Att_01_Quote_Sheet_140P8624Q0004.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
GOGA BLDG. 201 ELEVATOR SVS CONTRACT Federal contract opportunity
Solicitation number
140P8624Q0004
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document contains a quote sheet for a federal solicitation requesting elevator maintenance and inspection services. The solicitation is for annual maintenance and inspection of one existing passenger elevator located at the Golden Gate National Recreation Area in California. Services include monthly, quarterly, semi-annual, and annual inspections and maintenance. The base period of performance is from December 5, 2023 through December 4, 2024 with four optional one-year extensions. Pricing is provided for the base year and each option year assuming a 4% annual inflation rate. The total potential value of the contract over five years is unspecified. The soliciting agency is the National Park Service Pacific West Region under solicitation number 140P8624Q0004 for building 201 elevator services.

View the file

Other files for this federal contract opportunity

Other files attached to GOGA BLDG. 201 ELEVATOR SVS CONTRACT, newest first.
File Type Posted
Sol_140P8624Q0004_Amd_0002.pdf PDF
Sol_140P8624Q0004_Amd_0001.pdf PDF
Att_04_SCA_Wages_2015-5637.pdf PDF
Att_03_Exp_and_PP_Form.pdf PDF
Att_02_Statement_of_Work_140P8624Q0004.pdf PDF
Sol_140P8624Q0004.pdf PDF
Att_05_Reps_and_Certs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE

Quote Sheet

Request for Quote: 140P8624Q0004

Developed Area:Golden Gate National Recreation Area
Project Title:Annual Elevator Service Contract
Description of Estimate

Funished labor and equipment to provide inspections, and preventive maintenance for one passsenger elevator.

