AG-9AC7-S-17-0043_Final.pdf
PDF 592 KB Posted
- Attached to
- Smith River Decommissioning & Stormproofing Federal contract opportunity
- Solicitation number
- AG-9AC7-S-17-0043
About this file
AG-9AC7-S-17-0043
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_4.pdf | ||
| Schedule_of_Items_Road_17N41.pdf | ||
| Amendment_003_Rd_17N39_signed.pdf | ||
| Updated_SOI_Road_17N39.pdf | ||
| CA4_Mod_4,_05052017.pdf | ||
| SF-30_signed.pdf | ||
| A1_Attachment_CA9_dvb,_mod_7,_dated_042117.pdf | ||
| Amendment_001_Smith_River_(002).pdf | ||
| 5._CA4,_mod_3,_040717.pdf | ||
| 6._SF24_Bid_Bond.pdf | ||
| 1._Special_Project_Specs.pdf | ||
| 3._General_Notes_Road_Logs.pdf | ||
| 4._PAL_Fire_Plan_.pdf | ||
| 2._FINAL_DRAWINGS.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Smith River Decommissioning & Stormproofing, Six Rivers NF - 1 -
AG-9AC7-S-17-0043
SOLICITATION FORMS
OFFEROR'S COPY
CONSTRUCTION
Issuing Office: Project Name and Location:
U.S.D.A. - Forest Service
Northern California Acquisition Service Area 3644 Avtech Parkway Redding, CA 96002
SMITH RIVER DECOMMISSIONING &
STORMPROOFING
Gasquet Ranger District Six Rivers National Forest
Solicitation Number: Issue Date: 03/28/2017 AG-9AC7-S-17-0043 Due Date: 05/15/2017, 1:00 PT
IMPORTANT INFORMATION
1. This is a Request for Proposals (RFP) requiring a technical response along with pricing. Price information shall be submitted on the Schedule of Items. A separate Technical Proposal is required that addresses the evaluation criteria identified in the Provisions in Section M.
2. This project requires bonding and a Bid Guarantee is required. See Section I.
3. Electronic/Facsimile transmission is NOT authorized for this solicitation. Proposals shall be submitted to the issuing office address listed above.
4. This procurement is a 100% set-aside for small business concerns.
5. A DUNS number and registration in the System for Award Management (SAM) is required.
Please note that Vendors shall have a current entity registration in the System for Award Management (SAM) by the closing date of the solicitation.
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
840077
USDA FOREST SERVICE
R5 NO-CAL ACQ SERVICE AREA NCASA
3644 AVTECH PARKWAY SUITE 180
REDDING CA 96002
9AC7
KATHERINE E. PASINI
Northern CA Acquisition Service Area 3644 Avtech Parkway Redding, CA 96002
KATHERINE PASINI 530-226-2351
1x 03/28/2017
AG-9AC7-S-17-0043
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
SMITH RIVER DECOMMISSIONING & STORMPROOFING
SIX RIVERS NATIONAL FOREST
NAICS: 237310
Size Standard: $36.5 Million
Set Aside: 100% Total Small Business
Government Price Range: $250,000 - $500,000
DUNS:__________________________________________
Email: ________________________________________
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 calendar days and complete it within ________________ 75 calendar days after receiving
05/15/2017
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA FOREST SERVICE
R5 NO-CAL ACQ SERVICE AREA NCASA
3644 AVTECH PARKWAY SUITE 180
REDDING CA 96002
9AC7
KATHERINE E. PASINI
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 44
CONTINUATION SHEET
PAGE OFREFERENCE NO. OF DOCUMENT BEING CONTINUED
AG-9AC7-S-17-0043
Smith River Decommissioning and Stormproofing Project Delivery: 90 Days After Notice to Proceed FOB: Destination
001 Smith River Decommissioning and Stormproofing Project
Delivery Location Code: 9A47
SIX RIVERS NATIONAL FOREST
1330 BAYSHORE WAY
EUREKA CA 95501 US
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Smith River Decommissioning & Stormproofing, Six Rivers NF - 8 -
TABLE OF CONTENTS
PART I - SCHEDULE OF ITEMS
SECTION B - SUPPLIES OR SERVICES AND PRICES
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 Scope of Contract
C.2 Project Location and Access
C.3 Operating Season
C.4 Equipment
C.5 Equipment Cleaning
C.6 Standard Specifications for Construction Of Roads And Bridges On Federal Highway Projects (FP-03 U.S.
