2015_Placerville_Plantation_Release.docx
DOCX document 124 KB Posted
- Attached to
- 2015 Placerville Plantation Release Federal contract opportunity
- Solicitation number
- AG-9JGP-S-15-0084
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1.doc | DOC document | |
| Amendment_1_doc..doc | DOC document | |
| Attachment_4_PAL_Fire_Plan_jun2015.doc | DOC document | |
| Attachment_1.pdf | ||
| Attachment_2.pdf | ||
| Attachment_3_wage_det.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDA SHEET
2015 Placerville Plantation Release
REFERENCE NO. OF DOCUMENT BEING CONTINUED AG-9JGP-C-15-0084
PAGE
OF
| SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS |
| 1. REQUISITION NUMBER |
| PAGE 1 OF |
| OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 |
| 7407441 |
| 56 |
| 2. CONTRACT NO. |
| 3. AWARD/EFFECTIVE |
| 4. ORDER NUMBER |
| 5. SOLICITATION NUMBER |
| 6. SOLICITATION ISSUE |
DATE
| AG-9JGP-S-15-0084 | |
| DATE |
April 16, 2015
7. FOR SOLICITATION INFORMATION CALL:
Contract
a. NAME
O’Laine Martinez
b. TELEPHONE NUMBER(No collect calls)
530-478-6823
8. OFFER DUE DATE/ LOCAL TIME
May 5, 2015 3:00 PM
9. ISSUED BY CODE
10. THIS ACQUISITION IS |_| UNRESTRICTED OR |X| SET ASIDE: 100 % FOR
|X|SMALL BUSINESS |_| WOMEN-OWNED SMALL BUSINESS
|_| HUBZONE SMALL (WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
BUSINESS SMALL BUSINESS PROGRAM NAICS: 115310
|_| SERVICE DISABLED |_| EDWOSB
VETERAN- OWNED SIZE STANDARD:
SMALL BUSINESS |_| 8(A) 19 million
USDA Forest Service Central California Acquisition Service Area Nevada City, CA 95959
11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED
|_| SEE SCHEDULE
| 12. DISCOUNT TERMS |
| |_| 13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700) |
| 13b. RATING |
14. METHOD OF SOLICITATION
|X| RFQ |_| IFB |_| RFP
15. DELIVER TO CODE
See specifications.
16. ADMINISTERED BY CODE
See block 9.
17a. CONTRACTOR/ CODE FACILITY
OFFEROR CODE
18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE N0.
| |_| 17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN |
| 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW |
| OFFER |
| IS CHECKED |
|X| SEE ADDENDUM
| 19. |
| 20. |
| 21. |
| 22. |
| 23. |
| 24. |
| ITEM N0. |
| SCHEDULE OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2015 Placerville Plantation Release Eldorado NF
See separate schedule sheet.
Email quotes to tracymartinez@fs.fed.us Fax quotes to 530-478-6126
Contractor MUST be registered in the System for Award Management (SAM) before award can be made.
Please provide the following information:
DUNS#_________________
TIN#___________________
(Use Reverse and/or Attach Additional Sheets as Necessary)
See Page 27 for Pre-proposal Meeting
25. ACCOUNTING AND APPROPRIATION DATA
See IAS requisition.
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
| |X| |
| 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA |
| |X| |
| ARE |
| |_| |
| ARE NOT ATTACHED |
| |_| |
| 27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA |
| |_| |
| ARE |
| |_| |
| ARE NOT ATTACHED |
| |X| 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______1________ |
| |_| 29. AWARD OF CONTRACT: REF. OFFER |
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
| DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY |
| DATED .. YOUR OFFER ON SOLICITATION |
| ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED |
| (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE |
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: ____________________
| 30a. SIGNATURE OF OFFEROR/CONTRACTOR |
| 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) |
| 30b. NAME AND TITLE OF SIGNER (Type or print) |
| 30c. DATE SIGNED |
| 31b. NAME OF CONTRACTING OFFICER (Type or print) |
| 31c. DATE SIGNED |
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.2/2012)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA FAR (48 CFR) 53.212
See schedule on next page.
