AHU-205-2-1 Drawings.pdf
PDF 1 MB Posted
- Attached to
- Upgrades to Direct Digital Control System (DDCS) Federal contract opportunity
- Solicitation number
- W912EK21T0024
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment W912EK21T0024-0002.pdf | ||
| Amendment W912EK21T0024-0001.pdf | ||
| Solicitation W912EK21T0024.pdf | ||
| AHU-205-1-1 Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COIL
COOLING
AIR
SUPPLY
OUTSIDE
AIR
NO
NCNC
AIR
EXHAUST
S
DAS
PRF
BI
MAS
AI
M
M
M
AO AIAO AIBI
VFD-205-2-1VFD-205-2-2
T
D
SPS
ISBOAO BOAO
AO
CO
CI
PO
CI
AI
PO
AO
CO
AI
AI
RAF-205-2-1 SUPPLY FANAHU-205-2-1
CWR
CWS
LL
PRF
BI
CI
DF
AI
AI
AI
AI
CO
BO
FILTER
CI
BI
CO
BOBO
CO
CO
BO AO
AO
AO
AO
CI
BI AI
AI
AI
AI
AI
AI
PORT
IS
15 PSIG
MAIN
TO TSTATS
BI
CI
T
D
PRESSURE
BUILDING
RETURN
AIR
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
EXISTING PARTIAL BAS ONE-LINE DIAGRAM
REVISED PARTIAL BAS ONE-LINE DIAGRAM
NOT TO SCALE
DEMOLITION DDC DIAGRAM FOR AIR HANDLING UNIT AHU-205-2-1
N:217 D:73
AHU-205-2-1
CLP-205-2-1
VAV-205-2-3
CLP-205-2-2
N:217 D:18
MNB-V2
FILTER
COIL
COOLING
AIR
SUPPLY
OUTSIDE
AIR
NO
NCNC
AIR
EXHAUST
S
DAS
PRF
BI
MAS
AIAO AIBI AIBI
VFD-205-2-1VFD-205-2-2
T
D
BOAO BOAO
RAF-205-2-1 SUPPLY FANAHU-205-2-1
LL PRF
BI
RETURN
AIR
RAS
AI
MM
M
AO
T
D
AO AIAI
T
D
CO2
T
D
PRESSURE
BUILDING
BO
CWR
CWS
M
AO
15 PSIG
MAIN
TO TSTATS
DPS
DPS
DF
NEW WORK DDC DIAGRAM FOR AIR HANDLING UNIT AHU-205-2-1
S
S
MNB-1000
CLP-205-2-1
T
S L
IN
K
UI
UI
UO
TO
DI
UO
UI
UO
DI
UI
UO
DI
UO
TO
DI
UI
UI
UI
TO
MNB-1000
MSC-MPC
CLP-205-2-1
CLP-205-2-1 CLP-205-1-1
ROBERT SHAW ROBERT SHAW
AHU-205-2-1 AHU-205-1-1
EOL
CLOCKTOWER 1ST FLOOR
AHU20511
MSC-MPC
CLOCKTOWER 2ND FLOOR
AHU20512
MSC-MPC
BUS
PROPRIETARY
MNB-300
TAC
VAV-205-2-3
CLP-205-2-2
N:217 D:18
TAC
MNB-V2
MSTP BUS
CLP-205-1-1
ROBERT SHAW
AHU-205-1-1
CLOCKTOWER 1ST FLOOR
AHU20511
MSC-MPC
BUS
PROPRIETARYEOL
TAC
MSTP BUS
CT HW SYS
CLP-205-B-3
N:217 D:12
TAC
MNB-300
CT HW SYS
CLP-205-B-3
N:217 D:12
TIME IN ORDER TO DEMOLISH INPUTS/OUTPUTS.
