About this file

Special Project Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Curly Jack Kitchen Improvements, newest first.
File Type Posted
3-_Vicinity_Map.pdf PDF
4-_Plans.pdf PDF
Submittals_Form.docx DOCX document
AG-9AC7-S-17-0086.pdf PDF
2-_Location_Map.pdf PDF
5-_Wage_Determination_CA41.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Curly Jack Kitchen Improvements 1

SPECIAL CONTRACT SPECIFICATIONS

CURLY JACK KITCHEN IMPROVEMENTS

June 08, 2017

(Revision 01)

Curly Jack Kitchen Improvements

TABLE OF CONTENTS

Table of Contents

SECTION 01010 - SUMMARY OF WORK

SECTION 01060 - REGULATORY REQUIREMENTS

SECTION 01300 - SHOP DRAWINGS AND SUBMITTALS

SECTION 01700 - PROJECT CLEAN UP

SECTION 01741 - MANUFACTURER’S WARRANTIES

SECTION 02010 - SITE CONDITIONS

SECTION 02050 – DEMOLITION AND DEBRIS REMOVAL

SECTION 06100 - ROUGH CARPENTRY

SECTION 06200 - FINISH CARPENTRY

SECTION 09260 - GYPSUM DRYWALL SYSTEM AND FINISHES

SECTION 09900 - PAINTING

SECTION 11451 - RESIDENTIAL APPLIANCES

SECTION 12356 - KITCHEN CASEWORK

SECTION 15400 - BUILDING PLUMBING

SECTION 16010 - GENERAL PROVISIONS ELECTRICAL

SECTION 16510 - LIGHTING FIXTURES

SUMMARY OF WORK 01010

SECTION 01010 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 PROJECT DESCRIPTION

1.01 SCOPE: Furnish all labor, equipment and materials required for selective demolition and replacement of kitchen cabinets, countertops, and sink/fixtures, along with new built-in dishwasher, and standing and running trim for cabinets, baseboard work, and painting as indicated on the drawings and in these specifications. The work includes, but is not necessarily limited to:

Removing existing kitchen cabinets, counter-tops, sink and plumbing fixtures, and cove base as indicated on drawings. Washer, dryer, water heater, refrigerator and range are to remain but can be temporarily moved to accommodate new work. Laundry room sink to remain.

Carefully remove wood partition walls in kitchen which support upper kitchen cabinets;

Removing existing furnace grills and registers at Kitchen pantry and patching, preparing and painting. Make similar repairs on all wall and ceiling work where affected by demolition and prepare for painting;

Remove two existing light fixtures and replace at same locations with fixtures indicated on drawings and elsewhere in these specifications;

Protect existing flooring in place except as necessary to allow for a clean transition and trim installation;

Install new base board in Kitchen and Laundry Room.

Preparing and submitting for approval, final kitchen cabinet & counter-top layout and design; installing new cabinets, countertops and backsplash, install existing range exhaust venting hood and ducting over the stove and re-established with new cabinets. Cabinets shall be Maple or Cherry wood with shaker style front doors “cinnamon” stained finish with multiple coats of satin-finish polyurethane varnish. Cabinet stain color to be light to medium.

Furnish and install new solid surface countertops with matching backsplash. Countertops to have 1-1/2” bullnose and drip edge. Countertop color to be patterned medium and complimentary with cabinets and existing flooring. Final pattern to be approved by the Contracting Officer or COR.

Install new kitchen single basin sink and faucet system complete. Single basin to be self-rimming 16 ga stainless steel 9 inch deep x 28 inch wide single kitchen sink & single handle kitchen faucet with spring coiled arm, support arm, and toggle sprayer, and airgap system for dishwasher. Provide Watts Series 2-8-3H cast brass strainers or approved equal. Tie into the existing hot/cold water piping and waste piping in the adjoining wall. Use new hard copper water pipe and brass ¼ turn faucet shut-off and three-way angle valves. New drain piping and P-traps can be plastic. Connect faucet using new braided stainless steel hoses. Install sink waste vent per code. Relocate existing plumbing to accommodate new sink as applicable. Plumbing to be in accordance with section 15400.

Install new built-in dishwasher including all electrical and plumbing hookups;

Prime and paint walls and ceiling as well as trim in Kitchen and Laundry Room to match existing. Continue with painting of ceiling in dining room complete. Spray applications shall be back-rolled. Colors to be generally matching of the existing colors unless otherwise directed by the Contracting Officer or COR. Paint shall follow specifications in section 09900.

A. All work shall be done in accordance with the contract documents, reference plans and applicable state and local adopted building, electrical and plumbing codes.

B. The Contractor should carefully review all sections of the Specifications in order to completely understand the work and all constraints including schedule and material requirements.

C. Contractor is encouraged to proceed in an orderly and expeditious manner.

D. Location of Work: Curly Jack Residence #1

The residence is located at 708 Curly Jack Road, Happy Camp, CA 96097. To reach the project from Yreka, California, take Main Street north (Hwy 263) for approximately 10 miles to State Hwy 96, then west on Hwy 96 for approximately

60 miles to Happy Camp. After passing through the middle of town, turn left on

Elk Creek Road (on bridge over Klamath River) then turn right at “T” intersection, Elk Creek Road. Continue west and veer right to Curly Jack Road (approximately

1/3 mile). Driveway is 1st on the left, approximately 0.2 miles from beginning of

Curly Jack Road. Please see attached Happy Camp Vicinity Map and Curly Jack

Location Map.

