2._PLANS-SEIAD-DECOM-PHASE-1-2016.pdf
PDF 3 MB Posted
- Attached to
- Seiad Decommissioning, Phase I Federal contract opportunity
- Solicitation number
- AG-9AC7-S-16-0147
About this file
Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_8-17.pdf | ||
| 1._Updated-SPECIAL_PROJECT_SPECS.pdf | ||
| 3._PAL_Fire_Plan_030613.pdf | ||
| AG-9AC7-S-16-0147_Solicitation.pdf | ||
| 4._CA9._mod_8 _dated_07292016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ken Bigelow
Ken Kellogg
Jeff Marszel
P atri ci a Granth am
3/24/2016
3/24/2016
3/24/2016
3/24/2016
COUNTY ROAD
FOREST SERVICE
ROAD NUMBER
LEGEND
PROJECT ROAD
LOCALITY MAP
NO SCALE
METAL PIPE, PIPE ARCHES OR ARCHES
SECTION 602 OR 605 604 605 621 251
C O
R R
U G
A T
I O
N S
Ø
C M P
Ø
C M P
Ø
C M P
E L
B O
W
B R
A N
C H
O N
N
E N
D
S
E C
T I O
N
I N
L E
T
R
I S
E R
P I P
E
I N
L E
T
P R
E F
A B
R I C
A T
E D
R A
I N
S F
G R
A N
U L
A
F
I L
L E
R
M A
T E
R I A
L
C
Y
I N
C H
I N
C H
I N
C H
I N
C H
A N
C H
S
T A
K E
G E
O T
E X
T I L
E
SIZE
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
D E
B R
C
K
T
Y P
E
TYPE
PREFAB DRAIN
CORR. METAL SPILLWAY RIPRAP
REMARKS
VIII V III SY
SITE
MILE POST
ROAD NO.
NOTES:
1. QUANTITIES ON THIS SHEET ARE BASED ON
DESIGN DATA ONLY & ARE SUBJECT TO
ADJUSTMENTS BEFORE & DURING
CONSTRUCTION TO SUIT FIELD CONDITIONS.
ABBREVIATIONS:
Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE
SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH
PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT
SIZE TYPE NO TYPE
CU. YDS.
C L
A S
S
C L
A S
S
C L
A S
S
I N
L E
T
A S
S E
M B
L Y
FLUME OUTLET
PIPE
48N20.2 0.20 9020 CONSTRUCT TYPE IV ROLLING DIP
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
CONSTRUCT TYPE IV ROLLING DIP
CONSTRUCT TYPE IV ROLLING DIP
1.2647N17Y
1.34
9030 REPLACE EXISTING CMP W/ 36"Ø CMP, CONSTRUCT TYPE IV DIP
1.44
1.48
1.51
1.55
1.65
1.75
1.78
1.90
1.96
1.80
1.86
2.01
2.05
2.10
2.13
2.29
2.17
2.20
2.26
BASE PACKAGE
9030 REPLACE EXISTING CMP W/ 36"Ø CMP, CONSTRUCT TYPE IV DIP60
CONSTRUCT TYPE IV ROLLING DIP9030
CONSTRUCT TYPE IV ROLLING DIP9030
CONSTRUCT TYPE IV ROLLING DIP9030
CONSTRUCT TYPE IV ROLLING DIP9030
CONSTRUCT TYPE IV ROLLING DIP6020
CONSTRUCT TYPE IV ROLLING DIP3010
CONSTRUCT TYPE IV ROLLING DIP3010
CONSTRUCT TYPE IV ROLLING DIP3010
CONSTRUCT TYPE IV ROLLING DIP6020
CONSTRUCT TYPE IV ROLLING DIP6020
CONSTRUCT TYPE IV ROLLING DIP6020
CONSTRUCT TYPE IV ROLLING DIP6020
CONSTRUCT TYPE IV ROLLING DIP3010
CONSTRUCT TYPE IV ROLLING DIP3010
CONSTRUCT TYPE IV ROLLING DIP3010
CONSTRUCT TYPE IV ROLLING DIP3010
CONSTRUCT TYPE IV ROLLING DIP3010
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
47N17Y
METAL PIPE, PIPE ARCHES OR ARCHES
SECTION 602 OR 605 604 605 621 251
C O
R R
U G
A T
I O
N S
Ø
C M P
Ø
C M P
Ø
C M P
E L
B O
W
B R
A N
H
N
N
E N
D
S
E C
T I O
N
I N
L E
T
R
I S
E R
P I P
E
I N
L E
T
P R
E F
A B
R I C
A T
A
I N
S F
G R
A N
U L
F
L
L E
R
M A
T E
R I A
L
C
Y
I N
C H
I N
C H
I N
C H
I N
C H
A N
C H
A
K E
G E
O T
E X
T I L
E
SIZE
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
D E
B R
C
K
T
Y P
E
TYPE
PREFAB DRAIN
CORR. METAL SPILLWAY RIPRAP
REMARKS
VIII V III SY
SITE
MILE POST
ROAD NO.
