belt use is mandatory for all vehicle occupants.
1.3.5. Random Personnel and Vehicle Searches. Contractor personnel are subject to random personnel and vehicle searches. If contractor personnel refuse to be searched, they will be denied entry to the base, and may result in loss of base driving privileges and debarment from the base.
1.3.6. Vehicle Access Areas and Control. Commercial and Contractor personal vehicles will remain on common road access and business parking areas. Contractor’s requiring driving access across flightline and aprons will visit the VCO office for driving privileges. After privileges are provided by VCO, contractor will visit Control to be issued a Red cone and have it placed on vehicle while driving and parking on the flightline and aprons. Contractor’s requiring access to areas other than paved streets and parking will visit Control to be issued a Green cone and have if placed on vehicle while driving and parking on nonpaved streets and parking lots. All cones are issued for a 24-hour business day period. If contractors require a longer period, a temporary issue receipt; AF Form 1297; must be complete and cones returned at the end of the period of performance.
1.3.7. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor owned vehicle or privately owned vehicle while on Davis-Monthan AFB.
1.3.8. For Official Use Only (FOUO). The contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
1.3.9. Reporting Requirements. Contractor personnel shall immediately report to an appropriate Government authority any information or circumstances of which they are aware may pose a threat to the security of Department of Defense personnel, contractor personnel, resources, and classified or unclassified defense information.
1.3.10. Physical Security. The contractor shall safeguard all Government property, including controlled forms provided for contractor use. At the close of each work period, Government equipment, facilities, and other valuable materials shall be secured.
1.3.11. Key Control. If the contractor is issued any Government keys, the contractor shall establish and implement methods of making sure all keys and cipher lock combinations issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued by the Government and shall prohibit the use of keys and/or cipher lock combinations, issued by the Government, by any persons other than the contractor’s employees.
1.4. Environmental Protection Compliance
1.4.1. Adherence to the Davis-Monthan Air Force Base Contractor Environmental Guide. Adherence to this guide will help increase your company’s awareness of the installation’s Environmental Management System (EMS), and the environmental regulatory requirements that impact DMAFB.
1.4.2. Environmental Management System (EMS) Awareness Training. The contractor shall comply with the DMAFB Contractor Environmental Guide in completing the required EMS Awareness Training prior to start of work.
The Contractor Environmental Guide is available on the Environmental, Safety, Occupational Health (ESOH) Training Network at www.esohtn.com. Instructions for this site are found in paragraph 4.5.3.
1.4.3. Environmental Laws and Regulations. The contractor shall comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations/requirements change during the term of the contract, the contractor shall comply with such law/regulation as changed. The contractor is responsible for any penalties, fines, etc. resulting from violations.
The contractor shall immediately notify the COR when violations occur and cooperate fully with fire department personnel and Government investigators.
1.4.4. Environmental Permits. Contractors shall comply with all regulatory requirements to include permits if applicable. Pima County Department of Environmental Quality (PDEQ) and Arizona Department of Environmental Quality (ADEQ) require permits for asbestos removal or demolition as well as projects that require earth-moving or soil disturbance. These requirements may include storm protections. The contractor shall treat areas subject to dust producing activities with liquid palliatives which will not harm regrowth of vegetation, or other methods of dust control. The contractor shall also ensure methods to protect native plants, birds and wildlife are included in projects where required. All permit costs shall be considered as having been included as a factor in the contractor's bid price.
1.4.5. Hazardous Materials/Waste. The contractor shall be responsible for the proper management of both hazardous and non-hazardous waste. The contractor shall segregate hazardous or regulated materials and non-hazardous or non-regulated materials and handle, transport, store, and dispose of those materials, in accordance with the Resource Conservation and Recovery Act, all applicable federal, state, and local statutes and regulations, and IAW Appendix C, Hazardous, PCB, and Universal Waste: Proper Management and Disposal, of the Contractor Environmental Guide. The contractor shall coordinate all hazardous shipments with the 355 Civil Engineer Squadron Hazardous Waste Program Manager (355 CES/CEIE) at 228-4840.