E. Contractor’s Duties:

1. Except as specifically noted, provide and pay for:

a. Labor, materials, and transportation.

b. Tools, construction equipment and machinery.

c. All other facilities and services necessary for proper execution and completion of work.

2. Pay legally required sales, consumer and use taxes.

3. Give required notices to Contracting Officer and COR(s).

4. Comply with codes, ordinances, rules, regulations, orders and other legal requirements of public authorities which bear on performance of the work.

5. Promptly submit written notice to COR of observed variance of contract documents from legal requirements.

6. The Contractor shall obtain his own disposal site for replaced materials and other debris.

7. It is the Contractor's responsibility to obtain all necessary permits and comply with same.

1.2 CONTRACT SCHEDULE

A. On-site work may not commence until a Notice to Proceed has been issued. However, Contractor submittals may be provided and approved in advance of the Notice to

Proceed, and ordering and off-site fabrication may commence as soon as submittals for these items are approved by the Government. The Contractor shall also submit for approval a bar chart work schedule, to include all project sequences following award, not later than 15 days after receipt of award (unless another timeline is approved by the

COR).

1.3 UTILITIES

A. The Contractor shall provide all temporary power required for construction of this work.

Restrooms are not available at the site and must be provided by the Contractor. Power and water are on the site for use by the Contractor. Power will be available up until disconnections are made. Temporary power may be required and as such will need to be coordinated with the electrical utility company and will be the responsibility of the Contractor. Temporary restrooms for construction workers shall be provided by the Contractor. The Contractor shall be responsible for locating and protecting above and below ground utilities in the project areas.

1.4 CONTRACTOR USE OF PREMISES

A. Construction material storage areas are the responsibility of the Contractor.

B. Confine operations at site to areas agreed by the Contracting Officer or COR.

C. Do not encumber residence site with materials or equipment.

D. Assume full responsibility for protection and safekeeping of products stored on premises.

E. Move any stored products which interfere with operations of Owner/ Resident.

F. Return all staging areas to their original condition upon completion of the work.

PART 2 - PRODUCTS

Not Used.

PART 3 – EXECUTION

Not Used.

PART 4 – MEASUREMENT AND PAYMENT

4.1 MEASUREMENT

A. The Contractor shall be required to submit for approval a balanced schedule of values of sufficient detail on which to base monthly progress payments.

**END OF SECTION 01010**

REGULATORY REQUIREMENTS 01060

SECTION 01060 - REGULATORY REQUIREMENTS

1.1 SCOPE

A. This section describes the codes and standards which apply to the work in this contract.

Additional codes and standard may be cited in sections to which they apply.

1.2 CODES AND STANDARDS

A. The following, but not necessarily all inclusive codes and standards, shall apply to the work in this contract:

1. California Building Code (CBC), 2010 Edition with latest California Amendments

2. National Electrical Code (NEC), 2008 Edition

3. American Society for Testing and Materials (ASTM) latest edition

4. Underwriter's Laboratories (UL)

5. American Water Works Association (AWWA)

6. National Fire Protection Association (NFPA)

B. Unless otherwise specified in this contract, reference to a specific standard or specification shall mean the latest edition or amendment in effect on the quote due date.

1.3 DEFINITIONS

A. Administrative Authority as used in the California Mechanical Code, the California

Plumbing Code and the National Electrical Code will be the Contracting Officer.

B. Building Official as used in the California Fire Code, California Building Code and the California Building Code Standards will be the Contracting Officer.

**END OF SECTION 01060**

SHOP DRAWINGS AND SUBMITTALS 01300

SECTION 01300 - SHOP DRAWINGS AND SUBMITTALS

1.1 SCOPE:

A. The term submittal means all documents required for determining conformance with the contract as indicated herein. Documents include but are not limited to Shop Drawings, Samples, Catalog Data, Installation Instructions, Certifications and Test Results.

1.2 SUBMITTALS

A. Submittals shall include all pertinent data required to understand the quality of components, dimensional relationships, integration with other materials, assembly techniques, structural aspects, color, finish, texture, and other such characteristics as may be necessary to fully describe the item and its intended use.

B. All submittals shall be transmitted to the Contracting Officer’s Representative (COR) using the Submittal Form document provided by the COR, or via another mutually agreeable format.

PART 2 – PRODUCTS

Not Applicable

PART 3 - EXECUTION

3.1 SUBMITTALS

A. Submit for approval a Submittal Register in spreadsheet format listing all items required under this contract and the estimated date each item will be submitted. Include reference to the specification section and paragraph number.

B. Submittals and shop drawings shall be submitted in a timely fashion to allow seven (7) calendar days for review by the Government. "No work shall begin until associated shop drawings and submittals are approved".

3.2 SHOP DRAWINGS

A. Original Submittal: One electronic copy to the Contracting Officer’s Representative of all shop drawings along with detailed submittal sheet outlining all contents and purpose of each submittal element shall be submitted for approval as required under 3.1, above, prior to fabrication, installation or order placement to allow for checking and coordination.

B. Resubmittal: When a resubmittal is required, one electronic copy of the submittal so indicating the resubmission requirement will be returned to the Contractor. After revision of the original, a new electronic copy shall be submitted for approval, in addition to any other copies requested by the COR.

SHOP DRAWINGS AND SUBMITTALS 01300

3.3 APPROVAL

A. Once approved, documents will be returned to the Contractor in electronic format and shall be complied with as noted. Variation from the approved documents shall be likewise submitted and approved before being carried out.

