Att_01_Quote_Sheet_140P8624Q0004.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- GOGA BLDG. 201 ELEVATOR SVS CONTRACT Federal contract opportunity
- Solicitation number
- 140P8624Q0004
About this file
This document contains a quote sheet for a federal solicitation requesting elevator maintenance and inspection services. The solicitation is for annual maintenance and inspection of one existing passenger elevator located at the Golden Gate National Recreation Area in California. Services include monthly, quarterly, semi-annual, and annual inspections and maintenance. The base period of performance is from December 5, 2023 through December 4, 2024 with four optional one-year extensions. Pricing is provided for the base year and each option year assuming a 4% annual inflation rate. The total potential value of the contract over five years is unspecified. The soliciting agency is the National Park Service Pacific West Region under solicitation number 140P8624Q0004 for building 201 elevator services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8624Q0004_Amd_0002.pdf | ||
| Sol_140P8624Q0004_Amd_0001.pdf | ||
| Att_04_SCA_Wages_2015-5637.pdf | ||
| Att_03_Exp_and_PP_Form.pdf | ||
| Att_02_Statement_of_Work_140P8624Q0004.pdf | ||
| Sol_140P8624Q0004.pdf | ||
| Att_05_Reps_and_Certs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE
Quote Sheet
Request for Quote: 140P8624Q0004
| Developed Area: | Golden Gate National Recreation Area | |
| Project Title: | Annual Elevator Service Contract | |
| Description of Estimate |
Funished labor and equipment to provide inspections, and preventive maintenance for one passsenger elevator.
| Contract Year | Dates | CLIN | Description | Unit of Measure | # of Units | Unit Price* | Total Price |
| Base | Dec. 5, 2023 - Dec. 4, 2024 | 1 | Maintenance and Inspection of one existing elevator. | EA | 1 | ||
| Base | Dec. 5, 2023 - Dec. 4, 2024 | 2 | On a monthly basis; phone operation, hatchway, pit, lubrication, check oil in buffer, clean commutators with canvas pad, clean selector and door chains and grease lightly, maintain the elevator machinery clean from oils. | EA | 12 | ||
| Base | Dec. 5, 2023 - Dec. 4, 2024 | 3 | On a Quarterly basis; governer, car top and bottom, retiring cam, selector, relay switches, compensator sheaves, traveling cable, blow dust off motors, resistors, relay board. | EA | 4 | ||
| Base | Dec. 5, 2023 - Dec. 4, 2024 | 4 | On a Semi-Annually basis; guide shoes or roller guides, machine, doors and interlocks, leveling, lubrication. | EA | 2 | ||
| Base | Dec. 5, 2023 - Dec. 4, 2024 | 5 | On an Annula Basis; Control motors, starter controller, limit switches, rails selector, relay switches, lubrication. | EA | 1 | ||
| Base | Dec. 5, 2023 - Dec. 4, 2024 | 6 | Inspections on annual basis; Inspection from inside the car, inspection outside Hoistway, inspection from top of car, inspection in machine room, inspection in Pit, | EA | 1 | ||
| Base | Dec. 5, 2023 - Dec. 4, 2024 | 7 | Testing on annual Basis; Governor No-load tests, slack - rope device on top of car. | EA | 1 | ||
| Base | Dec. 5, 2023 - Dec. 4, 2024 | 8 | Service calls for entrapment only 2 times a year. | EA | 2 | ||
| Option Year 1 | Dec. 5, 2024- Dec. 4, 2025 | 9 | Maintenance and Inspection of one existing elevator. | EA | 1 | ||
| Option Year 1 | Dec. 5, 2024- Dec. 4, 2025 | 10 | On a monthly basis; phone operation, hatchway, pit, lubrication, check oil in buffer, clean commutators with canvas pad, clean selector and door chains and grease lightly, maintain the elevator machinery clean from oils. | EA | 12 | ||
| Option Year 1 | Dec. 5, 2024- Dec. 4, 2025 | 11 | On a Quarterly basis; governer, car top and bottom, retiring cam, selector, relay switches, compensator sheaves, traveling cable, blow dust off motors, resistors, relay board. | EA | 4 | ||
| Option Year 1 | Dec. 5, 2024- Dec. 4, 2025 | 12 | On a Semi-Annual basis; guide shoes or roller guides, machine, doors and interlocks, leveling, lubrication. | EA | 2 | ||
| Option Year 1 | Dec. 5, 2024- Dec. 4, 2025 | 13 | On an Annual Basis; Control motors, starter controller, limit switches, rails selector, relay switches, lubrication.) | EA | 1 | ||
| Option Year 1 | Dec. 5, 2024- Dec. 4, 2025 | 14 | IInspections on annual basis; Inspection from inside the car, inspection outside Hoistway, inspection from top of car, inspection in machine room, inspection in Pit. | EA | 1 | ||
| Option Year 1 | Dec. 5, 2024- Dec. 4, 2025 | 15 | Testing on annual Basis; Governor No-load tests, slack - rope device on top of car. | EA | 1 | ||
| Option Year 1 | Dec. 5, 2024- Dec. 4, 2025 | 16 | Service calls for entrapment only 2 times a year. | EA | 2 | ||
| Option Year 2 | Dec. 5, 2025 - Dec. 4, 2026 | 17 | Maintenance and Inspection of one existing elevator. | EA | 1 | ||
