Plans-Little North Fork Stormproofing.pdf
PDF 698 KB Posted
- Attached to
- RECOVERY-Little North Fork Stormproofing Federal contract opportunity
- Solicitation number
- AG-9702-S-10-0010
About this file
Attachment 3 Project Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Schedule B.xls | XLS spreadsheet | |
| Amendment 00001.pdf | ||
| Fire Plan.doc | DOC document | |
| PPQ.doc | DOC document | |
| Attachment 4 DBA Wage Det CA100009.pdf | ||
| AG-9702-S-10-0010 Pages 1-3.pdf | ||
| Special project specification.doc | DOC document | |
| AG-9702-S-10-0010 Pages 4-34.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL FOREST
VICINITY
Somes Bar
Dorris
Macdoel
Montague
Grenada
Weed
Mt hastaS
McCloud
YREKA
Fort Jones
Etna
Callahan
Happy Camp
Oregon
California
PROJECT LOCATION
Cecilville
APPROVED BY
STATE OF CALIFORNIA
INDEX MAP
SAN DIEGO
BLYTHE
NEEDLES
SAN BERNARDINO
PASADENA
LOS ANGELES
SANTA BARBARA
GOLETA
BAKERSFIELD
PORTERVILLE
FRESNO
BISHOP
STOCKTON
SONORA
PLACERVILLE
SACRAMENTO
MONTEREY
SAN
FRANCISCO
SANTA ROSA
TRUCKEE
NEVADA CITY
QUINCY
SUSANVILLE
REDDING
RED BLUFF
EUREKA
FORT BRAGG WILLOWS
WILLITS
UKIAH
ALTURAS
YREKA
CRESENT
CITY
MEXICO
NEVADA
OREGON
PACIFIC OCEAN
LEGEND
INTERSTATE HIGHWAYS
U.S. HIGHWAYS
STATE HIGHWAYS
FOREST HIGHWAYS
SCALE
0 50 100 150 200 MILES
DATE DATE
FOREST SUPERVISORDISTRICT RANGER
3 4 5 6
KLAMATH
DATE DATE
FOREST ENGINEER
Forks of
Salmon
N
W E
/S/ Ray Haupt /S/ Kenneth Stagg
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE - REGION FIVE
KLAMATH NATIONAL FOREST
SISKIYOU COUNTY, CALIFORNIA
PLANS FOR PROPOSEDPLANS FOR PROPOSED
SALMON RIVER RANGER DISTRICT
ROAD NO. MILES
40N51
DRAWING INDEX
TITLE
SHEET
No.
PROJECT ENGINEER
/S/ Michael Slette
LITTLE NORTH FORK STORMPROOF
02/18/09 02/18/0902/18/0902/18/09 /S/ Patricia Grantham
1 COVER SHEET/DRAWING INDEX
2 LOCALITY MAP
3 SUMMARY OF ESTIMATED QUANTITIES
4 DRAINAGE SUMMARY
5 HILFIKER WALL - GENERAL NOTES
6 UNDERDRAIN TYPICAL
7 CULVERT TYPICAL
8 DOWNDRAIN TYPICAL
9 TYPE I ROLLING DIP TYPICAL
10 TYPE IV ROLLING DIP TYPICAL
11 STRAIGHT LINE PLAN
12 REINFORCED EMBANKMENT TYPICAL
13-14 M.P. 1.30 ROCK FILL WITH CMPA
15 M.P. 4.02 REINFORCED EMBANKMENT
16 M.P. 4.22 REINFORCED EMBANKMENT
17-18 M.P. 4.41 REINFORCED SOIL RETAINING WALL
19 M.P. 4.48 RIPRAP RETAINING WALL
20-21 M.P. 4.60 REDUCE FILL
22-23 M.P. 4.77 REINFORCED SOIL RETAINING WALL
24-25 M.P. 5.10 REINFORCED SOIL RETAINING WALL
26 M.P. 5.63 LOWER GRADE
27-28 M.P. 6.97 REDUCE FILL NEW CMP
22.83
SHEET NO.PROJECT
SALMON RIVER RANGER DISTRICT
LOCALITY MAP
NO SCALE
Garden
G ulch
B
A 40N51 I
K CronanA J
Cr ee k
G ulchH
W indler
Boulder
O lsen
A
C re ek
N
N5
KanakaG
Gulch
G ul
F
40N41
Gulch D
Cre ek
C reekCrapo
A
B
Red Bank40N55Y e l l o w
G la sg ow
E Bi g
Shil tos
40N51 Jones
N2
Heiney Pollocks
G ulch Ri ve r
39N27
N
GulchSalmon
Gulch
AA
B
Fork 39N24 39N35
I B 39
N
39N
North
R12W
N1
40N51
Little North Fork
Sawyers Bar
N
EW
1C01
1C01
1C01Forks of Salmon
N5
40N51
40N51
M.P. 0.00
PROJECT
LIMIT
M.P. 22.83
PROJECT
LIMIT
T40N
EXISTING ROADS
WASTE AREA
STREAMS
LEGEND
ITEM
NO. DESCRIPTION
SUMMARY OF ESTIMATED QUANTITIES
KLAMATH NATIONAL FOREST
REVISED 4/81
METHOD
OF
MEASURE-
MENT
PAY
UNIT
ROAD NO. AND TOTALS
PROJECT SHEET NO.
