Schedule B.xls
XLS spreadsheet 216 KB Posted
- Attached to
- RECOVERY-Little North Fork Stormproofing Federal contract opportunity
- Solicitation number
- AG-9702-S-10-0010
About this file
Attachment 6 Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 00001.pdf | ||
| Plans-Little North Fork Stormproofing.pdf | ||
| Attachment 4 DBA Wage Det CA100009.pdf | ||
| AG-9702-S-10-0010 Pages 1-3.pdf | ||
| Special project specification.doc | DOC document | |
| AG-9702-S-10-0010 Pages 4-34.pdf | ||
| Fire Plan.doc | DOC document | |
| PPQ.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MP 1.30
| PART I - THE SCHEDULE | |||||||||
| SECTION B - SCHEDULE OF ITEMS | |||||||||
| LITTLE NORTH FORK STORMPROOF | |||||||||
| KLAMATH NATIONAL FOREST | |||||||||
| SISKIYOU COUNTY, CALIFORNIA | |||||||||
| The bidder must bid on all items. | |||||||||
| Item No. | description | method of meas. | unit | est. quantity | unit | ||||
| price | amount bid | ||||||||
| Project # 40N51 -M.P. 1.30 | |||||||||
| 204(20) | Soil Erosion and Polution Control | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 304(10) | Crushed Aggregate, Type Surface Course, Grading C, Compaction B | DQ | C.Y. | 100 | $ | _________ | $ | _________ | |
| 601A(01) | Mobilization | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 603(02) | 35-Inch Span, 24-Inch Rise, Corrugate metal pipe Arch, .079-Inch Thickness for Steel, or .075-inch thickness for Aluminum, Method A | AQ | L.F. | 80 | $ | _________ | $ | _________ | |
| 619(03)A | Machine-Placed RipRap, Class III | DQ | CY | 320 | $ | _________ | $ | _________ | |
| 619(18) | Geotextile without Gravel Cushion (Function J, Type Non-Woven, Needle Punched) | DQ | S.Y. | 160 | $ | _________ | $ | _________ | |
| TOTAL BID this Project: | $ |
MP 4.02
| PART I - THE SCHEDULE | |||||||||
| SECTION B - SCHEDULE OF ITEMS | |||||||||
| LITTLE NORTH FORK STORMPROOF | |||||||||
| KLAMATH NATIONAL FOREST | |||||||||
| SISKIYOU COUNTY, CALIFORNIA | |||||||||
| The bidder must bid on all items. | |||||||||
| Item No. | description | method of meas. | unit | est. quantity | unit | ||||
| price | amount bid | ||||||||
| Project # 40N51 -M.P. 4.02 | |||||||||
| 203(02) | Excavation, Placement Method 2 | DQ | C.Y. | 938 | $ | _________ | $ | _________ | |
| 204(20) | Soil Erosion and Polution Control | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 206(02) | Excavation for Reinforced Embankment Structure | DQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 304(10) | Crushed Aggregate, Type Surface Course, Grading C, Compaction B | DQ | C.Y. | 30 | $ | _________ | $ | _________ | |
| 601A(01) | Mobilization | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 603(01)A | 18-Inch Corrugated Metal Pipe, .079-Inch Thickness for Steel, or .075-Inch Thickness for Aluminum, Method A | AQ | L.F. | 50 | $ | _________ | $ | _________ | |
| 605(22) | Granular Filter Material | DQ. | C.Y. | 70 | $ | _________ | $ | _________ | |
| 605A(01) | Prefabricated Drain (Includes Geotextile and Drain Core) | DQ | S.F. | 1,080 | $ | _________ | $ | _________ | |
| 605A(27) | 6-Inch Polyethylene (PE) Drain Pipe Perforated | AQ | L.F. | 60 | $ | _________ | $ | _________ | |
| 605A(28) | 6-Inch Polyethylene (PE) Drain Pipe Non-Perforated | AQ | L.F. | 60 | $ | _________ | $ | _________ | |
