Attachment_1 _011000-Summary-of-work_(1).pdf
PDF 95 KB Posted
- Attached to
- ADVANCED METER INSTALLATION Federal contract opportunity
- Solicitation number
- AG-9AB5-S-15-0063
About this file
PROJECT SPECIFICATIONS SECTION 011000
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| Attachment_9 _SO_Electrical_Site_Plan.pdf | ||
| Attachment_6 _270000-TelecommunicationWiringSystems-20140507.pdf | ||
| Attachment_11 _Wage_Determination_CA150033_(CA33).pdf | ||
| Attachment_5 _260913-Advanced-Meter-System-20140507.pdf | ||
| Attachment_4 _260050_BasicMethodsAndMaterials-20140507.pdf | ||
| Attachment_3 _260010_General-Technical-Provisions-20140507(1).pdf | ||
| Attachment_10 _SO_Single_line_Diagram.pdf | ||
| Solicitation.pdf | ||
| Attachment_2 _013000-Submittals(1).pdf | ||
| Attachment_7 _Acton_one_line-Layout1.pdf | ||
| Attachment_8 _Sheet_E2.2_floor_plan_Acton.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Forest Service Project Specifications
5/7/2014 AMS Installation 011000 Page - 1/2
Summary of Work
SECTION 011000
SUMMARY OF WORK
1. GENERAL
1.01 SUMMARY
A. This Section includes the following:
1. Related Documents
2. Work covered by the Contract Documents.
3. Type of the Contract.
4. Work phases.
5. Work under other contracts.
6. Warranty
1.02 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and other Division 01 and Division 27 Specification
Sections, apply to this Section.
1.03 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Identification: Installation of Advanced Meter System
B. This project consists of installing an Advanced Metering system, including the installation meter enclosures, power wiring, circuit breakers, signal wiring, CT installations, and data communications wiring.
C. Government Furnished Material includes advanced meter(s) in an enclosure, and manufacturer’s drawings.
D. Contractor to provide necessary ancillary materials and equipment as identified in individual specification sections for a complete operational Advanced Meter System.
E. Coordinate all sections of Division 26 within the division and with all other divisions.
All general technical provisions apply to all sections of this division.
1.04 TYPE OF CONTRACT
A. Project will be a construction contract to install an Advanced Meter System. Service and supply contract to supply, submeters in existing enclosures, and provide a commissioning service, under a single prime contract.
1.05 WORK PHASES
A. The Work within this contract is Phase II of a larger project, as described below:
1. Phase I system delivery: Advanced meter(s) manufactured and shipped by
Schneider Electric to the Government. The product will be furnished to the
Phase II contractor for installation.
2. Phase II: Installation.
3. Phase III: On-site Start up and Base Commissioning: To be jointly performed under this contract and by Government personnel. See individual specification sections for the division of work.
USDA Forest Service Project Specifications
5/7/2014 AMS Installation 011000 Page - 2/2
Summary of Work
4. Phase IV: Remote Final Commissioning: by Schneider Electric.
1.06 WORK UNDER OTHER CONTRACTS
A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract.
Coordinate the Work of this Contract with work performed under separate contracts.
1.07 WARRANTY
A. All work within this contract as subject to a 1 year warranty period.
2. PRODUCTS (NOT USED)
3. EXECUTION (NOT USED)
END OF SECTION
File details come from the government source that posted it. Updated .