AQ
AQ
EA.
EA.DRAINAGE EXCAVATION, TYPE I ROLLING DIP
SOIL EROSION AND POLUTION CONTROL LSQ L.S.
CRUSHED AGGREGATE, TYPE SURFACE COURSE,
GRADING C, COMPACTION B
MOBILIZATION LSQ L.S.
AQ
AQ
L.F.
L.F.
AQ
AQ
DQ
REINFORCED SOIL RETAINING WALL-FRONT FACE AQ S.F.
MACHINE-PLACED RIPRAP, CLASS V
DQ
DQ
S.Y.DQ
204(20)
304(10)
601A(01)
605A(01)
605A(27)
605A(28)
619(18)
DQ
DQ
DQ
C.Y.
C.Y.
L.F.
L.F.
S.F.
L.F.
L.F.
JOBJOBJOBJOBJOB JOB JOB JOB JOB JOB
JOBJOBJOBJOBJOB
JOBJOB
JOB JOB JOB JOB JOB
DQ C.Y.
203(02) EXCAVATION, PLACEMENT METHOD (2) DQ C.Y.
JOB
JOB
1 1
613A(01)*
6-INCH POLYETHYLENE (PE) DRAIN PIPE PERFORATED
6-INCH POLYETHYLENE (PE) DRAIN PIPE NON-PERFORATED
LITTLE NORTH FORK STORMPROOF
MACHINE-PLACED RIPRAP, CLASS III
621 (06)
619(03)A
619(03)B
ANCHORS FOR DOWNDRAINS FOR 36-INCH PIPE AQ
AQ
AQ
EA
621 (07) 36-INCH FULL CIRCLE OUTLET PIPE L.F.
621 (09) PIPE ELBOW 36-INCH EA
1 1
464 185
203(20)A
203(20)B DRAINAGE EXCAVATION, TYPE IV ROLLING DIP
110 160
** INCLUDES
QUANTITIES
FROM
M.P. 5.83 & M.P. 5.92
*** INCLUDES
QUANTITIES
FROM
M.P. 7.09
206(02) EXCAVATION FOR REINFORCED EMBANKMENT STRUCTURE LSQ L.S.
603(01)A
603(01)B
603(01)C 72-INCH CORRUGATED METAL PIPE, .138 INCH THICKNESS FOR STEEL,
OR .134 INCH THICKNESS FOR ALUMINUM, METHOD A
605(22) GRANULAR FILTER MATERIAL C.Y.
613D(01)* REINFORCED EMBANKMENT DQ
DQ
C.Y.
613D(03) GEOGRID S.Y.
625(07) SEEDING, DRY METHOD (WITH MULCH) DQ ACRE
625(19) EROSION CONTROL BLANKET, TYPE STRAW AND COCONUT DQ S.Y.
0.16
0.12
280 358
M.P. 4.02 M.P. 4.22 M.P. 4.41 M.P. 4.48 M.P. 4.60 M.P. 4.77 M.P. 5.10 M.P. 5.63 M.P. 6.97
18-INCH CORRUGATED METAL PIPE, .079 INCH THICKNESS FOR STEEL,
OR .075 INCH THICKNESS FOR ALUMINUM, METHOD A
PREFABRICATED DRAIN (INCLUDES GEOTEXTILE AND DRAIN CORE)
GEOTEXTILE WITHOUT GRAVEL CUSHION
(FUNCTION J, TYPE NON-WOVEN NEEDLE PUNCHED)
36-INCH CORRUGATED METAL PIPE, .079 INCH THICKNESS FOR STEEL,
OR .075 INCH THICKNESS FOR ALUMINUM, METHOD A
* INCLUDES QUALITY CONTROL AND TESTING
REF. GENERAL NOTES ITEM #8 ON 613A AND
GENERAL NOTES ITEM #14 ON 613D
M.P. 1.30 M.P.