1.4.6. Hazardous Material (HAZMAT) Handling. The contractor shall have approval from Hazardous Waste Program Manager (355 CES/CEIE) at 228-4840, in accordance with the Contractor Environmental Guide, prior to handling, using, and storing any chemicals, solvents, lubricants, and other products that require Safety Data Sheet (SDS) or Material Safety Data Sheet (MSDS) on the installation. The contractor shall plan, fill out, and submit a HAZMAT worksheet to the COR prior to bringing HAZMAT on the base - see Appendix A, Guidance For Submission Of Safety Data Sheets For Hazardous Material (HAZMAT) and Reporting of Hazmat Usage, and Attachment(s) A-1 to A-3 of the Contractor Environmental Guide for details. The contractor shall maintain one copy of the MSDS’s for each HAZMAT line item used within the work center.
1.4.7. Prohibited Substances/Chemicals. The contractor shall not use products that are, or contain Extremely Hazardous Substances (EHS), Ozone Depleting Substances (ODS), and/or Persistent Bio-accumulative and Toxic (PBT) chemicals. Any HAZMAT containing one of these banned substances will not be allowed on base. Contact the environmental office (355 CES/CEIE) at 228-7201 if you have any questions on materials.
1.4.8. Hazardous Materials/Waste Spills. The contractor shall take every reasonable precaution to prevent spills of HAZMAT, and immediately report any HAZMAT spills to the COR and base fire department by calling 228-3333, in accordance with Appendix J, HAZMAT Incident Response Procedures, of the DMAFB Spill Prevention, Control, and Countermeasure (SPCC) Plan. The contractor shall comply with this plan when handling and storing all oils and fuels. The SPCC Plan can be found on the ESOH Training Network. The contractor shall clean and dispose of all HAZMAT spills in accordance with local, state, and federal laws and regulations and the Contractor Environmental Guide. The contractor shall bear full financial obligation incurred from cleaning and disposing of HAZMAT spills, or release of HAZMAT within the confines of DMAFB by contractor employees.
1.4.8.1. Spill Containment Kits. The contractor shall ensure that all vehicles used for transport of HAZMAT on DMAFB, carry a spill containment kit capable of containing a spill, until first responders arrive. The contractor shall make spill containment kits available for inspection by Government personnel, upon request.
http://www.esohtn.com/
1.4.9. ENVIRONMENTAL, SAFETY, OCCUPATIONAL HEALTH TRAINING NETWORK (ESOHtn) LOG ON AND
REGISTRATION INSTRUCTIONS
To access and register to the ESOH Training Network: Go to www.esohtn.com
Click on to enter, then
Choose
At the next screen, click Enter, and find the Registration box on the right side of the screen.
Type “esohtn” into the Registration Password box; Click - Create an Account
To complete each step of the registration process all blocks with an “*” must be filled.
Step 1. First and Last Name and email address Step 2. Account information User Id and password Step 3. Installation: Select Davis-Monthan Step 4. Training Type Select “Construction Contractor (even if you are not a construction contractor) Step 5. Select your company name if listed, if not listed select “Company not Listed”. Then fill in the company name, and other information Step 6. Under the “Job Specific Information” select EMS Awareness Training and any other applicable.
Step 7. Select “I agree” then the site should take you to your training Home page.
http://www.esohtn.com/
To get access to applicable Davis-Monthan documents and plans; from the home page Select “Installation Specific Information” then click on Davis-Monthan AFB Plans, then select the applicable plan.
To find the Civilian Contractor Environmental Guide from the “Installation Specific Information” page select “Davis- Monthan AFB Guidance Documents” then select the guide.
Appendix A
Floor Plan (Red Shade denotes no new flooring needed)
Appendix B
Photos – Current Condition
File details come from the government source that posted it. Updated .