Amended_Drawings_Jun7_17.pdf
PDF 1 MB Posted
- Attached to
- CHALLENGE BARRACKS PLUMBING/WATER DAMAGE REPAIRS Federal contract opportunity
- Solicitation number
- AG-9JGP-S-17-0106
About this file
Amended Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| sf30.doc | DOC document | |
| AmendedSch_scope_price.doc | DOC document | |
| Drawings.pdf | ||
| RFQMay18.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EUREJ<A
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE
PACIFIC SOUTHWEST REGION FIVE
PLUMAS NATIONAL FOREST
CHALLENGE BARRACKS PLUMBING/
WATER DAMAGE REPAIRS
FEATHER RIVER RANGER DISTRICT
PLUMAS NATIONAL
FOREST
LEGEND
(§) INTERSTATE HIGHWAY
8 U.S. HIGHWAY
§ STATE HIGHWAY
fE} PRIMARY FOREST ROUTE
8 COUNTY ROAD
ARIZONA
STA TE OF CALIFORNIA
INDEX MAP
PLUMAS NATIONAL FOREST
* PROJECT LOCATION
INDEX TO SHEETS
TITLE SHEET
2 LOCATION MAP
J COMPOUND SITE PLAN
4 BUILDING FLOOR PLAN
5 - 6 DETAILS
�g
D£S!GNED BY �
�� '-f-13�/
REVIEWED BY DATE:
SITE LOCATIONYC
YC6
YC137
YC3
YC
BC27581-2
YC103
YC129
BC277
15-
A
19N19
19N04
19N61
19N
YC136
19N16
BC
19N22
YC
N2
20N
19N
19N17
N6
YC
BC
45- D
N2
19N2019N36
19N10
YC
C
ON
IFE
R
LA
NE
20N24B
N5
19N24
19N41
N4
19N59
BC27581-1
N3
19N
N2
BC
5-C
19N32
19N50
19N40
N6
19N44
19N04A
N2
19N
19N21
N5
0Y
Lake Oroville
7 98
6 5 4
LOCATION MAPCHALLENGE RESIDENCE REPAIRS
FEATHER RIVER RANGER DISTRICT
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
PLUMAS NATIONAL FOREST
OROVILLE, CALIFORNIA
DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE:
DATE:
DATE REVISION DRAWING NAME
SHEET
BY
FORES T SERVICE
D
E PARTM ENT OF AGRICUL TU
RE
CHALLENGEREPAIRS.DWG
EXISTING ROADS
F.S. ROAD NUMBER
COUNTY ROAD
STATE HIGHWAY
PLUMAS NATIONAL FOREST
OTHER OWNERSHIP
STREAMS
LEGEND
24N10XA
+404
¬«70 i
C. PEREZ
C. PEREZ
03/01/17 03/01/17 0 3 / 30/ 1 7
26 Miles to Oroville
1 0 10.5 Miles
A. SEILER
¬«162
FORBESTOWN ROAD CHALLENGE
CUTOFF RD
LA PORTE RD
R6ER5E R7E
T N
KITCHEN REPAIRS
REMOVE PARTICLE BOARD BENEATH SINK AND
REPLACE UNDERSINK SURFACE. REMOVE MOLD
UNDER THE KITCHEN SINK WITH BLEACH AS
NECESSARY. PAINT WALL AND FLOOR WITH KILZ OR
LIKE PRODUCT. PAINT ALL PARTICLE BOARD SURFACES
TO MATCH CABINET INTERIOR AS CLOSELY AS
POSSIBLE. INSTALL NEW PLUMBING PER DETAIL.
BATHROOM REPAIRS
REMOVE AND DISPOSE OF EXISTING BATHTUB.
INSTALL NEW GRAB BARS, SHOWERHEAD, SHOWER ENCLOSURE,
BATHTUB, ACCESS PANEL, AND EXHAUST FAN PER DETAIL.
BATHROOM REPAIRS
REMOVE AND DISPOSE OF EXISTING BATHTUB AND TOILET.
INSTALL NEW GRAB BARS, SHOWERHEAD, SHOWER ENCLOSURE,
BATHTUB, SUPPLY VALVE AND SUPPLY LINE, TOILET, WAX RING, LIGHT
FIXTURE, OUTLET FACE PLATE, AND VANITY. PAINT WALLS AND CEILING.