16.34- 18.92
603(02) 80
306(01) RECONDITIONING OF ROADBED, COMPACTION A DQ MI 2.58
35-INCH SPAN, 24-INCH RISE, CORRUGATED MATAL PIPE ARCH, .079-INCH
THICKNESS FOR STEEL, OR .075- INCH THICKNESS FOR ALUMINUM, METHOD A
Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL
C CORRUGATED METAL PIPE
S P.
S.
. P.
.M. P. =
. P. P. A. = STRUCTURAL PLATE PIPE ARCH
S. P. A. = STRUCTURAL PLATE ARCH
P. P. = PERFORATED PIPE
C. M. P. A.= CORRUGATED METAL PIPE ARCH
DENOTES 5% SHOP ELONGATION*
K. N. F. REVISED 5/81
SECTION
EL
BO
W
BR
AN
C H
C O
N N
EN
D
S
EC
TI
O
N
IN
LE
T R
IS
ER
D
EB
R
IS
R
AC
K
TY
PE PI
PE
IN
LE
T
Ty pe
604 621
CORR. METAL SPILLWAYS
Type
AS
SE
M
BL
Y
IN
LE
T
IN
C
H
IN
C
H
IN
C
H
AN
C
H O
R
FLUME OUTLET
PIPE
No. Type
CU. YDS.
RIPRAP
REMARKS
PROJECT SHEET NO.
O R
R U
G
AT
IO
N
S C
ABBREVIATION
C
LA
SS
STRUCTURAL PLATE PIPE
NOTES :
2.
3.
alloy culvert at certain locations on this project. The pipe schedule defines of galvanized steel culvert pipe.
All pipe 48" in diameter and over shall be elongated 5% unless otherwise specified. Culverts in smaller diameters shall be elongated 5% if noted.
Quantities on this sheet are based on design data only and are subject to adjustments before and during construction to suit field conditions.
alternate thickness where aluminum alloy culvert pipe may be installed in lieu
1. The contractor has the option of installing either galvanized steel or aluminum
DRAINAGE SUMMARY
C. . .S.B.C.= CORRUGATED STEEL BOX CULVERT
603 or 617 or 605
METAL PIPE, PIPE ARCHES OR ARCHES, POLYETHYLENE PIPE
Size III
C
LA
SS
V
G
EO
TE
XT
IL
E
S.
Y.
PREFABRICATED DRAIN
PR
EF
AB
RI
CA
TE
D D
R
AI
N
S .F
SizeG R
AN
U
LA
R
F
IL
LE
R
M
AT
ER
IA
L C
.Y
6" P
ER
FO
R
AT
ED
PO
LY
ET
HY
LE
NE
P
IP
E
-IN
C H
C M
P
-IN
C H
C M
P
72 30
64 30
104 30
-IN
C H
30 2 1
-IN
C H
E
LB
O W
LITTLE NORTH FORK STORMPROOF
6" N
O N
-P
ER
FO
R
AT
ED
PO
LY
ET
HY
LE
NE
P
IP
E
ROAD No 40N51
M.P. 4.02 M.P. 4.02
M.P. 4.22
77 60 1386
1080 70
G
EO
G R
ID
M.P. 4.41 M.P. 4.48 M.P. 4.60 M.P. 4.77 M.P. 5.10
M.P. 6.97
-IN
C H
C M
P
M.P. 5.92
M.P. 5.63 M.P. 5.83 40
195195
M.P. 7.09
" X
4"
C M
PA
80 320 160
NO SCALE
WALL
LENGTH
FOUNDATION:
COMPACT TO 95%
OF T-180
2' 2'
ROADBED
BACKFILL:BACKFILL:
SLOPE 2:1 SLOPE 1/2:1
SHEET NO.
PROJECT
TYPICAL EXCAVATION LIMITS FOR RETAINING WALLS
HILFIKER WELDED WIRE WALLS - GENERAL NOTES
1. WORK - Under the provisions of Specification 613A, the contractor has the option of selecting among a variety of wall systems, subject to the
Hilfiker Retaining Walls ). If the contractor elects to use a wall met. As designed herein, the work consists of a welded wire retaining wall constructed in accordance with these specifications and the "Welded lines, grades, design, and dimensions shown on the plans or established by the Engineer.
