Atch_3_Baca_Fish_Passage_Submittals.pdf
PDF 21 KB Posted
- Attached to
- CO-BACA NWR-PASSAGE DITCH 9&10 PROJ Federal contract opportunity
- Solicitation number
- 140F0122R0009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0122R0009_Amd_0003.pdf | ||
| Sol_140F0122R0009_Amd_0002.pdf | ||
| Sol_140F0122R0009_Amd_0001.pdf | ||
| Atch_5_Baca_Fish_Passage_Past_Perf_Quest.doc | DOC document | |
| Atch_4_Baca_Fish_Passage_DB_Wage_Det.pdf | ||
| Atch_2_Baca_Fish_Passage_Drawings.pdf | ||
| Atch_1_Baca_Fish_Passage_Specifications.pdf | ||
| Sol_140F0122R0009.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NAME: Ditch 9 & 10 at Crestone Creek Fish Pasage Projects ENGR. PROJECT NO:21-060
LOCATION: Entrance of Ditch 9 & 10 at Crestone Creek In-Stream Structures CONTRACT NO.:
CONTRACTOR: SHEET NO.: 1 OF: 1
Spec.
Section
Number
Spec.
Paragraph
No.
Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)
Contractor's
Submittal
Number
Date
Submitte d
Action
Taken
Date
Resubmitted
Action
Taken Comments
012900 1.2 Schedule of Values 001
013200 1.2 Construction Schedule 002
013300 1.3 Submital Schedule 003
015000 1.3 Erosion & Sedimentation Control Plan 004
055000 1.03 Shop Drawings for Metal Fabrications 005
055000 1.03 Product Data for Metal Fabrications 006
312000 2.1 Product Data and Gradation: Engineered Fill 007
312000 3.7 Moisture-Density and Gradation Soil Tests 008
312000 3.8 Compaction Tests 009
312319 1.3 Water Control (Dewatering) Plan 010
313700 1.0 Product Data and Gradation: Riprap (Bone Rock) 011
313700 1.0 Product Data and Gradation: Stream Material 012
334213 2.01A Product Data Pipe Arch Culvert 013
334213 2.01B Product Data Round Pipe Culvert 014
Submittal Codes: A - Approved B - Approved, except as noted. Resubmittal not required
C - Approved, except as noted. Resubmission Required. D - No Action taken. See comments. Resubmission required.
E - Disapproved. See comments. Resubmission Required.
PROJECT SUBMITTAL LIST