3.4 SAMPLES

A. Original Submittal: A minimum of two samples of each physical sample item for which samples are required, unless otherwise specified, shall be furnished for approval.

Approval shall be obtained prior to delivery of the material to the project site. These samples shall be representative of the actual material proposed for use in the project and of sufficient size to demonstrate design, color, texture and finish as they will appear in the completed installation.

B. Resubmittals: All rejected samples will be returned upon request and any or all resubmittals required shall consist of two new samples unless otherwise indicated.

C. Approval: Upon approval, one sample so noted will be returned and the remainder will be retained by the Contracting Officer’s Representative until completion of the work.

When requested, all approved samples will be returned for installation providing identity is maintained in an approved manner until final acceptance of the project.

3.5 CATALOG DATA

A. Submittals: Electronic copies of catalog data are required for the original submittal and each resubmittal. Catalog data shall be submitted along with shop drawings. An electronic copy will be returned.

B. Data: Each submittal shall have all pertinent data contained therein that is applicable to the item submitted for approval.

3.6 IDENTIFICATION

A. Catalog Data: Each separate catalog brochure or page submitted shall have the identification shown. Catalog of brochures submitted containing multiple items for approval need have only cover identification. In such cases the identification shall include page and catalog item numbers.

B. In the event one or more of the multiple items are not approved in any submittal, the additional copies required will not be requested until all items are approved.

**END OF SECTION 01300**

PROJECT CLEANUP 01700

SECTION 01700 - PROJECT CLEAN UP

1.1 DESCRIPTION

A. This section covers the disposal of excess material from selective demolition work, cleaning or any other operation in which waste is generated.

1.2 MEASUREMENT AND PAYMENT

A. No separate payment shall be made for work specified in this section.

Compensation for this work will be considered included in the payment for the completed project.

Not Applicable

3.01 WORKMANSHIP

A. All debris and unused material shall be removed from the site daily. All debris shall be disposed of off National Forest land in accordance with local regulations. All affected areas within the residence shall be cleaned and wiped free of construction related dust and debris. Work area shall be cleaned and ready for use at final inspection.

**END OF SECTION 01700**

MANUFACUTURER’S WARRANTIES 01741

SECTION 01741 - MANUFACTURER’S WARRANTIES

PART I GENERAL

1.1 SCOPE: The work of this Section consists of the assignment of manufacturer’s warranties for products incorporated into the work.

1.2 MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work specified in this section.

PART 2 PRODUCTS

2.1 QUALITY ASSURANCES: Warranties for the following shall be provided if applicable:

A. All electrical items.

B. All plumbing fixture items and related equipment.

C. All appliances.

D. All finishes.

E. Cabinetry and finish hardware.

F. All other products not specified herein but for which the manufacturer provides a warranty.

PART 3 EXECUTION

3.01 All warranties shall be executed in the name of the Current Forest Supervisor of Klamath National Forest. The Contractor shall file the original copy of each manufacturer's warranty in a loose-leaf binder. Copies of warranties shall be included with the Operations and Maintenance Manuals as specified elsewhere herein. The binder shall be given to the Contracting Officer or COR at or prior to the Final Inspection.

**END OF SECTION 01741**

SITE CONDITIONS 02010

SECTION 02010 - SITE CONDITIONS

1.1 RELATED INFORMATION

See related sections:

Demolition and Debris Removal - Section 02050

1.2 INFORMATION ON SITE CONDITIONS

A. Information obtained by the designer regarding site conditions, existing facilities, and similar data are shown on the Plans.

1.3 CONTRACTOR'S RESPONSIBILITIES

A. The Contractor shall satisfy himself as to the nature and location of the work, the general and local conditions, particularly those bearing upon availability of transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads, work in sensitive environment and uncertainties of weather, or similar physical conditions at the site, the character of equipment facilities needed preliminary to and during the prosecution of the work and all other matters which can in any way affect the work or the cost thereof under this contract.

B. The Contractor further shall satisfy himself as to the character, quality, and quantity of surface materials to be encountered from inspecting the site, as well as from information presented by the Plans and Specifications made a part of this contract. Any failure by the Contractor to acquaint himself with all the available information will not relieve him from responsibility for properly estimating the difficulty or cost of successfully performing the work.

1.4 ADDITIONAL INFORMATION

N/A.

**END OF SECTION 02010**

DEMOLITION AND DEBRIS REMOVAL 02050

SECTION 02050 – DEMOLITION AND DEBRIS REMOVAL

1.1 DESCRIPTION

Selective material demolition and debris removal is required in the building work area.

1.2 JOB CONDITIONS

A. Disposition of material:

1. Title to materials:

a. Title to all materials to be removed, except as specified otherwise, is vested in the Contractor upon receipt of notice to proceed. The Government will not be responsible for the condition or loss of, or damage to, such property after Notice to Proceed.

2. Reuse of materials and equipment:

a. Carefully remove and store materials and equipment indicated to be reused or relocated to prevent damage, and reinstall as the work progresses.

B. Cleanup:

1. Debris and rubbish:

a. Contain, remove and transport debris and rubbish daily and in a manner that will prevent spillage to adjacent areas.

2. General:

a. Use all means necessary to protect existing structures designated to remain and, in the event of damage, immediately make all repairs and replacements necessary to the approval of the COR at no additional cost to the Government.

C. UTILITY SERVICES

1. The Contractor will have power and water from the residence during normal work hours. Coordinate with Government Representative for shut off of utilities when required to accomplish the work.