3. AHU-205-2-1 SHALL REMAIN OPERATIONAL DURING THE CONTRACT. THE CONTRACTOR SHALL BE ALLOWED TO SHUT DOWN THE AHU FOR BRIEF PERIODS NOT TO EXCEED 120 MINUTES DURING THE NORMALLY OCCUPIED
TO THE MAIN LOCATED AT THE EXISTING CONTROL PANEL LOCATION. THE CONTROL COMPONENT DEMOLITION SHALL ALSO INCLUDE ANY OTHER CONTROL COMPONENTS NOT RESUED WITH THE NEW BACNET CONTROL PANEL.
VALVE AND THE DAMPER ASSEMBLIES WITH ELECTRIC ACTUATORS. THE CONTRACTOR SHALL REMOVE THE LINKAGE BETWEEN THE RETURN AND OUTSIDE AIR DAMPERS. THE PNEUMATIC TUBING SHALL BE DEMOLISHED BACK
EXPANSION MODULES, POWER SUPPLY, AND ACTUATORS. ALL THESE ITEMS SHALL BE RETURNED TO THE COR AS SALVAGE ITEMS. THE CONTRACTOR SHALL REPLACE THE PNEUMATIC ACTUATORS ON THE CHILLED WATER
2. CLP-205-2-1 IS AN EXISTING ROBERT SHAW MSC-MPC CONTROLLER. THE CONTRACTOR SHALL TAKE PRECAUTIONS DURING THE DEMOLITION PHASE OF THE WORK NOT TO DAMAGE THE EXISTING CONTROLLER,
1. ALL ITEMS SHOWN IN HEAVY LINE WEIGHT ARE TO BE DEMOLISHED.
NOTES:
EOL TO CLP-205-1-1.
1. DEMOLISH THE PROPRIETARY BUS BACK TO THE FIRST FLOOR MECHANICAL ROOM AND RELOCATE THE
NOTES:
DAMPER AND VALVE ACTUATOR AND OPERATE THEM THROUGH THEIR ENTIRE RANGE FROM CLOSED TO OPEN AND BACK AGAIN.
8. THE CONTRACTOR SHALL SIZE THE ELECTRIC ACTUATORS WITH THE PROPER TORQUE REQUIREMENTS FOR THE END DEVICE CONTROLLED. DURING EQUIPMENT STARTUP, THE CONTRACTOR SHALL DEMONSTRATE EACH
MINIMUM. LABEL EACH WIRE EVERY TEN FEET. 120 VOLT WIRING SHALL BE RUN IN CONDUIT. KEEP LOW VOLTAGE WIRING (30 VOLTS AND LESS) AND 120 VOLT WIRING IN SEPARATE CONDUITS.
BE NEATLY SECURED IN BUNDLES WITH TIE-WRAPS AND SECURED TO BRIDAL HANGERS WITH WIRE TIES AT THE VERY LEAST, TO ORGANIZE THE WIRES AND NOT ALLOW WIRES TO LIE ON THE CEILING TILE AT A
7. SENSOR WIRING SHALL NOT BE EXPOSED IN OCCUPIED SPACES. OPEN WIRING ABOVE SUSPENDED CEILINGS SHALL BE ALLOWED ONLY FOR LOW VOLTAGE PLENUM RATED CABLE (30 VOLTS & LESS), AND CABLE SHALL
6. UPDATE GRAPHIC SCREENS ON NIAGARA FRONTEND. ADJUSTABLE VALUES DETAILED IN THE SEQUENCE OF OPERATION SHALL BE AVAILABLE ON THE GRAPHIC SCREEN.
5. PROGRAM NEW CONTROLLER WITH SEQUENCE OF OPERATION SHOWN ON FOLLOWING SHEET.
4. REPLACE SPACE THERMOSTAT WITH SLINK SENSOR WITH PB OVERRIDE.
TIME IN ORDER TO DEMOLISH INPUTS/OUTPUTS.
3. AHU-205-2-1 SHALL REMAIN OPERATIONAL DURING THE CONTRACT. THE CONTRACTOR SHALL BE ALLOWED TO SHUT DOWN THE AHU FOR BRIEF PERIODS NOT TO EXCEED 120 MINUTES DURING THE NORMALLY OCCUPIED
2. THE NEW CLP-205-2-1 SHALL BE A SINGLE CONTROLLER TO CONTAIN THE REQUIRED I/O TO ACCOMODATE THE CONTROL POINTS SHOWN.
INSTALLATION.