2. MATERIALS - The contractor shall make his own arrangements to purchase the welded wire retaining wall elements, and all necessary attachments for the complete wall. For information concerning purchase and delivery of such materals, contact Hilfiker Retaining Walls, P.O. Box 2012, Eureka, Ca. 95502-2012; Toll Free ( 800 ) 762-8962. It should be noted that the company provides free technical assistance to the project site.
3. METHOD OF MEASUREMENT AND BASIS OF PAYMENT - The welded wire retaining wall shall be measured by the number of square feet of facing in place and accepted. No separate measurement will be made for the structure excavation, backfill, or embedment lengths. Payment under item 613A(01), at the contract price, shall be full compensation for 1) excavation, 2) furnishing the welded wire and accessories, labor, tools, and the plans, and 7) other incidentals necessary to complete the work identified by the plans, specifications, and Engineer.
4. WALL EXCAVATION - Typical excavation limits shall be as shown in the plans. The excavation shall be sloped to provide safety for construction workers and inspection personnel. Boulders, logs, and any other unsuitable materials encountered shall be removed and disposed of in areas approved by the Engineer. All suitable excavation material shall be contained in the work areas or on the adjacent roadway and shall not enter adjacent streams.
system other than Hilfiker, the requirements of section 613A.02 shall be
Wire 24" Lifts Construction Guide" ( Hilfiker Retaining Walls Corp., 1st.
Edition - November 2003 ), and in reasonably close conformity with the equipment, 3) placing the welded wire material, 4) backfilling,
6) reconstructing the existing road within the construction limits to the dimensions, grade, and crosslope as shown in and 7 on 40N51 is based on the use of Welded Wire Mesh ( trademark -
5. FOUNDATION APPROVAL - Prior to wall placement the foundation shall be level and smooth and compacted to 95% of AASHTO T-180, Method C or D.
The foundation shall be approved by the Engineer before any retaining wall elements are installed.
6. WALL PLACEMENT - The welded wire elements shall be set to the lines and grades shown on the drawings or directed by the Engineer. Wall tiers shall be battered 1:48. Wall placement shall be in accordance with the "Welded Wire Construction Guide" referred to in note (1) above.
placement of the tiers. Each layer of the backfill material shall be shall be placed in layers not exceeding 10 inches ( loose ). The contractor shall decrease this lift thickness, if necessary to obtain the specified density. Organic material and rocks greater than 4 inches in diameter shall be removed from the backfill. The contractor shall compaction of the backfill. The Engineer may direct the contractor to replace wall elements damaged during the backfilling.
exercise care to avoid damaging the wire galvanizing during the approval of the Engineer. The design for little north fork ERFO sites 2, 5
8.
compacted to achieve a density of at least 95% of the maximum density, as determined by AASHTO T-99, Method C or D. The backfill material
COMPACT TO 95%
OF T-99
COMPACT TO 95%
OF T-99
LITTLE NORTH FORK STORMPROOF 5
CONTRACTOR SHALL BE REQUIRED TO PROVIDE A QUALITY CONTROL
SYSTEM THAT WILL ENSURE THAT ALL CONSTRUCTION REQUIRED UNDER
THIS CONTRACT CONFORM TO THE CONTRACT REQUIREMENTS. A QUALITY
CONTROL PLAN SHALL BE SUBMITTED IN WRITING TO DETAIL COMPACTION
TESTING ON THE FOUNDATION AND THE 1ST 6 FT. OF EMBANKMENT IN THE
HILFIKER WALL CONSTRUCTION. CONTRACTOR SHALL USE A STATE CERTIFIED
LABORATORY FOR ALL TESTING PROVIDED UNDER THIS CONTRACT. WORK IS
CONSIDERED INCIDENTAL TO ITEM 613A(01).
7. BACKFILLING - Backfilling shall progress simultaneously with the
9. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS DESIGNATED OUTSIDE OF ROAD
PRISM (BORROW, WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR APPROVAL
FROM THE HERITAGE PROGRAM MANAGER.