2. At no times shall the Contractor interrupt existing utilities that serve occupied or active facilities, except when authorized in writing to do so by the Contracting Officer’s Representative.

3. Perform all operations to avoid breakage, marring, bending or other damage to existing features, elements and furniture which are to remain.

4. If damage is done to any adjacent facilities caused by demolition operations, the Contractor shall promptly repair the damage. All costs for repair of damaged facilities shall be at the Contractor’s expense.

PART 2 – PRODUCTS - Not Applicable

DEMOLITION AND DEBRIS REMOVAL 02050

3.1 SITE INSPECTION

A. Prior to any demolition and debris removal work, carefully inspect the site and determine the extent of work involved.

B. Report any discrepancy to the COR immediately, including any obstructions which are not noted or shown on the plans or described herein. Protect such facilities until further direction is received from the COR. Additional work required due to unforeseen conditions shall be performed as directed by the Contracting Officer and will be paid for as extra work in accordance with the General Conditions. No extra work is authorized without written approval from the Contracting Officer.

3.2 COORDINATION AND SCHEDULING

A. Coordinate work with the Contracting Officer or COR.

3.3 SAFETY

A. All work shall conform to pertinent OSHA regulations and to other State and local codes and ordinances as applicable.

3.4 REMOVAL OF DEBRIS

A. Remove all debris from the site daily and leave the site in a neat and orderly condition and legally dispose of off the project site at an approved disposal site.

**END OF SECTION 02050**

ROUGH CARPENTRY 06100

SECTION 06100 - ROUGH CARPENTRY

A. The scope of this Section includes the following:

1. Blocking and/or backing with dimension lumber.

1.2 DEFINITIONS

A. Rough carpentry includes carpentry work not specified as part of other Sections and generally not exposed, unless otherwise specified.

1.3 SUBMITTALS

A. Not Used

1.4 DELIVERY, STORAGE, AND HANDLING

A. Delivery and Storage: Keep materials under cover and dry. Protect against exposure to weather and contact with damp or wet surfaces. Stack lumber as well as plywood and other panels; provide for air circulation within and around stacks and under temporary coverings including polyethylene and similar materials.

1. For lumber and plywood pressure treated with waterborne chemicals, place spacers between each bundle to provide air circulation.

1.5 QUALITY CONTROL

A. Codes and Standards

1. International Building Code, 2009 Edition.

B. Quality of products and installation shall conform to codes and standards referenced above, as applicable.

C. Moisture Content: Air-dry untreated lumber, with sticking both horizontally and vertically, for not less than 30 days prior to installation. Kiln-dry treated lumber to 19 percent moisture content.

2.1 LUMBER, GENERAL

A. Lumber Standards: Furnish lumber manufactured to comply with PS 20 "American Softwood Lumber Standard" and with applicable grading rules of inspection agencies certified by American Lumber Standards Committee's (ALSC) Board of Review.

ROUGH CARPENTRY 06100

2.2 DIMENSION LUMBER

A. All dimension lumber shall be graded as indicated on the drawings or as otherwise used as standard industry practice.

2.3 MISCELLANEOUS LUMBER

A. General: Provide lumber for support or attachment of other construction including cant strips, bucks, nailers, blocking, furring, grounds, stripping, and similar members.

2.4 FASTENERS

A. General: Provide fasteners of size and type indicated that comply with requirements specified in this article for material and manufacturer.

B. Nails, Wire, Brads, and Staples: FS FF-N-105.

C. Power Driven Fasteners: National Evaluation Report NER-272.

D. Wood Screws: ANSI B18.6.1.

2.5 MISCELLANEOUS MATERIALS

A. Water Repellent Preservative: NWWDA-tested and -accepted formulation containing 3-iodo-2-propynyl butyl carbonate (IPBC) as its active ingredient.

3.1 INSTALLATION AND WORKMANSHIP, GENERAL

A. Fit rough carpentry to other construction; scribe and cope as required for accurate fit. Correlate location of furring, nailers, blocking, grounds, and similar supports to allow attachment of other construction.

B. Securely attach rough carpentry work to substrate by anchoring and fastening as required.

C. Countersink nail heads on exposed carpentry work and fill holes.

D. Use common wire nails, unless otherwise indicated. Use finishing nails for finish work. Select fasteners of size that will not penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting of wood; predrill as required.

**END OF SECTION 06100**

FINISH CARPENTRY 06200

SECTION 06200 - FINISH CARPENTRY

A. This Section includes the following:

1. Interior crown moldings, shoe and standing running trim.

B. Related Sections: The following Sections contain requirements that relate to this

Section:

1. Division 6 Section "Rough Carpentry" for furring, blocking, and other carpentry work that is not exposed to view.

2. Division 9 Section "Painting" for back priming and finishing of finish carpentry.

3. Division 12 Section “Kitchen Casework” for trim matching and finish at top and bottom of cabinets.

1.2 DELIVERY, STORAGE, AND HANDLING

A. Delivery and Storage: Keep materials under cover and dry. Protect against exposure to weather and contact with damp or wet surfaces. Stack lumber as well as plywood and other panels. Provide for air circulation within and around stacks and under temporary coverings including polyethylene and similar materials.

1.3 PROJECT CONDITIONS

A. Environmental Conditions: Obtain and comply with finish carpentry manufacturer's and installer's coordinated advice for optimum temperature and humidity conditions for finish carpentry during its storage and installation.

