Solicitation AG-9AC7-S-17-0063

View the file

Other files for this federal contract opportunity

Other files attached to Oak Bottom Roofing, newest first.
File Type Posted
SF_30_Final_2A.pdf PDF
Merged_Attachments_-_Oak_Bottom_Roofing.pdf PDF
FINAL_PROJECT_SPECS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION FORMS

OFFEROR'S COPY

CONSTRUCTION

Issuing Office: Project Name and Location:

U.S.D.A. - Forest Service

Northern California Acquisition Service Area 3644 Avtech Parkway Redding, CA 96002

Oak Bottom Roofing Somes Bar, CA Six Rivers National Forest

Solicitation Number: Issue Date: April 28, 2017

AG-9AC7-S-17-0063 Due Date: May 18, 2016, 1:00 pm. PT

IMPORTANT INFORMATION

1. This is a Request for Quote (RFQ) requiring both price and technical proposals responding to evaluation criteria. Price information shall be submitted on the Schedule of Items. A separate Technical Proposal is required that addresses the evaluation criteria identified in the Provisions in Section M.

2. Electronic/Facsimile transmission is authorized for this solicitation. Proposals shall be submitted to the issuing office address listed above.

3. This procurement is a 100% set-aside for small business concerns.

4. A DUNS number and registration in the System for Award Management (SAM) is required.

Please note that Vendors shall have a current entity registration in the System for Award Management (SAM) by the closing date of the solicitation.

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

850562

USDA FOREST SERVICE

R5 NO-CAL ACQ SERVICE AREA NCASA

3644 AVTECH PARKWAY SUITE 180

REDDING CA 96002

9AC7

USDA FOREST SERVICE - KATIE PASINI

R5 NO-CAL ACQ SERVICE AREA (NCASA)

3644 Avtech Parkway Redding, CA 96002-9241

KATHERINE PASINI

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

530-226-2446

104/28/2017

AG-9AC7-S-17-0063

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Oak Bottom Roofing Project, Six Rivers National Forest

NAICS: 238160

SIZE STANDARD: $15.0 Million

SET ASIDE:

DUNS: ______________________________

EMAIL: _____________________________

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 60 calendar days and complete it within ________________ ________________ calendar days after receiving

05/18/2017

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA FOREST SERVICE

R5 NO-CAL ACQ SERVICE AREA NCASA

3644 AVTECH PARKWAY SUITE 180

REDDING CA 96002

9AC7

KATHERINE E. PASINI

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

AG-9AC7-S-17-0063

Delivery: 60 Days After Notice to Proceed

Delivery Location Code: 9A47

SIX RIVERS NATIONAL FOREST

1330 BAYSHORE WAY

EUREKA CA 95501 US

FOB: Destination

001 Oak Bottom Roofing Project, Six Rivers N.F.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

CONSTRUCTION RFQ

Oak Bottom Roofing AG-9AC7-S-17-0063 Six Rivers National Forest Page 4 of 26

OAK BOTTOM ROFFING NURSERY

Klamath National Forest (Administered by the Six Rivers National Forest)

Contents

PART I: THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS/SCHEDULE OF ITEMS

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF WORK

C.2 BUILDING INFORMATION

C.3 PROJECT LOCATION AND ACCESS

C.4 CONTRACT TIME

C.5 DAVIS BACON WAGE RATES

C.6 CONTRACTOR LICENSE REQUIREMENTS

C.7 SITE VISIT

C.8 PROJECT SPECIFICATIONS

C.9 PROJECT ATTACHMENTS

SECTION D--PACKAGING AND MARKING

SECTION E--INSPECTION AND ACCEPTANCE

SECTION F--DELIVERIES OR PERFORMANCE

SECTION G--CONTRACT ADMINISTRATION DATA

SECTION H--SPECIAL CONTRACT REQUIREMENTS

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF

OFFERORS OR RESPONDENTS

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO QUOTERS

SECTION M--EVALUATION FACTORS FOR AWARD

M.1 AWARD DETERMINATION

M.2 ACCEPTABILITY OF THE OFFER

M.3 TECHNICAL EVALUATION FACTORS

Six Rivers National Forest Page 5 of 26

PART I: THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS/SCHEDULE OF ITEMS

Oak Bottom Roofing

Klamath National Forest (Administered by the Six Rivers N.F.)

