SF_30_Final_2A.pdf
PDF 726 KB Posted
- Attached to
- Oak Bottom Roofing Federal contract opportunity
- Solicitation number
- AG-9AC7-S-17-0063
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FINAL_PROJECT_SPECS.pdf | ||
| Final_AG-9AC7-S-17-0063.pdf | ||
| Merged_Attachments_-_Oak_Bottom_Roofing.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-9AC7-S-17-0063
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
9AC7
REDDING CA 96002
3644 AVTECH PARKWAY SUITE 180
R5 NO-CAL ACQ SERVICE AREA NCASA
USDA FOREST SERVICE
04/28/2017000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/28/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
KATHERINE E. PASINI
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
This modification hereby removes pages 7 and 26 of the solicitation and replace them with the attached pages 7 and 26. In addition, this modification hereby removes page 16 of the Special Protect Specs and replaces it with the amended page 16. Replacement pages correct the license requirements and include verification of requirements in Section M - Evaluation Criteria.
Quote due date is hereby extended until June 8, 2017 at 1:00pm PT
6/1/2017
CONSTRUCTION RFQ
Oak Bottom Roofing Six Rivers National Forest
AG-9AC7-S-17-0063
Amended Page 7 of 26
C.4 CONTRACT TIME
Start time is anticipated to begin June 15, 2017 with all items of work completed within 60 calendar days
C.5 DAVIS BACON WAGE RATES
Contractor’s employees and subcontractors shall be paid according to General Decision Number: CA170041 01/06/2017 CA41 for Siskiyou County.
C.6 CONTRACTOR LICENSE REQUIREMENTS
The Contractor shall hold a valid roofing contracting license in good standing for not less than the past 3 years. If roofing subcontractors are used the subcontractor shall also hold a valid roofing contracting license in good standing for not less than the past 3 years.
C.7 SITE VISIT
A scheduled site visit is not planned. However, it is strongly advised to interested vendors to thoroughly investigate the site to determine the full extent of the work and the quantities of materials needed.
C.8 PROJECT SPECIFICATIONS
SECTION 01010 - SUMMARY OF WORK
SECTION 01300 - SHOP DRAWING AND SUBMITTALS
SECTION 01560 - SITE AND AREA CLEANUP
SECTION 01900 - MOBILIZATION
SECTION 02050 - DEMOLITION
SECTION 06100 - CARPENTRY
SECTION 07311 - FIBER GLASS-BASED ASPHALT SHINGLES
SECTION 07620 - SHEET METAL FLASHING AND TRIM
C.9 PROJECT ATTACHMENTS
Page 1 of 2 - Location Map Page 2 of 2 – Oak Bottom Compound Map Page 1 thru 2 – Pictures of Oak Bottom residences General Decision Number CA170041 - CA 41
AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#21172 http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#21173
CONSTRUCTION RFQ
Oak Bottom Roofing Six Rivers National Forest
AG-9AC7-S-17-0063
Amended Page 26 of 26
SECTION M--EVALUATION FACTORS FOR AWARD
M.1 AWARD DETERMINATION
Award will be based on the lowest priced technically acceptable proposal considering price and technical factors listed below. A technical evaluation will begin with the lowest priced proposal and continue only if that proposal is determined technically unacceptable. In other words, a technical evaluation is not expected to be performed on every proposal received. A comparative assessment of each offer will NOT be accomplished and no tradeoff will be conducted.
M.2 ACCEPTABILITY OF THE OFFER
The Contracting Officer will examine proposals and if any of the situations below are identified, the proposal will be rejected as unacceptable and will not receive further consideration.
(1) Proposal takes exception or changes any term or conditions of the RFP, including attachments.
(2) Vendor is NOT currently registered in the System for Award Management (SAM) by the closing time of the solicitation.
(3) Vendor cannot be verified as a Small Business Concern as shown in SAM or other proof as submitted by the vendor.
(4) Proposal is missing a technical proposal.
M.3 TECHNICAL EVALUATION FACTORS
The Government will evaluate technical acceptability on a pass or fail basis considering the following factors:
(1) Relevant Experience: Relevant experience must be clearly demonstrated in the technical proposal and not left to speculation. Identify specific projects successfully completed that you consider gives the evidence that proves your firm has the experience required to complete this project. The government will be assessing if the experience identified is similar in nature, size and complexity to the proposed project.
(2) Relevant Past Performance: Proposals shall submit references with a current point of telephone contact for at least three similar projects but no more than six. The government will be assessing if the past performance is relevant to the work being performed and reflects a positive record of customer satisfaction and contract compliance. The government is not limited to contractor provided references and may obtain performance information from other sources.
(3) Technical Approach (Understanding the Government’s Requirement): The Government will evaluate your understanding of the Government's requirements and the manner in which you plan to manage and execute the work defined in the solicitation. Offerors shall provide a written narrative proposal that outlines the offeror’s proposed construction methodology which will ensure the timely delivery of specified products and materials to the job site allowing more than adequate time for submittal approval, fabrication, and delivery time to the job site. The narrative shall be supported with construction timelines/Project Schedule outlining the proposed progression of the project and information gleaned from a project site visit. Please make sure your explanation directly addresses the labor and equipment needed to meet the special requirements of this work. Include proof that your firm holds the appropriate license to meet the requirements of this solicitation.
(4) Price Evaluation Factor: Offerors shall submit pricing information on the Schedule of Items. It is the Government's intent to assess the prices to determine reasonableness (reflective of the offeror's understanding of the work and ability to perform the contract) and consistency (if prices are balanced and consistent with the Government price estimate and those of other proposals.
B. Installer Qualifications:
1. Installer shall follow manufacturers published installation instructions
2. The Contractor shall hold a valid roofing contracting license in good standing for not less than the past 3 years. If roofing subcontractors are used the subcontractor shall also hold a valid roofing contracting license in good standing for not less than the past 3 years.
1.06 REGULATORY REQUIREMENTS
A. Provide a roofing system achieving an Underwriters Laboratories (UL) Class A fire classification.
B. Provide a roofing system achieving an ENERGY STAR® rating.
C. Provide a roofing system achieving a COOL ROOF RATING COUNCIL
(CRRC).
D. Install all roofing products in accordance with all federal, state and local building codes.
E. All work shall be performed in a manner consistent with current OSHA guidelines.
1.07 DELIVERY, STORAGE, AND HANDLING
A. Store all products in manufacturer's unopened, labeled packaging until they are ready for installation.
B. Store products in a covered, ventilated area, at temperature not more than 110 degrees F (43 degrees C); do not store near steam pipes, radiators, or in direct sunlight.
C. Store bundles on a flat surface. Maximum stacking height shall not exceed manufacturers recommendations. Store all rolls on end.
D. Store and dispose of solvent-based materials in accordance with all federal, state and local regulations.
1.08 WEATHER CONDITIONS
Proceed with work only when existing and forecasted weather conditions will permit work to be performed in accordance with manufacturer’s recommendations.
1.09 WARRANTY
Special Specs Page 16
Amended Page 16
| 2017-06-01T15:48:50-0700 | |
| KATHERINE PASINI |