Standard_Specificationsdoc.pdf
PDF 106 KB Posted
- Attached to
- Green Fire Maintenance Federal contract opportunity
- Solicitation number
- AG-9AC7-S-16-0039
About this file
2) Standard Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15-2055_updated_3-16-2016.pdf | ||
| SF-30_Amendment_001.pdf | ||
| Solicitation_AG-9AC7-S-16-0039.pdf | ||
| Updated_PAL_Fire_Plan_complete.pdf | ||
| Location_Vicinity_Map.pdf | ||
| Road_Structure_Details_801-1.pdf | ||
| 842_LS.pdf | ||
| WD_05_2055_(Rev.19)_01_05_2016.pdf | ||
| RevisedRoadLog.pdf | ||
| 833-2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Standard Specifications
806 -- REGULATORY REQUIREMENTS (2015)
1. DESCRIPTION
This Section identifies the codes and standards which apply to the work in this contract.
2 REQUIREMENTS
The Contractor shall comply with any Federal, State, and municipal laws, codes, regulations, and standards that apply to the work to include but not limited to the following:
29 CFR Part 1926 -- Safety and Health Regulations for Construction 49 CFR -- Transportation Manual of Uniform Traffic Control Devices (MUTCD) NFPA 30 -- Flammable and Combustible Liquids Code NFPA 30A -- Motor Fuel Dispensing Facilities and Repair Garages American Society for Testing and Materials (ASTM) Standards National Historic Preservation Act
3. MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for meeting requirements of this Section. All work and materials shall be incidental to paid work in this contract.
808 - WORK AREA MANAGEMENT (1/92)
This Section establishes Contractor responsibilities for traffic control and equipment requirements in work areas.
2. REQUIREMENTS
a. Traffic Conditions - Roads other than those listed for work under Section 835 shall be open to traffic with not more than fifteen (15) minutes maximum delay time unless otherwise provided in Special Project Specifications.
b. Work which interferes with use of traveled roadways shall not be initiated or performed until a plan for satisfactory handling of traffic has been approved by the Government.
c. Traffic Control Devices
1. The Contractor shall provide signs and other devices complying with National Standards as contained in Part VI of the Manual of Uniform Traffic Control Devices (MUTCD). Traffic control for occupied work areas shall be in accordance with MUTCD specifications. All signs and devices remain the property of the Contractor.
2. Traffic devices shall be kept current with maintenance operation and removed upon its completion.
3. Traffic approaching the work zone from either direction and side accesses open to travel within the work zone shall be warned by signing.
4. Required signs may be mounted on portable or temporary mountings.
Standard MUTCD shapes, colors, sizes, and legends shall be used.
5. Hazards incidental to the work within or on the traveled way, shoulders, or turnouts shall be marked with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Work segments not completed on a daily basis shall be marked appropriately for night travel. Contractor shall obtain authorization before commencing work at night.
6. Advisory speed plates may be used to control traffic through the work area.
d. Flaggers - Properly equipped flag person(s) shall be provided where the traffic is required to stop before proceeding. Traffic shall be stopped in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required.
e. Contractor's Equipment
1. All vehicles and machinery operating on or from the traveled way or road shoulder shall have flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Truck headlights shall be on while operating. Back-up horns shall be required on all self-propelled equipment.
2. Vehicles and machinery not currently used in the maintenance operation shall be parked off the traveled way at approved locations to minimize interference with normal use.
3. Refuel and service vehicles and machinery well away from water or riparian resources. Clean up spills immediately. Remove service residues, waste oils, and other materials from National Forest land and dispose of them according to Federal, State, and Local laws.
4. Areas marked as being contaminated by invasive plants shall not be used to park, stage, or service vehicles and machinery.
3. MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for meeting requirements of this Section. All work and materials shall be incidental to paid work in this contract.
811 BLADING (2/2016)
This work consists of surface blading native or aggregate roads to a condition to facilitate traffic and provide proper drainage. Blading includes shaping the crown or slope of traveled way, maintaining berms and drainage dips, and compacting the surface in accordance with this specification.
2. MAINTENANCE REQUIREMENTS
a. Timing
Surface blading shall be performed during the contract period as ordered by the Government.
b. General
1. The existing traveled way and shoulders, including turnouts unless otherwise ordered, shall be bladed and shaped to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface unless otherwise Marked on the Ground, to at least one half inch (1/2") per foot of width, but not more than three quarter inch (3/4") per foot of width.