B. Weather Conditions: Proceed with finish carpentry only when existing and forecasted weather conditions will permit exterior finish carpentry to be installed in compliance with manufacturer's recommendations and when substrate is completely dry.

2.1 MATERIALS, GENERAL

A. Softwood Lumber Standards: Comply with PS 20 "American Softwood Lumber Standard" for lumber and with applicable grading rules of inspection agencies certified by American Lumber Standards Committee Board of Review.

B. Hardwood Lumber Standards: Comply with National Hardwood Lumber

Association (NHLA) rules.

A. Plywood Standards: Comply with PS I "U.S. Product Standard for Construction and Industrial Plywood" for plywood and, for products not manufactured under PS I, with APA PRP-I 08.

B. Inspection Agencies: Inspection agencies and the abbreviations used to reference them with lumber grades and species include the following:

1. WCLIB - West Coast Lumber Inspection Bureau.

2. WWPA - Western Wood Products Association.

C. Grade Stamps: Provide lumber with each piece factory-marked with grade stamp of inspection agency evidencing compliance with grading rule requirements and identifying grading agency, grade, species, moisture content at time of surfacing, and mill.

1. For exposed lumber furnish pieces with grade stamps applied to ends or back of each piece, or omit grade stamps entirely and provide certificates of grade compliance issued by inspection agency.

2.2 INTERIOR FINISH CARPENTRY

A. Standing and Running Trim: For trim in form of boards and worked products, provide lumber complying with the following requirements.

1. Species: Maple; WWPA

2. Select Grade: B and Better.

3. Finish Grade: Prime.

4. Texture: Surfaced (smooth).

5. Lumber for Transparent Finish (Stained or Clear): Solid lumber stock.

B. Lumber for Painted Finish: Glued-up lumber or solid lumber stock.

2.3 INTERIOR FINISH PLYWOOD

A. See Section 12356 “Kitchen Casework”

2.4 MISCELLANEOUS MATERIALS

A. Fasteners for Interior Finish Carpentry: Nails, screws, and other anchoring devices of type, size, material, and finish required for application indicated to provide secure attachment, concealed where possible.

1. Countersink nails, fill surface flush, and sand where face nailing is unavoidable.

2. Where finish carpentry materials are exposed in areas of high humidity, provide fasteners and anchorages with hot-dip galvanized coating complying with ASTM A 153 .

B. Adhesives: Comply with manufacturer's recommendations for adhesives.

2.5 FABRICATION

A. Wood Moisture Content: Comply with requirements of specified inspection agencies and manufacturer's recommendations for moisture content of finish carpentry in relation to relative humidity conditions existing during time of fabrication and in installation areas. Provide finish carpentry with moisture content that is compatible with Project requirements.

B. Fabricate finish carpentry to dimensions, profiles and details indicated.

3.1 EXAMINATION

A. Examine substrates for compliance with requirements for installation tolerances and other conditions affecting installation and performance of finish carpentry. Do not proceed with installation until unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Clean substrates of projections and substances detrimental to application.

B. Condition finish carpentry to average prevailing humidity conditions in installation areas before installation for a minimum of 24 hours unless longer conditioning recommended by manufacturer.

3.3 INSTALLATION, GENERAL

A. Do not use finish carpentry materials that are unsound, warped, bowed, twisted, improperly treated or finished, not adequately seasoned, or too small to fabricate with proper jointing arrangements.

1. Do not use manufactured units with defective surfaces, sizes, or patterns.

B. Install finish carpentry plumb, level, true, and aligned with adjacent materials. Use concealed shims where required for alignment.

1. Scribe and cut finish carpentry to fit adjoining work. Refinish and seal cuts as recommended by manufacturer.

2. Install to tolerance of 1/8 inch in 8 feet for plumb and level. Install adjoining finish carpentry with 1116 inch maximum offset for flush installation and 1/8 inch maximum offset for reveal installation.

4. Coordinate finish carpentry with materials and systems that may be in or adjacent to standing and running trim and rails. Provide cutouts for mechanical and electrical items that penetrate exposed surfaces of trim and rails.

C. Finish in accordance with specified requirements.

D. Refer to Division 9 Sections for final finishing of finish carpentry.

E. Anchor finish carpentry work to anchorage devices or blocking built-in or directly attached to substrates. Secure to grounds, stripping and blocking with countersunk, concealed fasteners and blind nailing as required for a complete installation. Except where prefinished matching fastener heads are required, us fine finishing nail for exposed nailing, countersunk and filled flush with finished surface, and matching final finish where transparent is indicated.

3.4 STANDING AND RUNNING TRIM AND SHOES

A. Install with minimum number of joints practical, using full-length pieces from maximum lengths of lumber available. Stagger joints in adjacent and related standing and running trim and rails. Cope at returns and miter at corners to produce tight-fitting joints with full-surface contact throughout length of joint. Use scarf joints for end-to-end joints. Plane back of casings to provide uniform thickness across joints if required.

1. Drill pilot holes in hardwood prior to nailing or fastening to prevent splitting. Fasten to prevent movement or warping. Countersink nail heads on exposed carpentry work and fill holes.

2. Fit exterior joints to exclude water.

3.5 ADJUSTING

A. Repair damaged or defective finish carpentry where possible to eliminate functional or visual defects. Where not possible to repair, replace finish carpentry. Adjust joinery for uniform appearance.

3.6 CLEANING

A. Clean finish carpentry on exposed and semi exposed surfaces. Touch up factory-applied finishes to restore damaged or soiled areas.

