SECTION_F._Arcata_Boiler_Peplacement.docx

DOCX document 17 KB Posted

Attached to
Redwood Sciences Laboratory Boiler Replacement Federal contract opportunity
Solicitation number
AG-9AD6-S-17-0002
Issued by
Department of Agriculture Forest Service Pacific Southwest Research Station

About this file

Section F - Deliveries or Performance

View the file

Other files for this federal contract opportunity

Other files attached to Redwood Sciences Laboratory Boiler Replacement, newest first.
File Type Posted
Amendment__2,_AG-9AD6-S-17-0002.pdf PDF
Arcata_100_DWG_Revised_binder.pdf PDF
Amendment_1,_AG-9AD6-S-17-0002.pdf PDF
SECTION_L_-__Arcata_Boiler_Replacement.docx DOCX document
SECTION_M_-__Arcata_Boiler_Replacement.docx DOCX document
SECTION_E._Arcata_Boiler_Replacement.docx DOCX document
SECTION_G._Arcata_Boiler_Replacement.docx DOCX document
Section_B_-_Schedule_of_Items,_Arcata_Boiler_Project.docx DOCX document
Section_C_-_Redwood_Sciences_Laboratory_Boiler_Replacement_SOW.pdf PDF
Arcata_SF_1442.pdf PDF
Section_J-1,_Arcata_Boiler_Project,_Davis_Bacon_Wages.pdf PDF
Part_II_Section_I._Arcata_Boiler_Project.docx DOCX document
Section_J-2,_Arcata_Boiler_Project_-_Drawings.pdf PDF
Section_J_-_Index_for_Arcata_Boiler_Project.docx DOCX document
PART_IV_Section_K-_Arcata_Boiler_Replacement.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION F – DELIVERIES OR PERFORMANCE

CLAUSES INCORPORATED BY REFERENCE ((FAR 52.252-2)(FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.acquisition.gov/far/

FEDERAL ACQUISITION REGULATION 948 CFR CHAPTER 1) CLAUSES

FAR 52.242-14 Suspension of Work (APR 1984) FAR 52.242-15 Stop Work Order (AUG 1989)

PERIOD OF PERFORMANCE (AGAR 452.211-74)(FEB 1988)

The period of performance of this contract is from ____02/28/2017_______ through ___04/14/2017_____________.(anticipated) Work Timing Delays due to normal adverse weather, weekends, and holidays have been included in the calculation of contract time.

BIO PREFERRED PRODUCT PERFORMANCE REQUIREMENTS SUMMARY

Required Service – Ensure the mandatory purchasing & use of biobased products Performance Indicator – Quantitative Factor Performance Standard – Contractor compliance with FSIRA, EO 13423 and FAR Surveillance Methodology – 100% Inspection

AQL – 100%

Deduction – COR state dollar amount or percentage of deduction for non-compliance Material and Workmanship (FAR 52.236-5)(Apr 1984)

(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.

(b) The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.

(c) All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.

Superintendence by the Contractor (FAR 52.236-6)(Apr 1984) At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.