| 613D(01) | Reinforced Embankment | DQ. | C.Y. | 1,029 | $ | _________ | $ | _________ | |
| 613D(03) | Geogrid | DQ | S.Y. | 1,573 | $ | _________ | $ | _________ | |
| 619(03)B | Machine-Placed RipRap, Class V | DQ | CY | 15 | $ | _________ | $ | _________ | |
| 625(07) | Seeding, Dry Method (with Mulch) | DQ | ACRE | 0.12 | $ | _________ | $ | _________ | |
| 625(19) | Erosion Control Blanket, Type Straw and Coconut | DQ | S.Y. | 280 | $ | _________ | $ | _________ | |
| TOTAL BID this Project: | $ |
MP 4.22
| PART I - THE SCHEDULE | |||||||||
| SECTION B - SCHEDULE OF ITEMS | |||||||||
| LITTLE NORTH FORK STORMPROOF | |||||||||
| KLAMATH NATIONAL FOREST | |||||||||
| SISKIYOU COUNTY, CALIFORNIA | |||||||||
| The bidder must bid on all items. | |||||||||
| Item No. | description | method of meas. | unit | est. quantity | unit | ||||
| price | amount bid | ||||||||
| Project # 40N51 -M.P. 4.22 | |||||||||
| 203(02) | Excavation, Placement Method 2 | DQ | C.Y. | 751 | $ | _________ | $ | _________ | |
| 204(20) | Soil Erosion and Polution Control | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 206(02) | Excavation for Reinforced Embankment Structure | DQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 304(10) | Crushed Aggregate, Type Surface Course, Grading C, Compaction B | DQ | C.Y. | 40 | $ | _________ | $ | _________ | |
| 601A(01) | Mobilization | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 605(22) | Granular Filter Material | DQ. | C.Y. | 80 | $ | _________ | $ | _________ | |
| 605A(01) | Prefabricated Drain (Includes Geotextile and Drain Core) | DQ | S.F. | 1,386 | $ | _________ | $ | _________ | |
| 605A(27) | 6-Inch Polyethylene (PE) Drain Pipe Perforated | AQ | L.F. | 77 | $ | _________ | $ | _________ | |
| 605A(28) | 6-Inch Polyethylene (PE) Drain Pipe Non-Perforated | AQ | L.F. | 60 | $ | _________ | $ | _________ | |
| 613D(01) | Reinforced Embankment | DQ. | C.Y. | 1,320 | $ | _________ | $ | _________ | |
| 613D(03) | Geogrid | DQ | S.Y. | 2,019 | $ | _________ | $ | _________ | |
| 625(07) | Seeding, Dry Method (with Mulch) | DQ | ACRE | 0.16 | $ | _________ | $ | _________ | |
| 625(19) | Erosion Control Blanket, Type Straw and Coconut | DQ | S.Y. | 358 | $ | _________ | $ | _________ | |
| TOTAL BID this Project: | $ |
MP 4.41
| PART I - THE SCHEDULE | |||||||||
| SECTION B - SCHEDULE OF ITEMS | |||||||||
| LITTLE NORTH FORK STORMPROOF | |||||||||
| KLAMATH NATIONAL FOREST | |||||||||
| SISKIYOU COUNTY, CALIFORNIA | |||||||||
| The bidder must bid on all items. | |||||||||
| Item No. | description | method of meas. | unit | est. quantity | unit | ||||
| price | amount bid | ||||||||
| Project # 40N51 -M.P. 4.41 | |||||||||
| 203(20)A | Drainage Excavation, Type I Rolling Dip | AQ | EACH | 1 | $ | _________ | $ | _________ | |
| 204(20) | Soil Erosion and Polution Control | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 304(10) | Crushed Aggregate, Type Surface Course, Grading C, Compaction B | DQ | C.Y. | 60 | $ | _________ | $ | _________ | |
| 601A(01) | Mobilization | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 605A(01) | Prefabricated Drain (Includes Geotextile and Drain Core) | DQ | S.F. | 560 | $ | _________ | $ | _________ | |
