A1_Supplimental_Specs.pdf

PDF 451 KB Posted

Attached to
Sims Culvert Replacement Project Federal contract opportunity
Solicitation number
AG-9AC7-S-16-0044
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Supplemental Specs

View the file

Other files for this federal contract opportunity

Other files attached to Sims Culvert Replacement Project, newest first.
File Type Posted
Amendment_002_Signed.pdf PDF
AG-9AC7-S-16-0044_Amend_001.pdf PDF
SF_24_BID_BOND.pdf PDF
A3_Sims_Drawings.pdf PDF
AG-9AC7-S-16-0044_Solicitation.pdf PDF
A4_Sims_PAL_Fire_Plan_030613.pdf PDF
A5_CA9 _mod_5_Dated_030416.pdf PDF
A2_Sims_Road_Logs_ _General_Notes.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sims Culvert Replacement Page 1 of 28 Special Project Specs

AG-9AC7-S-16-0044

Sims Culvert Replacement

Supplemental Specifications

For Construction of

Roads and Bridges on

Federal Highway Projects

FP-03

U.S. Customary Units

U.S. DEPARTMENT

OF TRANSPORTATION

Federal Highway Administration

Sims Culvert Replacement Page 2 of 28 Special Project Specs

Table of Contents

Table of Contents

Preface

101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid, Award, and Execution of Contract

102 Bid, Award, and Execution of Contract

103 - Scope of Work

Deletions

104 - Control of Work

Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources

105.02(a) Government-provided sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.07 Delete

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims

107.06 Contractor’s Responsibility for Work

107.09 Legal Relationship of the Parties

107.10 Environmental Protection

107.02 Protection and Restoration of Property and Landscape

108 - Prosecution and Progress

108 Delete

109 - Measurement and Payment

109 Deletions

109.02 Measurement Terms and Definitions

155 - Schedules for Construction Contracts

155 Delete

203 - Removal of Structures and Obstructions

203.01 Description

209 - Structure Excavation and Backfill

209.10 Backfill

209.11 Compacting

Table 209-1 Sampling and Testing Requirements

602 - Culverts and Drains

602.03 General

703 - Aggregate

703.05 Subbase, Base, Surface Course, and Screened Aggregate

704 - Soil

Sims Culvert Replacement Page 3 of 28 Special Project Specs

704.02 Bedding Material

718 - Traffic Signing and Marking Material

Sims Culvert Replacement Page 4 of 28 Special Project Specs

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of

National Forest System Roads.

Sims Culvert Replacement Page 5 of 28 Special Project Specs

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association

Mine Safety and Health Administration

National Institute of Standards and Technology

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the

“purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

http://www.nist.gov/

Sims Culvert Replacement Page 6 of 28 Special Project Specs

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal

Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale

Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition

Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.

Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the

Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Sims Culvert Replacement Page 7 of 28 Special Project Specs

Figure 101-1—Illustration of road structure terms.

Sims Culvert Replacement Page 8 of 28 Special Project Specs

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

Sims Culvert Replacement Page 9 of 28 Special Project Specs

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

Sims Culvert Replacement Page 10 of 28 Special Project Specs

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Sims Culvert Replacement Page 11 of 28 Special Project Specs

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The

Government is not obligated to make reimbursement for the cost of producing these materials.

Sims Culvert Replacement Page 12 of 28 Special Project Specs

106 - Acceptance of Work

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

Sims Culvert Replacement Page 13 of 28 Special Project Specs

107 - Legal Relations and Responsibility to the Public

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

Exact time and location of spill including a description of the area involved.

Containment procedures.

Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

Sims Culvert Replacement Page 14 of 28 Special Project Specs

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

107.10_05_us_05_04_2007

107.02 Protection and Restoration of Property and Landscape

Meet the requirements of AqEco-2 (pp. 21-23), Fac-7 (pp. 46-47), Road-7 (pp.117-120), Road-10 (pp.123-132), and Veg-2 (pp.131-132) in their entirety from “National Best

Management Practices for Water Quality Management on National Forest System Lands” dated April, 2012

(http://www.fs.fed.us/biology/resources/pubs/watershed/FS_National_Core_BMPs_April

2012.pdf).

Sims Culvert Replacement Page 15 of 28 Special Project Specs

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

Sims Culvert Replacement Page 16 of 28 Special Project Specs

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of

15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

Sims Culvert Replacement Page 17 of 28 Special Project Specs

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

Sims Culvert Replacement Page 18 of 28 Special Project Specs

203 - Removal of Structures and Obstructions

203.01_nat_us_02_25_2005

203.01 Description.

Delete and replace with the following:

This work consists of disposing of construction slash and debris, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.

Sims Culvert Replacement Page 19 of 28 Special Project Specs

209 - Structure Excavation and Backfill

209.10_nat_us_10_23_2007

209.10 Backfill.

(a) General.

Add the following:

Replace any pipe that is distorted by more than 5 percent of nominal dimensions, or that is ruptured or broken.

Do not place or backfill pipe that meets any of the following conditions until the excavation and foundation have been approved in writing by the CO:

Embankment height greater than 6 feet at subgrade centerline.

Installation in a protected streamcourse.

Round pipe with a diameter of 48 inches or greater.

Pipe arches with a span of 50 inches or greater.

Any box culvert of structure other than pipe culverts.