3.7 PROTECTION

A. Provide final protection and maintain conditions that ensure finish carpentry is without damage or deterioration at time of Substantial Completion.

**END OF SECTION 06200**

GYPSUM DRYWALL SYSTEM AND FINISHES 09260

SECTION 09260 - GYPSUM DRYWALL SYSTEM AND FINISHES

PART 1 GENERAL

A. The work of this Section includes but is not limited to gypsum drywall application, taping, joint treatment and texturing to address repair of holes, tears, or other damage to existing sheetrock associated with proposed work.

2.1 GYPSUM BOARD MATERIALS AND ACCESSORIES

A. Gypsum board materials and accessories shall be in accordance with IBC Table 2506.2.

2.2 GYPSUM DRYWALL

A. Gypsum drywall shall be U.S.G. SW wallboard 1/2" thick by 48" wide for 8’ walls.

B. Recycled Content: Minimum 10 percent post-consumer recycled content, or minimum 20 percent pre-consumer recycled content at Contractor’s option.

2.3 JOINT TREATMENT: Tape, taping compound, and topping compound shall be the same manufacturer as the gypsum drywall.

A. Reinforcing Tape:

1. Toxicity/IEQ: Sheetrock Joint Tape. Paper; fiberglass joint tape not permitted.

B. Joint-Treatment Materials:

1. Toxicity/IEQ: Lime compound. All purpose joint and texturing compound containing inert fillers and natural binders. Pre-mixed compounds shall be free of antifreeze, vinyl adhesives, preservatives, biocides and other slow releasing compounds.

2.4 FASTENERS

A. Fastening of drywall shall be done in accordance with the IBC and GA-216.

Fastening of drywall to wood framing shall be done with 1-1/4” Type W drywall screws spaced in accordance with Table 1 of GA -216 unless otherwise required by the IBC.

3.1 CONDITION OF SURFACES:

A. The Contractor shall verify dimensions and insure all work that will affect drywall application is properly prepared and any deficiencies reported to the Contracting

Officer or COR for corrective action. Proper temperature for taping and texturing shall be maintained at all times during the work of this Section.

B. Separate supports shall be provided at each side of control joint. Control joints should be located where indicated but in no case more than 30 feet apart for walls and 50 feet apart for ceilings.

3.2 APPLICATION: The work shall be performed in the accepted best practice of the trade, by skilled workmen under experienced supervision. The work shall be true, plumb, level, secured, smooth, and free of blemishes, ready to receive paint, or other finishing materials.

A. Ceilings: Single layer. Drywall shall be applied to the ceilings with the long dimension of the wallboard at right angles to the framing/ furring members. Drywall may be applied with the long dimension parallel to framing/ furring members that are spaced 16 inches on center where attachment members are provided at end joints.

B. Walls:

1. Single layer horizontal application. The long dimension of the panels shall be placed at right angles to the framing/ furring members. End joints, where required, shall be made over framing/ furring members.

2. Single layer vertical application. The short dimension of the panels shall be placed at right angles to the framing/ furring members. The panels shall be of the length required to reach from ceiling line to the floor line in one continuous length unless height exceeds standard stock lengths. Joints shall be made over framing/ furring members.

C. Joint and Fastener Concealment: All joints shall receive the following joint and fastener treatment:

1. Adhesive compound for treatment of drywall joints and fastener heads shall be mixed and applied in accordance with manufacturer's printed instructions.

2. Embedding compound shall be applied to drywall joints and fastener heads in a thin uniform layer. Compound shall be spread not less than 3 inches wide at joints and reinforcing tape shall be centered on joint and embedded in the compound. A thin layer of compound shall then be spread over the tape. After this treatment has dried a second coat of embedding compound shall be applied to drywall joints and fastener heads. Compound shall be spread in a thin uniform coat and to not less than 6 inches wide at joints. Treated areas shall be sanded to eliminate ridges and high points.

3. Finishing compound: After embedding compound has dried, a coat of finishing compound shall be applied to joints and fastener heads. Finishing compound applied at joints shall be feathered out evenly. After compound has dried, the treated areas shall be sanded as necessary to obtain uniformly smooth surfaces.

Care shall be taken not to scuff the paper surface of the drywall.

H. Finish walls and ceilings shall have smooth texture.

**END OF SECTION 09260**

PAINTING 09900

SECTION 09900 - PAINTING

A. This Section includes surface preparation, painting, and finishing of exposed interior items and surfaces.

1. Surface preparation, priming, and finish coats specified in this section are in addition to shop priming and surface treatment specified under other sections.

2. Operating parts not to be painted include moving parts of operating equipment such valve and damper operators, and motor and fan shafts.

3. Labels: Do not paint over Underwriter's Laboratories, Factory Mutual or other code-required labels or equipment name, identification, performance rating, or nomenclature plates.

1.2 DEFINITIONS

A. "Paint" includes coating systems materials, primers, emulsions, enamels, stains, sealers and fillers, and other applied materials whether used as prime, intermediate, or finish coats.

A. Product Data: Manufacturer's technical information, label analysis, and application instructions for each material proposed for use.

1. List each material and cross-reference the specific coating and finish system and application. Identify each material by the manufacturer's catalog number and general classification.

1.4 QUALITY ASSURANCE

A. Single-Source Responsibility: Provide primers and undercoat paint produced by the same manufacturer as the finish coats.

B. Coordination of Work: Review other sections in which primers are provided to ensure compatibility of the total systems for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers.

