Amended Schedule of Items, Scope of Work, and Price Range
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| sf30.doc | DOC document | |
| Amended_Drawings_Jun7_17.pdf | ||
| RFQMay18.doc | DOC document | |
| Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION RFQ
SOL NO
UPDATED: 12-21-01
UNIT
IBET 12-21-01
PROJ NAME
PART 1, SCHEDULE OF ITEMS
SECTION B
SUPPLIES OR SERVICES, AND PRICES/COSTS
| PROJECT |
| Challenge Barracks Plumbing/Water Damage Repairs |
| UNIT |
| Feather River RD, Plumas N.F. |
| SOL. # |
| AG-9JGP-S-17-0106 |
METHOD OF
| ITEM NO. |
| DESCRIPTION |
| MEASURE |
| UNIT |
| QTY |
| UNIT PRICE |
| TOTAL PRICE |
| 01 |
| 1032 Bathroom – Remove and replace existing bathtub, shower enclosure, shower fixtures, toilet, vanity, existing flooring, light fixture and outlet face plate, paint walls and ceiling, install grab bars, and access panel, all incidental plumbing and carpentry |
| LSQ |
| LS |
| 1. |
| $__________ |
| $___________ |
| 02 |
| 1035 Bathroom – Remove and replace existing bathtub, shower enclosure, and shower fixtures, install garb bar, install new exhaust fan and plumbing access panel, and all incidental plumbing and carpentry |
| LSQ |
| LS |
| 1. |
| $__________ |
| $___________ |
| 03 |
| 1035 Kitchen – Remove and replace particle board under kitchen sink, install new faucet, supply , and drain line, treat areas affected by mold with bleach and paint over with KILZ and brown paint, all incidental plumbing and carpentry |
| LSQ |
| LS |
| 1. |
| $__________ |
| $___________ |
| Option A |
| 1032 Bathroom – Add access panel |
| LSQ |
| LS |
| 1. |
| $__________ |
| $___________ |
| TOTAL |
| $____________ |
| NOTES: |
| 1) Respondent must price each item to be considered for award. |
2) Responses for quantities less than those listed may be rejected.
3) If award is made in excess of $30,000, bonds will be required. (See Section I.)
4) Following are abbreviation definitions from FP-03, Section 109 that may appear in the "Unit" column of the Schedule of Items; AC=Acre, CQ=Contract Quantity, CY= Cubic Yard, EA=Each, GAL=Gallon, HR=Hour, LF=Linear Foot, LS=Lump Sum, MI=Mile, LB=Pound, SF=Square Foot, SY=Square yard, ST=Station, TON=Ton.
PRICE SUBMITTED BY:
Signature
Phone
Vendor Name
FAX
Address
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Scope of Contract
Project consists of repairs to two barracks facilities at the Challenge Work Center. This includes water damage repairs in the bathroom, mold removal in the kitchen cabinets, and the replacement of several bathroom and kitchen fixtures, as well as any incidental plumbing and carpentry work associated with those replacements. Work in the individual residences is broken down in the following sections:
Work in the kitchen of residence 1035 will require replacing the particle board in the cabinets beneath the kitchen sink. All particle board surfaces in the kitchen cabinets that have been affected by mold will be treated with Kilz or a similar product and painted over brown. Other items which will also require replacement include the under sink surface, supply line, supply valve, drain line, and faucet.
Work in the bathrooms of residences 1032 and 1035 will consist of several fixture replacements. The existing bathtub in each residence will need to be removed and mortar or foam will need to be installed beneath the replacement tubs for support. Items that will also need to be installed include a new showerhead, a new one piece shower enclosure, and grab bars, including all incidental waterproofing and finish work. Grab bars may require the installation of additional blocking. Additionally, the bathroom in residence 1032 will require the removal and replacement of a toilet and wax ring, bathroom vanity, light fixture, and light switch face plate. The bathroom floor in residence 1032 is also slightly higher than the floor in the adjacent hallway. The floor transition will be made flush by removing the current floor underlayment and installing a new vinyl flooring and a new floor threshold in its place.
Option A:
Install an access panel to the bathroom in residence 1032. The bathroom in residence 1035 will also require a new exhaust fan and the shelves in the closet on the outside wall of the bathroom will need to be removed so that a new access panel can be added.
Price Range The Government's estimate is:
[X] < $25,000
[ ] $25,000 to $100,000.
[ ] $100,000 and $250,000.
[ ] $250,000 and $500,000.
[ ] $500,000 and $1,000,000.
[ ] $1,000,000 and $5,000,000.
[ ] $5,000,000 and $10,000,000
[ ] > $10,000,000
File details come from the government source that posted it. Updated .