(b) Pipe culverts.

(1) Pipe culverts with compacted backfill.

Add the following:

Excavate an area on each side of the pipe as needed to effectively achieve compaction requirements. Backfill without damaging or displacing the pipe. Complete backfilling of the trench with suitable material.

209.11_nat_us_02_24_2005

209.11 Compacting.

Delete the subsection and add the following:

Compact backfill using designated compaction method A, B, or C:

Method A. Ensure that backfill density exceeds the density of the surrounding embankment.

Method B. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact each layer using appropriate compaction equipment until visual displacement ceases. For compaction under sections 252, 254, 255, 257, 258 and 262 compact with a vibratory steel wheeled roller with a mass of at least 8 tons.

Method C. Determine optimum moisture content and maximum density according to

AASHTO T 99 method C. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact material placed in all layers to at

Sims Culvert Replacement Page 20 of 28 Special Project Specs least 95 percent of the maximum density. Determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

Table 209-1 Sampling and Testing Requirements

(2) Compaction methods (A) and (B) do not require AASHTO T-99 or T-310 test methods for foundation fill.

Sims Culvert Replacement Page 21 of 28 Special Project Specs

602 - Culverts and Drains

602.03_nat_us_09_06_2005

602.03 General.

Add the following:

Ensure that the final installed alignment of all pipe allows no reverse grades, and does not permit horizontal and vertical alignments to vary from a straight line drawn from center of inlet to center of outlet by more than 2 percent of pipe center length or 1.0 feet, whichever is less.

Sims Culvert Replacement Page 22 of 28 Special Project Specs

703 - Aggregate

703.05_nat_us_12_07_2006

Delete 703.05 and replace with the following:

703.05 Subbase, Base, Surface Course, and Screened Aggregate.

(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-2

(2) Liquid limit, AASHTO T 89 25 max.

(3) Plastic limit, AASHTO T 90 Nonplastic

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 50% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.

Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-3

(2) Liquid limit, AASHTO T 89 35 max.

(3) Plastic Index, AASHTO T 90

a) If the percent passing the No. 200 sieve is less than 12% 2 to 9

b) If the percent passing the No. 200 sieve is greater than 12% Less than 2

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 75% min.

(9) Free from organic matter and lumps or balls of clay

Do not furnish material that contains asbestos fibers.

Sims Culvert Replacement Page 23 of 28 Special Project Specs

Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:

(1) Gradtion Table 703-16

(2) Plastic Index, AASHTO T 90 Less than 9

(3) Los Angeles abrasion, AASHTO T 96 55% max.

(4) Free from organic matter and lumps or balls of clay.

Sims Culvert Replacement Page 24 of 28 Special Project Specs

Delete Table 703-2 and replace with the following:

T a b le

-2 rg et

V a lu e

R a n g es f o r

S u b b a se a n d B a se

G ra d a ti o n

P er ce n t b y M a ss

P a ss in g D es ig n a te d

S ie v e

(A A

S H

T O

T a n d

T

G ra d in g D es ig n a ti

E

B a se

.0

.0

T h e v al u e in t h e p ar en th es es i s th e al lo w ab le d ev ia ti o fr o m t h e ta rg et v al u es

D

B a

.0

.0

C

B a

.0

.0

B

S u b b a

.0

.0

A

S u b b a se

.0

.0

S ie v e

S iz e

½ i ch i

½ i

/4 i

/2 i

/8 i

N

Sims Culvert Replacement Page 25 of 28 Special Project Specs

Delete Table 703-3 and replace with the following:

b le

-3 rg et

V a lu e

R a n g es f o r

S u rf a ce G ra d a ti

P er ce n t b y M a ss

P a ss in g D es ig n a te d

S ie v e

(A A

S H

T O

T a n d

T

G ra d in g D es ig n a ti

U

.0

.0

T h e v al u e in t h e p ar en th es es i s th e al lo w ab le d ev ia ti o fr o m t h e ta rg et v al u es

I f th e p la st ic it y i n d ex

P I) i s g re at er t h an th e T

V r an g e fo r th e

N o s ie v e si ze i s

-1

.0

.0

S

.0

.0

H

.0

.0

G

.0

.0

F

-1

-8

-6

-5

-3

-2

.0 -1

.0

S ie v e

S iz e

/2 i

/4 i

/2 i

/8 i

Sims Culvert Replacement Page 26 of 28 Special Project Specs

Add Table 703-16:

Table 703-16

Gradation Requirements for Screened Aggregate

Sieve Size

Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

L M N O P Q R

6 inch 100 100

4 inch 100 100

3 inch 100 100

2 inch 100

No. 4 15-45 15-45 15-45

Sims Culvert Replacement Page 27 of 28 Special Project Specs

704 - Soil

704.02_nat_us_03_02_2005

704.02 Bedding Material.

Delete Subsection 704.02 and substitute the following:

Furnish a well graded, free draining material free of excess moisture, muck, frozen lumps, roots, sod, or other deleterious material conforming to the following:

(a) Maximum particle size 1/2 inch or half the corrugation depth, whichever is smaller

(b) Material passing No. 200 sieve, 10% max.

AASHTO T 27 and T 11

Sims Culvert Replacement Page 28 of 28 Special Project Specs

718 - Traffic Signing and Marking Material

718.05_nat_us_02_25_2008

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM

B-449.