Surfacing materials shall be thoroughly loosened to a depth of no less than 2 inches or the depth of potholes or corrugations. Corrugations are washboarding and similar defects. Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected by the Contractor but will be considered incidental to blading. Scarification shall not go deep enough to cause contamination of the surfacing.
2. The Contractor shall apply water during blading when sufficient moisture is not present to prevent segregation. Water supply, hauling, and application shall be in accordance with Section 891 and shall be incidental to blading unless Pay Items for Section 891 are included in the Schedule of Items.
3. Existing native, rock or aggregate surfaced drainage dips shall be cleaned and shaped incidental to blading to divert surface runoff to existing outlet devices, ditches and discharge locations.
4. The Contractor shall establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than two (2) inches above the adjacent surface unless otherwise provided in the contract. Material not meeting this dimension shall be removed and placed outside the roadbed so as not to obstruct drainageways or structures. This material may be scattered off the roadbed if there is free drainage.
c. Routine Blading
1. Excess roadbed width shall be shaped only as needed to provide drainage away from the traveled way. Established grasses and other vegetation shall not be removed from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.
d. Compaction
All roads bladed under this section shall be compacted using one of the two following methods:
Compaction shall commence immediately following blading. Compaction methods are:
Compaction Method A: By breaking track while operating equipment on the bladed surface. Compaction shall cover the full width bladed surface.
Compaction Method B: 8-10 ton pneumatic, steel or equivalent vibrating roller, operated to cover the full width of the bladed surface two (2) times.
e. Intrusions
Where the minimum width of 12 feet is not available, the Contractor shall construct berms where ordered and marked on the ground. Material to provide berms will come from sources designated by the Government.
f. Undercutting
Roadway backslope shall not be undercut.
g. Intersections
1. Intersections with side roads which are not closed or restricted to vehicular use shall be bladed to assure smooth transitions.
2. Field evidence of closure or restrictions shall be considered to be signing, cross ditching in the road surface (traveled way), earth berms or other devices placed to discourage or eliminate use by passenger cars. Also, roads listed for work under Sections 835 or 838 shall be considered restricted.
3. Side roads listed for work under this Section shall be considered as not restricted.
h. Cleaning of Structures
Materials resulting from work under this Section shall not be allowed to remain on or in structures, such as bridges, culverts, cattleguards, drainage dips, aprons, or flumes.
i. Berms
Existing berms shall be maintained to the condition of adjacent segments when ordered by the Government.
j. Scarification
1. This work shall consist of distroying or breaking up old or damaged chip seal and dust oil surfaces and the loosening of native and pit run surfaces for blading and reshaping the road surface.
2. Scarification shall be accomplished by rippers spaced not more than
12 inches apart.
3. Scarification shall not penetrate the aggregate base to the subgrade.
Where aggregate base is 3 inches or greater in depth, the minimum scaification depth shall be 3 inches.
3. MEASUREMENT
Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.
a. Measurement for blading will be by the mile measured along the centerline of the roadway (see quantity measurement terms). Measurement will be to the nearest one-tenth (0.1) mile.
b. Each intersection bladed under 2.g. will be equivalent to one-tenth
(0.1) single-lane mile; however, when the intersecting side road is scheduled for subsequent blading under this Section, no measurement will be made.
c. Berm maintained or established will be measured by linear foot.
d. No measurement will be made under this Section for Compaction Method A.
Measurement for Compaction Method B will be the same as stated in 3.a for blading.
4. PAYMENT
a. The quantities measured and accepted will be paid for at the contract unit price shown in the Schedule of Items.
b. Payment will be made under:
Pay Item Pay Unit
811(1) Blading Surfaced Roads Mile 811(2) Blading Native and Pit Run Roads Mile 811(3) Berm Maintained Linear Foot 811(4) Establishing Berms Linear Foot 811(5) Compaction - Method B Mile 811(6) Scarification Pass Mile 811(7) Blading Surfaced Roads Mile
813 SPOT SURFACING (2/2016)
This work consists of placing surface aggregate as staked on the ground. It includes preparing the area, furnishing, hauling, and placing all necessary materials and other work necessary to blend with the adjacent road cross section.
2. MATERIALS
a. Materials will be Government furnished when stated in Schedule of Items.
b. Materials furnished by the Contractor shall conform to the gradation requirements and the quality requirements of Section 893.
