This document is a Statement of Work (SOW) for a federal contract opportunity to provide construction services for the electrical upgrades to Building 6414 at the U.S. Department of Agriculture (USDA) Animal and Plant Health Inspection Service (APHIS) facility at Moore Air Base in Edinburg, Texas.

The key details are:

  • Project involves replacing the existing 30+ year old exterior main electrical distribution switchboard and transformer for Building 6414, which is used for research, development, and specimen preservation.
  • The contractor will furnish and install a new 2000A main switchboard with a 1800A main breaker. An add-alternate for a new 1500kva transformer is also included.
  • The contractor will be required to provide preconstruction services such as a site walkthrough, construction schedule, shop drawings, and submittals, as well as construction phase services including final inspection, punchlist, warranties, and as-built drawings.
  • The project must comply with all applicable building codes, environmental regulations, and USDA green purchasing requirements.
  • The solicitation number is 12639524R0040 and it is a two-phase project, with this being Phase 1.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 12639524R0040, Attachment 1

Statement of Work

For Construction Services August 23, 2024

1.0 CONTRACT PROJECT:

1.1 Title: PPQ MAB Building 6414 Electrical Upgrades

1.2 Location: U.S. Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS), Plant Protection Quarantine (PPQ), Science and Technology (S&T), Insect Management and Molecular Diagnostics Laboratory (IMMDL).

Moore Air Base

Building 6414

22675 N. Moorefield Rd.

Edinburg, TX 78541

1.3 Project Background: Building 6414 is used for research development, specimen preservation, and testing. The building contains an outdoor electrical main distribution switchboard enclosure/cabinet dating back over 30+ years that has reached its useful life. The switchgear enclosure is severely dilapidated with corrosion, rust and subjected to water leaks entering the enclosure during rainy days along the top, back and sides. Coffman Engineers was tasked to design a replacement of the outdoor switchboard enclosure at a new location. The design is currently at the 80% completion stage with Phase 1, Issued For Bid (IFB) documents provided for this solicitation.

1.4 Project Scope: USDA needs Construction Services, identified as Phase I, per the Issued for Bid (IFB) Design Documents prepared by Coffman Engineers to furnish and install a new exterior 2000A Main Switchboard. New switchboard shall be 2000A with a 1800A main breaker. A new 1500kva transformer will be identified for furnishing and installation as an add-alternate for this project. Add alternate shall be broken out to reflect equipment cost and labor associated with installation in the event the new transformer is Government furnished. New transformer pad and transformer shall be installed at stub-up location of spare 4” conduits in the front grass which are identified on the construction drawings. Once the power transfer takes place for new switchgear and new transformer, the existing cabinet, switches, transformer, wiring and components shall be removed and disposed of by the contractor.

A new breaker shall also be furnished and installed in the new switchgear cabinet for the existing 800KW Caterpillar generator along with furnishing and installing a new automatic transfer switch per the drawings. Contractor shall make all connections.

Work that is unclear in the SOW shall be brought to the attention of the CO, EPM and FM prior to incurring costs. All work under this project shall comply with all applicable codes, State and Local codes and standards and environmental regulations in the State of Texas and local ordinances.

1.5 Project Data: The following information is available for use and compliance:

· Construction Documents Issued for Bid dated August 15, 2024, followed by Final Construction Documents, both prepared by Coffman Engineers

· APHIS Environmental Protection Program:

http://inside.aphis.usda.gov/mrpbs/publications/ep_manual/downloads/environmental_protection_program.pdf

· Preferred Biobased Products found at http://www.biopreferred.gov/ProposedAndFinalItemDesignations.aspx

· Recommended Recycled-Content Construction Material found at http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm#construct

· Designated Green Products for Federal Procurement (see separate Excel Spreadsheet: All_Green_Products_07-09.xls).