1. Notify the Contracting Officer or COR of problems anticipated using the materials specified.

C. Material Quality: Provide the manufacturer's best quality trade sale paint material of the various coating types specified. Paint material containers not displaying manufacturer's product identification will not be acceptable.

1. Proprietary names used to designate colors or materials are not intended to imply that products named are required or to exclude equal products of other manufacturers.

2. Federal Specifications establish a minimum quality level for paint materials, except where other product identification is used. Provide written certification from the manufacturer that materials provided meet or exceed these criteria.

3. Products that comply with qualitative requirements of applicable Federal Specifications, yet differ in quantitative requirements, may be considered for use when acceptable to the Contracting Officer or COR. Furnish material data and manufacturer's certificate of performance to Contracting Officer or COR for proposed substitutions.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to the job site in the manufacturer's original, unopened packages and containers bearing manufacturer's name and label and the following information:

1. Product name or title of material.

2. Product description (generic classification or binder type).

3. Federal Specification number, if applicable.

4. Manufacturer's stock number and date of manufacture.

5. Contents by volume, for pigment and vehicle constituents.

6. Thinning instructions.

7. Application instructions.

8. Color name and number.

B. Store materials not in use in tightly covered containers in a well-ventilated area at a

Minimum ambient temperature of 45 deg F (7 deg C). Maintain containers used in storage in a clean condition, free of foreign materials and residue.

1. Protect from freezing. Keep storage area neat and orderly. Remove oily rags and waste daily. Take necessary measures to ensure that workers and work areas are protected from fire and health hazards resulting from handling, mixing, and application.

1.6 JOB CONDITIONS

A. Apply water-based paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 50 deg F (10 deg C) and 90 deg F (32 deg C).

B. Apply solvent-thinned paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 45 deg F (7 deg C) and 95 deg F (35 deg C).

C. Do not apply paint in snow, rain, fog, or mist, when the relative humidity exceeds 85 percent, at temperatures less than 5 deg F (3 deg C) above the dew point, or to damp or wet surfaces.

1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by the manufacturer during application and drying periods.

2.1 PAINT MATERIALS: Paint products and the like shall be LEED Certified, Green seal (GS-11, 208) with zero VOC and shall be as follows or approved equal:

A. Gypsum Board: Primer to be Benjamin Moore ECO Spec WB Interior Latex Primer (372). Finish to be a minimum of 2 coats of Benjamin Moore ECO Spec WB Eggshell (374). Match existing interior colors for body and trim unless directed otherwise by the Contracting Officer or COR.

B. Pine/MDF (not noted as clear finish): Primer to be Benjamin Moore Fresh Start All Purpose 100% Acrylic Primer (023). Finish to be a minimum of 2 coats of Benjamin Moore Aura WB Exterior, Semi-Gloss (632).

2.2 STAIN AND CLEAR FINISH: Stain and clear finish shall have a VOC equal to or less than 350 gIL and shall be as follows or equal:

A. See Section 12356 “Kitchen Casework”

3.1 EXAMINATION

A. Examine substrates and conditions under which painting will be performed for compliance with requirements for application of paint. Do not begin paint application until unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. General Procedures: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items in place that are not to be painted, or provide surface-applied protection prior to surface preparation and painting.

Remove these items if necessary for complete painting of the items and adjacent surfaces. Following completion of painting operations in each space or area, have items reinstalled by workers skilled in the trades involved.

1. Clean surfaces before applying paint or surface treatments. Remove oil and grease prior to cleaning. Schedule cleaning and painting so that dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces.

B. Surface Preparation: Clean and prepare surfaces to be painted in accordance with the manufacturer's instructions for each particular substrate condition and as specified.

1. Provide barrier coats over incompatible primers or remove and reprime.

Notify Contracting Officer or COR in writing of problems anticipated with using the specified finish-coat material with substrates primed by others.

2. Wood: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required. Sand surfaces exposed to view smooth and dust off.

a. Scrape and clean small, dry, seasoned knots and apply a thin coat of white shellac or other recommended knot sealer before application of primer. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Sand smooth when dried.

3. Ferrous Metals: Clean non-galvanized ferrous-metal surfaces that have not been shop coated; remove oil, grease, silt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning methods that comply with recommendations of the Steel Structures Painting Council.

a. Touch up bare areas and shop-applied prime coats that have been damaged. Wire-brush, clean with solvents recommended by the paint manufacturer, and touch up with the same primer as the shop coat.

4. Galvanized Surfaces: Clean galvanized surfaces with non-petroleum-based solvents so that the surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods.

C. Materials Preparation: Carefully mix and prepare paint materials in accordance with manufacturer's directions.

1. Maintain containers used in mixing and application of paint in a clean condition, free of foreign materials and residue.

2. Stir material before application to produce a mixture of uniform density; stir as required during application. Do not stir surface film into material.

Remove film and, if necessary, strain material before using.

3. Use only thinners approved by the paint manufacturer, and only within recommended limits.

D. Tinting: Tint each undercoat a lighter shade to facilitate identification of each coat where multiple coats of the same material are applied. Tint undercoats to match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat.

3.3 SCAFFOLDING AND PROTECTION: The Contractor shall furnish, maintain and remove all scaffolding, ladders, and planks required for this work and all drop cloths for the protection of concrete walks, floors, prefinished materials, metal roofing, gutters, downspouts and building fixtures. Contractor shall be responsible for any and all damage caused by this work.