NOTES:
1. QUANTITIES ON THIS SHEET ARE BASED ON
DESIGN DATA ONLY & ARE SUBJECT TO
ADJUSTMENTS BEFORE & DURING
CONSTRUCTION TO SUIT FIELD CONDITIONS.
ABBREVIATIONS:
Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL CMP = CORRUGATED METAL PIPE
SPP = STRUCTURAL PLATE PIPE SPPA = STRUCTURAL PLATE PIPE ARCH SPA = STRUCTURAL PLATE ARCH
PP = PERFORATED PIPE CMPA = CORRUGATED METAL PIPE ARCH CSBC = CORRUGATED STEEL BOX CULVERT
SIZE TYPE NO TYPE
CU. YDS.
C L
A S
S
C L
A S
S
C L
A S
S
I N
L E
T
A S
S E
M B
L Y
FLUME OUTLET
PIPE
Ø
C M P
Ø
C M P
Ø
C M P
Ø
C M P
CONSTRUCT TYPE IV ROLLING DIP0.0847N17Y 9030
OPTIONAL PACKAGE
0.1447N17Y
0.2647N17Y
0.4447N17Y
0.4847N17Y
0.5447N17Y
0.6047N17Y
0.6647N17Y
0.6847N17Y
0.7147N17Y
0.7547N17Y
0.7847N17Y
0.8147N17Y
0.9047N17Y
0.9347N17Y
1.0447N17Y
CONSTRUCT TYPE IV ROLLING DIP3010
CONSTRUCT TYPE IV ROLLING DIP
CONSTRUCT TYPE IV ROLLING DIP
CONSTRUCT TYPE IV ROLLING DIP6020
CONSTRUCT TYPE IV ROLLING DIP
CONSTRUCT TYPE IV ROLLING DIP
CONSTRUCT TYPE IV ROLLING DIP
CONSTRUCT TYPE IV ROLLING DIP3010
CONSTRUCT TYPE IV ROLLING DIP9030
CONSTRUCT TYPE IV ROLLING DIP9030
CONSTRUCT TYPE IV ROLLING DIP9030
CONSTRUCT TYPE IV ROLLING DIP9030
CONSTRUCT TYPE IV ROLLING DIP9030
CONSTRUCT TYPE IV ROLLING DIP9030
CONSTRUCT TYPE IV ROLLING DIP9030
10 30
EXCAVATE ENTIRE FILL TO
NATURAL GROUND AND PLACE ON
ROADWAY TO OBTAIN OUTSLOPE
OR AS DIRECTED BY THE
ENGINEER
NATURAL GROUND
LINE
CLEARING FILL SLOPE AS NEEDED
EXCAVATE FILL AND PLACE
ON ROADWAY TO OBTAIN
OUTSOPE OR AS DIRECTED
BY THE ENGINEER
NATURAL GROUND
LINE
FILL
CLEARING FILL SLOPE AS NEEDED
EXCAVATE AND
USE FOR FILL
ON DITCH LINE
AND INSIDE OF
ROAD
FILL DITCH
LINE IF
APPLICABLE
O
U
T
S
L
O
P
FILL
CLEARING
AS NEEDED
TO CREATE
OUTSLOPE
NOTES:
1. TEMPORARY DRAINAGE STRUCTURES
REQUIRED TO DE-WATER SITES NEEDED FOR
ACCESS TO WORK AREAS ARE INCIDENTAL TO
CONSTRUCTION.
2. DECOMMISSION SHALL RE-ESTABLISH
PRE-ROAD DRAINAGE PATTERNS AS
DETERMINED BY THE ENGINEER. OUTSLOPING
SHALL BE CARRIED THROUGH TURNOUTS AND
LANDINGS.
3. ALL DISTURBED AREAS SHALL BE DRY
SEEDED AND MULCHED. SEEDING SEASON
WAIVED.