REMOVE FLOOR UNDERLAYMENT AND MAKE TWO FLOORS FLUSH.
INSTALL NEW VINYL FLOORING AND TRANSITION STRIP PER DETAIL.
NOTE: IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL DIMENSIONS.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF ALL MATERIALS.
WORK INCLUDES ALL INCIDENTAL CAULKING AND FINISH WORK.
BUILDING FLOOR PLAN NOT TO SCALE.
EXISTING BATHROOM NEW BATHROOM
REMOVE 1 PIECE SHOWER ENCLOSURE AND INSTALL NEW ONE. MUST NOT
OBSTRUCT CONTROLS, FAUCET, OR SHOWERHEADS. CHECK FOR ANY ROT
BENEATH ENCLOSURE AND CAULK/SEAL/PAINT AS NECESSARY.
REPLACE FIXTURES (FAUCET, MIXER, SHOWER HEAD, DRAIN PLUG)
INSTALL NEW CIRCULAR GRAB BARS
33 IN TO 36 IN FROM FINISH FLOOR.
SPACE BETWEEN GRAB BARS AND WALL SHALL BE 1.5 IN
OUTSIDE DIAMETER SHALL BE 1.25 IN - 2 IN
INSTALL BLOCKING AS NECESSARY.
1 2
REPLACE VANITY WITH SIMILAR
INSTALL FACE PLATE ON RECEPTICLE
REPLACE SUPPLY VALVE AND SUPPLY LINE
OPTION: INSTALL ACCESS
PANEL FROM KITCHEN SIDE
REPLACE TOILET AND WAX RING.
CAULK AROUND TOILET BASE.
REPLACE LIGHT FIXTURE
TO COVER HOLE IN DRYWALL
REMOVE UNDERLAYMENT
MAKE FLOOR TRANSITION FLUSH
INSTALL NEW VINYL FLOORING AND TRANSITION STRIP
REMOVE EXISTING TUB AND SHOWER
FIXTURES AND REPLACE IN-KIND. USE
MORTAR OR FOAM BENEATH TUB FOR
SUPPORT.
CAULK BATHTUB TO FLOOR
MOLD STAINS UNDER
KITCHEN SINK
EXISTING CABINET HEIGHTS
ARE APPROX. 35.5" FROM
FLOOR TO COUTERTOP
REMOVE PARTICLE BOARD BENEATH SINK
AND REPLACE UNDERSINK SURFACE
(INCLUDE ANY INCIDENTAL MINOR FRAMING FOR SUPPORT)
CLEAN AREAS AFFECTED BY MOLD WITH BLEACH
PAINT ALL PARTICLE BOARD SURFACES WITH KILZ OR SIMILAR
PAINT OVER BROWN TO MATCH EXISTING SURFACES
REMOVE EXISTING BATHTUB AND
REPLACE IN-KIND PER MANUFACTURER'S
RECOMMENDATIONS
EXISTING BATHROOM
NEW BATHROOMEXISTING KITCHEN CABINETS
REPLACE FAUCET AND PLUMBING
UNDER KITCHEN SINK
(SUPPLY LINE, SUPPLY VALVE,
DRAIN LINE) PER 1 PC
REPLACE TUB AND SHOWER FIXTURES
IN-KIND. USE MORTAR OR FOAM
BENEATH TUB FOR SUPPORT.
REMOVE 1 PIECE SHOWER ENCLOSURE AND
INSTALL NEW ONE. MUST NOT OBSTRUCT
CONTROLS, FAUCET, OR SHOWERHEAD.
CHECK FOR ANY ROT BENEATH ENCLOSURE
AND CAULK/SEAL/PAINT AS NECESSARY.
REPLACE ALL FIXTURES (FAUCET, MIXER,
SHOWER HEAD, DRAIN PLUG)
INSTALL NEW CIRCULAR GRAB BARS 33 IN TO 36 IN
FROM SHOWER FLOOR. SPACE BETWEEN GRAB BARS
AND WALL SHALL BE 1.5 IN
OUTSIDE DIAMETER: 1.25 IN - 2 IN
INSTALL BLOCKING AS NECESSARY
3 5
REMOVE SHELVES AND
CONSTRUCT ACCESS
PANEL
INSTALL NEW EXHAUST FAN
IN CEILING
CLOSET
File details come from the government source that posted it. Updated .