3.4 APPLICATION

A. Apply paint in accordance with manufacturer's directions. Use applicators and techniques best suited for substrate and type of material being applied.

B. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.

1. Paint colors, surface treatments, and finishes are indicated in drawings or elsewhere in these specifications.

2. Provide finish coats that are compatible with primers used.

3. The number of coats and film thickness required is the same regardless of the application method. Do not apply succeeding coats until the previous coat has cured as recommended by the manufacturer. Sand between applications where sanding is required to produce an even smooth surface in accordance with the manufacturer's directions.

4. Apply additional coats when undercoats, stains, or other conditions show through final coat of paint until paint film is of uniform finish, color, and appearance. Give special attention to ensure that surfaces, including edges, corners, crevices, welds, and exposed fasteners, receive a dry film thickness equivalent to that of flat surfaces.

5. The term "exposed surfaces" includes areas visible when permanent or built-in fixtures, convector covers, covers for finned tube radiation, grilles, and similar components are in place. Extend coatings in these areas as required to maintain the system integrity and provide desired protection .

6. Paint surfaces behind movable equipment and furniture same as similar Exposed surfaces. Paint surfaces behind permanently fixed equipment or furniture with prime coat only before final installation of equipment.

7. Paint backsides of access panels and removable or hinged covers to match exposed surfaces.

8. Sand lightly between each succeeding enamel or varnish coat.

9. Omit primer on metal surfaces that have been shop-primed and touch up painted.

C. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration.

1. Allow sufficient time between successive coats to permit proper drying. Do not recoat until paint has dried to where it feels firm, and does not deform or feel sticky under moderate thumb pressure and where application of another coat of paint does not cause lifting or loss of adhesion of the undercoat.

D. Minimum Coating Thickness: Apply materials at not less than the manufacturer's recommended spreading rate. Provide a total dry film thickness on the entire system as recommended by the manufacturer.

E. Mechanical and Electrical Work: Painting mechanical and electrical work is limited to items exposed and in occupied spaces.

F. Prime Coats: Before application of finish coats, apply a prime coat of material as recommended by the manufacturer to material that is required to be painted or finished and has not been prime coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to assure a finish coat with no bum through or other defects due to insufficient sealing.

G. Orange Peel Enamel Finish: Roll and redistribute paint to an even and fine texture.

Leave no evidence of rolling such as laps, irregularity in texture, skid marks, or other surface imperfections.

H. Pigmented (Opaque) Finishes: Completely cover to provide an opaque, smooth surface of uniform finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections will not be acceptable.

I. Transparent (Clear) Finishes: Use multiple coats to produce a glass-smooth surface film of even luster. Provide a finish free of laps, cloudiness, color irregularity, runs, brush marks, orange peel, nail holes, or other surface imperfections.

1. Provide satin finish for final coats.

3.5 Completed Work: Match approved samples for color, texture, and coverage. Remove, refinish, or repaint work not in compliance with specified requirements.

3.6 CLEANING

A. Cleanup: At the end of each work day, remove empty cans, rags, rubbish, and other discarded paint materials from the site.

B. Upon completion of painting, clean glass and paint-spattered surfaces. Remove spattered paint by washing and scraping, using care not to scratch or damage adjacent finished surfaces.

3.7 PROTECTION

A. Protect work of other trades, whether to be painted or not, against damage by painting. Correct damage by cleaning, repairing or replacing, and repainting, as acceptable to Contracting Officer or COR.

B. Provide "wet paint" signs to protect newly painted finishes. Remove temporary protective wrappings provided by others for protection of their work after completion of painting operations.

1. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.

3.8 INTERIOR PAINT SCHEDULE

A. General: Provide the following paint systems for the various substrates, as indicated.

B. Gypsum Drywall Systems:

1. Semi-Gloss Latex Based Enamel Finish: 2 coats with total dry film thickness not less than 2.5 mils.

a. Primer Coat: Interior Latex-Based White Primer.

b. Finish Coat: interior Semi-Gloss Latex Based Enamel (Color determined by C.O. or COR)

A. Painted Woodwork:

1. Semi-Gloss Latex Based Enamel Finish: 2 coats.

a. Primer Coat: Interior Enamel Undercoat.

b. Finish Coat: Interior Semi-gloss Acrylic Latex Enamel (Color determined by C.O. or COR).

B. Stained Woodwork:

1. Stained-Varnish Rubbed Finish: 3 finish coats over stain plus filler on open-grain wood. Wipe filler before applying first varnish coat.

a. Stain Coat: Oil type interior “cinnamon” wood stain (selected by C.O.

or COR).

b. Second Coat: Polyurethane satin finish.

c. Third Coat: Polyurethane satin finish.

**END OF SECTION 09900**

RESIDENTIAL APPLIANCES/FURNITURE 11451

SECTION 11451 - RESIDENTIAL APPLIANCES

1.1 SECTION REQUIREMENTS

A. Submittals: Product Data.

2.1 RESIDENTIAL APPLIANCES

A. 24” Built-in Electric Dishwasher, brushed stainless steel or black, or combination finish, Energy Star compliant, stainless steel tub, multi-rack with removable silverware basket, multi-cycle. Front control, 120 volt, dishwasher connection kit, steam function, delayed start, 60 Hz, AC single phase power requirements, Color:

Brushed SST, Black, combination): General Electric, Kitchenaid, Fridgidaire, Maytag, or equivalent.

3.1 INSTALLATION

A.…