ATTACHED SCOPE OF WORK FOR ADDITIONAL REQUIREMENTS FOR I/O DEVICES. CONTRACTOR TO PROVIDE A SUBMITTAL OF THE PROPOSED CONTROL DRAWINGS AND CONTROL COMPONENTS FOR APPROVAL PRIOR TO
1. ALL ITEMS SHOWN IN HEAVY LINE WEIGHT ARE TO BE NEW. THE NEW DPS SAFETY SHUTDOWN PRESSURE SWITCHES SHALL BE SET AT 2.5 INWC TO PREVENT OVERPRESSURIZATIONS OF THE EQUIPEMENT. SEE
NOTES:
2. CONTRACTOR TO VERIFY CLP-205-2-1 DEVICE ADDRESS IN THE FIELD.
SHALL PROVIDE THE PROPER COMMUNICATION BUS TERMINATION DEVICES FOR THEIR CONTROL SYSTEM.
SHALL BE RUN WITHOUT SPLICES BETWEEN THE HVAC EQUIPMENT CONTROL PANELS. THE CONTRACTOR
COMMUNICATIONS. THE COMMUNICATION BUS WIRING SHALL BE RUN IN EMT. THE COMMUNICATION BUS
1. RUN NEW MSTP BUS AS SHOWN PRIOR TO DEMOLITION OF EXISTING TO MAINTIAN MSTP
NOTES:
CLP-205-2-1 POINT DATABASE SEQUENCE OF OPERATION FOR AHU-205-2-1
ROUTING OF THE BAS ALARMS.
ALARMS: DURING THE EXECUTION OF THIS CONTRACT, THE CONTRACTOR SHALL COORDINATE THROUGH THE COR WITH THE BUILDING OCCUPANT ON THE
DAMPERS MORE THAN 40 PERCENT OA (ADJ).
BELOW 50 DEGREES (ADJ). IF THE AHU IS USING CHILLED WATER TO ACHIEVE THE DAT_SP, THE OVERRIDE SHALL NOT BE ALLOWED TO FORCE THE
PER MILLION GREATER THAN THE OAT_Co2. THE OAT_Co2 IS A GLOBAL VALUE. THE OVERRIDE SHALL NOT BE ALLOWED TO CAUSE THE MAT TO GO
OA ECONOMIZER DAMPER POSITION. THE MINIMUM POSITION SHALL BE OVERRIDDEN UPWARD TO KEEP THE RA CO2 LEVEL BETWEEN 600 AND 700 PARTS
CARBON DIOXIDE (CO2) DEMAND VENTILATION CONTROL SEQUENCE: THE CO2 LEVEL IN THE RA STREAM SHALL BE USED TO OVERRIDE THE MINIMUM
AND 68 DEGREES F (ADJ) OAT.
MODULATED BACK TO THE MINIMUM OUTSIDE AIR POSITION (15% ADJ.). THE USE OF BOTH OA AND CHILLED WATER SHALL BE ALLOWED BETWEEN 60
ECONOMIZER DAMPERS SHALL BE MODULATED TO ACHIEVE THE DAT_SP. IF THE ANNX_OAT IS ABOVE 68 DEGREES F (ADJ), THE DAMPERS SHALL BE
ECONOMIZER CONTROL SEQUENCE: WHEN THE ANNX_OAT IS BELOW 60 DEGREES F (ADJ), THE CHILLED WATER VALVE SHALL BE CLOSED AND THE
DEGREES F (ADJ), THE DAT_SP SHALL BE 55 DEGREES F. WHEN p_20521 IS 74 DEGREES F (ADJ), THE DAT_SP SHALL BE 60 DEGREES F (ADJ).