19. ITEM NO
| 20. SCHEDULE OF SUPPLIES/SERVICES |
| 21. QTY |
| 22. UNIT |
| 23. UNIT PRICE |
| 24. AMOUNT |
32a. QUANTITY IN COLUMN 21 HAS BEEN
|_| RECEIVED |_| INSPECTED |_| ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ________________________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
| 33. SHIP NUMBER |
| 34. VOUCHER NUMBER |
| 35. AMOUNT VERIFIED |
CORRECT FOR
| 36. PAYMENT |
| 37. CHECK NUMBER |
|PARTIAL | |FINAL
|_| COMPLETE |_| PARTIAL |_| FINAL
| 38. S/R ACCOUNT NUMBER |
| 39. S/R VOUCHER NUMBER |
| 40. PAID BY |
| 41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT |
| 42a. RECEIVED BY (Print) |
| 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER |
| 41c. DATE |
42b. RECEIVED AT (Location)
| 42c. DATE RECD (YY/MM/DD) |
| 42d. TOTAL CONTAINERS |
STANDARD FORM 1449 (REV.2/2012) BACK
PART 1, SCHEDULE OF ITEMS
SECTION B
SUPPLIES OR SERVICES, AND PRICES/COSTS
| PROJECT |
| 2015 Plantation Release |
| Ver 12/02 |
| UNIT |
| Placerville R.D., ENF |
| SOL. # |
| AG-9JGP-S-15-0084 |
| ITEM NO. |
| DESCRIPTION |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| TOTAL PRICE |
| 1 |
| 2015 Placerville Plantation Release 1.5% |
| Acre |
| 191. |
| $ - |
| $ - |
| 2 |
| 2015 Placerville Plantation Release 3.0% |
| Acre |
| 323. |
| $ - |
| $ - |
| 3 |
| Yellow Star Thistle Plantation Treatment |
| Acre |
| 190. |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| . |
| $ - |
| $ - |
| TOTAL |
| $ - |
| NOTES: |
| 1. Responses for quantities less than those listed in the numbered items may be rejected. |
2. Responses without prices for each item and sub-item may be rejected.
PRICE SUBMITTED BY:
Signature
Phone
Vendor Name
FAX
Address
SECTION I THE SCHEDULE
1.1 SCOPE OF CONTRACT
Description of Work: The intent of this contract is to secure services for vegetation control treatment in and around young conifer plantations. The specified treatment will be the foliar application of herbicide mixtures from backpack sprayers to target vegetation using a shielded directed spray technique.
Contractor Responsibility: The Contractor shall provide everything--including, but not limited to, all equipment, supplies, transportation, labor, and supervision--necessary to complete the project, except for that which the contract clearly states is to be furnished by the Government.
Before work may begin the Contractor shall designate, in writing, at least one person on site with authority to act in case of the Contractor’s absence from the work site. The Contractor shall list the extent of authority this representative will have on the job. The Contractor or authorized representative shall be on the project area whenever work is in progress and shall act as a non-working supervisor. In the absence of the Contractor, this authorized representative shall receive orders and instructions from the Contracting Officer and shall take such action as is required to keep the job in progress under the terms of the contract. The Contractor and authorized representative(s) shall have an oral command of both the English language and the language common to the crew(s).
1.2 Project Location & Description
Location: The project is located on the Placerville Ranger District of the Eldorado National Forest. The location of the work sites and other information pertinent to each treatment unit is contained in the Contract Maps and Supplemental Specifications.
The Placerville Ranger District office is located at 4260 Eight Mile Road, Camino, CA 95709, approximately 8 miles east of Placerville, CA on U.S. Highway 50, at Exit 54. All work sites in Items 1 & 2 are within approximately 1 hour travel time from the district office.
Description: Boundaries of treatment units will be verbally designated by the Contracting Officer’s personnel on site at the time of treatment. Boundaries will generally be identifiable features on the ground, such as roads, ridges, drainages, or the residual tree line. Boundaries may also be indicated with flagging.
Item 1, Kyburz Fire Units: Work will be performed in 5 stands, totaling 191 acres. Elevation ranges from 4,600’ to 6,400’ above sea level. Slopes are generally less than 35%, with some steeper areas. Aspect is generally south-facing. Soil conditions are mainly fast draining volcanic type. All stands are within the boundary of the Kyburz Fire of 2013, which burned young plantations within the Freds Fire of 2004. The ground is therefore generally clear of logging slash and brush, although some areas of brush were not burned. Scattered conifer regeneration survives, both planted and natural, as well as some live residual overstory trees and oak re-sprouts. These stands were planted with conifer seedlings at 300 trees per acre in April of 2014. Target vegetation will be primarily grass and forbs, but also includes surviving and/or sprouting brush. All target vegetation within the treatment areas will be sprayed and crop trees will be protected from spray.
Item 2, Freds Retreatment Units: Work will be performed in 9 stands, for a total of 323 acres. Elevation ranges from approximately 5,400’ to 6,600’ above sea level, and aspect is south facing. These stands are young plantations resulting from restoration efforts following the Fred’s Fire of 2004. They were salvage logged in 2005, and planted with conifer seedlings in the spring of 2006. A foliar herbicide mixture was applied to competing vegetation in 2011. Target vegetation is primarily dense whitethorn, but includes all woody brush. All target vegetation within the treatment area will be sprayed and crop trees will be protected from spray.
Item 3, Yellow Starthistle plantation treatment: Work will be performed in 4 stands in the vicinity of the other contract stands, for a total of 190 acres. All yellow star thistle, including both live and dead plants, within the treatment area shall be treated, plus a 20’ radius beyond the extent of the plant occurrences. No tree protection measures are expected to be necessary
Exclusions (non-work areas): All standing and/or running water shall have a no-treatment buffer. Additional areas to be left untreated will be designated by the Contracting Officer’s Representative on site at the time of treatment. Contractor personnel are prohibited from entering exclusion areas. Boundaries of these areas may also be indicated with flagging. See Supplemental Specifications for more detailed spray buffer information.
