Annual Fire Hose Inspection QASP.doc

DOC document 35 KB Posted

Attached to
Fire Hose Testing Services at DSCR Federal contract opportunity
Solicitation number
SP470320Q0015
Issued by
Defense Logistics Agency

View the file

Other files for this federal contract opportunity

Other files attached to Fire Hose Testing Services at DSCR, newest first.
File Type Posted
Hose Testing Chart.xlsx XLSX spreadsheet
PWS Hose and Appliance Testing.docx DOCX document
Continuation Page Synopsis-Solicitation FHT.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan

Annual Fire Hose Inspections For Informational Purposes

The government representative will monitor vendor performance and complete the quality assurance worksheet provided below on a “per inspection” basis. The quality assurance worksheet will be submitted to the COR, contract specialist, and KO within 72 hours of services provided.

If a rating other than green is identified, the government representative must provide sufficient information to document and substantiate the rating.

Table 1. Performance Criteria for Performance Deliverables

Deliverable
Acceptable Quality Level (AQL)
Method Used/Frequency
Fire hose/appliance inspections
Testing of all fire hose and appliances must be accomplished annually in accordance with NFPA 1962.
100% inspection

Quality Assurance Rating Scheme

Rating
Description
Green
Yes, performance and technical specifications are being met at AQL.
Yellow
Yes, performance and technical specifications are currently being met at the minimum AQL, but a minimum of one service/deliverable needs contractor attention.

The customer must identify what component of the deliverable and/or service requires attention.

Red
No, performance and technical specifications are not being met at AQL and the service/deliverable needs immediate contractor resolutions.

The customer must identify what component of the deliverable and/or service is below the minimum AQL.

REMEDIES FOR CONTRACTOR NOT MEETING ACCEPTABLE QUALITY LEVELS OF PERFORMANCE OBJECTIVES WITHIN CONTRACT PERIOD:

1st violation: The government will issue a cure notice to the contractor;

2nd violation: The government will issue a show cause notice to the contractor;

3rd violation: The government will terminate the contract for cause.

The government will evaluate the contractor’s performance under this contract using the method of surveillance specified in Table 1, Performance Criteria. All surveillance observations will be recorded by the government. Those observations indicating defective performance must be initialed by the contractor’s designated representative. The contractor must designate at least one employee for this purpose. If no such designated employee is available, recorded observation will so state.

The following evaluation form will be filled out by the government representative and delivered to the COR, contract specialist, and KO. This evaluation form will be incorporated into the contract file.

Quality Assurance Worksheet

INSPECTIONS
GREEN
YELLOW
RED
Fire hoses
[ ]
[ ]
[ ]
Appliances
[ ]
[ ]
[ ]
OVERALL
GREEN
YELLOW
RED
Vendor performance
[ ]
[ ]
[ ]

Comments: _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Date of Inspection: _______________________

Completed by: _______________________________Date: _________________

File details come from the government source that posted it. Updated .