RESET SCHEDULE BASED ON p_20521_RMT. THE DAT_SP SHALL RANGE FROM 55 DEGREES F (ADJ) TO 65 DEGREES F (ADJ). WHEN p_20521 IS 78
DISCHARGE AIR TEMPERATURE CONTROL SEQUENCE: THE DISCHARGE AIR TEMPERATURE SET POINT (DAT_SP) SHALL BE RESET PER AN ADJUSTABLE
EXHAUST DAMPER CONTROL SEQUENCE: THE EXHAUST AIR DAMPER SHALL MODULATE TO MAINTAIN THE BSP_SP (ADJ.).
ACHIEVES THE DSP_SP.
PVT PHASE OF THE CONTRACT, THE CONTROL TECHNICIAN SHALL DETERMINE THE MAP WHEN THE AHU IS OPERATING AT 0% OA AND THE SUPPLY FAN
MIXED AIR PLENUM PRESSURE SET POINT AS ESTABLISHED DURING THE CONTROL SYSTEM STARTUP AND POINT VERIFICATION TESTING. DURING THE
RETURN FAN VARIABLE FREQUENCY DRIVE (VFD) CONTROL SEQUENCE: THE VFD SHALL VARY THE SPEED OF THE RETURN FAN MOTOR TO ACHIEVE THE
THE VFD SHALL VARY THE SPEED OF THE SUPPLY FAN MOTOR TO ACHIEVE THE DUCT STATIC PRESSURE SET POINT.
SUPPLY FAN VARIABLE FREQUENCY DRIVE (VFD) CONTROL SEQUENCE: THE DUCT STATIC PRESSURE SET POINT (DSP_SP) SHALL BE 1.0 INWC (ADJ).
ENABLED:
p_20521_NSB SWITCHED TO OCCUPIED MODE (DAY). WHEN THE MOTOR PROOFS ARE CONFIRMED, THE FOLLOWING CONTROL SEQUENCES SHALL BE
OCCUPIED PERIOD CONTROL SEQUENCE: WHEN THE SPACE IS OCCUPIED, THE SUPPLY AND RETURN AIR FANS SHALL BE COMMANDED ON AND
TERMINATED.
DISCHARGE AIR TEMPERATURE OF 55 DEGREES F (ADJ.). WHEN p_20521_RMT IS LESS THAN CLD_DIS, THE COOL-DOWN SEQUENCE SHALL BE
FAN VARIABLE FREQUENCY DRIVE (VFD) CONTROL SEQUENCE SHALL BE ENABLED, AND COOLING COIL VALVE SHALL MODULATE TO ACHIEVE A
WHEN THE MOTOR PROOFS ARE CONFIRMED, THE SUPPLY FAN VARIABLE FREQUENCY DRIVE (VFD) CONTROL SEQUENCE SHALL BE ENABLED, THE RETURN
SHALL BE COMMANDED ON, p_20521_NSB SWITCHED TO OCCUPIED MODE (DAY), AND THE OUTSIDE AND EXHAUST AIR DAMPERS SHALL REMAIN CLOSED.
MECHANICAL COOL-DOWN SEQUENCE FOR UNOCCUPIED MODE: DURING THE MECHANICAL COOL-DOWN SEQUENCE, THE SUPPLY AND RETURN AIR FANS
BE TERMINATED.
FREQUENCY DRIVE (VFD) CONTROL SEQUENCE SHALL BE ENABLED. WHEN p_20521_RMT IS GREATER THAN WRMUP_DIS, THE WARM-UP SEQUENCE SHALL
ARE CONFIRMED, THE SUPPLY FAN VARIABLE FREQUENCY DRIVE (VFD) CONTROL SEQUENCE SHALL BE ENABLED AND THE RETURN FAN VARIABLE p_20521_NSB SWITCHED TO OCCUPIED MODE (DAY), AND THE OUTSIDE AND EXHAUST AIR DAMPERS SHALL REMAIN CLOSED. WHEN THE MOTOR PROOFS
WARM-UP SEQUENCE FOR UNOCCUPIED MODE: DURING THE WARM-UP SEQUENCE, THE SUPPLY AND RETURN AIR FANS SHALLS BE COMMANDED ON, VALVE SHALL BE CLOSED.