3. MAINTENANCE REQUIREMENTS
a. The area to be spot surfaced shall be thoroughly loosened to a minimum depth of one (1) inch prior to placement of aggregate.
b. Mixing and Placing
1. When scheduled coincident with work under Section 811, spot surfacing and existing aggregate shall be mixed with water until a uniform mixture is obtained prior to final shaping and compaction.
2. The material shall otherwise be spread on the prepared area in layers no more than four (4) inches in depth. When more than one (1) layer is required, each layer shall be shaped and compacted before the succeeding layer is placed. Upon completion, the spot surfacing shall reasonably conform to the adjacent cross section and provide smooth transition in the road profile.
3. Compaction shall be accomplished by using Method A. Compaction Method A is considered incidental. Compaction Method B shall be used when ordered.
Compaction methods are:
Compaction Method A: By breaking track while operating equipment on the bladed surface. Compaction shall cover the full width bladed surface.
Compaction Method B: 8-10 ton pneumatic, steel or equivalent vibrating roller, operated to cover the full width of each layer two
(2) times.
4. MEASUREMENT
a. The quantity will be the number of cubic yards measured in the vehicles, or square yards of aggregate placed, or tonnage verified by weight slips whichever is shown in the Schedule of Items.
b. Hauling is considered incidental.
5. PAYMENT
a. The accepted quantities will be paid for at the contract unit prices shown in the Schedule of Items.
b. Payment will be made under:
Pay Item Pay Unit
813(1) Spot Surfacing, Grading ____ Cubic Yard 813(2) Spot Surfacing, Grading ____ Square Yard 813(3) Spot Surfacing, Grading ____ Ton 813(4) Spot Surfacing, Government Furnished Materials Cubic Yard 813(5) Compaction Method B Square Yard
832 REMOVAL, DISPOSAL AND HAUL OF MATERIALS (2/2016)
Work consists of ordered removal, hauling, and placing of slide, slough, or excess materials such as rock, soil, vegetation, and other materials to designated disposal sites.
2. MAINTENANCE REQUIREMENTS
a. Excess materials generated by work under other Sections of this contract may be ordered for removal, haul, and disposal under this Section.
Excess material from work sites contaminated with invasive plants shall be disposed of on site or hauled to a site that is already contaminated.
Contaminated matrials shall be covered while being hauled. Contaminated work sites and disposal sites will be MARKED ON THE GROUND.
b. Slide and slough materials to be removed shall include those in the area extending approximately six (6) feet vertically above the road surface and that area extending not more than four (4) feet downslope from the roadbed. Material shall be disposed of at designated sites as Marked on the Ground.
The slope which generated the slide material shall be reshaped as nearly as practical to its original condition by equipment operating from road surface. Reshaping of roadside ditches in slide area shall be in accordance with Section 831.
c. When ordered by the Government, slumps shall be filled by compacting selected materials into roadway depressions. Compaction shall be by Method 2.
d. All materials removed and placed in disposal sites shall be placed by one or more of the following methods as shown in Road Listing.
1. Method 1 - Side Casting and End Dumping. Material may be placed by side casting and end dumping. Where materials include large rocks, a solid fill shall be provided by working smaller pieces and fines into voids. The finished surfaces shall be shaped to drain.
2. Method 2 - Layer Placement. Surfaces on which materials are to be placed shall be stepped or roughened prior to placing any material.
Materials shall be placed in approximately horizontal layers no more than twelve (12) inches thick. Each layer shall be compacted by using one of the following methods:
Compaction Method A: By breaking track while operating equipment on the bladed surface. Compaction shall cover the full width bladed surface. Compaction method A is incidental Placement method 2 and shall be used unless compaction method B is specified.
Compaction Method B: 8-10 ton steel or equivalent vibrating roller, operated to cover the full width of each layer two (2) times.
a. Removal and disposal will be measured by the cubic yard, determined by equipment measure, for materials acceptably removed and placed.
b. Haul of materials will be measured by the cubic yard mile, determined by the number of miles hauled times the cubic yards. Mileage will be measured one way rounded to the nearest 1/10 mile.
a. The accepted quantity will be paid for at the contract unit price shown in the Schedule of Items.