Accessibility: All work areas are accessible by standard pickup. Four-wheel drive vehicles may be beneficial in improving the access points of any given treatment unit. It is the Contractor's responsibility to reach the work site when it is ready for treatment. The Contracting Officer will determine the access routes which may be used.
Any prospective contractor desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.
In no event shall failure to inspect the site prior to contracting constitute grounds for a claim after contract award. (FAR 52.237-1, Site Visit.)
1.3 Maps. Maps showing the general vicinity and/or specific work areas are included in attachments. Maps are general in nature and are not to be considered as definitively identifying locations.
1.4 Estimated Start Date & Contract Time
Start: May 13, 2015 Time: 34 days
1.5 Restrictions on Work
Work may be performed at any time during the period of the contract, except as outlined here. Nothing in this part shall be construed to take away any of the Government's rights under the Suspension of Work Clause (52.242-14). Restrictions are as follows:
1. In accordance with the fire plan, if included in Section J.
2. When the Contracting Officer determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage.
3. Work shall be performed only when the Contracting Officer, Contracting Officer Representative or inspector are present on the work site.
4. Work shall not be performed before 6:00 a.m. or after 6:00 p.m.
5. Work shall not be performed on Sundays or Federal Holidays.
6. It is anticipated that this contract will require a minimum of two twelve person crews, plus one foreman and one licensed applicator per crew.
7. Once contract work has begun, replacement of personnel will be subject to approval of the Contracting Officer.
8. Each stand shall be completed prior to starting work on the next stand.
9. Contractor will be informed whether target vegetation is in an appropriate stage of growth for the herbicide application to be effective.
10. Specific stands or portions thereof may have a limited operating period (LOP) during which work may not be performed. See Supplemental Specifications for more details. These restrictions may be lifted based on field review at the time of treatment with CO approval.
1.6 Licenses and Insurance
Before work may begin on this project, the Contractor shall provide the documentation required in this section (C.6). Failure to provide the information will not change the date for starting work, and contract time may begin before the contractor is actually permitted to work. Once contract time begins, the contractor shall provide the documentation within 10 calendar days or 20 percent of the contract time (whichever is less) or the contract may be terminated for default in accordance with the clause governing default (termination for cause).
The contractor shall obtain the insurance and licenses listed here (see also Section L, Notices to Offerors and Respondents).
MSPA Card (Form WH510): This contract [X] does [ ] does not require the contractor to be registered with the US Department of Labor as a Farm Labor Contractor. The Contractor shall provide a current Form WH510 or legible copy.
Worker's Compensation Insurance: The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.
Other: See C.8-2 Specifications, Licensing and Safety Requirements.
1.7 Camping and Housing
Camping is not permitted in US Forest Service campgrounds. Contractor [ ] will [X] will not be permitted to camp elsewhere on US Forest Service land. Camping on Forest Service land is not a right; permission may be revoked for failure to comply with the terms of the permit. (See also Section H, Camping Permit Compliance)
1.8 Technical Requirements
1.8-a Definitions
Crop Tree: The healthiest, most vigorous, well-formed conifer seedling meeting the spacing and species mix guidelines that were used to plant the stand.
Herbicide: The concentrate before mixing occurs.
Herbicide mixture: The herbicide, water, surfactant, and dye (if used).
Target vegetation: All vegetation except crop trees and excluded vegetation.
Triple Rinse: Filling the empty container at least 1/10 full of clean water, replacing the container lid, shaking vigorously for at least 15 seconds, and immediately pouring contents from the container into the batch tank, and repeating this for a total of three times.
1.8-b Specifications
1.8-b(1) Work Methods:
The Contractor shall apply the herbicide mixture to all target vegetation in each stand. The application shall be uniform. All surfaces of the target vegetation shall be covered, including the interior of dense brush species. See Section J, Exhibit A for examples of acceptable and unacceptable application coverage.
The conifer seedlings in all units shall be protected from herbicide mixture in the following manner:
Work Methods:
Item 1- Tree protection, bagging of trees shall be used instead of workers with backpack sprayers with clean water. Requirements are as follows:
1) Bags must be of sufficient size to allow trees to remain completely upright, the bole not bent in any way.
2) Bags must be placed on trees sufficiently in advance of applicators such that no drift or direct application can reach crop trees.
3) Bags must be weighted down such that they cannot blow off and the bottom is secure such that no spray can enter underneath bags.
4) Bags must be removed within one hour of being placed on the tree. (Any trees remaining bagged more than one hour will be considered “Damaged Trees”, and the contractor may be charged liquidated damages.)
5) Applicators must each carry a quart size spray bottle of clean water for washing off all traces of herbicide mix that come in contact with crop trees.
Item 2-Seedlings up 2 feet in height shall be shielded to protect the entire plant from herbicide spray (i.e., cones, shields, etc.). Protective equipment shall not damage seedlings. Seedlings taller than 2 feet will be protected by directed spray application. Where there are multiple trees planted per spot, all trees on that spot shall be protected while the adjacent area is being sprayed.