CUSTOMARY UNITS)
C.7 Supplemental Project Specifications
C.8 ERRATA
C.9 Contract Time and Estimated Start Work Date
C.10 AGAR 452.211-73 Attachments to Statement Of Work/Specifications (FEB 1988)
SECTION D – GOVERNMENT FURNISHED PROPERTY
SECTION E - INSPECTION AND ACCEPTANCE
E.1 Inspection of Construction FAR 52.246-12 (AUG 1996)
SECTION F - DELIVERIES OR PERFORMANCE
F.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)
F.2 Commencement, Prosecution, and Completion of Work, FAR 52.211-10 (APR 1984)
F.3 Schedules for Construction Contracts, FAR 52.236-15 (APR 1984)
F.4 Submittal Requirements
F.5 Material Certifications and Testing Reports
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 Postaward Conference, AGAR 452.215-73 (NOV 1996)
G.2 Designation of Contracting Officer's Representative
G.3 Contractor Performance Assessment Reporting System (CPARS)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 Use of Premises
H.2 Emergency Response, AGAR 452.236-77 (NOV 1996)
H.3 Invoice Processing Platform (IPP)
PART II – CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
Smith River Decommissioning & Stormproofing, Six Rivers NF - 9 -
I.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)
I.2 Updates of Publicly Available Information Regarding Responsibility Matters. FAR 52.209-9 (JUL 2013)
I.3 Affirmative Procurement of Biobased Products under Service and Construction Contracts, FAR 52.223-2
(SEP 2013)
I.4 Buy American—Construction Materials. FAR 52.225-9 (MAY 2014)
I.5 Bid Guarantee, FAR 52.228-1 (SEP 1996)
I.6 Alternative Forms of Security. AGAR 452.228-70 (NOV 1996)
PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
J.1 Attachments to Statements of Work/Specifications, AGAR 452.211-73 (FEB 1988)
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
K.1 Annual Representations and Certifications, FAR 52.204-8 (JAN 2017)
K.2 Certification Regarding Responsibility Matters. FAR 52.209-5 (Oct 2015)
K.3 Biobased Product Certification, FAR 52.223-1 (MAY 2012)
K.4 Size Standard and NAICS Code Information, AGAR 452.219-70 (SEP 2001)
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
L.1 Inquiries AGAR 452.204-70 (FEB 1988)
L.2 System for Award Management, FAR 52.204-7 (OCT 2016)
L.3 Instructions to Offerors—Competitive Acquisition, FAR 52.215-1 (JAN 2017)
L.4 Type of Contract, FAR 52.216-1 (APR 1984)
L.5 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction, FAR 52.222-23 (FEB 1999)
L.6 Notice of Buy American Act Requirement - Construction Materials, FAR 52.225-10 (MAY 2014)
L.7 Service of Protest, FAR 52.233-2 (SEP 2006)
L.8 Preparation of Proposals – Construction, FAR 52.236-28 (OCT 1997)
L.9 Instructions for the Preparation of Technical and Business Proposals
L.10 Site Visit, FAR 52.237-1 (Apr 1984)
SECTION M - EVALUATION FACTORS FOR AWARD
M.1 Award Determination
M.2 Acceptability of the Offer
M.3 Technical Evaluation Factors
M.4 Evaluation of Options Exercised at Time of Contract Award, FAR 52.217-4 (June 1988)
Smith River Decommissioning & Stormproofing, Six Rivers NF - 10 -
PART I - SCHEDULE OF ITEMS
SECTION B - Supplies or Services and Prices
SMITH RIVER NRA STORMPROOFING
Gasquet Ranger District
Six Rivers National Forest Del Norte County
Project Base Items The following items include Mobilization and Seeding work for all work items in the project.