4. AT THE TRANSITION TO DECOMMISSIONING
TOPOGRAPHIC FEATURES WILL BE RESTORED
FOR 50' TO 100' OR AS SPECIFIED IN THE
PROJECT DRAWINGS.
5. TREES OVER 8" DBH CAN BE LEFT IN THE
CLEARING AND GRADED AROUND.
6. ALL CLEARING WILL BE DISPOSED OF BY
SCATTERING OUTSIDE OF AREA SEEDED.
7. ALL AREAS TO BE EXCAVATED OR RECEIVE
FILL WILL BE CLEARED IN ADVANCE OF
CONSTRUCTION.
8. A LIMITED OPERATING SEASON WILL BE
REQUIRED TO PROTECT THREATENED SPECIES
UNLESS OTHERWISE AGREED, NO WORK SHALL
BE PERFORMED ON THIS PROJECT BETWEEN
OCT 15 AND MAY 15.
9. PRIOR TO PROJECT IMPLEMENTATION ALL
AREAS DESIGNATED OUTSIDE OF ROAD PRISM
(BORROW, WASTE AND STOCKPILE AREAS)
WILL REQUIRE PRIOR APPROVAL FROM THE
HERITAGE PROGRAM MANAGER.
BEGIN PLACEMENT OF EXCAVATED
MATERIAL FROM THROUGH FILLS
AND CMP REMOVAL 50' FEET
BEYOND THE HINGE POINT OF
ANY CMP & FILL REMOVAL SITE.
MATERIAL PLACEMENT
NOT TO EXCEED TOP OF
ROAD CUT BANK
O
U
T
S
L
O
M
N
I M
U
M
O
U
T
S
L
O
M
X
I M
U
M
FILL HEIGHT
VARIABLE
FILL RATIO
1-1/2:1
FILL
EXCAVATE AND USE FOR FILL IN THROUGH CUTS
ADDITIONAL MATERIAL CAN BE OBTAINED FROM
THROUGH FILLS AS DIRECTED BY THE ENGINEER
FILL
CLEARING AS
NEEDED TO
CREATE
OUTSLOPE
O
U
T
S
L
O
AREA TO BE
SEEDED & MULCHED
AREA TO BE
SEEDED & MULCHED
AREA TO BE SEEDED & MULCHED
AREA TO BE SEEDED & MULCHED
AREA TO BE SEEDED & MULCHED
N
A
T
U
R
L
L
O
P
E
PLACE EXCAVATED MATERIAL
INTO CUT AREA.
EXCAVATE EXISTING FILL
EXISTING ROADWAY
LIMBS W/IN THE CLEARING
LIMITS SHALL BE CUT IN A
CLEAN, STRAIGHT
FASHION, FLUSH W/ THE
TREES TRUNK EVEN IF IT
REQUIRES GOING
OUTSIDE THE CLEARING
LIMITS
NOTES:
1. TRAVELED WAY SHALL BE 16 FEET, PLUS CURVE WIDENING & TURNOUTS.
2. LENGTH OF THE TURNOUTS SHALL BE AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER.
3. THE EXISTING DITCH SHALL BE FILLED UNLESS NOTED OTHERWISE ON THE DRAWING.
4. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS DESIGNATED OUTSIDE OF THE ROAD PRISM (BORROW, WASTE & STOCKPILE AREAS) WILL
REQUIRE PRIOR APPROVAL FROM THE HERITAGE PROGRAM MANAGER.
5. ALL VEGETATION GREATER THAN 4" DBH SHALL BE LEFT TO MAINTAIN SITE STABILITY EXCEPT WHERE SIGHT DESIGN REQUIRES REMOVAL OR
WHERE DRAINAGE WOULD BE IMPEDED.
6. ALL DISTURBED AREAS OUTSIDE OF THE TRAVELED WAY SHALL BE SEEDED & MULCHED IN ACCORDANCE W/ SPECIFICATION 625.
7. OUTSIDE EDGE OF ROAD SHALL BE EXCAVATED TO CREATE OUTSLOPE. EXCAVATED MATERIAL SHALL BE USED ON INSIDE OF ROAD TO FILL DITCH &
CONSTRUCT SHOULDER.
8. CULVERTS IDENTIFIED FOR REMOVAL SHALL BE DISPOSED OF OFF FEDERAL LANDS. THOSE NOT IDENTIFIED FOR REMOVAL SHALL REMAIN.