Other excluded vegetation shall be avoided by directed spray application. See Supplemental Specifications for a list of excluded vegetation.
The Contractor shall keep equipment in good operating condition maintaining flow rate and nozzle pressure. Application of herbicide mixture will be made with a nozzle pressure of 15 psi. The spray tip will be kept from 12 to 24 inches from the target vegetation during application.
For every 5 (or less) applicators there shall be one worker equipped with a clean Government supplied backpack sprayer full of clean water. Conifers contaminated with any amount of herbicide mix shall be washed down within 1 minute of exposure. Wash down shall remove all traces of herbicide mix.
Application of herbicide mix must be discontinued if the following critical weather parameters exist:
1. Precipitation or a 70% or greater chance predicted within 24 hours.
2. Wind speed and/or air temperature that exceed the herbicide label requirements.
3. Temperature cold enough to freeze the herbicide mix in the nozzles.
If not otherwise specified on the label, spraying will be discontinued when wind speeds are in excess of 5 mph. Spraying shall also be discontinued whenever any amount of wind increases exposure to workers or to protected sites. The Contractor shall be responsible for monitoring weather conditions. In case of discrepancy between government’s monitoring of weather conditions and that of the contractor, the government’s measurement shall prevail.
The Contractor shall be responsible for washing and cleaning out all equipment at the end of each work day. The exact location for cleanup will be selected by the Contracting Officer.
The Contractor shall use soft material such as bristle to clean the nozzles. Wire shall not be used.
Under no circumstances shall sprayers, containers, clothing, personnel or other contaminated materials be washed in any stream, lake, reservoir, or other surface water.
The Contracting Officer shall determine the sequence in which each stand will be treated. Each stand shall be completed prior to moving on to the next stand. The contractor will flag a line delineating the sprayed portion of any partially completed stand at the end of each day.
The Contractor shall keep his crew organized so that units are covered systematically without skipped areas. The Contractor shall not scatter his crew over different parts of the stand.
The Contractor shall be responsible for training his employees in the proper techniques to be used during application of herbicides and safety procedures to be followed when handling herbicides.
1.8-b(2) Batching of Herbicide Mix:
Contractor shall do all batching of herbicide mix and conform to label instructions and safety requirements. See Supplemental Specifications for the herbicide mix for each stand.
A graduated container of at least one-half gallon in size shall be used to measure chemicals and surfactants during the batching operation.
All batching of herbicide mix will be done in the presence of the Contracting Officer or their representative at the work site. The batching location will be designated by the Contracting Officer. When drafting water into the clean water tank, the batch tank and any containers of herbicide concentrate will remain at the approved batching location. The Contractor shall use only water sources approved by the Contracting Officer.
Batching sequence is as follows:
1. One half of the water for the mix shall be put in the batch tank.
2. The herbicide(s) and colorants, if used, shall be put in the batch tank next.
3. Begin agitation.
4. Add the remaining water in the batch tank while continuing agitation.
5. The last ingredient to be added to the tank will be the surfactant, if used.
The herbicide mix shall be under constant agitation in the batch tank to prevent separation. All mix shall be sprayed out. The mix shall not sit overnight in the batch tank or other equipment unless permitted by the Contracting Officer.
1.8-b(3) Storing and Transporting Herbicides:
All unattended herbicide concentrate shall be stored under lock and key in its original container.
The Contractor shall work with the Contracting Officer to insure a minimal amount of herbicide mix is moved between units.
1.8-b(4) Disposal of Containers:
The Contractor shall dispose of the containers in the following manner:
1. All containers shall be triple rinsed, with clean water, on the work site. The rinse water shall be disposed of by placing it in the batch tank.
2. Used containers, except those that are returnable, shall be punctured on the top and bottom to render them unusable.
3. A log of the containers and how they were rinsed and where they were disposed of shall be made available to the Contracting Officer.
4. Certification of disposal at an approved dump or a receipt from the point of redemption on returnable containers is required.
1.8-b(5) Herbicide Spills:
If a spill occurs, the contractor shall:
1. Take action immediately to contain the spill.
2. Notify the Contracting Officers' Representative on site.
3. Be under the control of the Contracting Officer during the spill clean up.
4. Be liable for all costs of damages, clean-up, and decontamination.
1.8-b (6) Licensing and Safety Requirements:
The Contractor shall have a current State of California Agriculture Pest Control Operator License including Category "E" (Forest), and Pest Control Business License, prior to the award of contract. The Contractor shall register this State License with the appropriate County Agriculture Commissioner(s) prior to beginning work. The Contractor shall be required to provide the following:
1. Required permits.
2. Complete and file all reports, with a copy to the Contracting Officer.
3. Complete any other incidental requirements.
The Contractor's authorized representative(s) on site must, at a minimum, be a State of California Certified Pesticide Applicator.