ITEM NO. DESCRIPTION PAY
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
15101 Mobilization Lump Sum
1 $__________ $___________
62503 Seeding, Dry Method (GOV Furnished)
Lump Sum
1 $__________ $___________
Base project work is separated by Road in the following sections.
Base Road Item 16N18A
ITEM NO. DESCRIPTION PAY
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
20301 Removal of culverts (Method A) Each 4 $__________ $___________
20420 Drainage excavation, Rolling Dip Type 2 with aggregate Each 4 $__________ $___________
30326 Road reconditioning Mile 1.26 $__________ $___________
60211-1 24 Inch Corrugated Steel Pipe, 14 Gauge Foot 100 $__________ $___________
60211-2 36 Inch Corrugated Steel Pipe, 14 Gauge Foot 60 $__________ $___________
60211-3 48 Inch Corrugated Steel Pipe, 14 Gauge Foot 40 $__________ $___________
60403-1 Drop Inlet, 36 Inch Corrugated Steel Pipe, 14 Gauge Foot 3 $__________ $___________
60403-2 Inlet, 24 Inch MES Each 2 $__________ $___________
60403-3 Inlet, 48 Inch MES Each 1 $__________ $___________
62530 Mulching, Straw bales Each 8 $__________ $___________
TOTAL $___________ $____________
Smith River Decommissioning & Stormproofing, Six Rivers NF - 11 -
Base Road Item 16N02L
ITEM NO. DESCRIPTION PAY
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
20301 Removal of culverts (Method A) Each 2 $__________ $___________
20420 Drainage excavation, Rolling Dip Type 2 with aggregate Each
5 $__________ $___________
30326 Road reconditioning Mile 1.67 $__________ $___________
60211-1 24 Inch Corrugated Steel Pipe, 14 Gauge Foot 120 $__________ $___________
60403-1 Drop Inlet, 36 Inch Corrugated Steel Pipe, 14 Gauge Foot 1 $__________ $___________
62530 Mulching, Straw bales Each 6 $__________ $___________
Base Road Item 16N36B
ITEM NO. DESCRIPTION PAY
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
20301 Removal of culverts (Method A) Each 1 $__________ $___________ 20420 Drainage excavation, Rolling
Dip Type 2 with aggregate Each 5 $__________ $___________
30326 Road reconditioning Mile 1.00 $__________ $___________ 60211-3 48 Inch Corrugated Steel Pipe, 14 Gauge Foot 60 $__________ $___________
62530 Mulching, Straw bales Each 2 $__________ $___________
Base Road Item 16N37
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
20301 Removal of culverts (Method A) Each 1 $__________ $___________ 20420 Drainage excavation, Rolling
Dip Type 2 with aggregate Each 13 $__________ $___________
30326 Road reconditioning Mile 1.55 $__________ $___________ 60211-1 24 Inch Corrugated Steel Pipe, 14 Gauge Foot 30 $__________ $___________
60211-3 48 Inch Corrugated Steel Pipe, 14 Gauge Foot 40 $__________ $___________
62530 Mulching, Straw bales Each 4 $__________ $___________
Smith River Decommissioning & Stormproofing, Six Rivers NF - 12 -
Base Road Item 17N36
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
20301 Removal of culverts (Method A) Each 2 $__________ $___________ 20420 Drainage excavation, Rolling
Dip Type 2 with aggregate Each 8 $__________ $___________
30326 Road reconditioning Mile 2.57 $__________ $___________ 60211-2 36 Inch Corrugated Steel Pipe, 14 Gauge Foot 40 $__________ $___________
60211-3 48 Inch Corrugated Steel Pipe, 14 Gauge Foot 50 $__________ $___________
62530 Mulching, Straw bales Each 4 $__________ $___________
Base Road Item 17N39
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
20420 Drainage excavation, Rolling Dip Type 2 with aggregate Each 5 $__________ $___________