9. ROADWAY MAY BE SHIFTED TO PROVIDE SIGHT DISTANCE & CURVE WIDENING AS DIRECTED BY THE ENGINEER.
10. A LIMITED OPERATING SEASON WILL BE REQUIRED TO PROTECT THREATENED AQUATIC SPECIES. UNLESS OTHERWISE AGREED, NO WORK SHALL
BE PERFORMED ON THIS PROJECT BETWEEN OCTOBER 15TH AND APRIL 15TH.
11. IN ACCORDANCE W/ SECTION 15714 AN EROSION CONTROL PLAN SHALL BE SUBMITTED PRIOR TO COMMENCEMENT OF WORK.
Scale: NOT TO SCALE
TYPICAL SECTION - OUTSLOPING W/ FILLED DITCH
A
Scale: NOT TO SCALE
TYPICAL SECTION - OUTSLOPING W/ NO DITCH
C
Scale: NOT TO SCALE
TYPICAL SECTION - OUTSLOPING & RETAIN DITCH
B
Scale: NOT TO SCALE
TYPICAL SECTION - INSLOPING & RETAIN DITCH
D
4'
CLEARING LIMITS
TRAVELED WAY
OUTSLOPE EDGE
WIDTH VARIABLE
AREA TO BE
SEEDED
4'
CLEARING LIMITS
TRAVELED WAY
OUTSLOPE
EDGE
WIDTH
VARIABLE
AREA TO BE
SEEDED
4'
CLEARING LIMITS
TRAVELED WAY
OUTSLOPE EDGE
WIDTH VARIABLE
AREA TO BE
SEEDED
CLEARING LIMITS
4'
TRAVELED WAY
10 14.0
50 60 75 100 150 300
17.0
22.7
26.6
29.4
31.3
32.6
33.5
34.6
14.0 14.7 15.2 15.6 15.7
17.3 17.5 17.6 17.4 16.4
21.9
24.9
26.8
28.1
28.9
29.4
30.0
21.2 20.3 19.0 16.8
23.4 21.6 19.5 16.8
16.8
16.8
16.8
16.8
16.8
19.7
19.7
19.8
19.8
19.8
22.3
22.6
22.7
22.8
22.9
24.6
24.6
25.7
26.0
26.2
R I
R = CURVE RADIUS TO ROADWAY ℄ (FEET)
I = CENTRAL ANGLE (DEGREES)
***NOTE: CRUSHED
AGGREGATE SURFACING, IF
APPLICABLE, COMPACTED
DEPTH TO VARY (FROM 4" MIN
TO 6" MAX) BASED ON THE
AMOUNT OF AGGREGATE
AWARDED IN THE CONTRACT &
AS MARKED ON THE GROUND
BY THE ENGINEER. ALL
BLADING OF THE ROAD
SURFACE SHALL BE
INCIDENTAL TO ROCKING.***
6"
12"
2"
1"
#4
#200
80-100 (±6)
64-94 (±6)
40-69 (±6)
31-54 (±6)
4.0-7.0 (±3)
E
REINFORCEMENT
AGGREGATE
LENGTH
B+A+A+B
SURFACE AGGREGATE &
TOTAL DIP LENGTH
1 FT
DEPTH
SEIAD DECOMMISSIONING
FS ROAD 48N20.2
PROJECT LIMIT
REF JCT 48N20
BEGIN CLEARING & BRUSHING
OBLITERATE ROAD 200' &
DECOMMISSIONING
48N20
MP 0.00
N
MP 0.20 RE-ESTABLISH STREAM INTO
NATURAL CHANNEL, RE-CONTOUR &
CONSTRUCT TYPE IV DIP (W/ NO
1-1/2" MINUS SURFACE AGGREGATE)
AFTER CROSSING TO PREVENT
FUTURE STREAM DIVERSION;
REMOVE PERCHED FILL ALONG
ROAD UNTIL ROAD END
MP 0.22 REF END OF PROJECT
END RE-CONTOURING
END DECOMMISSIONING
SEIAD DECOMMISSIONING
FS ROAD 48N20.5
PROJECT LIMIT
REF JCT 48N20
BEGIN CLEARING &
BRUSHING
OBLITERATE ROAD 200'.