The Contractor shall comply with the State of California Safety Orders found under the California Administrative Code and with the requirements of the Federal Worker Protection Standards (40 CFR, part 170). For further information regarding licensing requirements contact the California Department of Pesticide Regulation at (916) 445-4038, or online at www.cdpr.ca.gov.
1.8-b(7) Herbicide Mix Specifications:
Where the herbicide mix specification is “1.5% Glyphosate w/ R-11” (Item 1), the mix shall contain 1.5% glyphosate herbicide (53.8% formulation), 1% “R-11” adjuvant, and 0.25% “Colorfast” purple dye. 100 gallons of herbicide mixture would thus be as follows:
97.25 gal water
1.50 gal glyphosate herbicide
1.00 gal “R-11” adjuvant
0.25 gal “Colorfast” purple dye
Where the herbicide mix specification is “3% Glyphosate w/ R-11” (Items 2 & 3), the mix shall contain 3% glyphosate herbicide (53.8% formulation), 1% “R-11” adjuvant, and 0.25% “Colorfast” purple dye. 100 gallons of herbicide mixture would thus be as follows:
95.75 gal water
3.00 gal glyphosate herbicide
1.00 gal “R-11” adjuvant
0.25 gal “Colorfast” purple dye
Spray Buffers (Exclusion Areas):
Buffers will be designated by the Contracting Officer’s personnel at time of treatment. In the event the contractor encounters undesignated water features, the contractor shall notify the Contracting Officer’s personnel immediately, and proceed to implement the standard buffer width shown below. In general, buffers will be as follows:
Perennial streams = 50’ unless flagged otherwise Any other standing and/or running water = 25’ unless flagged otherwise Other resource protection areas = pink & green flagging and/or pink & black flagging
Excluded Vegetation:
Black oak (Quercus kelloggii) Live oak (Quercus wislizenii) Elderberry (Sambucus Spp.)
Supplemental Specifications Data Table
| Item |
| Stand |
| Acres* |
| LOP |
| Mix |
| Remarks |
| 1 |
| 609-026-1 |
| 6 |
| 1.5% Glyphosate w/ R-11 |
| Bag Seedlings |
| 1 |
| 613-005-4 |
| 68 |
| 1.5% Glyphosate w/ R-11 |
| Bag Seedlings |
| 1 |
| 613-052-2 |
| 21 |
| 1.5% Glyphosate w/ R-11 |
| Bag Seedlings |
| 1 |
| 613-053-3 |
| 53 |
| 1.5% Glyphosate w/ R-11 |
| Bag Seedlings |
| 1 |
| 613-054 |
| 43 |
| 1.5% Glyphosate w/ R-11 |
| Bag Seedlings |
| 2 |
| 503-009 |
| 7 |
| 3% Glyphosate w/ R-11 |
| None |
| 2 |
| 503-111 |
| 5 |
| 3% Glyphosate w/ R-11 |
| None |
| 2 |
| 613-005-5 |
| 51 |
| 3% Glyphosate w/ R-11 |
| None |
| 2 |
| 613-007 |
| 17 |
| 3% Glyphosate w/ R-11 |
| None |
| 2 |
| 613-025 |
| 94 |
| 3% Glyphosate w/ R-11 |
| None |
| 2 |
| 613-037-1 |
| 11 |
| 3% Glyphosate w/ R-11 |
| None |
| 2 |
| 609-050-7 |
| 26 |
| 3% Glyphosate w/ R-11 |
| None |
| 2 |
| 609-051 |
| 88 |
| 3% Glyphosate w/ R-11 |
| None |
| 2 |
| 613-1902 |
| 24 |
| 3% Glyphosate w/ R-11 |
| None |
* Acres are an ESTIMATED Quantity, subject to FAR 52.211-18 Variation in Estimated Quantity.
1.8-c Contractor-Furnished Equipment
1.8-c(1) Required Materials:
The contractor shall provide the following herbicides, adjuvants, and dye:
1. A 53.8% glyphosate herbicide formulation without an integrated surfactant. E.g. Accord Concentrate (EPA Reg. No. 62719-324), Foresters’ Non Selective (EPA Reg. No. 228-381), Roundup Custom (EPA Reg. No. 524-343), or equivalent.
2. R-11 (CA Reg. No 2935-50142) or equivalent nonionic surfactant, and Hasten (CA Reg. No 2935-50160) or equivalent modified vegetable oil surfactant.
3. Colorfast brand or equivalent purple dye.
All herbicides and adjuvants shall be provided in factory sealed containers no larger than 2.5 gallons each. Equivalent herbicides, adjuvants, and dye may be substituted only as approved by the Contracting Officer. Contractor shall provide clean water for the wash down packs.
1.8-c(2) Required Equipment:
Backpack sprayers – shall have an adjustable pressure regulator or a pressure gauge mounted on the spray wand. All sprayers shall be equipped with a "TeeJet" XR80-04VS spray tip or equivalent, with a 50 mesh screen. Plastic, brass, or aluminum spray tip nozzles shall not be used.