30326 Road reconditioning Mile 2.40 $__________ $___________ 60211-1 24 Inch Corrugated Steel Pipe, 14 Gauge Foot 30 $__________ $___________
60211-2 36 Inch Corrugated Steel Pipe, 14 Gauge Foot 30 $__________ $___________
62530 Mulching, Straw bales Each 4 $__________ $___________ 20420 Drainage excavation, Rolling
Dip Type 2 with aggregate Each 5 $__________ $___________
30326 Road reconditioning Mile 2.40 $__________ $___________ 60211-1 24 Inch Corrugated Steel Pipe, 14 Gauge Foot 30 $__________ $___________
60211-2 36 Inch Corrugated Steel Pipe, 14 Gauge Foot 30 $__________ $___________
Base Road Item 17N40
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
20420 Drainage excavation, Rolling Dip Type 2 with aggregate Each 6 $__________ $___________
30326 Road reconditioning Mile 1.30 $__________ $___________ 65002 Install road closure device, Earthen Mound Barrier Each 1 $__________ $___________
Smith River Decommissioning & Stormproofing, Six Rivers NF - 13 -
Base Road Item 17N41
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
20301 Removal of culverts (Method A) Each 2 $__________ $___________ 20420 Drainage excavation, Rolling
Dip Type 2 with aggregate Each 6 $__________ $___________
30326 Road reconditioning Mile 1.60 $__________ $___________ 60211-1 24 Inch Corrugated Steel Pipe, 14 Gauge Foot 40 $__________ $___________
60211-2 36 Inch Corrugated Steel Pipe, 14 Gauge Foot 30 $__________ $___________
62530 Mulching, Straw bales Each 4 $__________ $___________ 65002 Install road closure device, Earthen Mound Barrier Each 1 $__________ $___________
20301 Removal of culverts (Method A) Each 2 $__________ $___________ 20420 Drainage excavation, Rolling
Dip Type 2 with aggregate Each 6 $__________ $___________
TOTAL BASE BID - ALL ROADS, MOBILIZATION, & SEEDING $
B- 2 – OPTION ITEMS
Optional Items will be awarded in increments of one road up to all option items, dependent upon available funding.
Option Item A – Road 15N36N
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
20420 Drainage excavation, Rolling Dip Type 2 with aggregate
Each 3 $___________ $___________
30326 Road reconditioning Mile 1.32 $___________ $___________
TOTAL OPTION A ITEMS $___________
Option Item B – Road 16N03K
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
20420 Drainage excavation, Rolling Dip Type 2 with aggregate
Each 7 $___________ $___________
30326 Road reconditioning Mile 1.44 $___________ $___________
TOTAL OPTION B ITEMS $___________
Smith River Decommissioning & Stormproofing, Six Rivers NF - 14 -
Option Item C – Road 16N16
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
30326 Road reconditioning Mile 1.50 $___________ $___________
TOTAL OPTION C ITEMS $___________
Option Item D - Road 16N19
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
20420 Drainage excavation, Rolling Dip Type 2 with aggregate
Each 7 $___________ $___________
30326 Road reconditioning Mile 8.02 $___________ $___________
TOTAL OPTION D ITEMS $___________
OPTION ITEM E – Road 16N41
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY
UNIT PRICE TOTAL PRICE
20420 Drainage excavation, Rolling Dip Type 2 with aggregate
Each 9 $___________ $___________
30326 Road reconditioning Mile 0.96 $___________ $___________
TOTAL OPTION E ITEMS $___________
TOTAL ALL OPTION ITEMS: $___________
TOTAL BASE AND ALL OPTION ITEMS: $___________
B-1 - NOTE: All quantities in the bid schedule are contract quantities. Refer to FP-03 109.02(b) for authorizing adjustments to contract quantities.