832(1) Removal and Disposal, Placement Method 1 Cubic Yard 832(2) Removal and Disposal, Placement Method 2 Cubic Yard 832(3) Haul Yard Mile 832(4) Hauling Contaminated Materials Yard Mile 832(5) Compaction Method B Cubic Yard
833 CULVERT REPLACEMENT (11/07)
This work includes removal of existing culverts and appurtenances, bed preparation, and installation and backfill of new culverts and appurtenances of the size and length specified.
2. MATERIALS
Materials shall be furnished by the Contractor. All materials shall meet the requirements of Section 894
3. MAINTENANCE REQUIREMENTS
a. Excavation for culverts shall be at least as wide as three diameters of the existing pipe, and long enough to provide for proper joining of the culvert. The completed bottom shall be firm for its entire length and width. The culvert shall be installed to maintain a uniform flow line from inlet to outlet, with a positive camber in the invert. See Drawing 833-1 for culvert installation details.
b. Pipe sections shall be joined firmly by form-fitting coupling bands.
End sections shall be attached to pipe by connecting bands or other means recommended by the manufacturer. Gaskets shall be installed at each joint to form a watertight connection.
c. After the bedding is prepared and the pipe is placed, backfill material shall be placed in layers not exceeding six (6) inches loose thickness and compacted under the haunches and alongside the pipe. The material shall be readily compactible material free of frozen lumps, chunks of highly plastic clay or other objectionable material. Rocks larger than three (3) inches in greatest dimension shall not be used within one (1) foot of the pipe.
d. Backfill density shall be that obtained by compacting each layer with mechanical equipment designed for this purpose. Compaction shall continue until visual displacement ceases.
e. Backfill shall continue for a minimum of twelve (12) inches above the top of the culvert. Compaction shall continue to finished grade.
f. Culverts with cover exceeding seven (7) feet from the bottom of the pipe to the top of the fill or at locations requiring dewatering shall not be replaced under this section.
g. Drop Inlets shall be frabricated and installed as SHOWN ON DRAWING 833- 2.
h. Removed culverts and appurtenances become the property of the Contractor and shall be disposed of off of Government land. Disposal of removed culverts and appurtenances is considered incidental to the work in this specification.
Measurement will be made for each lineal foot of culvert specified and installed for culvert replacement and downpipe installation.
Measurement for hinged elbows, drop inlets, and drop inlet covers will be for each unit specified and installed. Costs included are for materials, labor for fabrication and installation, and miscellaneous parts.
Measurement for anchor assemblies will be for each assembly specified and installed.
a. Accepted quantities will be paid for at the Contract unit prices shown
833(1) Culvert Replacement, 18 inches Diameter Linear Foot
833(2) Culvert Replacement, 24 inches Diameter Linear Foot 833(3) Culvert Replacement, 36 inches Diameter Linear Foot 833(4) Culvert Replacement, 48 inches Diameter Linear Foot 833(5) Downpipe, 18 inches Diameter Linear Foot 833(6) Downpipe, 24 inches Diameter Linear Foot 833(7) Downpipe, 36 inches Diameter Linear Foot 833(8) Downpipe, 48 inches Diameter Linear Foot 833(9) Hinged Elbow, 18 and 24 inches Diameter Each 833(10) Hinged Elbow, 36 and 48 inches Diameter Each 833(11) Drop Inlet, 36 inches Diameter Each 833(12) Drop Inlet Cover Each 833(13) Anchor Assembly, 18 inches Diameter Each 833(14) Anchor Assembly, 24 inches Diameter Each 833(15) Anchor Assembly, 36 inches Diameter Each 833(16) Anchor Assembly, 48 inches Diameter Each 833(17) 18 inch Polyethylene Pipe, Dual Wall Linear Foot 833(18) 24 inch Polyethylene Pipe, Dual Wall Linear Foot 833(19) 36 inch Polyethylene Pipe, Dual Wall Linear Foot 833(20) 48 inch Polyethylene Pipe, Dual Wall Linear Foot
834 DRAINAGE STRUCTURE MAINTENANCE (11/07)
This work consists of cleaning and reconditioning culverts and other drainage structures.
a. Drainage structures, inlet structures (debris racks, drop inlets, etc.), culverts, catch basins, outlet structures, and inlet and outlet channels shall be cleaned and reconditioned when required by the Government. Catch basins shall be cleaned by removing the material within the area shown on Drawing 834-1.
b. The transition from the ditchline to the catch basin shall be cleaned a distance of ten (10) feet. Inlet channels shall be cleaned for a distance of ten (10) feet of debris that obstructs water flow or could move down and plug the culvert inlet. Outlet channels and lead-off ditches shall be cleaned their full length. Debris and vegetation shall be removed and placed so as to not enter the channel or ditch or obstruct traffic. Debris and vegetation in quantities of ten (10) cubic yards or less is incidental.