| 605A(27) | 6-Inch Polyethylene (PE) Drain Pipe Perforated | AQ | L.F. | 72 | $ | _________ | $ | _________ | |
| 605A(28) | 6-Inch Polyethylene (PE) Drain Pipe Non-Perforated | AQ | L.F. | 30 | $ | _________ | $ | _________ | |
| 613A(01) | Reinforced Soil Retaining Wall - Front Face | AQ | S.F. | 560 | $ | _________ | $ | _________ | |
| 619(03)A | Machine-Placed RipRap, Class III | DQ | CY | 30 | $ | _________ | $ | _________ | |
| 619(18) | Geotextile without Gravel Cushion (Function J, Type Non-Woven, Needle Punched) | DQ | S.Y. | 70 | $ | _________ | $ | _________ | |
| TOTAL BID this Project: | $ |
MP 4.48
| PART I - THE SCHEDULE | |||||||||
| SECTION B - SCHEDULE OF ITEMS | |||||||||
| LITTLE NORTH FORK STORMPROOF | |||||||||
| KLAMATH NATIONAL FOREST | |||||||||
| SISKIYOU COUNTY, CALIFORNIA | |||||||||
| The bidder must bid on all items. | |||||||||
| Item No. | description | method of meas. | unit | est. quantity | unit | ||||
| price | amount bid | ||||||||
| Project # 40N51 -M.P. 4.48 | |||||||||
| 203(02) | Excavation, Placement Method 2 | DQ | C.Y. | 150 | $ | _________ | $ | _________ | |
| 204(20) | Soil Erosion and Polution Control | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 304(10) | Crushed Aggregate, Type Surface Course, Grading C, Compaction B | DQ | C.Y. | 50 | $ | _________ | $ | _________ | |
| 601A(01) | Mobilization | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 619(03)A | Machine-Placed RipRap, Class III | DQ | CY | 150 | $ | _________ | $ | _________ | |
| 619(18) | Geotextile without Gravel Cushion (Function J, Type Non-Woven, Needle Punched) | DQ | S.Y. | 180 | $ | _________ | $ | _________ | |
| TOTAL BID this Project: | $ |
M P 4.60
| PART I - THE SCHEDULE | |||||||||
| SECTION B - SCHEDULE OF ITEMS | |||||||||
| LITTLE NORTH FORK STORMPROOF | |||||||||
| KLAMATH NATIONAL FOREST | |||||||||
| SISKIYOU COUNTY, CALIFORNIA | |||||||||
| The bidder must bid on all items. | |||||||||
| Item No. | description | method of meas. | unit | est. quantity | unit | ||||
| price | amount bid | ||||||||
| Project # 40N51 -M.P. 4.60 | |||||||||
| 203(02) | Excavation, Placement Method 2 | DQ | C.Y. | 1,160 | $ | _________ | $ | _________ | |
| 204(20) | Soil Erosion and Polution Control | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 304(10) | Crushed Aggregate, Type Surface Course, Grading C, Compaction B | DQ | C.Y. | 90 | $ | _________ | $ | _________ | |
| 601A(01) | Mobilization | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 603(01)B | 36-Inch Corrugated Metal Pipe, .079-Inch Thickness for Steel, or .075-Inch Thickness for Aluminum, Method A | AQ | L.F. | 92 | $ | _________ | $ | _________ | |
| 619(03)A | Machine-Placed RipRap, Class III | DQ | CY | 236 | $ | _________ | $ | _________ | |
| 619(18) | Geotextile without Gravel Cushion (Function J, Type Non-Woven, Needle Punched) | DQ | S.Y. | 400 | $ | _________ | $ | _________ | |
| 621(06) | Anchors for Downdrains for 36-inch Pipe | AQ | EACH | 2 | $ | _________ | $ | _________ | |
| 621(07) | 36-Inch Full Circle Outlet Pipe | AQ | L.F. | 30 | $ | _________ | $ | _________ | |
| 621(09) | Pipe Elbow 36-inch | AQ | EACH | 1 | $ | _________ | $ | _________ | |
| TOTAL BID this Project: | $ |
MP 4.77
| PART I - THE SCHEDULE | |||||||||
| SECTION B - SCHEDULE OF ITEMS | |||||||||