| Option Year 2 | Dec. 5, 2025 - Dec. 4, 2026 | 18 | On a monthly basis; phone operation, hatchway, pit, lubrication, check oil in buffer, clean commutators with canvas pad, clean selector and door chains and grease lightly, maintain the elevator machinery clean from oils. | EA | 12 | ||
| Option Year 2 | Dec. 5, 2025 - Dec. 4, 2026 | 19 | On a Quarterly basis; governer, car top and bottom, retiring cam, selector, relay switches, compensator sheaves, traveling cable, blow dust off motors, resistors, relay board. | EA | 4 | ||
| Option Year 2 | Dec. 5, 2025 - Dec. 4, 2026 | 20 | On a Semi-Annual basis; guide shoes or roller guides, machine, doors and interlocks, leveling, lubrication. | EA | 2 | ||
| Option Year 2 | Dec. 5, 2025 - Dec. 4, 2026 | 21 | On an Annual Basis; Control motors, starter controller, limit switches, rails selector, relay switches, lubrication.) | EA | 1 | ||
| Option Year 2 | Dec. 5, 2025 - Dec. 4, 2026 | 22 | Inspections on annual basis; Inspection from inside the car, inspection outside Hoistway, inspection from top of car, inspection in machine room, inspection in Pit. | EA | 1 | ||
| Option Year 2 | Dec. 5, 2025 - Dec. 4, 2026 | 23 | Testing on annual Basis; Governor No-load tests, slack - rope device on top of car. | EA | 1 | ||
| Option Year 2 | Dec. 5, 2025 - Dec. 4, 2026 | 24 | Service calls for entrapment only 2 times a year. | EA | 2 | ||
| Option Year 3 | Dec. 5, 2026 - Dec. 4, 2027 | 25 | Maintenance and Inspection of one existing elevator. | EA | 1 | ||
| Option Year 3 | Dec. 5, 2026 - Dec. 4, 2027 | 26 | On a monthly basis; phone operation, hatchway, pit, lubrication, check oil in buffer, clean commutators with canvas pad, clean selector and door chains and grease lightly, maintain the elevator machinery clean from oils. | EA | 12 | ||
| Option Year 3 | Dec. 5, 2026 - Dec. 4, 2027 | 27 | On a Quarterly basis; governer, car top and bottom, retiring cam, selector, relay switches, compensator sheaves, traveling cable, blow dust off motors, resistors, relay board. | EA | 4 | ||
| Option Year 3 | Dec. 5, 2026 - Dec. 4, 2027 | 28 | On a Semi-Annual basis; guide shoes or roller guides, machine, doors and interlocks, leveling, lubrication. | EA | 2 | ||
| Option Year 3 | Dec. 5, 2026 - Dec. 4, 2027 | 29 | On an Annual Basis; Control motors, starter controller, limit switches, rails selector, relay switches, lubrication.) | EA | 1 | ||
| Option Year 3 | Dec. 5, 2026 - Dec. 4, 2027 | 30 | Inspections on annual basis; Inspection from inside the car, inspection outside Hoistway, inspection from top of car, inspection in machine room, inspection in Pit, | EA | 1 | ||
| Option Year 3 | Dec. 5, 2026 - Dec. 4, 2027 | 31 | Testing on annual Basis; Governor No-load tests, slack - rope device on top of car. | EA | 1 | ||
| Option Year 3 | Dec. 5, 2026 - Dec. 4, 2027 | 32 | Service calls for entrapment only 2 times a year. | EA | 2 | ||
| Option Year 4 | Dec. 5, 2027 to Dec. 4, 2028 | 33 | Maintenance and Inspection of one existing elevator. | EA | 1 | ||
| Option Year 4 | Dec. 5, 2027 to Dec. 4, 2028 | 34 | On a monthly basis; phone operation, hatchway, pit, lubrication, check oil in buffer, clean commutators with canvas pad, clean selector and door chains and grease lightly, maintain the elevator machinery clean from oils. | EA | 12 | ||
| Option Year 4 | Dec. 5, 2027 to Dec. 4, 2028 | 35 | On a Quarterly basis; governer, car top and bottom, retiring cam, selector, relay switches, compensator sheaves, traveling cable, blow dust off motors, resistors, relay board. | EA | 4 | ||
| Option Year 4 | Dec. 5, 2027 to Dec. 4, 2028 | 36 | On a Semi-Annual basis; guide shoes or roller guides, machine, doors and interlocks, leveling, lubrication. | EA | 1 | ||
| Option Year 4 | Dec. 5, 2027 to Dec. 4, 2028 | 37 | On an Annual Basis; Control motors, starter controller, limit switches, rails selector, relay switches, lubrication.) | EA | 1 | ||
| Option Year 4 | Dec. 5, 2027 to Dec. 4, 2028 | 38 | Inspections on annual basis; Inspection from inside the car, inspection outside Hoistway, inspection from top of car, inspection in machine room, inspection in Pit, | EA | 1 | ||
| Option Year 4 | Dec. 5, 2027 to Dec. 4, 2028 | 39 | Testing on annual Basis; Governor No-load tests, slack - rope device on top of car. | EA | 1 | ||
| Option Year 4 | Dec. 5, 2027 to Dec. 4, 2028 | 40 | Service calls for entrapment only 2 times a year. | EA | 2 | ||
| Option Year 4 | Dec. 5, 2027 to Dec. 4, 2028 | 41 | Hydraulic Load Test Report | EA | 1 | ||
| TOTAL BASE YEAR PRICE (CLIN 1-8) | $0 | ||||||
| TOTAL OPTION YEAR 1 PRICE (CLIN 9-16) | $0 | ||||||
| TOTAL OPTION YEAR 2 PRICE (CLIN 17-24) | $0 | ||||||
| TOTAL OPTION YEAR 3 PRICE (CLIN 25-32) | $0 | ||||||
| TOTAL OPTION YEAR 4 PRICE (CLIN 33-41) | $0 | ||||||
| TOTAL POTENTIAL CONTRACT VALUE | $0 | ||||||
| * Assumes 4% annual inflation for option years |
File details come from the government source that posted it. Updated .