BEGIN RE-CONTOURING &
DECOMMISSIONING
48N20
MP 0.00
N
MP 0.20 REF END OF PROJECT
RE-CONTOUR LANDING
END RE-CONTOURING
END DECOMMISSIONING
SEIAD DECOMMISSIONING
FS ROAD 48N20.5A
PROJECT LIMIT
REF JCT 48N20.5
BEGIN CLEARING &
BRUSHING
BEGIN RE-CONTOURING &
DECOMMISSIONING
48N20.5
MP 0.00
N
A
MP 0.18 REF END OF PROJECT
RE-CONTOUR LANDING
END RE-CONTOURING
END DECOMMISSIONING
FS ROAD 48N20.5B
PROJECT LIMIT
REF JCT 48N20.5
BEGIN CLEARING &
BRUSHING
BEGIN RE-CONTOURING &
DECOMMISSIONING
48N20.5
MP 0.00
N
B
MP 0.02 REF END OF PROJECT
RE-CONTOUR LANDING
END RE-CONTOURING
END DECOMMISSIONING
SEIAD DECOMMISSIONING
FS ROAD 48N20.6
PROJECT LIMIT
REF JCT 48N20
BEGIN CLEARING &
BRUSHING
OBLITERATE ROAD 200'
BEGIN RE-CONTOURING &
DECOMMISSIONING
48N20
MP 0.00
N
MP 0.07 REF END OF PROJECT
RE-CONTOUR LANDING
END RE-CONTOURING
END DECOMMISSIONING
PROJECT LIMIT
REF 47N17Y
BEGIN CLEARING & BRUSHING
OBLITERATE ROAD 200' BEGIN
RE-CONTOURING &
DECOMMISSIONING
47N17Y
MP 0.00
MP 0.10 REF END OF PROJECT
END DECOMMISSIONING
N
Y
REMOVE APPROXIMATELY 20 CY
OF FILL FROM STREAM CHANNEL,
RE-ESTABLISH @ GRADE
MP 0.05
FS ROAD 47N17Y.1
FS ROAD 47N17Y
47N77
MP 0.00
N
Y
MP 1.65 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 1.55 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
N
Y
MP 1.75 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 1.80 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 1.86 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 1.90 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 1.96 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 2.01 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 2.05 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
PROJECT LIMIT REF 47N77
BEGIN CLEARING &
BRUSHING, BEGIN ROAD
RECONDITIONING, BEGIN
OUTSLOPING ROAD 3% - 5%,
CROWN OTHERWISE W/ 14'
ROAD WIDTH W/ CURVE
WIDENING. MAINTAIN OR
IMPROVE ALL EXISTING
ROLLING DIPS.
N
Y
MP 2.31 REF END OF PROJECT
END CLEARING & BRUSHING
END OUTSLOPING
MP 2.10 REMOVE EXISTING CULVERT,
INSTALL 36"Ø X 60' CMP,
CONSTRUCT TYPE IV, CLASS M
ROLLING DIP
MP 2.20 REMOVE EXISTING CULVERT,
INSTALL 36"Ø X 60' CMP,
CONSTRUCT TYPE IV, CLASS M
ROLLING DIP
MP 2.26 CONSTRUCT TYPE IV, CLASS M
ROLLING DIP
MP 2.29 CONSTRUCT TYPE IV, CLASS M
ROLLING DIP
MP 2.17 CONSTRUCT TYPE IV, CLASS M
ROLLING DIP
MP 2.13 CONSTRUCT TYPE IV, CLASS M
ROLLING DIP
MP 1.78 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 1.57 REF JCT 47N17.1
MP 1.18 REF JCT 47N17A RT
MP 1.51 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 1.48 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 1.44 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 1.34 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 1.26 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
NOTE: ALL MILEPOSTS ARE APPROXIMATE & SHALL BE MARKED ON THE GROUND BY THE ENGINEER
FS ROAD 47N17Y OPTIONAL
PACKAGE
PROJECT LIMIT REF 47N77
FS 47N77
MP 0.00
N
Y
MP 0.48 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.14 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.66 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.60 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.08 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.44 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.26 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.54 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.68 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.71 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.75 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.78 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.81 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.90 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 0.93 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
MP 1.04 CONSTRUCT TYPE IV,
CLASS M ROLLING DIP
N
Y
MP 1.18 REF JCT 47N17A RT
REF END OF PROJECT
NOTE: ALL MILEPOSTS ARE APPROXIMATE & SHALL BE MARKED ON THE GROUND BY THE ENGINEER
File details come from the government source that posted it. Updated .