Batch tank – shall be a mixing tank equipped with a constant agitator, a sight level in good condition to measure tank volume, and a leveling gauge which will be adequate for leveling the tank in all directions. The filler hose from the batch tank shall be equipped with a self-closing nozzle. The batch tank shall be in good condition, meeting all state requirements. The batch tank shall be mounted such that it can be moved and operated separately from the clean water tank; for example, mounted on a separate vehicle from the clean water tank, or mounted on a trailer.
Clean water tank – shall be a tank exclusively for water, having a back flow prevention device or proper air gap filling apparatus. The water tank and all drafting equipment must be free of pesticide and dye residue. Pesticides and dyes shall not be stored or transported in the same vehicle used to transport the clean water tank.
Locked storage area for herbicide and containers.
Spill kit containing a minimum of 25 pounds of absorbent material such as kitty litter, two 30 gallon, 4 mil polyethylene garbage bags with ties, and 2 shovels.
Trailer hitches used to tow equipment and trailers shall be securely mounted directly to the vehicle frame. Bumper hitches shall not be used unless specifically designed and rated for towing heavy loads.
Contractor shall provide all other supplies and incidentals necessary to accomplish the required contract work while complying with herbicide label directions, pesticide application license requirements, and worker safety protection standards.
1.8-c(3) Calibration and Equipment Check:
Prior to and during work the Government reserves the right to provide inspect, test, and approve equipment, for example, checks for cracked hoses, worn seals, and leaks.
Prior to and during work the Government reserves the right to test and inspect the herbicide concentrate and mixture.
Prior to and during work the Contractor shall be required to calibrate his equipment in the presence of the Contracting Officer.
1.8-d Government-Furnished Property
See Section G.
1.8-e Public Safety
The Contractor shall be required to carry out all operations in a manner which ensures the safety of the Public.
1.8-f Salvage Rights There are no salvage rights under this contract.
1.8-g Road Maintenance
The Contractor may be required to repair damage to any roads are which are used without the consent of the Forest Service.
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-4 Inspection of Services--Fixed-Price (AUG 1996)
1.9 Government Inspections
Government inspections are for the purpose of satisfying the Government that the services are acceptable and do not relieve the Contractor of the responsibility for maintaining quality control.
The Contracting Officer's Representative or designated inspector will conduct all inspections. The Contractor (or designated representative) is encouraged to be present to observe inspections. Summary results will be made available on request.
Compliance Inspections. Visual compliance inspections will be made on a periodic basis. Such inspections are not final and do not constitute acceptance by the Government.
Final Inspections. Final (formal) inspections for payment will be made on completed sub-items only. Contractor shall request final inspections in writing and give the Forest Service at least two working days advanced notice. Inspections will be completed within four working days after the notice is received If the work is not ready for inspection at the time specified by the Contractor, the cost associated with the inspection attempt may be charged to the Contractor.
Disputed Inspection.
The Contractor may request re-inspection without rework if the results are unacceptable. Re-inspection must be requested in writing within 48 hours after receiving written notice of the inspection results. Re-inspection will be accomplished within five working days after receipt of the contractor's written request.
The same sampling and inspection procedures will be used, but new samples will be taken. The inspection pattern will be shifted so that new samples will not overlap previously inspected samples. Results will be rounded to the nearest whole percent.
If re-inspection results are within five percentage points of the first inspection, the original inspection result will be used in determining acceptability and payment. If re-inspection results are greater than five percentage points above or below the first inspection, the re-inspection results will be used.
1.9-a Specific Inspection Procedures
The Contracting Officer will make visual inspections while work is in progress for compliance with the terms of the contract.
Inspection will be performed by sampling plots. At least one percent of each treatment area will be sampled by a random series of plots distributed over the entire area. Plot size will be: 1/50 acre
A systematic inspection using 1/50th acre (16.7 foot radius circle on a horizontal plane) plots to calculate an inspection quality based on application coverage and crop tree damage. Plots will be selected randomly and will not overlap. Sufficient plots will be taken to achieve a 1% sample of the treatment area (i.e. 1 plot for every 2 acres). Results will be recorded on inspection forms.
The quality of application coverage will be determined by observing the indicator dye or colorant on the target vegetation surfaces. To determine this, the inspection plots will be divided into four (4) quadrants on cardinal directions (North, South, East and West). Each quadrant will be examined for coverage. If more than 90% of the target vegetation surfaces within the quadrant have been treated to specifications, it will be considered acceptable.
To determine the percent satisfactory coverage, the number of acceptable quadrants will be divided by the total number of quadrants examined, then multiplied by 100 to give a percentage. For example, out of a total of 30 plots examined (120 quadrants), 112 quadrants received acceptable coverage:
112 / 120 x 100 = 93%
Tree damage will be determined by inspecting each crop tree on the inspection plot. Crop trees will have unacceptable levels of damage if the following occurs:
1. Herbicide mixture or damage on more than 25% of the green crown.
2. Evidence of any amount of herbicide or damage on the terminal leader.
3. Any mechanical damage to the bole, limbs, or terminal leader of the tree.
Tree damage will be determined by dividing the number of damaged trees by the total number of trees in all inspection plots. Percent of damaged trees in excess of 5% will be deducted from the inspection quality.