Quantities over ten (10) cubic yards will be paid for under Section 832.
Debris and vegetation ordered to be hauled shall be hauled to a designated disposal area in accordance with Section 832.
c. Hydraulic flushing of drainage structures is not allowed unless approved by the Government.
d. Cleaning and reconditioning is limited to the first four (4) feet of inlet and outlet determined along the top of the culvert and includes any inlet and outlet structres attached to the culvert. Reconditioning of culvert inlet or outlet or inlet or outlet structres shall be by field methods such as jacking out, welding broken parts, or cutting away damaged metal which obstructs flow. All cut edges and damage to galvanized coating shall be cleaned and treated with zinc rich coating. Damage or obstructions which are not field corrected under the requirements of this Section shall be reported to the Government.
e. Removal of brush and trees less than six (6) inches in diameter is incidental. The removal of brush and trees six (6) inches in diameter and larger shall be paid under Section 831. Brush and trees shall be disposed of by cutting into lengths of four (4) feet or less and scattered on fill slopes or outside the roadway limits.
a. Measurement will be the number of units of each culvert type including cleaning of inlet and outlet ditches or channels and catch basins completed and accepted.
b. Reconditioning and cleaning of drainage structures will be incidental to cleaning.
c. Ordered haul of materials will be measured under Section 832.
a. Quantities as determined above will be paid at the contract unit price.
834(1) Clean Culverts 24" Diameter and under Each 834(2) Clean Culverts Over 24" through 48" diameter Each 834(3) Clean Culverts Over 48" diameter Each
835 ROADWAY DRAINAGE MAINTENANCE (3/96)
This work consists of providing drainage on roads that have been physically closed to traffic.
a. Access
1. The Government will provide for access through locked gates and also provide any special devices other than standard wrenches or tools, required for removal or replacement of fabricated barricades.
2. Other work associated with Contractor's access shall be the responsibility of the Contractor. The entrance shall not be left available for access to persons not associated with this contract;
temporary barricades shall be used during the active performance of work.
b. Drainage
1. Upon completion of work, the roadway shall be shaped to provide for the removal of surface water, but need not be passable to vehicles.
Waterbars, barriers or berms existing prior to the Contractor's operation shall be repaired or reinstalled. Areas where water is ponded by existing centerline profile sags in through cuts may be left untreated.
2. Continuous blade shaping of the roadbed is not required under this specification.
3. Work to be done at staked locations shall be as indicated on the stake.
4. Any of the following methods are acceptable for use at eroded or rutted locations.
a. Method A: Outsloping the roadbed at not less than one-half (1/2) inch per foot.
b. Method B: Insloping the roadbed at not less than one-half (1/2) inch per foot of width.
c. Method C: Water bar roadbed at locations staked on the ground.
Construct in accordance with Drawings.
5. Drainage structures located in through fills and natural watercourses shall be fully functional without obstructions, including inlet and outlet channel within twenty (20) feet of the structure.
6. Culverts and other fabricated structures providing drainage from road ditches shall either be cleaned and the ditch made functional or waterbar(s) shall be provided across the roadbed. Fabricated drainage structures discharging on natural ground within three (3) feet of roadbed elevation may be removed at Government's option to provide the waterbar. Removed structures shall become Contractor's property to be removed from National Forest. Contractor-installed temporary drainage structures, if any, shall be removed and replaced with a water bar.
c. Slides, Slumps and Slough
1. Slides and slough may be left in place provided they do not potentially impound water or divert water from watercourses. Reshaping of the various surfaces shall be done as necessary to provide drainage.
2. Drainage shall be provided to effectively decrease or eliminate the entry of surface water into slides, slumps, and roadbed surface cracks.
