3N16_AMENDMENT_002.doc
DOC document 112 KB Posted
- Attached to
- 3N16 Slope Repair Federal contract opportunity
- Solicitation number
- AG-9JGP-S-16-0030
About this file
Amendment 002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PLANS-FINAL-2-16-16.pdf | ||
| water_drafting_map.pdf | ||
| Site_Visit_Sign_IN.PDF | ||
| 3N16_AMENDMENT_003.doc | DOC document | |
| 3N16_AMENDMENT_001.doc | DOC document | |
| Site_Plans.pdf | ||
| Project_Specifications.docx | DOCX document | |
| Solicitation_SF1442.doc | DOC document | |
| Wage_Determination.docx | DOCX document | |
| Fire_Plan.docx | DOCX document | |
| Solicitation_SF1442.doc | DOC document | |
| Wage_Determination.docx | DOCX document | |
| Fire_Plan.docx | DOCX document | |
| Site_Plans.pdf | ||
| Project_Specifications.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 3 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| AMEND 002 |
| 01/29/2016 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA Forest Service Central California Acquisition Service Area Tahoe National Forest
631 Coyote Street
Nevada City, CA 95959
USDA Forest Service
Central California Acquisition Service Area
Tahoe National Forest
631 Coyote Street
Nevada City, CA 95959
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
FORMCHECKBOX
AG-9JGP-S-16-0030
9B. DATED (SEE ITEM 11)
01/22/2016
FORMCHECKBOX
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE 9JGP |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. (TO BE FILLED OUT BY THE CONTRACTING OFFICER)
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, FORMCHECKBOX is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
3N16 Slope Repair:Stanislaus National Forest
The purpose of this amendment is to add the option clauses and replace the Schedule of Items or Pricing sheet in this solicitation.
See continued changes on page 2……
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
| MATTHEW GAGNON |
| 01/29/2016 |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
AMENDMENT 002 -PAGE 2
SOLICITATION AG-9JGP-S-16-0030
1. Incorporate the following clauses into the solicitation:
52.217-5 Evaluation of Options.
Evaluation of Options (July 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision) 52.217-7 Option for Increased Quantity—Separately Priced Line Item.
Option for Increased Quantity—Separately Priced Line Item (Mar 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 60 days after contract award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
2. Replace the Schedule B: Schedule of Items in the solicitation with the following new Schedule of Items (please use this Schedule of Items with the submittal of your pricing Proposal):
PART 1, SCHEDULE OF ITEMS
SECTION B
SUPPLIES OR SERVICES, AND PRICES/COSTS
| PROJECT |
| 3N16 & 3N27 Road Repair |
| UNIT |
| R5-Stanislaus National Forest- Mi-Wok District |
| SOL. # |
| AG-9JGP-S-16-0030 |
METHOD OF
| ITEM NO. |
| DESCRIPTION |
| MEASURE |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| TOTAL PRICE |
FS Road 3N16- BASE BID
| 151.01 |
| Mobilization |
| AQ |
| LS |
| 1. |
| 204.20 |
| Drainage Excavation, Type Rolling Dip |
| AQ |
| Each |
| 1. |
| 251.02 |
| Placed Riprap, Class 2 |
| CQ |
| Ton |
| 2. |
| 255.02 |
| Mechanically Stabilized Earth Wall |
| AQ |
| LS |
| 1. |
| 301.11 |
| Aggregate Surface Course, Grading Table 703-3 Type G, compaction method B |
| CQ |
| CY |
| 90. |
| 303.04 |
| Road Reconditioning, Ditch |
| CQ |
| MI |
| .07 |
| 625.30 |
| Seeding and Mulching Dry Method |
| AQ |
| LS |
| 1. |
TOTAL BASE BID:
FS Road 3N27-Optional
| 151.01 |
| Mobilization-Optional |
| AQ |
| LS |
| 1. |
| 201.03 |
| Clearing & Grubbing, Disposal- Limbs Scatter, Logs Deck, Stumps scatter-Optional |
| AQ |
| MI |
| .01 |
| 204.19 |
| Drainage Excavation, Type Ditch |
| CQ |
| MI |
| .12 |
| 204.20 |
| Drainage excavation, type Rolling Dip-Optional |
| AQ |
| Each |
| 2. |
| 251.02 |
| Placed riprap, class 2-Optional |
| CQ |
| Ton |
| 4. |
| 252.07 |
| Rock Buttress, Mechanically-Placed Rock Buttress-Optional |
| AQ |
| LS |
| 1. |
| 301.11 |
| Aggregate Surface Course, Grading Table 703-3 Type G, Compaction Method B-Optional |
| CQ |
| CY |
| 25. |
| 625.30 |
| Seeding and Mulching Dry Method-Optional |
| AQ |
| LS |
| 1. |
TOTAL OPTIONAL BID:
TOTAL BASE + OPTIONAL BID
| NOTES: |
| 1) Respondent must price each item to be considered for award. |
2) Responses for quantities less than those listed may be rejected.
3) If award is made in excess of $30,000, bonds will be required. (See Section I.)
4) If response is greater than $150,000, include bid bond =20% of the total price.
(5) Following are abbreviation definitions from FP-03, Section 109 that may appear in the "Unit" column of the Schedule of Items; AC=Acre, CQ=Contract Quanitity, CY= Cubic Yard, EA=Each, GAL=Gallon, HR=Hour, LF=Linear Foot, LS=Lump Sum, MI=Mile, LB=Pound, SF=Square Foot, SY=Square yard, ST=Station, TON=Ton. CQ and LS will be measured and paid as stated in FP-03, Section 109-02. All other Units will be paid according to FAR clause 52.211-18, Variation in Estimated Quanitity.
PRICE SUBMITTED BY:
Signature
Phone
Vendor Name
FAX
Address
AMENDMENT 002 -PAGE 3 SOLICITATION AG-9JGP-S-16-0030