Contract YearDatesCLINDescriptionUnit of Measure# of UnitsUnit Price*Total Price
BaseDec. 5, 2023 - Dec. 4, 20241Maintenance and Inspection of one existing elevator.EA1
BaseDec. 5, 2023 - Dec. 4, 20242On a monthly basis; phone operation, hatchway, pit, lubrication, check oil in buffer, clean commutators with canvas pad, clean selector and door chains and grease lightly, maintain the elevator machinery clean from oils.EA12
BaseDec. 5, 2023 - Dec. 4, 20243On a Quarterly basis; governer, car top and bottom, retiring cam, selector, relay switches, compensator sheaves, traveling cable, blow dust off motors, resistors, relay board.EA4
BaseDec. 5, 2023 - Dec. 4, 20244On a Semi-Annually basis; guide shoes or roller guides, machine, doors and interlocks, leveling, lubrication.EA2
BaseDec. 5, 2023 - Dec. 4, 20245On an Annula Basis; Control motors, starter controller, limit switches, rails selector, relay switches, lubrication.EA1
BaseDec. 5, 2023 - Dec. 4, 20246Inspections on annual basis; Inspection from inside the car, inspection outside Hoistway, inspection from top of car, inspection in machine room, inspection in Pit,EA1
BaseDec. 5, 2023 - Dec. 4, 20247Testing on annual Basis; Governor No-load tests, slack - rope device on top of car.EA1
BaseDec. 5, 2023 - Dec. 4, 20248Service calls for entrapment only 2 times a year.EA2
Option Year 1Dec. 5, 2024- Dec. 4, 20259Maintenance and Inspection of one existing elevator.EA1
Option Year 1Dec. 5, 2024- Dec. 4, 202510On a monthly basis; phone operation, hatchway, pit, lubrication, check oil in buffer, clean commutators with canvas pad, clean selector and door chains and grease lightly, maintain the elevator machinery clean from oils.EA12
Option Year 1Dec. 5, 2024- Dec. 4, 202511On a Quarterly basis; governer, car top and bottom, retiring cam, selector, relay switches, compensator sheaves, traveling cable, blow dust off motors, resistors, relay board.EA4
Option Year 1Dec. 5, 2024- Dec. 4, 202512On a Semi-Annual basis; guide shoes or roller guides, machine, doors and interlocks, leveling, lubrication.EA2
Option Year 1Dec. 5, 2024- Dec. 4, 202513On an Annual Basis; Control motors, starter controller, limit switches, rails selector, relay switches, lubrication.)EA1
Option Year 1Dec. 5, 2024- Dec. 4, 202514IInspections on annual basis; Inspection from inside the car, inspection outside Hoistway, inspection from top of car, inspection in machine room, inspection in Pit.EA1
Option Year 1Dec. 5, 2024- Dec. 4, 202515Testing on annual Basis; Governor No-load tests, slack - rope device on top of car.EA1
Option Year 1Dec. 5, 2024- Dec. 4, 202516Service calls for entrapment only 2 times a year.EA2
Option Year 2Dec. 5, 2025 - Dec. 4, 202617Maintenance and Inspection of one existing elevator.EA1
Option Year 2Dec. 5, 2025 - Dec. 4, 202618On a monthly basis; phone operation, hatchway, pit, lubrication, check oil in buffer, clean commutators with canvas pad, clean selector and door chains and grease lightly, maintain the elevator machinery clean from oils.EA12
Option Year 2Dec. 5, 2025 - Dec. 4, 202619On a Quarterly basis; governer, car top and bottom, retiring cam, selector, relay switches, compensator sheaves, traveling cable, blow dust off motors, resistors, relay board.EA4
Option Year 2Dec. 5, 2025 - Dec. 4, 202620On a Semi-Annual basis; guide shoes or roller guides, machine, doors and interlocks, leveling, lubrication.EA2
Option Year 2Dec. 5, 2025 - Dec. 4, 202621On an Annual Basis; Control motors, starter controller, limit switches, rails selector, relay switches, lubrication.)EA1
Option Year 2Dec. 5, 2025 - Dec. 4, 202622Inspections on annual basis; Inspection from inside the car, inspection outside Hoistway, inspection from top of car, inspection in machine room, inspection in Pit.EA1
Option Year 2Dec. 5, 2025 - Dec. 4, 202623Testing on annual Basis; Governor No-load tests, slack - rope device on top of car.EA1
Option Year 2Dec. 5, 2025 - Dec. 4, 202624Service calls for entrapment only 2 times a year.EA2
Option Year 3Dec. 5, 2026 - Dec. 4, 202725Maintenance and Inspection of one existing elevator.EA1
Option Year 3Dec. 5, 2026 - Dec. 4, 202726On a monthly basis; phone operation, hatchway, pit, lubrication, check oil in buffer, clean commutators with canvas pad, clean selector and door chains and grease lightly, maintain the elevator machinery clean from oils.EA12
Option Year 3Dec. 5, 2026 - Dec. 4, 202727On a Quarterly basis; governer, car top and bottom, retiring cam, selector, relay switches, compensator sheaves, traveling cable, blow dust off motors, resistors, relay board.EA4
Option Year 3Dec. 5, 2026 - Dec. 4, 202728On a Semi-Annual basis; guide shoes or roller guides, machine, doors and interlocks, leveling, lubrication.EA2
Option Year 3Dec. 5, 2026 - Dec. 4, 202729On an Annual Basis; Control motors, starter controller, limit switches, rails selector, relay switches, lubrication.)EA1
Option Year 3Dec. 5, 2026 - Dec. 4, 202730Inspections on annual basis; Inspection from inside the car, inspection outside Hoistway, inspection from top of car, inspection in machine room, inspection in Pit,EA1
Option Year 3Dec. 5, 2026 - Dec. 4, 202731Testing on annual Basis; Governor No-load tests, slack - rope device on top of car.EA1
Option Year 3Dec. 5, 2026 - Dec. 4, 202732Service calls for entrapment only 2 times a year.EA2
Option Year 4Dec. 5, 2027 to Dec. 4, 202833Maintenance and Inspection of one existing elevator.EA1
Option Year 4Dec. 5, 2027 to Dec. 4, 202834On a monthly basis; phone operation, hatchway, pit, lubrication, check oil in buffer, clean commutators with canvas pad, clean selector and door chains and grease lightly, maintain the elevator machinery clean from oils.EA12
Option Year 4Dec. 5, 2027 to Dec. 4, 202835On a Quarterly basis; governer, car top and bottom, retiring cam, selector, relay switches, compensator sheaves, traveling cable, blow dust off motors, resistors, relay board.EA4
Option Year 4Dec. 5, 2027 to Dec. 4, 202836On a Semi-Annual basis; guide shoes or roller guides, machine, doors and interlocks, leveling, lubrication.EA1
Option Year 4Dec. 5, 2027 to Dec. 4, 202837On an Annual Basis; Control motors, starter controller, limit switches, rails selector, relay switches, lubrication.)EA1
Option Year 4Dec. 5, 2027 to Dec. 4, 202838Inspections on annual basis; Inspection from inside the car, inspection outside Hoistway, inspection from top of car, inspection in machine room, inspection in Pit,EA1
Option Year 4Dec. 5, 2027 to Dec. 4, 202839Testing on annual Basis; Governor No-load tests, slack - rope device on top of car.EA1
Option Year 4Dec. 5, 2027 to Dec. 4, 202840Service calls for entrapment only 2 times a year.EA2
Option Year 4Dec. 5, 2027 to Dec. 4, 202841Hydraulic Load Test ReportEA1
TOTAL BASE YEAR PRICE (CLIN 1-8)$0
TOTAL OPTION YEAR 1 PRICE (CLIN 9-16)$0
TOTAL OPTION YEAR 2 PRICE (CLIN 17-24)$0
TOTAL OPTION YEAR 3 PRICE (CLIN 25-32)$0
TOTAL OPTION YEAR 4 PRICE (CLIN 33-41)$0
TOTAL POTENTIAL CONTRACT VALUE$0
* Assumes 4% annual inflation for option years

File details come from the government source that posted it. Updated .