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within [insert in the clause the period of time in which the Contracting Officer has to exercise the option]. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
Smith River Decommissioning & Stormproofing, Six Rivers NF - 15 -
SECTION C - Description/Specifications/Statement of Work
C.1 Scope of Contract The purpose for this construction contract is to secure services to stormproof National Forest system roads in the Craigs, Coon, Gordon, Hurdygurdy, Jones, Quartz, upper South Fork Smith, and Little Jones watersheds. The primary work items include replacing culverts, installing drivable dips, and road reconditioning. The Schedule of Items and the General Notes/Road Logs contain the full listing of included work.
Unless otherwise provided, the Contractor shall furnish all labor, transportation, equipment, tools, supervision, materials and any incidentals necessary to accomplish work on the Smith River National Recreation Area of the Six Rivers National Forest.
The contractor shall carefully examine the existing conditions and information, shall become familiar with the nature and location of the work, the conformation of the ground slopes and terrain, the nature of the soil and subsoil conditions, nature and extent of the materials that will be encountered during the construction operations and any existing site conditions that may affect the project, prior to the beginning of work.
C.2 Project Location and Access
All roads in the project area are located on the Smith River National Recreation Area of the Six Rivers National Forest. The Project Roads are located southwest of Gasquet. Gasquet is located approximately 18 miles east of Crescent City, California on State Highway 199. Project Roads can be accessed from State Highway 199, Del Norte County Roads 411, 427, and 405. See the project map for access routes to the roads.
C.3 Operating Season There is a limited operating season for this project. Work can begin after July 31st or as soon the Northern Spotted Owl breeding season is over. Until September 15 there will be daily restrictions where no heavy equipment would work until two hours after sunrise and stop two hours before sunset. All work is to be completed by October 15, the anticipated start of the wet weather season. Work after October 15 may be authorized by the Contracting Officer due to extended dry weather or where existing conditions warrant continuing work to protect resources.
C.4 Equipment All equipment shall be suitable for the purpose intended and shall meet all requirements of the Occupational Safety and Health Act. The Contracting Officer may order the removal or require the replacement of any unsatisfactory equipment.
All vehicles and machinery operating on or from the traveled way or road shoulder shall have flashing lights or rotary beacons operated continuously while work is in progress. All equipment shall be equipped with a standard slow moving vehicle emblem. Truck headlights shall be on while operated. Backup warning devices shall be required on self-propelled equipment in excess of 8,000 pounds gross vehicular weight.
Vehicles and machinery not currently used in maintenance operation shall be parked off the traveled way at the approved location to minimize interference with normal use of the road.
Smith River Decommissioning & Stormproofing, Six Rivers NF - 16 -
C.5 Equipment Cleaning To prevent the spread of the root disease Phytophora lateralis in the Port Orford cedar (POC) and to prevent the spread of non-native plant species and invasive weeds, the following will be required on the Gasquet Ranger District of the Six Rivers National Forest.
Unless otherwise agreed, Contractor shall clean all vehicles and equipment before entry into the district unless Forest Service waives the cleaning requirement in writing. Thereafter, all vehicles and equipment that leave the district or enter infected portions of the district must be cleaned prior to their reentry, unless waived by the Forest Service. All cleaning of vehicles or equipment shall be done at sites agreed to by Forest Service and the Contractor. The water used for washing will be from a source in non-infected drainages. Forest Service shall inspect all equipment prior to entry, as appropriate and determined necessary. Forest Service will determine infected and uninfected areas. Cleaning shall include the removal of soil by steam cleaning or use of high-pressure water spray.