BACKFILL
COMPACTED
BACKFILL
COMPACTED
BACKFILL
PREFABRICATED
SYSTEM
PIPE CAP
10 GAGE WIRE, GALV.
OUTLET PIPE
PREFABRICATED UNDERDRAIN SYSTEM TYPICAL
1. PERFORATED AND NONPERFORATED PIPE SHALL BE
WILL BE INCLUDED IN THE LENGTH MEASURMENT
OF PIPE, SEE ITEM 605 (27 & 28).
2. FOR PAYMENT PURPOSES, ELBOWS, TEES AND CAPS
ASSEMBLIES ARE INCIDENTAL TO 605(28).
THE PREFABRICATED UNDERDRAIN DURING CONSTRUCTION.
OVERLAP OF FABRIC
SHALL NOT BE LESS
THAN 1 FOOT.
PERFORATED PIPE
PREFABRICATED SYSTEM
WITH FABRIC ON BOTH
SIDES.
OVERLAP OF FABRIC
SHALL NOT BE LESS
THAN 1 FOOT.
1/2" MESH, 19 GAGE
GALVANIZED HARDWARE
CLOTH 12" X 12"
FRONT VIEWSIDE VIEW
NOTES
FINISH ROAD GRADE
1' MIN.
VARIABLE
OUTLET SCREEN
CUT
10 GAGE
WIRE, GALV.
3' LONG
133 T POSTS
GROUND LINE
ANCHOR ASSEMBLY
6-INCH CORRUGATED POLYETHYLENE.
3. OUTLET PIPE SHALL BE ANCHORED EVERY 20 FEET. ANCHOR
4. LOCATION OF THE OUTLET SHALL BE DESIGNATED BY ENGINEER.
5. THE CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGING
PROJECT SHEET NO.
6LITTLE NORTH FORK STORMPROOF
B B
D
1'
4" m in
SECTION B-B
1/10D
2'
4'
Flow
2'R
7'
C
PROJECT SHEET NO.
LITTLE NORTH FORK STORMPROOF
CULVERT INSTALLATION DETAILS
Existing ground C.M.P.
4" m in
L L
L
C C
C
D
Bedding material
Minimum excavated limits
Selected granular .1
Minimum of d + 4
Dia or span + 2'
1' m in
Existing ground
1/10 D
4" m in . C.M.P.
D
Existing ground
D
1/10 D
D
4" M
IN
. C.M.P.
Bedding material
C.M.P.
1/10 D
Bedding material
Existing ground
Profile grade
Bedding material roadbed. 12" minimum for 18" miminum for unpaved paved roadbed.
Existing ground
Bedding material
Introduce camber under center of fill to provide for settlement.
Minimum camber 1% of pipe length.
Subgrade
C.M.P.
specified.
Install inlet and outlet protection when
Pipe invert at inlet and outlet of pipe shall be at stream grade, unless designated otherwise. CULVERT SECTION
Note:
TYPICAL BEDDING AND EXCAVATION DETAILS
A A
METHOD OF BACKFILLING PIPE
UNSTABLE FOUNDATION
ROCK FOUNDATION
SECTION A-A
Slope variable construct as staked
PLAN
C
Centerline of roadbedC.M.P.
15' Minimum Edge of road
Top of catch basin cut slope
Bottom of catch basin cut slope
Normal top of cut
Warp back for pipe inlet (catch basin)
Bottom width may vary when catch basin is constructed in natural drainage
Backfill material
C.M.P.
Existing ground
D or 12' max
C.M.P.
SECTION C-C
Slope ratio as staked
Slope ratio as staked
Existing ground
Width Ditch Roadbed
Subgrade
18" minimum for unpaved roadbed. 12" minimum for paved roadbed
2' beyond fill
EARTH CATCH BASIN DETAILS
SHEET NO.
ANCHOR ASSEMBLY SPACING
NOTES:
2. ALL BAND COUPLERS FOR PIPE GREATER THAN 8-INCH DIAMETER
3. MINIMUM THICKNESS OF FULL-CIRCLE OUTLET PIPE SHALL BE
4. NO FOLDED LOCKED-SEAM HELICAL CORRUGATED PIPE SHALL BE
USED FOR PIPE GREATER THAN 8-INCHES.
5. FOR PAYMENT PURPOSES, AN ANCHOR ASSEMBLY SHALL INCLUDE
TWO PIPE STAKES AND ALL NECESSARY HARDWARE.
6. ANCHOR ASSEMBLY COMPONENTS SHALL BE STEEL OR IRON AND
SHALL BE GALVANIZED AFTER FABRICATION.
