3) Road 13N18 Road Repair Log
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15-2055_updated_3-16-2016.pdf | ||
| SF-30_Amendment_001.pdf | ||
| Solicitation_AG-9AC7-S-16-0039.pdf | ||
| Updated_PAL_Fire_Plan_complete.pdf | ||
| Location_Vicinity_Map.pdf | ||
| Road_Structure_Details_801-1.pdf | ||
| 842_LS.pdf | ||
| Standard_Specificationsdoc.pdf | ||
| WD_05_2055_(Rev.19)_01_05_2016.pdf | ||
| 833-2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Road 13N18 Road Repair
General Notes / Road Log
General Notes
Government furnish aggregate is located at the rock pit on Forest Road13N18 at mile post 6. Haul is considered incidental to Spot Surfacing.
Compaction of spot surfacing material shall be method B, roller compaction. Aggregate material shall be at a water content suitable for maximum compaction in accordance with AASHTO T 310. Water hauling is considered incidental.
Disposal sites will be designated on the ground by the Contracting Officers Representative (COR).
Disposal sites will be within 2 miles of slide and sluff removal.
Road Log
13N18 – Donahue Flat Road Repair
MP 1.1: Install Drop Inlet on existing 18” culvert.
MP 2.0: Begin Brushing
MP 6.8: Clean Culvert inlet and remove two trees. There is a tree growing right next to the culvert inlet that needs removing and another that has pulled over plus a root wad about 15 feet up that needs removal. Haul to disposal area.
MP 6.9: Clean culvert inlet.
MP 7.1: 200 CY slide removal, haul to disposal area.
MP 7.4: Remove down tree from culvert inlet area.
MP 7.8: Remove tree from roadway.
MP 8.0: 20 CY of sluff removal.
MP 8.4: 20 CY of sluff removal.
MP 8.7: 100 CY of slide removal.
MP 8.8: 40 CY of slide removal.
MP 9.6: 80 CY of slide removal.
MP 10.0: Road settlement and crack. Grade the road through the settlement area (approximately 300 feet) and roller compact. (This is where the road takes a significant dip over a culvert and then crosses a reinforced fill).
MP 11.6: 40 CY slide removal.
MP 13.7: 30 CY slide removal.
MP 14.0 : End Brushing
Optional Item – Road 13N18
MP 2.0 to 2.3: Spot rock 4 inches depth.