C.6 Standard Specifications for Construction Of Roads And Bridges On Federal Highway Projects
(FP-03 U.S. CUSTOMARY UNITS)
All of the specifications from the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 are applicable to this project and are a part of this solicitation and any resultant contract. The specifications are included by reference and the full specifications are available at the following website: http://flh.fhwa.dot.gov/resources/pse/specs/fp-03.htm
C.7 Supplemental Project Specifications Supplemental Specifications are applicable to this Solicitation and any resultant contract. Special Project Specifications reference the Standard Specifications and delete, supplement or substitute information contained therein. See the Table of Contents under Supplemental Specifications for Construction of Roads and Bridges on Federal Highway Projects contained within for a full listing.
C.8 ERRATA
The words ". . . or equal", ". . .or approved equal" and ". . .equivalent to" when referring to brand name items are hereby deleted in their entirety from this solicitation
C.9 Contract Time and Estimated Start Work Date Contract time is 75 calendar days. Weather permitting, a Notice to be Proceed will be issued by the Government August 1st, 2017.
C.10 AGAR 452.211-73 Attachments to Statement Of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made a part of this solicitation and any resultant contract.
http://flh.fhwa.dot.gov/resources/pse/specs/fp-03.htm
Smith River Decommissioning & Stormproofing, Six Rivers NF - 17 -
SECTION D – Government Furnished Property
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the FAR clauses “52.245-1 -- Government Property”, or “52.245-9 -- Use and Charges” as applicable.
Item No. Description Quantity Delivery Date 62503 Seed As needed Notify COR 7 days prior to use for delivery
SECTION E - Inspection and Acceptance
E.1 Inspection of Construction FAR 52.246-12 (AUG 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not—
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may—
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect
Smith River Decommissioning & Stormproofing, Six Rivers NF - 18 -due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
SECTION F - Deliveries or Performance
F.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.acquisition.gov/far/ https://www.dm.usda.gov/procurement/policy/agar.htm (AGAR)
Variation in Estimated Quantity, FAR 52.211-18 (APR 1984) Suspension of Work, FAR 52.242-14 (APR 1984)
F.2 Commencement, Prosecution, and Completion of Work, FAR 52.211-10 (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 75 calendar days. The time stated for completion shall include final cleanup of the premises.
F.3 Schedules for Construction Contracts, FAR 52.236-15 (APR 1984)
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer.
If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or http://www.acquisition.gov/far/ https://www.dm.usda.gov/procurement/policy/agar.htm
Smith River Decommissioning & Stormproofing, Six Rivers NF - 19 -schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
F.4 Submittal Requirements
SUBMITTALS
The following submittals are required for this project: Title
Referenced by Specification No
Time of Government Approval After Submittal
Erosion control plan 157.03a, Landscape Preservation
14 days
Hazardous spill plan 107.10 14 days
Fire Plan Fire protection and suppression 14 days
Construction Schedule FAR 52.236-15 14 days
Safety Plan FAR 52.236-13 14 days
Traffic control Plan 156.00 14 days
Erosion control plan 157.03a, Landscape Preservation 14 days
Hazardous spill plan 107.10 14 days
F.5 Material Certifications and Testing Reports
The following material certifications and/or testing reports shall be submitted on this project: Title
Referenced by Specification No
Time of Government Approval After Submittal
Aggregate Surface Course 703.05 14 days
Smith River Decommissioning & Stormproofing, Six Rivers NF - 20 -
SECTION G - Contract Administration Data
G.1 Postaward Conference, AGAR 452.215-73 (NOV 1996) A post award conference with the successful offeror may be held after contract award. The conference will be held at a mutually agreeable time and location.
G.2 Designation of Contracting Officer's Representative The Contracting Officer designates the Contracting Officer's Representative(s) (COR). The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)
On all matters that pertain to the contract terms, the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G.3 Contractor Performance Assessment Reporting System (CPARS)
(a) General. This contract may be subject to Federal Acquisition Regulations (FAR), Agriculture Acquisition Regulations (AGAR), and Forest Service Acquisition Regulations (FSAR) that require past performance evaluations to be completed and entered into the Contractor Performance Assessment Reporting System (CPARS).