Item No. DESCRIPTION PAY

UNIT QTY UNIT

PRICE TOTAL PRICE

Mobilization Lump

Sum 1 $_________ $ __________

2 Oak Bottom Modular 1, Space 12

Lump Sum 1 $_________ $ __________

3 Oak Bottom Modular 2, Space 17

Lump Sum 1 $_________ $ __________

4 Oak Bottom Modular 3, Space 11

Lump Sum 1 $_________ $ __________

5 Oak Bottom Residence 2, Space 8

Lump Sum 1 $_________ $ __________

6 Oak Bottom DW Mobile, Space 10

Lump Sum

Total All Items $ __________

Six Rivers National Forest Page 6 of 26

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF WORK

The Contractor shall furnish all labor, supervision, equipment, transportation and materials for the replacement of roofing and gutters on five residences at the Oak Bottom Compound on the Ukonom Ranger District. The work shall include the removal and replacement of the existing roof cover, gutters and downspouts. The scope of work includes but is not limited to the installation of new roof deck, fascia, rakes, roof underlayment, flashings, roof jacks, ridge cap, attic vents, metal roofing, gutters and downspouts. The Contractor shall verify all existing conditions prior to the beginning of work.

C.2 BUILDING INFORMATION

1. Oak Bottom Modular 1. Located at Space 12, this modular was manufactured in 1988 and is 1,233 square feet. The existing roofing is composite shingles on a plywood roof deck. There are existing seamless metal gutters and downspouts.

2. Oak Bottom Modular 2. Located at Space 17, this modular was manufactured in 1988

3. Oak Bottom Modular 3. Located at Space 11, this modular was manufactured in 1988

4. Oak Bottom Residence 2. Located at Space 8, this is a light wood frame constructed home built in 1965 and is 1,219 square feet. The existing roofing is composite shingles on a plywood roof deck. There are existing seamless metal gutters and downspouts.

5. Oak Bottom Double Wide Mobile. Located at Space 10, this mobile home was manufactured in 1991 and is 1,517 square feet. The existing roofing is composite shingles on a plywood roof deck. There are existing seamless metal gutters and downspouts.

C.3 PROJECT LOCATION AND ACCESS

The project is located at Oak Bottom Compound near Somes Bar, California. The Oak Bottom Compound is on the Ukonom Ranger District, Klamath National Forest. The Ukonom Ranger District is administered by the Six Rivers National Forest.

Directions to Oak Bottom Compound: from Eureka travel approximately 10 miles north to Highway 299 in Arcata; from Arcata travel approximately 38 miles east on Highway 299 to Willow Creek; from Willow Creek travel approximately 45 miles north on Highway 96 to Orleans. Continue north from Orleans on Highway 96 for approximately 7 miles to Salmon River Road. Travel 3 miles on Salmon River Road to the Oak Bottom Compound project site (see compound map).

Six Rivers National Forest Page 7 of 26

C.4 CONTRACT TIME

Start time is anticipated to begin June 1, 2017 with all items of work completed within 60 calendar days

C.5 DAVIS BACON WAGE RATES

Contractor’s employees and subcontractors shall be paid according to General Decision Number: CA170041 01/06/2017 CA41 for Siskiyou County.

C.6 CONTRACTOR LICENSE REQUIREMENTS

Installer shall be licensed in the State of California as a General Building Contractor and shall as defined by Business & Professions Code Division 3, Chapter 9. Contractors, Article 4. Classifications.

C.7 SITE VISIT

A scheduled site visit is not planned. However, it is strongly advised to interested vendors to thoroughly investigate the site to determine the full extent of the work and the quantities of materials needed.

C.8 PROJECT SPECIFICATIONS

SECTION 01010 - SUMMARY OF WORK

SECTION 01300 - SHOP DRAWING AND SUBMITTALS

SECTION 01560 - SITE AND AREA CLEANUP

SECTION 01900 - MOBILIZATION

SECTION 02050 - DEMOLITION

SECTION 06100 - CARPENTRY

SECTION 07311 - FIBER GLASS-BASED ASPHALT SHINGLES

SECTION 07620 - SHEET METAL FLASHING AND TRIM

C.9 PROJECT ATTACHMENTS

Page 1 of 2 - Location Map Page 2 of 2 – Oak Bottom Compound Map Page 1 thru 2 – Pictures of Oak Bottom residences General Decision Number CA170041 - CA 41

AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)

The contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#21172 http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#21173

Six Rivers National Forest Page 8 of 26

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

FAR: https://www.acquisition.gov/far AGAR: http://www.dm.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

INCORPORATED BY REFERENCE

FAR 52.246-1 Contractor Inspection Requirements (APR 1984) FAR 52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

FAR 52.242-14 Suspension of Work (APR 1984)

FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

The anticipated start work date is June 1, 2017. Note: Submittals and ordering may begin before construction starts.