| LITTLE NORTH FORK STORMPROOF | |||||||||
| KLAMATH NATIONAL FOREST | |||||||||
| SISKIYOU COUNTY, CALIFORNIA | |||||||||
| The bidder must bid on all items. | |||||||||
| Item No. | description | method of meas. | unit | est. quantity | unit | ||||
| price | amount bid | ||||||||
| Project # 40N51 -M.P. 4.77 | |||||||||
| 203(20)A | Drainage Excavation, Type I Rolling Dip | AQ | EACH | 1 | $ | _________ | $ | _________ | |
| 204(20) | Soil Erosion and Polution Control | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 304(10) | Crushed Aggregate, Type Surface Course, Grading C, Compaction B | DQ | C.Y. | 80 | $ | _________ | $ | _________ | |
| 601A(01) | Mobilization | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 605A(01) | Prefabricated Drain (Includes Geotextile and Drain Core) | DQ | S.F. | 768 | $ | _________ | $ | _________ | |
| 605A(27) | 6-Inch Polyethylene (PE) Drain Pipe Perforated | AQ | L.F. | 64 | $ | _________ | $ | _________ | |
| 605A(28) | 6-Inch Polyethylene (PE) Drain Pipe Non-Perforated | AQ | L.F. | 30 | $ | _________ | $ | _________ | |
| 613A(01) | Reinforced Soil Retaining Wall - Front Face | AQ | S.F. | 768 | $ | _________ | $ | _________ | |
| 619(03)A | Machine-Placed RipRap, Class III | DQ | CY | 30 | $ | _________ | $ | _________ | |
| 619(18) | Geotextile without Gravel Cushion (Function J, Type Non-Woven, Needle Punched) | DQ | S.Y. | 70 | $ | _________ | $ | _________ | |
| TOTAL BID this Project: | $ |
M P 5.10
| PART I - THE SCHEDULE | |||||||||
| SECTION B - SCHEDULE OF ITEMS | |||||||||
| LITTLE NORTH FORK STORMPROOF | |||||||||
| KLAMATH NATIONAL FOREST | |||||||||
| SISKIYOU COUNTY, CALIFORNIA | |||||||||
| The bidder must bid on all items. | |||||||||
| Item No. | description | method of meas. | unit | est. quantity | unit | ||||
| price | amount bid | ||||||||
| Project # 40N51 -M.P. 5.10 | |||||||||
| 203(20)A | Drainage Excavation, Type I Rolling Dip | AQ | EACH | 1 | $ | _________ | $ | _________ | |
| 204(20) | Soil Erosion and Polution Control | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 304(10) | Crushed Aggregate, Type Surface Course, Grading C, Compaction B | DQ | C.Y. | 50 | $ | _________ | $ | _________ | |
| 601A(01) | Mobilization | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 605A(01) | Prefabricated Drain (Includes Geotextile and Drain Core) | DQ | S.F. | 1,664 | $ | _________ | $ | _________ | |
| 605A(27) | 6-Inch Polyethylene (PE) Drain Pipe Perforated | AQ | L.F. | 104 | $ | _________ | $ | _________ | |
| 605A(28) | 6-Inch Polyethylene (PE) Drain Pipe Non-Perforated | AQ | L.F. | 30 | $ | _________ | $ | _________ | |
| 613A(01) | Reinforced Soil Retaining Wall - Front Face | AQ | S.F. | 1,664 | $ | _________ | $ | _________ | |
| 619(03)A | Machine-Placed RipRap, Class III | DQ | CY | 30 | $ | _________ | $ | _________ | |
| 619(18) | Geotextile without Gravel Cushion (Function J, Type Non-Woven, Needle Punched) | DQ | S.Y. | 70 | $ | _________ | $ | _________ | |
| TOTAL BID this Project: | $ |
MP 5.63
| PART I - THE SCHEDULE | |||||||||
| SECTION B - SCHEDULE OF ITEMS | |||||||||
| LITTLE NORTH FORK STORMPROOF | |||||||||
| KLAMATH NATIONAL FOREST | |||||||||
| SISKIYOU COUNTY, CALIFORNIA | |||||||||
| The bidder must bid on all items. | |||||||||