(b) Contact Information. At the Pre-work Meeting, the name and email address of the Contractor Representative will be required.
(c) Assessment. Upon completion of the work associated with the contract/delivery orders (including prior to any renewal options exercised), an evaluation will be initiated by the Contracting Officer in the CPARS system and the Contractor Representative will receive an auto-email from CPARS with instructions for completion of the evaluation.
Smith River Decommissioning & Stormproofing, Six Rivers NF - 21 -
SECTION H - Special Contract Requirements
H.1 Use of Premises
(a) Forest Service Regulations for Use of Campground prohibits occupancy of developed recreation sites for other than primarily recreation purposes. One camp unit will be allowed at the project site for use by a watchman.
(b) A storage site will be permitted at a designated site within the project area. The Forest Service assumes no liability for materials stored within the storage site. The Contractor will be allowed to erect a temporary fence to secure materials and equipment, however, the fence shall be removed and the site restored prior to final acceptance of the contract.
(c) When the Contractor’s operations require a temporary electrical power distribution system, the system shall comply with the National Electrical Code, applicable local codes and utility regulations. The Contractor shall make all arrangements with the serving utility for temporary power and shall pay the serving utility for all applicable fees and power consumed.
(d) Potable water and sanitary facilities are NOT available for use during construction.
(e) The Contractor is authorized to use roads that are part of the construction project and those Forest Service Roads designated below for performance of work under this contract.
(f) The Contractor is responsible for all road maintenance and repair work caused by their operations.
Road No. Road Termini Authorizations, Restrictions or Requirements
Maintenance Required
16N02
0.00 – 17.8
None Incidental Repair 16N03 0.00 – 14.4 16N18 0.00 – 9.0 17N04 0.00 – 7.9 17N05 0.00 – 9.7 17N07 0.00 – 8.4
Load Limits - All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, over-width permits.
Forest Service overload permits for this project may be obtained from the Gasquet District Ranger.
H.2 Emergency Response, AGAR 452.236-77 (NOV 1996)
(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
Smith River Decommissioning & Stormproofing, Six Rivers NF - 22 -
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.
H.3 Invoice Processing Platform (IPP)
INVOICE SUBMISSION PROCEDURES
The "Submit Invoice-to" address for invoices on USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). All invoices for work performed under this contract shall be submitted via the electronic Invoice Processing Platform. This platform is managed by the U.S. Department of Treasury and additional information is available at this website: https://www.ipp.gov/index.htm.
After award of a contract, please make sure your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account, there is no pre-award registration. PRIOR to starting the IPP enrollment process, please verify that the point of contact’s (POC’s) email address is current in the System for Award Management (SAM) account for your company (www.sam.gov). Recent update(s) to a SAM registration need time to process from a “Pending” to in an “Active” status on the SAM account. The one-time enrollment in IPP means a series of emails will be sent to the POC identified in the SAM account. For assistance with questions on the IPP enrollment process, creating invoices, or uploading attachments to IPP please contact the IPP help desk phone number is 1- 866-973-3131.
Invoices in IPP are the official request for payment. Supporting information is required for all construction progress payments and shall be attached to the IPP invoice.
• The payment certification required in FAR 52.232-5 Payments under Fixed-Price Construction Contracts must be signed and submitted for each progress payment requested,
• A breakdown of billing, based on the pricing schedule along with the progress schedule, must be included as attachments to the IPP invoice.
Additionally, the government will verify the contractor’s compliance with the submission of certified payrolls for the invoiced timeframe as required in FAR Clause 52.222-8 Payrolls and Basic Records. The Contractor shall submit payrolls weekly for each week in which any contract work is performed by the prime or any subcontractors. The copies shall be sent to the COR. Payrolls submitted shall set out accurately and completely all of the information required in the contract clause (form WH-347 is an optional form compliant with the requirement and is available for download at www.dol.gov). State or County government forms lack the specific certification requirement and are not acceptable without supplementation of the certification statement.