https://acquisition.gov/far/current/html/52_248_253.html#wp1120047 https://www.acquisition.gov/far http://www.dm.usda.gov/procurement/policy/agar.html http://acquisition.gov/far/current/html/52_246.html#wp1118709 https://acquisition.gov/far/current/html/52_246.html#wp1118901 https://acquisition.gov/far/current/html/52_241_244.html#wp1128875 https://acquisition.gov/far/current/html/52_207_211.html#wp1141217

Six Rivers National Forest Page 9 of 26

SECTION G--CONTRACT ADMINISTRATION DATA

POST-AWARD CONFERENCE

A post award conference with the successful offeror may be scheduled after the date of contract award and held at a location mutually agreed upon between the Contracting Officer and the awarded contractor prior to start of work.

INVOICE SUBMISSION PROCEDURES

The "Submit Invoice-to" address for invoices on USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). All invoices for work performed under this contract shall be submitted via the electronic Invoice Processing Platform. This platform is managed by the U.S. Department of Treasury and additional information is available at this website: https://www.ipp.gov/index.htm.

After award of a contract, please make sure your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account, there is no pre-award registration. PRIOR to starting the IPP enrollment process, please verify that the point of contact’s (POC’s) email address is current in the System for Award Management (SAM) account for your company (www.sam.gov). Recent update(s) to a SAM registration need time to process from a “Pending” to in an “Active” status on the SAM account. The one-time enrollment in IPP means a series of emails will be sent to the POC identified in the SAM account. For assistance with questions on the IPP enrollment process, creating invoices, or uploading attachments to IPP please contact the IPP help desk phone number is 1-866-973- 3131.

Invoices in IPP are the official request for payment. Supporting information is required for all construction progress payments and shall be attached to the IPP invoice.

• The payment certification required in FAR 52.232-5 Payments under Fixed-Price Construction Contracts must be signed and submitted for each progress payment requested,

• A breakdown of billing, based on the pricing schedule along with the progress schedule, must be included as attachments to the IPP invoice.

Additionally, the government will verify the contractor’s compliance with the submission of certified payrolls for the invoiced timeframe as required in FAR Clause 52.222-8 Payrolls and Basic Records. The Contractor shall submit payrolls weekly for each week in which any contract work is performed by the prime or any subcontractors. The copies shall be sent to the COR. Payrolls submitted shall set out accurately and completely all of the information required in the contract clause (form WH-347 is an optional form compliant with the requirement and is available for download at www.dol.gov). State or County government forms lack the specific certification requirement and are not acceptable without supplementation of the certification statement.

Invoices not complying with contract requirements will be rejected.

https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm http://www.sam.gov/ http://www.dol.gov/

Six Rivers National Forest Page 10 of 26

SECTION H--SPECIAL CONTRACT REQUIREMENTS

WORKER’S COMPENSATION INSURANCE

The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone as an owner/operator is not required to carry the insurance.

EMERGENCY RESPONSE (NOV 1996) AGAR 452.236-77

(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.

(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.

( c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.

http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#23677

Six Rivers National Forest Page 11 of 26

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

FAR: www.acquisition.gov/far AGAR:https://www.dm.usda.gov/procurement/policy/agar.htm

52.204-7 System for Award Management (OCT 2016) 52.209-11 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-6 Representation by Corporations Regarding Delinquent Tax Liability or a Felony

Conviction under any Federal Law (FEB 2016) 52.222-3 Convict Labor (JUN 2003) 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work (MAY 2014) 52.222-6 Construction Wage Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (MAY

