About this file

This solicitation is for the fabrication, delivery, installation, and demolition of precast concrete toilet buildings at four campground sites and one optional site on National Forest lands. Key details include:

  • The work consists of replacing four double-unit toilet buildings and vaults as well as demolishing and disposing of four existing toilet buildings. There is also an option to replace one additional double-unit toilet building and vault with demolition and disposal of the existing facility.

  • Toilet buildings must meet accessibility and natural ventilation standards. Construction drawings and maps showing the specific locations are provided as attachments.

  • A pre-bid site visit will be held virtually on January 12, 2022 at 10:00am. Questions are due by January 19, 2022 at 1:00pm.

  • The soliciting agency is the US Department of Agriculture Forest Service. Responses are due based on the standard solicitation schedule.

  • The solicitation provides relevant details on the scope of work, specifications, and submission requirements for interested contractors to prepare a response to replace these aging toilet facilities on National Forest lands.

View the file

Other files for this federal contract opportunity

Other files attached to Sunshine/Ouray Toilet Replacement, newest first.
File Type Posted
Att 4 WD CO20210003 Rv 2 11.5.21.pdf PDF
Att 2 Sunshine_Ouray Toilet Replacement_Specs.pdf PDF
Att 1 Sunshine_Ouray Toilet replacement_SOW.pdf PDF
1240LT22R0018 Sunshine_Ouray Toilet Replacement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2647_001.pdf

Sunshine Drawings Signed.pdf
Sunshine_Ouray Toilet Replacement 01 Cover Sheet (1)
Sunshine_Ouray Toilet Replacement 02 GENERAL NOTES (1)
Sunshine_Ouray Toilet Replacement 03 Sunshine CG Map (1)
Sunshine_Ouray Toilet Replacement 04 Silver Jack PG Map (
Sunshine_Ouray Toilet Replacement 05 AlpineTH Map (1)
Sunshine_Ouray Toilet Replacement 06 Iron Springs CG Map
Sunshine_Ouray Toilet Replacement 07 Sunshine CG toilets
Sunshine_Ouray Toilet Replacement 08 Silver Jack PG toile
Sunshine_Ouray Toilet Replacement 09 Alpine TH toilet (1)
Sunshine_Ouray Toilet Replacement 10 Iron Springs CG toil
Sunshine_Ouray Toilet Replacement 11 Concrete pad details
Sunshine_Ouray Toilet Replacement 12 New toilets details
Sunshine_Ouray Toilet Replacement 13 New toilets details
2021-07-01T08:07:06-0600
CURTIS CROSS
2021-06-30T16:12:12-0600
DANA GARDUNIO
2021-07-01T12:32:16-0600
CHAD STEWART
2021-07-12T08:42:40-0600
DOUGLAS WISE

File details come from the government source that posted it. Updated .