Invoices not complying with contract requirements will be rejected.
https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm http://www.sam.gov/ http://www.dol.gov/
Smith River Decommissioning & Stormproofing, Six Rivers NF - 23 -
PART II – CONTRACT CLAUSES
SECTION I - Contract Clauses
I.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATIONS (FAR)
52.202-1 Definitions. (NOV 2013) 52.203-3 Gratuities. (APR 1984) 52.203-5 Covenant against Contingent Fees. (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (May 2011) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or
Proposed for Debarment. (OCT 2015) 52.215-2 Audit and Records - Negotiation (OCT 2010) 52.219-6 Notice of Total Small Business Set Aside (NOV 2011) 52.219-8 Utilization of Small Business Concerns. (NOV 2016) 52.219-14 Limitations on Subcontracting. (JAN 2017) 52.219-28 Post-Award Small Business Program Representations (JUL 2013) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation (MAY 2014) 52.222-5 Davis-Bacon Act--Secondary Site of the Work. (MAY 2014) 52.222-6 Davis-Bacon Act. (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (OCT 2015) 52.222-36 Equal Opportunity Action for Workers with Disabilities (JUL 2014) 52.222-37 Employment Reports on Veterans (FEB 2016) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.223-6 Drug-Free Workplace. (MAY 2001) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent. (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity--Construction Contracts (DEC 2007) http://www.acquisition.gov/ http://www.usda.gov/procurement/policy/agar.html
Smith River Decommissioning & Stormproofing, Six Rivers NF - 24 -
52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets. (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit. (NOV 2014) 52.228-15 Performance and Payment Bonds - Construction. (OCT 2010) 52.229-3 Federal, State, and Local Taxes. (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014) 52.232-17 Interest. (MAY 2014) 52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims. (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (JUL 2013) 52.233-1 Disputes. (MAY 2014) 52.233-3 Protest after Award. (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) 52.236-2 Differing Site Conditions. (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-5 Material and Workmanship. (APR 1984) 52.236-6 Superintendence by the Contractor. (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-8 Other Contracts. (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) 52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984) 52.236-12 Cleaning Up. (APR 1984) 52.236-13 Accident Prevention. (NOV 1991) 52.236-15 Schedules for Construction Contracts. (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.242-13 Bankruptcy. (JUL 1995) 52.243-4 Changes. (JUN 2007) 52.246-21 Warranty of Construction. (MAR 1994) 52.248-3 Value Engineering - Construction. (OCT 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) 52.249-10 Default (Fixed-Price Construction). (APR 1984) 52.253-1 Computer Generated Forms. (JAN 1991)
AGRICULTURE ACQUISITION REGULATION
452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996) 452.236-72 Use of Premises. (NOV 1996) 452.236-73 Archaeological or Historic Sites. (FEB 1988) 452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996) 452.236-76 Samples and Certificates. (FEB 1988)
Smith River Decommissioning & Stormproofing, Six Rivers NF - 25 -
I.2 Updates of Publicly Available Information Regarding Responsibility Matters. FAR 52.209-9
(JUL 2013)
(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management database via https://www.acquisition.gov.
(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments—
(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by—
(i) Government personnel and authorized users performing business on behalf of the Government;
or
(ii) The Contractor, when viewing data on itself; and
(2) The publicly-available segment, to which all data in the non-public segment of FAPIIS is automatically transferred after a waiting period of 14 calendar days, except for—
(i) Past performance reviews required by subpart 42.15;
(ii) Information that was entered prior to April 15, 2011; or
(iii) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.
(c) The Contractor will receive notification when the Government posts new information to the
Contractor’s record.
(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the non-public segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of Information procedures, prior to reposting the releasable information.
The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.
(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.
(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.
(d) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.
I.3 Affirmative Procurement of Biobased Products under Service and Construction Contracts, FAR 52.223-2 (SEP 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The…