· USDA Green Purchasing Affirmative Procurement Program: http://greening.usda.gov/gpapp08.pdf

1.6 Attachments to this Statement of Work: The following attachments are provided for use and compliance:

· All_Green_Products_07-09.xls

2.0

PROJECT CONTACTS

2.1 Contracting Officer (CO):

Jim Roloff

USDA, APHIS, Contracting

250 Marquette Ave

Minneapolis, MN 55401

Tel. No.: 612-590-7603

Email: James.G.Roloff@usda.gov

2.2 Engineering Project Manager (EPM):

Toni T Mitchell

USDA, APHIS, ASD, ESB

4700 River Road, Unit 115 (3A-03-39)

Riverdale, MD 20737 - 1238

Tel. No.: (301) 252-4333

E-mail: Toni.T.Mitchell@usda.gov

2.3 APHIS PPQ Facilities Manager (FM&COR):

Gabriel Lopez

USDA, APHIS, PPQ – Moore Air Base

22675 North Moorefield Road, Bldg. 6407

Edinburg, TX 78541

Tel. No.: (956) 205-7608

Cell No.: (956) 207-9594

Email: Gabriel.lopez@usda.gov

2.4 APHIS PPQ Supervisory Maintenance Mechanic:

Javier Caltzontzint

USDA, APHIS, PPQ FO

22675 North Moore Field

Building 6407

Tel. No.: (956) 205-7734

Cell No.: (956) 330-1145

Email: Javier.caltzontzint@usda.gov 2.5 Program Project Manager (PPM):

Ralph “Randy” O’Neal

Facility Operations Specialist

USDA, APHIS,

Raleigh, North Carolina 27606

Office (919) 855-7363

Mobile (919) 559-6152

Email: Ralph.w.oneal@usda.gov 2.6 PPQ National Facility Manager:

Michael J. Richardson

Assistant Director BES – Facilities

USDA, APHIS, PPQ

475 N 100 W

Wellsville, UT 84339

Mobile (435) 515 2881

Email: Michael.j.richardson@usda.gov 2.7

PPQ Safety & Occupational Health Specialist

Adan Martinez

USDA, APHIS, PPQ FO

22675 North Moore Field

Building 6407

Tel. No.: (956) 205-7736

Cell No.: (956) 540-1910

Email: Adan.c.martinez@usda.gov 2.8

Safety, Health, and Environmental Staff (SHEB):

Timothy Snidow

Chief, SHEB

USDA, APHIS, ERCS, EMSSD, SHEB

Room 2A-02H

4700 River Road, Unit 124

Riverdale, MD 20737-1238

Tel. No.: 301-436-3145

Email: Timothy.Snidow@usda.gov 2.9

APHIS Biosafety Manager:

Eilyn Fabregas

Biosafety Program Manager

USDA, APHIS, EMSSD, SHEPB

4700 River Road, Unit 124, Room 2A-02.36

Riverdale, MD 20737

PH: 301-436-3117

E-mail: Eilyn.N.Fabregas@usda.gov 2.10

APHIS Environmental Protection Specialist:

Elizabeth Roether

USDA, APHIS, EMSSD, EMRC

Room 2A-02.38

4700 River Road, Unit 124

Riverdale, MD 20737-1238

Phone: 301-436-3114

E-mail: Elizabeth.Roether@usda.gov 2.11 APHIS OSHA Specialist:

James McKee

USDA, APHIS, EMSSD, SHEPB

Room 2A-02.48

4700 River Road, Unit 124

Riverdale, MD 20737-1238

Phone: 301-436-3115

E-mail: James.E.Mckee@usda.gov

2.12 APHIS Security Anthony Perretta

Security Specialist

USDA/APHIS/MRPBS/EMSSD

2150 Centre Ave, Bldg B

Fort Collins, CO 80526

Work: 970-494-7116

Cell: 970-213-1775

E-mail: Anthony.Perretta@usda.gov

2.13 APHIS Telecommunications Specialist

John Brinsko

USDA, APHIS, TRM

4700 River Road, Unit 104, Rm 2D05

Riverdale MD 20737

Phone: 301-734-7651

E-mail: John.Brinsko@usda.gov 2.14 Designer of Record (DOR)

Coffman Engineers

Matthew Verheul, Project Manager

Phone: (509)328-2994

E-mail: matthew.verheul@coffman.com

3.0 SCOPE OF SERVICES: The Contractor shall provide the following services.

3.1 Preconstruction Phase Services: The Contractor shall provide all professional services necessary for the accomplishment of the contract project as described in this Statement of Work and per the design drawings and specifications prepared by Coffman Engineers. If clarification is required for items identified in this SOW and per the final design drawings and specifications, it should be brought to the attention of the EPM.

The Contractor shall provide Preconstruction Phase Services for the following tasks marked by an "X".

[X] Participate in the Pre-Bid Walk-through at the job site to determine resources required. Date TBD and shall be identified in the solicitation.