EXHAUST AIR DAMPERS SHALL BE CLOSED, THE TSTAT SETBACK SOLENOID (p_20521_NSB) SHALL BE SWITCHED TO MAIN (NIGHT), AND THE COOLING
SHALL BE INITIATED. AT ALL OTHER TIMES DURING THE UNOCCUPIED PERIOD, THE SUPPLY AND RETURN FANS SHALL BE OFF, THE OUTSIDE AND
VALUE) IS LESS THAN OR EQUAL TO CWS_HL, AND, THERE IS CWP PROOF (CWP_234_1_1 OR CWP_234_1_2), THE MECHANICAL COOL-DOWN SEQUENCE
THE OUTSIDE AIR TEMPERATURE (ANNX_OAT IS A GLOBAL VALUE) IS GREATER THAN 65 DEGREES F (ADJ), THE CWS TEMPERATURE (CWS IS A GLOBAL
HCPB2_PRF), THE WARM-UP SEQUENCE SHALL BE INITIATED. IF THE p_20521_RMT IS GREATER THAN CLD_ENA DURING THE UNOCCUPIED PERIOD, WATER SUPPLY (CT_HWS) TEMPERATURE IS GREATER THAN HWS_LL, AND, THERE IS CLOCK TOWER HEATING WATER SYSTEM PUMP PROOF (HCPB1_PRF OR
UNOCCUPIED PERIOD CONTROL SEQUENCE: IF p_20521_RMT IS LESS THAN WRMUP_ENA DURING THE UNOCCUPIED PERIOD, THE CLOCK TOWER HEATING
SYSTEM.
SHALL ACCOUNT FOR THE OUTSIDE AIR TEMPERATURE AND HVAC SYSTEM PERFORMANCE IN ORDER TO OPTIMIZE THE PRESTART TIME OF THE HVAC
SO THAT THE SPACE IS AT THE OCCUPANCY SET POINT TEMPERATURE AT THE BEGINNING OF THE OCCUPIED PERIOD. THE OPTIMAL START FEATURE
THE CONTROL PANEL SHALL PERFORM OPTIMAL START SUCH THAT THE CONTROL PANEL SHALL START THE AHU BEFORE THE OCCUPANCY SCHEDULED TIME
72 DEGREES F (ADJ) FROM SEPTEMBER 16 (ADJ) THROUGH MAY 14 (ADJ). FOR THE REMAINDER OF THE TIME, THE SPACE SHALL BE UNOCCUPIED.
HOLIDAY. THE OCCUPIED SPACE TEMPERATURE SET POINT SHALL BE 76 DEGREES F (ADJ) FROM MAY 15 (ADJ) THROUGH SEPTEMBER 15 (ADJ) AND
IF A HOLIDAY FALLS ON A SATURDAY, THE PRECEDING FRIDAY IS A HOLIDAY. IF THE HOLIDAY FALLS ON A SUNDAY, THE FOLLOWING MONDAY IS A
CHRISTMAS DAY, DECEMBER 25TH
THANKSGIVING DAY, 4TH THURSDAY IN NOVEMBER
VETERAN'S DAY, NOVEMBER 11TH
COLUMBUS DAY, 2ND MONDAY IN OCTOBER
LABOR DAY, 1ST MONDAY IN SEPTEMBER
INDEPENDENCE DAY, JULY 4
MEMORIAL DAY, LAST MONDAY IN MAY
PRESIDENT'S DAY, 3RD MONDAY IN FEBRUARY
MARTIN LUTHER KING DAY, 3RD MONDAY IN JANUARY
NEW YEAR'S DAY, JANUARY 1
HOLIDAYS. THE FEDERAL HOLIDAYS ARE:
OCCUPIED/UNOCCUPIED SCHEDULE: THE SPACE SHALL BE OCCUPIED FROM 6:30 A.M. TO 4:00 P.M., MONDAY THROUGH FRIDAY EXCEPT FOR FEDERAL
File details come from the government source that posted it. Updated .