The Contractor shall place berms, waterbars, or ditches as needed to intercept and remove runoff water from the roadbed. Cracks shall be surface sealed by covering with native soil materials to prevent additional water entry and compacting with equipment tires.
d. Entrance Devices
Upon completion of work, entrance devices shall be replaced to effectively eliminate access by motorized vehicles having four (4) wheels and a width in excess of fifty (50) inches.
e. Seeding
All disturbed areas shall be seeded and fertilized in accordance with requirements set forth in Section 836 and are incidental.
3. MEASUREMENT
Measurement for the ordered and accepted work will be the length of the road in miles as shown on the Road Listing.
a. The accepted quantity will be paid for at the contract unit price shown
835(1) Roadway Drainage Maintenance Miles
842 CUTTING ROADWAY VEGETATION (11/2016)
842.01 Service Required
Remove and dispose of vegetation to provide for user safety, and to facilitate routine roadway surface and drainage maintenance on Forest Service roads or road segments.
842.02 Equipment
1. Work shall be performed mechanically using a tractor mounted or self propelled brush cutting machine. The cutting head shall be a heavy duty flail type using heavy duty hammer head flails. The cutting head shall have minimum cutting width of 44 inches.
2. The brush cutting machine shall have an articulated boom able to reach 15 feet beyond the edge of the roadbed.
3. Tractors must meet or exceed the minimum requirements of the make and model of brush cutting machine being used. Tractors shall be rubber tired.
842.03 Performance Standard
General: Acceptable performance is attained when vegetation has been removed in accordance with the following requirements and those on Drawing 842.
1. Vegetation six (6) inches or less in diameter, within the cutting limits, shall be cut to a maximum height of six (6) inches above the ground surface or 2 feet below the roadbed. Vegetation shall be removed to the limits shown on Drawing 842.
2. Trees within the cutting limits which are over six (6) inches in diameter shall be limbed in lieu of cutting. Limbs shall be cut within four (4) inches of the trunk.
3. Trees or vegetation that restrict sight distance on the inside of road curves shall be cut or limbed to provide 125 feet of sight distance, measured from the centerline of the traveled way. The maximum cutting distance required to provide sight distance shall be as shown on Drawing 842.
4. Trees and vegetation growing in the ditch line, on the shoulder, on the roadbed or at culvert inlets and outlets shall be cut to a maximum height of three (3) inches above the ground.
5. Limbs and chunks in excess of three (3) inches in any dimension shall be removed from the traveled way and shoulders.
6. Trees and large branches shall be cut into lengths not to exceed four (4) feet.
842.04 Measurement
Measurement under this section will be made by the total number of completed and accepted units for each item listed in the Schedule.
Measurement for cutting vegetation will be determined by measuring the distance along the road centerline to the nearest one-tenth (1/10) mile on each road or road segment shown on the road listing.
842.05 Payment
Payment will be made under:
842(1) Cutting Roadway Vegetation, Both Sides Mile Heavy Vegetation
842(2) Cutting Roadway Vegetation, One Side Mile Heavy Vegetation
842.06 Acceptable Quality Levels
Description Major Defect Allowable Major Defects
Action Required to Correct Major
Defects Minor Defect Allowable Minor
Defects
Action Required to Correct Minor
Defects
Vegetation Removal
Vegetation remaining above the roadbed within the cutting limits
None Rework
Vegetation remaining within the cutting limits, but outside the road bed.
An aggregate total of 100 linear feet in any one mile segment.
Spot occurrences shall count for a minimum of 10 linear feet.
Rework, if more than 100 linear feet in any one mile segment exists.
Tree Damage
Bark peeled more than 6 inches in any dimension
None
Treat with approved sealer or remove tree as directed by the
C.O.
Bark peeled less than 6 inches in any dimension.
A total of 10 occurrences in any one mile segment.
Treat with approved sealer, if more than 10 occurrences in any one mile segment exist.
Brushing Debris Disposal
Scatter debris along fill slopes or outside cutting limits greater than 18 inches in depth
None Rework
Continuous debris concentrations 18 to 12 inches in height.
A maximum of 100 linear feet.
Rework if concentrations extend more than 100 feet.
Brushing Debris Disposal
Brushing debris placed in a drainage facility (ditch or culvert)
None Rework Brushing debris placed on a cut slope.
5 occurrences in any one mile segment.
Rework, if more than 5 occurrences in any one mile segment exists.
Brushing Debris Disposal
Brushing debris left on the traveled way or shoulders for more than 100 linear feet.