[X] Itemized Proposal and Construction Schedule

[X] Participate in the Post Award Meeting at the job site

[X] Provide a Construction Phasing Plan for review and approval [X] Shop Drawings, Product Data Submittals, QC and Safety Plan Submission for review and approval [X] Submittal Register for review and approval

3.2 Construction Phase Services: Construction Services shall be performed strictly as required by the rules, regulations, standards, codes, ordinances and laws of Local, State and Federal Governments and all other authorities that have legal jurisdiction over the site.

[X] Notify the CO, COR and EPM two weeks prior to final inspection for coordination.

Record deficiencies during final inspection and provide Punch List to COR and EPM.

Obtain warranties and turn over to COR.

Provide written certification to the CO that the project was constructed in compliance with design documents and is ready for final acceptance.

Transfer As-Built information to Record CADD drawings. Furnish Record drawings and specifications as follows:

Three full size sets of prints, three half size sets of prints, and three sets of CDs to COR.

Two full size sets of prints, two half size sets of prints, and two sets of CDs to Engineering Project Manager.

4.0 OTHER PROJECT REQUIREMENTS:

4.1 Pre-Proposal Meeting: The Contractor shall participate in a pre-bid meeting at the job site to gather information needed to submit an itemized proposal and proposed project schedule to the Contracting Officer.

4.2 Field Investigation and Site Survey: The Contractor shall coordinate, schedule, and conduct site investigations with the Facility Manager (FM).

4.3 Compliance with Building Codes: In accordance with Public Law 100-678, Federal Agencies must comply with National Building Codes, Local Building Codes, and Zoning Ordinances. The project shall comply with the requirements of Americans with Disabilities Act and be barrier free for the physically handicapped in accordance with ANSI A117.1 and the Uniform Federal Accessibility Standards.

4.4 Code Analysis: The Contractor shall submit a code analysis indicating compliance with applicable codes and environmental permitting. The topics for the code analysis are applicable codes, occupancy classifications, type of construction, fire resistance ratings, interior finishes, flame spread, and smoke develop ratings, egress, fire suppression, fire detection and alarm systems, combustible and flammable liquids, compressed gas storage, structural live loads and dead loads, wind loads, seismic design, frost depth, and sediment/erosion control.

4.5 Specifications to include Preferred Biobased Products:

Construction specifications shall include the use of appropriate Preferred Biobased Products. A list of Preferred Biobased Products can be found at http://www.biopreferred.gov/ProposedAndFinalItemDesignations.aspx

4.6 Specifications shall include Recycled-Content Construction Material: Construction specifications shall include the use of appropriate Recycled-Content construction material. A list of recommended recycled-content construction material can be found at http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm#construct

4.7 Biweekly Progress Meetings: USDA will hold biweekly progress meetings to track construction progress. The Contractor shall be in attendance and shall prepare a two week look ahead and look back along with progress photos for each progress meeting.

4.8 Meeting Minutes for meeting other than Biweekly Progress Meetings: The Contractor shall document and distribute all project meeting minutes. A copy of all meeting minutes shall be included in each progress submission. The meeting minutes need only record the date, time, location, attendees, major issues discussed, and conclusions reached.

4.9 Submittals: The Contractor shall provide product data submittals including manufacturing specifications. The Contractor shall also submit a Construction Phasing Plan for USDA review and approval along with all other required submittals identified above in this SOW and per the Coffman Engineers construction drawings and specifications.

5.0 PROJECT SCHEDULE:

Submittal: The schedule provided indicates project requirements for each submission and review stage. It is provided for negotiation with the Contractor for setting contract time requirements for meeting contract submissions and construction deadlines. A minimum of 10 working days for review time will be required by the Government.

(Working days)

Solicitation reflects pre-award submittals

Follow Solicitation

Itemized Proposal/Construction Schedule

Follow Solicitation

Award

TBD

Construction Phasing Plan Submission

Government Review/Approval

14 days

QC and Safety Plan Submission

30 days

14 days

Product Data Submittals

5 days or less for each

NTP for Construction

Construction Period

(to be negotiated0 Close out and Warranty

30 days

6.0 SUBMITTAL DISTRIBUTION:

Proposal and Project Schedule (Electronic)

Contracting Officer:

Engineering Project Manager:

Product Submittals, Construction Phasing Schedule, Construction Phasing Plan for Review and Approval: (Electronic: as specified below)

Contracting Officer

Engineering Project Manager

Program Project Manager

Designer of Record

Construction Inspection Contractor CIC

Safety, Health & Environmental Group-EPM to forward