2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEPT 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.232-5 Payments Under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (JUL 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) https://acquisition.gov/far/current/html/52_248_253.html#wp1120047 http://www.acquisition.gov/far https://www.dm.usda.gov/procurement/policy/agar.htm https://acquisition.gov/far/current/html/52_200_206.html#wp1137850 https://acquisition.gov/far/current/html/52_217_221.html#wp1136004 https://acquisition.gov/far/current/html/52_222.html#wp1147479 https://acquisition.gov/far/current/html/52_222.html#wp1150718 https://acquisition.gov/far/current/html/52_222.html#wp1147505 https://acquisition.gov/far/current/html/52_222.html#wp1147521 https://acquisition.gov/far/current/html/52_222.html#wp1147526 https://acquisition.gov/far/current/html/52_222.html#wp1147541 https://acquisition.gov/far/current/html/52_222.html#wp1147548 https://acquisition.gov/far/current/html/52_222.html#wp1147560 https://acquisition.gov/far/current/html/52_222.html#wp1147565 https://acquisition.gov/far/current/html/52_222.html#wp1147570 https://acquisition.gov/far/current/html/52_222.html#wp1147575 https://acquisition.gov/far/current/html/52_222.html#wp1147649 https://acquisition.gov/far/current/html/52_222.html#wp1147656 https://acquisition.gov/far/current/html/52_222.html#wp1147711 https://acquisition.gov/far/current/html/52_222.html#wp1147739 https://acquisition.gov/far/current/html/52_222.html#wp1162802 https://acquisition.gov/far/current/html/52_222.html#wp1151848 http://acquisition.gov/far/current/html/52_222.html#wp1163045 https://acquisition.gov/far/current/html/52_223_226.html#wp1168850 https://acquisition.gov/far/current/html/52_223_226.html#wp1169608 https://acquisition.gov/far/current/html/52_227.html#wp1139101 https://acquisition.gov/far/current/html/52_232.html#wp1152507 https://acquisition.gov/far/current/html/52_232.html#wp1152984 https://acquisition.gov/far/current/html/52_232.html#wp1153110 https://acquisition.gov/far/current/html/52_232.html#wp1153351 https://acquisition.gov/far/current/html/52_233_240.html#wp1113304 https://acquisition.gov/far/current/html/52_233_240.html#wp1113329 https://acquisition.gov/far/current/html/52_233_240.html#wp1113344 https://acquisition.gov/far/current/html/52_233_240.html#wp1113365 https://acquisition.gov/far/current/html/52_233_240.html#wp1113375

Six Rivers National Forest Page 12 of 26

52.236-5 Material and Workmanship (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

(APR 1984)

52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items (JAN 2017) 52.246-21 Warranty of Construction (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-76 Samples and Certificates (FEB 1988)

FAR 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered are, are as follows:

Goals for minority participation for each trade: 6.8% Goals for female participation for each trade: 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative actions obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to https://acquisition.gov/far/current/html/52_233_240.html#wp1113390 https://acquisition.gov/far/current/html/52_233_240.html#wp1113402 https://acquisition.gov/far/current/html/52_233_240.html#wp1113412 https://acquisition.gov/far/current/html/52_233_240.html#wp1113418 https://acquisition.gov/far/current/html/52_233_240.html#wp1113425 https://acquisition.gov/far/current/html/52_233_240.html#wp1113431 https://acquisition.gov/far/current/html/52_233_240.html#wp1113436 https://acquisition.gov/far/current/html/52_233_240.html#wp1113461 https://acquisition.gov/far/current/html/52_233_240.html#wp1113477 https://acquisition.gov/far/current/html/52_233_240.html#wp1113494 https://acquisition.gov/far/current/html/52_233_240.html#wp1113534 https://acquisition.gov/far/current/html/52_241_244.html#wp1129035 https://acquisition.gov/far/current/html/52_241_244.html#wp1129139 https://acquisition.gov/far/current/html/52_246.html#wp1119079 https://acquisition.gov/far/current/html/52_248_253.html#wp1119604 https://acquisition.gov/far/current/html/52_248_253.html#wp1119885 https://acquisition.gov/far/current/html/52_248_253.html#wp1120078 http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#23672 http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#23673 http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#23676 https://acquisition.gov/far/current/html/52_222.html#wp1147671

Six Rivers National Forest Page 13 of 26 employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U. S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Siskiyou County, California.

FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE

AND CONSTRUCTION CONTRACTS (SEP 2013)

(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—

(1) The product cannot be acquired—

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

(iii) At a reasonable price.

(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:

(i) Spacecraft system and launch support equipment.

(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.

(b) Information about this requirement and these products is available at http://www.biopreferred.gov.

(c) In the performance of this contract, the Contractor shall—

(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30;

and

(2) Submit this report no later than—

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance.

https://acquisition.gov/far/current/html/52_223_226.html#wp1168786 http://www.biopreferred.gov/

Six Rivers National Forest Page 14 of 26

FAR 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND

CONSTRUCTION CONTRACTS (MAY 2008)

(a) In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired—

(1) Competitively within a timeframe providing for compliance with the contract performance schedule; (2) Meeting contract performance requirements; or

(3) At a reasonable price.

(b) Information about this requirement is available at EPA’s Comprehensive Procurement Guidelines web site, http://www.epa.gov/cpg/. The list of EPA-designated items is available at http://www.epa.gov/cpg/products.htm.

FAR 52.225-9 BUY AMERICAN - CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.