None Rework
Spot occurrences of brushing debris left on the traveled or shoulders less than 10 linear feet.
An aggregate total of 100 linear feet in any one mile segment.
Rework, if more than 100 linear feet in any one mile segment exists.
SECTION 883 CLEANING OF EQUIPMENT (1/08)
883.01 Services Required
Remove all soil from equipment working in areas infected with Port-Orford- Cedar Root Rot or containing noxious weeds. The locations of the infected areas will be noted in the Task Orders.
883.02 Performance Standard
Cleaning shall consist of the removal of all soil from equipment. Areas for cleaning of equipment will be designated by the Government. Cleaning will be inspected and accepted by the Government prior to the equipment leaving the area.
All equipment shall be clean when mobilized onto the Forest or moved from one District to another.
883.03 Measurement
Measurement under this section will be made by the total number of completed and accepted units for each item listed in the Schedule.
883.04 Payment
A. Payment will be made under:
883(1) Cleaning of Equipment Each
883.06 Acceptble Quality Levels
Description Major Defect
Allowable Major
Defects
Action Required to
Correct Major
Defects
Minor Defect Allowable Minor Defects
Action Required to
Correct Minor Defects
Equipment Cleaning
Soil remaining on equipment post cleaning
None Rework
Soil in the tracks or tires within the cleaning area
Minor amounts of soil from the cleaning prior to transport loading
Rework on transport
851 LOGGING OUT (2/2016)
This work consists of ordered removal of fallen trees and snags which encroach into the roadway.
a. Fallen timber, when marked with paint, shall be limbed and cut into standard log lengths. Resulting logs shall be decked at designated locations.
b. Unmarked materials shall be limbed and may be cut into lengths for handling and shall be decked outside ditches and drainages, off of the traveled way and turnouts or at staked locations.
c. Unmarked materials and any remaining trunks from marked materials shall be cut a minimum of four (4) feet beyond the roadbed limits.
d. All materials remain the property of the Government, unless otherwise stated in the contract.
e. Woody debris and slash in excess of one (1) foot in length or three (3) inches in diameter shall not remain in ditches, drainage channels, or on backslopes, traveled way, shoulders or turnouts. Accumulations of debris may be ordered hauled and paid under Section 832. Materials not ordered hauled shall be scattered downslope from the roadbed, avoiding any drainage ways or concentrations.
Measurement will be the number of trees ordered and acceptably logged out under this Section. Diameter size will be measured at the largest cut. Miles will be measured to the nearest tenth of a mile.
a. The quantity accepted will be paid at the contract unit price shownin the Schedule of Items.
851(1) Logging Out Unmarked Trees, Each
851(2) Logging Out Unmarked Trees, Mile All trees
851 LOGGING OUT (2/2016)
This work consists of ordered removal of fallen trees and snags which encroach into the roadway.
a. Fallen timber, when marked with paint, shall be limbed and cut into standard log lengths. Resulting logs shall be decked at designated locations.
b. Unmarked materials shall be limbed and may be cut into lengths for handling and shall be decked outside ditches and drainages, off of the traveled way and turnouts or at staked locations.
c. Unmarked materials and any remaining trunks from marked materials shall be cut a minimum of four (4) feet beyond the roadbed limits.
d. All materials remain the property of the Government, unless otherwise stated in the contract.
e. Woody debris and slash in excess of one (1) foot in length or three (3) inches in diameter shall not remain in ditches, drainage channels, or on backslopes, traveled way, shoulders or turnouts. Accumulations of debris may be ordered hauled and paid under Section 832. Materials not ordered hauled shall be scattered downslope from the roadbed, avoiding any drainage ways or concentrations.
Measurement will be the number of trees ordered and acceptably logged out under this Section. Diameter size will be measured at the largest cut. Miles will be measured to the nearest tenth of a mile.
a. The quantity accepted will be paid at the contract unit price shownin the Schedule of Items.
851(1) Logging Out Unmarked Trees, Each
851(2) Logging Out Unmarked Trees, Mile All trees
SECTION 883 CLEANING OF EQUIPMENT (6/07)
This work consists of removing all soil from equipment working in areas infected with Port-Orford-Cedar Root Rot or containing noxious weeds. The locations of the infected areas will be MARKED ON THE GROUND.