| Item No. | description | method of meas. | unit | est. quantity | unit | ||||
| price | amount bid | ||||||||
| Project # 40N51 -M.P. 5.63 | |||||||||
| 203(02) | Excavation, Placement Method 2 | DQ | C.Y. | 464 | $ | _________ | $ | _________ | |
| 203(20)B | Drainage Excavation, Type IV Rolling Dip | AQ | EACH | 1 | $ | _________ | $ | _________ | |
| 204(20) | Soil Erosion and Polution Control | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 304(10) | Crushed Aggregate, Type Surface Course, Grading C, Compaction B | DQ | C.Y. | 110 | $ | _________ | $ | _________ | |
| 601A(01) | Mobilization | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 619(03)A | Machine-Placed RipRap, Class III | DQ | CY | 140 | $ | _________ | $ | _________ | |
| 619(18) | Geotextile without Gravel Cushion (Function J, Type Non-Woven, Needle Punched) | DQ | S.Y. | 300 | $ | _________ | $ | _________ | |
| TOTAL BID this Project: | $ |
MP16.34
| PART I - THE SCHEDULE | |||||||||
| SECTION B - SCHEDULE OF ITEMS | |||||||||
| LITTLE NORTH FORK STORMPROOF | |||||||||
| KLAMATH NATIONAL FOREST | |||||||||
| SISKIYOU COUNTY, CALIFORNIA | |||||||||
| The bidder must bid on all items. | |||||||||
| Item No. | description | method of meas. | unit | est. quantity | unit | ||||
| price | amount bid | ||||||||
| Project # 40N51 -M.P. 16.34 | |||||||||
| _________ | _________ | ||||||||
| 204(20) | Soil Erosion and Polution Control | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 304(10) | Crushed Aggregate, Type Surface Course, Grading C, Compaction B | DQ | C.Y. | 4,036 | $ | _________ | $ | _________ | |
| 306(01) | Reconditioning of Roadbed, Compaction A | DQ | MI | 2.58 | $ | _________ | $ | _________ | |
| 601A(01) | Mobilization | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| TOTAL BID this Project: | $ |
MP 6.97
| PART I - THE SCHEDULE | |||||||||
| SECTION B - SCHEDULE OF ITEMS | |||||||||
| LITTLE NORTH FORK STORMPROOF | |||||||||
| KLAMATH NATIONAL FOREST | |||||||||
| SISKIYOU COUNTY, CALIFORNIA | |||||||||
| The bidder must bid on all items. | |||||||||
| Item No. | description | method of meas. | unit | est. quantity | unit | ||||
| price | amount bid | ||||||||
| Project # 40N51 -M.P. 6.97 | |||||||||
| 203(02) | Excavation, Placement Method 2 | DQ | C.Y. | 185 | $ | _________ | $ | _________ | |
| 203(20)B | Drainage Excavation, Type IV Rolling Dip | AQ | EACH | 1 | $ | _________ | $ | _________ | |
| 204(20) | Soil Erosion and Polution Control | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 304(10) | Crushed Aggregate, Type Surface Course, Grading C, Compaction B | DQ | C.Y. | 160 | $ | _________ | $ | _________ | |
| 601A(01) | Mobilization | LSQ | L.S. | JOB | $ | _________ | $ | _________ | |
| 603(01)C | 72-Inch Corrugated Metal Pipe, .138-Inch Thickness for Steel, or .134-Inch Thickness for Aluminum, Method A | AQ | L.F. | 90 | $ | _________ | $ | _________ | |
| 619(03)A | Machine-Placed RipRap, Class III | DQ | CY | 110 | $ | _________ | $ | _________ | |
| 619(03)B | Machine-Placed RipRap, Class V | DQ | CY | 38 | $ | _________ | $ | _________ | |
| 619(18) | Geotextile without Gravel Cushion (Function J, Type Non-Woven, Needle Punched) | DQ | S.Y. | 256 | $ | _________ | $ | _________ | |
| TOTAL BID this Project: | $ | ||||||||
| GRAND TOTAL BID ALL PROJECTS: | $ |