However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means— http://acquisition.gov/far/current/html/52_223_226.html#wp1181056 http://www.epa.gov/cpg/ http://www.epa.gov/cpg/products.htm https://acquisition.gov/far/current/html/52_223_226.html#wp1169273 https://acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/

Six Rivers National Forest Page 15 of 26

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic;

or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

_____NONE____

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

http://uscode.house.gov/ http://uscode.house.gov/ https://acquisition.gov/far/current/html/Subpart%2012_5.html#wp1077123

Six Rivers National Forest Page 16 of 26

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON

Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:

Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______

Item 2: _______ _______ _______ Foreign construction material _______ _______ _______ Domestic construction material [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

ALTERNATE PAYMENT PROTECTIONS (JUL 2000) **APPLICABLE IF CONTRACT EXCEEDS

$35,000.00**

(a) The Contractor shall submit one of the following payment protections:

(1) A payment bond; or

(2) An irrevocable letter of credit (ILC)

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

Six Rivers National Forest Page 17 of 26

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

If furnished as security, money orders, drafts, cashier’s checks, or certified checks shall be drawn payable to: USDA Forest Service.

FAR 52.215-8 ORDER OF PRECEDENCE—CONSTRUCTION

Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The Schedule (excluding the specifications).

(2) Representations and other instructions.

(3) Contract clauses.

(4) Other documents, exhibits, and attachments.

(5) The specifications.

(6) Drawings.

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

ATTACHMENT No. PAGES Project Specifications 24 Davis Bacon Wage Determination No. CA170041 01/06/2017 CA41 5 Location Map, Compound Map, Photos 4

Six Rivers National Forest Page 18 of 26

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND

OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238160.

(2) The small business size standard is $15.0 million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

(i) Paragraph (d) applies.

(ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain

Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations— Representation.

(vi) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

https://acquisition.gov/far/current/html/52_200_206.html#wp1140074 https://acquisition.gov/far/current/html/52_200_206.html#wp1137850 https://acquisition.gov/far/current/html/52_200_206.html#wp1137850 https://acquisition.gov/far/current/html/52_200_206.html#wp1137583 https://acquisition.gov/far/current/html/FARTOCP13.html#wp271421 https://acquisition.gov/far/current/html/52_200_206.html#wp1137684 https://acquisition.gov/far/current/html/52_200_206.html#wp1137777 https://acquisition.gov/far/current/html/52_200_206.html#wp1137850 https://acquisition.gov/far/current/html/52_200_206.html#wp1149919 https://acquisition.gov/far/current/html/52_207_211.html#wp1144766 https://acquisition.gov/far/current/html/52_207_211.html#wp1144909

Six Rivers National Forest Page 19 of 26

(vii) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xiii) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA–designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.

(xvi) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xvii) 52.225-4, Buy American—Free Trade Agreements—Israeli Trade Act Certificate.

(Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $79,507, the provision with its Alternate II applies.

(D) If the acquisition value is $79,507 or more but is less than $100,000, the provision with its Alternate III applies.

(xviii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xix) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan—

Certification. This provision applies to all solicitations.

(xx) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or

Transactions Relating to Iran-Representation and Certifications. This provision applies to all solicitations.

https://acquisition.gov/far/current/html/52_214.html#wp1129381 https://acquisition.gov/far/current/html/52_215.html#wp1144523 https://acquisition.gov/far/current/html/52_217_221.html#wp1135900 https://acquisition.gov/far/current/html/52_217_221.html#wp1135943 https://acquisition.gov/far/current/html/52_222.html#wp1147663 https://acquisition.gov/far/current/html/52_222.html#wp1147711 https://acquisition.gov/far/current/html/52_222.html#wp1147704 https://acquisition.gov/far/current/html/52_222.html#wp1147711 https://acquisition.gov/far/current/html/52_222.html#wp1148142 https://acquisition.gov/far/current/html/52_223_226.html#wp1168785 https://acquisition.gov/far/current/html/52_223_226.html#wp1168786 https://acquisition.gov/far/current/html/52_223_226.html#wp1168826 https://acquisition.gov/far/current/html/52_223_226.html#wp1169013 https://acquisition.gov/far/current/html/52_223_226.html#wp1192900 https://acquisition.gov/far/current/html/52_223_226.html#wp1169071 https://acquisition.gov/far/current/html/52_223_226.html#wp1169038 https://acquisition.gov/far/current/html/52_223_226.html#wp1169193 https://acquisition.gov/far/current/html/52_223_226.html#wp1169151 https://acquisition.gov/far/current/html/52_223_226.html#wp1181379 https://acquisition.gov/far/current/html/52_223_226.html#wp1188714

Six Rivers National Forest Page 20 of 26

(xxi) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following certifications are applicable as indicated by the Contracting Officer:

(i) 52.204-17, Ownership or Control of Offeror.

(ii) 52.222-18,…