2. REQUIREMENTS
Cleaning shall consist of the removal of all soil from equipment by steam cleaning or the use of high pressure cleaning equipment. Areas for cleaning of equipment will be designated by the government. Cleaning will be inspected and accepted by the Government prior to the equipment leaving the area.
All equipment shall be clean when mobilized onto the Forest or moved from one District to another.
3. PAYMENT
Payment will be made, for all units cleaned, inspected and accepted, at the unit price SHOWN IN THE SCHEDULE OF ITEMS.
a. Payment will be made under:
883(1) Cleaning of Equipment Each
881 MOBILIZATION (5/15)
This Section consists of one or more mobilizations of personnel, equipment, supplies, and incidentals to the project site, or sites listed in the Schedule of Items. Unless otherwise shown in the Schedule of Items, there will be only one mobilization onto each District.
2. MEASUREMENT
When the contract establishes separate work periods within the contract time any additional mobilization included as a Bid Item will be retained until the actual work period.
3. PAYMENT
a. Progress payments will be made on the basis of the Bid Items contained in the Schedule of Items as follows:
1. When five (5) percent of the estimated contract amount in the work period is earned, fifty (50) percent of the amount of mobilization will be paid.
2. When twenty-five (25) percent of the estimated contract amount in the work period is earned, one hundred (100) percent of the amount for mobilization will be paid.
3. The total sum of all payments under this Section shall not exceed 10% of the total contract amount.
4. The contract amount for mobilization shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals involved in mobilization.
881(1) Mobilization Work Period Each
891 WATER SUPPLY AND WATERING (3/96)
This work consists of providing facilities to furnish an adequate water supply, hauling and applying water, and maintaining existing water quality, including times outside normal work hours.
2. MATERIALS
Suitable and adequate water sources and use restrictions will be designated by the Government. If the Contractor elects to provide water from other than designated sources, the Contractor shall be responsible to obtain the right to use the water including any cost for royalties involved. The rate of applications shall be based on the gallonage per mile ordered by the Government.
3. EQUIPMENT
a. Mobile watering equipment shall have watertight tanks of known capacity. If tank capacity is not known, it shall be measured and certified by the Contractor prior to use.
b. Positive control of water application is required. Equipment shall provide uniform application of water without ponding or washing.
c. An air gap or positive anti-siphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul if the source is a domestic potable water supply, or the water is used for tank mixing with any other materials.
d. The designated water sources may require some work prior to their use. Such work may include cleaning ponded areas, installing temporary weirs, or sandbags, pipe repair, pump installation or other items appropriate to the Contractor's operations. Flowing streams may be temporarily sandbagged or a weir placed to pond water. Contractor shall obtain approval on improvements for sandbags or weirs prior to placement. The Contractor is responsible for protection of water quality immediately downstream of Contractor installed improvements.
a. Unless specified in the Schedule of Items, development of water supply sources shall be incidental to work ordered. If in the Schedule of Items, measurement for development of water supply sites will be the number of sites ordered and accepted. When the Contractor elects to furnish water from other than the site designated, the elected source will be measured as a water supply site.
b. Unless specified in the Schedule of Items as watering for a specific Section of these specifications, measurement of water haul and application will be incidental. If indicated in the Schedule of Items, measurement shall be M- GALLONS (1,000 gallons) using calibrated tanks, distributors, or accurate water meters furnished by the Contractor. Hauling shall be incidental. In no case will payment be made for more gallons than ordered by the Government.
a. The accepted quantities will be paid for at the contract unit price shown in the Schedule of Items.
891(1) Developing Water Supply Sites Each 891(2) Water For Section ____________ M-Gallons 891(3) Water For Section ____________ M-Gallons
894 CULVERT PIPE (3/99)
1. Metallic-Coated Corrugated Steel Pipe
Pipe, special sections (such as elbows) and coupling bands shall conform to
AASHTO M 36M and AASHTO M 218, M 274, or M 289 for the dimensions and thicknesses specified. The thickness for steel pipe shall be as follows:
Diameter Thickness 18" .064 24" .064 36" .064 48" .079
2. Dual Wall Polyethylene Pipe
Polyethylene pipe 18 in. to 48 in. in diameter shall confrom to ASTM 894 and minimum cell class, ASTM D 3350, 334433C or 335434C.
Watertight joints shall conform to ASTM D 3212.
3. Watertight Gaskets
Gaskets for rigid pipe shall conform to AASHTO M198, type A or B.
Performance Standard