Appendix C - Safety Specifications.pdf

PDF 98 KB Posted

Attached to
B3907 Remote Pump Module Upgrade Federal contract opportunity
Solicitation number
FA812522Q0089
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document contains safety specifications for a pump module modification project at Building 3907 on Tinker Air Force Base, as well as the related federal contract solicitation. The safety specifications outline requirements for contractor safety programs, mishap reporting procedures, and safety elements that must be addressed. These include OSHA standards, housekeeping, material handling equipment, hazardous materials handling, vehicle operations, hazardous energy control, and fire protection. The related solicitation is seeking quotes for the B3907 Remote Pump Module Upgrade project, with quotes due by the closing date stated on page one. The set-aside is 100% for small businesses, with FOB destination of Tinker AFB, Oklahoma. Quotes must include pricing, company and CAGE code information, and an explanation of how the technical requirements will be met.

View the file

Other files for this federal contract opportunity

Other files attached to B3907 Remote Pump Module Upgrade, newest first.
File Type Posted
Solicitation Amendment FA812522Q00890001 SF 30.pdf PDF
Appendix F - Certification Test Plan.pdf PDF
Appendix D - Glossary and Definitions.pdf PDF
Appendix G - Pump Module Operations Manual_note.pdf PDF
SOW_B3907 Pump Module.pdf PDF
Appendix B - RCM and Vib Sev Chart.pdf PDF
Appendix I - UUT TOs_note.pdf PDF
Appendix J - Design Guideline 450.pdf PDF
Appendix E - Environmental Language.pdf PDF
Appendix A - Equipment List.pdf PDF
Appendix H -Drawings_note.pdf PDF
Solicitation - FA812522Q0089.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX C

SAFETY SPECIFICATIONS

FOR

PUMP MODULE

MODIFICATION IN

BUILDING 3907

SECTION I - GENERAL REQUIREMENTS

A. Safety Program Requirements. The contractor will implement a safety program that ensures protection of Government personnel and property. The program will consist of, as a minimum:

1. Mishap notification/reporting as defined in paragraph B. below.

2. A Safety Program that addresses, as a minimum, the subjects listed in Safety Program Elements, Section II and to be used during performance of the work described in the contract.

B. Mishap Notification.

1. The contractor shall notify the procuring Safety Office or a designated Government Representative (GR) within one (1) hour of all mishaps or incidents. A written report of the mishap/incident shall be sent within three calendar days to the GR, who will forward it to the Procuring Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the Safety Office.

2. Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

3. If requested by the designated government representative, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

C. The safety provisions of this contract, shall apply to any subcontracts/subcontractors.

D. Safety requirements listed herein that do not concern contractor’s operations or services shall be considered self-deleting as mutually agreed by the contractor and the procuring office.

SECTION II - SAFETY PROGRAM ELEMENTS

The contractor’s Safety Program shall clearly define procedures, personnel qualifications, facilities and required equipment necessary to fulfill the following elements:

Element/Requirement Referenced Benchmark

OSHA Standards for General Industry 29 CFR 1910

Housekeeping AFI. 91-203

Material Handling Equipment (MHE) AFI 91-203

Handling, Storage and use of AFI 91-203 Flammable/Combustible Liquid

Vehicle Operations AFI 91-207

Hazardous Energy Control AFI 91-203

Fire Protection Tinker Instruction 32-2001

SECTION III - BIBLIOGRAPHY OF PUBLICATIONS/DIRECTIVES

These publications/directives and all supplements/changes thereto apply to the extent required by the provisions of Sections I, and II.

AFI 91-204 Apr 15 Safety Investigations and Reports

AFI 91-207 May 15 USAF Traffic Safety Program

AFI 91-203 Jun 12 Air Force Consolidated Occupational Safety Standard

AFI 91-203 Jun 12 Confined Space (Chapter 23)

AFI 91-203 Jun 12 Welding, Cutting, and Blazing (Chapter 27)

AFI 91-203 Jun 12 Flightline and Ground Operations (Chapter 24)

AFI 91-203 Jun 12 Housekeeping (Chapter 5)

Tinker Instruction 32-2001 Oct 09 Fire Protection Program

29 CFR 1910 OSHA Standards for General Industry

SECTION II - SAFETY PROGRAM ELEMENTS

File details come from the government source that posted it. Updated .