Amendment_1.pdf
PDF 26 KB Posted
- Attached to
- ADVANCED METER INSTALLATION Federal contract opportunity
- Solicitation number
- AG-9AB5-S-15-0063
About this file
Amendment 1 to add correct wording in section M. Evaluations Factors. M.5 Evaluation Factors line 5.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_9 _SO_Electrical_Site_Plan.pdf | ||
| Attachment_6 _270000-TelecommunicationWiringSystems-20140507.pdf | ||
| Attachment_11 _Wage_Determination_CA150033_(CA33).pdf | ||
| Attachment_5 _260913-Advanced-Meter-System-20140507.pdf | ||
| Attachment_1 _011000-Summary-of-work_(1).pdf | ||
| Attachment_4 _260050_BasicMethodsAndMaterials-20140507.pdf | ||
| Attachment_3 _260010_General-Technical-Provisions-20140507(1).pdf | ||
| Attachment_10 _SO_Single_line_Diagram.pdf | ||
| Solicitation.pdf | ||
| Attachment_2 _013000-Submittals(1).pdf | ||
| Attachment_7 _Acton_one_line-Layout1.pdf | ||
| Attachment_8 _Sheet_E2.2_floor_plan_Acton.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 1 (4/21/2015) Solicitation #RFP #AG-9AB5-S-15-0063
Project: Angeles Advanced Meter Installation
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Amendment 1 4/21/2015
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Southern California Acquisitions Service Area 1839 S. Newcomb Street Porterville, CA 93257
Southern California Acquisitions Service Area 1839 S. Newcomb Street Porterville, CA 93257
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
RFQ #AG-9AB5-S-15-0063
9B. DATED (SEE ITEM 11)
4/10/2015
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning ___1_ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or © By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
See #14 Description of Amendment
E. IMPORTANT: Contractor is not, is required to sign this document and return Original copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
The subject solicitation is hereby amended as follows:
Delete the sentence in section M.5, page 55 that reads: The technical work which must be addressed to be considered responsive includes the final design, fabrication, and installation of steel framed boarding floats with concrete decking and accessories in accordance with the project plans and specifications.
Add the correct sentence that reads: The technical work which must be addressed to be considered responsive includes the installation of the advanced meters, enercept sub-meters and the conduits and wiring in accordance with the plans and specifications.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
LINDA PHIPPS, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
File details come from the government source that posted it. Updated .