To calculate inspection quality, inspection plots will be grouped by stand, and then stands will be grouped in order of treatment until the total number of plots equals or exceeds 30. An inspection quality percentage will then be calculated for each such group. Results will be rounded to the nearest whole percent.
EXAMPLE INSPECTION QUALITY CALCULATION: Inspection of two stands yields 25 and 15 plots respectively, which are then grouped to exceed 30 plots. In the total of 40 plots, 152 of 160 quadrants are acceptable, and 12 of 200 crop trees are damaged. The overall inspection quality would be calculated as follows:
Application coverage = 152 / 160 X 100 = 95%
Crop tree damage = 12 / 200 X 100 = 6% - 5% = 1% deduction
Inspection quality = 95% - 1% = 94% Inspection results will be available to the contractor upon request.
1.9-b Acceptance
The following clauses which affect acceptance are incorporated by reference in Section I:
Responsibility for Supplies, Clause 52.246-16 Use and possession, Clause 52.236-11
Work will be deemed acceptable when the government’s visual inspections show acceptable performance and sample plot data indicate a work quality of 90% or higher.
If the re-inspection results are within five percentage points of the first inspection, the Contractor shall pay the actual costs of the re-inspection.
Re-inspection after Rework. Where rework after a failed inspection may improve the inspection results, the Contractor may rework the area and request (in writing) a second inspection. The Government will charge to the Contractor the cost of this additional inspection. Re-inspection will be accomplished within five working days after the notice is received. The results of the second inspection will be final, and no further rework will be permitted. Areas not ready for re-inspection at the time specified by the Contractor will not be re-inspected, and the results of the first inspection will be final.
1.9-c Quality Assurance Surveillance Plan.
Surveillance of performance is addressed in Inspection above provide information on frequency and method by sampling.
Quality Performance Measures.
Applied the herbicide mixture to all target vegetation in each stand.
Item 1.
Applied the herbicide mixture to all target vegetation in each stand Protected Crop trees from spray - Trees bagged, remained upright, and without damage, bags did not blow off, crop trees did not catch spray drift, all bags removed within 1 hour.
Item 2.
Apply the herbicide mixture to all target vegetation in each stand.
Protect Crop trees from spray. Same as above and includes: all trees on that spot are protected while the adjacent area was being sprayed.
Item 3 Apply the Herbicide mixture to yellow star thistle (both live and dead plants), within the treatment area.
Treatment extended to a 20’ radius beyond the extent of the plant occurrences.
Exclusions/non-work areas are free of direct spray application/treatment.
1.10 Deliveries or performance.
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
1.10-a Work Timing
The Contractor shall begin work within ____3____ calendar days after the effective date of the Notice to Proceed and shall prosecute the work at a rate that will result in completion of all work within the following time frame:
| Item No. | Estimated Start Work Date | Contract Time (Calendar Days) | |||
| 1 | May 13, 2015 | 9 calendar days | |||
| 2 | May 22, 2015 | 16 calendar days | |||
| 3 | June 10, 2015 | 9 calendar days |
Failure to begin work on schedule will make the contract subject to immediate termination for default.
Delays due to normal adverse weather, weekends, and holidays have been included in the calculation of contract time. The Government reserves the right to set the priority of items or sub-items. Contractor shall complete all work on one sub-item before proceeding to another.
If this solicitation has more than one numbered item, award of more than one item to one contractor will not change the start work dates or the amount of contract time; times will run concurrently.
1.10-b Winter Shutdown When winter weather sets in and the continuation of work is impractical, the Contracting Officer may authorize a total suspension until such time as work can proceed. During the period of total suspension, the calendar days elapsed will not be charged against the contract time.
1.11 Contract Administrative Data
1.11-a Pre-work Pre-work conference. Before work begins on service contracts, a pre-work conference is normally held to discuss the contract--especially the specifications, labor provisions, plan of work, and selected standard clauses. The pre-work meeting should be attended by an officer of the firm or someone designated in writing to act on behalf of the firm. The pre-work meeting may be waived at the discretion of the Contracting Officer.
Notice to Proceed.
A. [X] No work may begin on this contract until the Contracting Officer has issued a Notice to Proceed.
1.11-b Measurement Methods of Measurement.
Acreage was measured on a horizontal plane using a Global Positioning System.
Re-measurement. Unless otherwise indicated by this contract, the contractor may request re-measurement of any quantities in Part B, when the units are acres or any linear measurement. The request must be made in writing and must be made within 10 calendar days of completing work on the unit in question. If re-measurement indicates a variance of five percent or less from the stated quantity, the Contractor shall pay for the actual cost of re-measurement and no adjustment will be made in the quantity as stated in Part B. If re-measurement indicates a variance more than five percent from the stated quantity, payment will be based on the re-measured quantity, and the Contractor will not be liable for the costs of re-measurement. All re-measurements will be done by the Government. Re-measurement of acreage will be done with two people using a hand compass and ground measurement or by means of a Global Positioning System. This clause is not applicable to quantities listed as estimated quantities.
1.11-c Payment Payments and Deductions. Payment will be made for fully acceptable work at the prices bid in the schedule of items. In the event of extended non-work periods because of adverse weather, the Contracting Officer may authorize progress payments for partially completed sub-items on a case-by- case basis. In accordance with the inspection clause, payment may be made for less than fully acceptable work at a reduced price. Other exceptions are noted below:
Payment will be made in full if inspection results are 90 percent or higher. If inspection results are below 90 percent, a deduction will be made equal to 2 percent for every 1 percent below 90. For example, if inspection results are 87 percent, the bid price would be reduced by 6 percent. No payment will be made if results are less than 80 percent.
1.11-d Liquidated damages will be charged as follows:
Trees determined to be “damaged” will be charged for at the rate of $ 1.00 per tree. Such charges will be deducted from earnings. The number of trees to be charged for will be calculated as follows: Total number of damaged trees from the inspection record, multiplied by the reciprocal of the plot size, times the number of acres in the pay item, divided by the total number of plots taken, plus trees determined to be damaged under care of trees specifications.
1.11-e Contract Release. The following supplements the Payments clause in Section I:
Before final payment will be made the Contractor shall sign a release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of 1940 (31 U.S.C. 3727 and 41 U.S.C. 15).
1.11-f Invoices.
Payment will be made from the contractor’s invoice. All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. There is no pre-award registration.
After award of a contract, please make sure that your company registers promptly at http://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. PRIOR to start the IPP enrollment process, please verify that the point of contract’s (POC’s) email address is up to date in your company’s System for Award Management (SAM) account at www.sam.gov and that any recent update(s) have been allowed time to process resulting in an “Active” status on the SAM account. The one-time enrollment in IPP means a series of emails will be sent to the SAM POC. If you have questions on the IPP enrollment process, the help desk phone number is 1-866-973-3131.
IPP invoices are now the official payment record. Contractors must include and IPP attachment which shows the breakdown of billing based on the pricing schedule items and/or subitems. For assistance with invoicing in IPP, the help desk phone number is 1-866-973-3131.
1.11-g Retainage (applicable to service contracts where work accomplishments are measured in units other than time)
The following supplements Clause 52.232-1, Payments:
The Contracting Officer may retain up to 10 percent of the invoiced amount if the contractor is behind schedule at the time the invoice is presented. “Behind schedule” means that the percentage of work completed is less than the percentage of time used.
GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
1. Clean backpack sprayers for wash down of accidently sprayed conifer seedlings.
1.12 Special Contract Requirements
Loss, Damage or Destruction Equipment Furnished with Operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
Other. Even though this contract may provide for performing services at the direction of Government personnel, the contract is not for personal services, and neither the Contractor nor his or her personnel are Government employees. The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties' property as a result of the Contractor's operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) acting within the scope of their employment.
AGAR 452.237-74 Key Personnel (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel:
Crew Superintendent(s)/Foreman(s)
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
Emergencies Fire Plan See attachments, Fire Plan
Area of Responsibility for Fire. Unless otherwise noted elsewhere in the contract, the following define the limits of a contractor's area of responsibility for fire under the terms of the Fire Plan:
Silviculture Projects - 70 meters around the perimeter of the unit being worked in
Wages See attachments, Wage Determination
The Forest Service reserves the right to terminate a camping permit at any time.
Archaeological and Historic Sites Location of known archaeological, historic, or pre-historic materials--such as Amerind artifacts and/or historic mining, logging, or fur trapping remains protected by the American Antiquities Act (l6 USC 433)--will be identified for the contractor before work commences.
Spill Plan If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on or in the vicinity of the project which are caused by the Contractor's employees directly or indirectly as a result of contract operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractor's employees or resulting from contract operations. The Contractor shall immediately report all petroleum products spills to the Contracting Officer.
Equipment Cleaning All off-road equipment used on this project shall be washed before moving into the project area so that the equipment is free of soil, seeds, vegetative material, or other debris that could contain or hold seeds of noxious weeds. “Off-road equipment” includes all logging and construction equipment and such brushing equipment as brush hogs, masticators, and chippers; it does not include log trucks, chip vans, service vehicles, water trucks, pickup trucks, and similar vehicles not intended for off-road use.
Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material, or other such debris. Disassembly of equipment components or specialized inspection equipment is not required. Contractor shall notify the Contracting Officer at least five days in advance of moving equipment in so that arrangements can be made for inspection.
If the project area is known to contain noxious weeds, the equipment shall be cleaned before moving to other Forest Service system lands which do not contain noxious weeds.
PART II CONTRACT CLAUSES
FAR 52.212-4 -- Contract Terms and Conditions -- Commercial Items (Dec 2014)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or re-performance of nonconforming services at no increase in contract price. If repair/replacement or re-performance will not correct the defects or is not possible, the government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights --
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C.3727). However, when a third party makes payment (e.g., use of the Government wide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c)…