7. ALL PIPE STAKES ARE TO BE DRIVEN FLUSH WITH ANCHOR
ASSEMBLY, OR TO THE POINT OF REFUSAL.
CONTACT AREAS SHALL BE PROTECTED AGAINST ELECTRO-CHEMICAL
CORROSION.
CLAMP
6- 5/
8"
4"
PLATE DETAIL
ANCHOR ASSEMBLY
ANCHOR ASSEMBLY .064-INCH FOR STEEL AND .060-INCH FOR ALUMINUM.
8. WHERE ALUMINUM IS TO BE IN CONTACT WITH STEEL OR IRON,
DOWNDRAIN
TYPE "F"
LITTLE NORTH FORK STORMPROOF
PROJECT
LOCATION AND
SPACING OF
ANCHOR ASSEMBLIES
NUMBER OF
ANCHOR
ASSEMBLIES
LENGTH OF
DOWNDRAIN
2' FROM OUTLETONE20' OR LESS
1 - 2' FROM OUTLET
1 - AT MIDPOINT
TWO22' - 42'
1 - 2' FROM OUTLET
REMAINDER SHALL
BE EQUALLY SPACED
THREE44' - 62'
1 - 2' FROM OUTLET
REMAINDER SHALL
BE EQUALLY SPACED
FOUR64' - 82'
FIVE84' TO 102'
20' MAXIMUM SPACING104' AND OVER
SHALL 24-INCHES LONG.
NO SCALE
1. UNIVERSAL COUPLER (DIMPLED) BANDS SHALL NOT BE USED.
1 - 2' FROM OUTLET
REMAINDER SHALL
BE EQUALLY SPACED
CROSSDRAIN CMP
BAND COUPLERS
FULL-CIRCLE
OUTLET PIPE
TRAVELED WAY
PIPE ELBOW TYPE F
30 BEND
ANCHOR ASSEMBLIES)
(SEE TABLE FOR NUMBER AND SPACING OF
20'-0" MAX. TO FIRST ANCHOR ASSEMBLY
2'FINISHED
FILL SLOPE
ANCHOR
ASSEMBLY
2" DIA.
COLLAR OF
2" PIPE
1"
WELD
1/2" R.
D + 9"
WELD 3-1/4"
D + 2-1/2"
U-BOLT
D
1-1/2" DIA. X 6'-0" LONG PIPE STAKES
(ONE EACH SIDE OF OUTLET PIPE)
3/4" ROUND IRON
SHARPEN OR FLATTEN
TYPE "A"
BAND COUPLER
HOLE SIZE AND SPACING SHALL ALIGN WITH
BOLT SPACING FOR 24-INCH BAND COUPLER.
(SEE PLATE DETAIL)
PIPE STAKE
(SAME AS ABOVE)
1/4" PLATE
TYPE "B"
FOR TYPE "B"
3"
1" R
1"
12" 3/4"
12" MIN.
60'
1. ENTIRE LENGTH OF DIP SHALL BE
2. DIP SHALL BE CONSTRUCTED TO THE
4. RIPRAP SHALL BE CLASS III. SEE
5. RIPRAP SLOPES SHALL BE THE SAME AS
3. ROLLING DIP STATIONS SHOWN ARE
TYPE I ROLLING DIP
A A
A
RIPRAP
A
10' MIN.
10' MIN.
60'
30'
ORIGINAL
GRADIENT
GRADIENT
A
0 % - 10 %
10 % - 20 %
+ 2 %
- 5 %
ORIGINAL GRADE LINE
RAISE GRADE WITH
EXCAVATED MATERIAL
BOTTOM OF DIP
NO SCALE
NOTES:
K.N.F. REVISED 4/94
TOE OF FILL
A
FINISHED GRADE LINE
TOP OF CUT
OR TO STAKED TOE OF
8 FEET FROM ROAD EDGE
RIPRAP SHALL EXTEND
GREATER.
FILL, WHICHEVER IS
PROJECT SHEET
LITTLE NORTH FORK STORMPROOF 9
OUTSLOPED 5 TO 7 PERCENT.
DIMENSIONS SHOWN PRIOR TO PLACEMENT
OF AGGREGATE COURSE.
APPROXIMATE. FINAL STATION TO BE
DESIGNATED BY THE ENGINEER
BEFORE CONSTRUCTION.
DRAINAGE SUMMARY FOR RIPRAP QUANTITY.
CONSTRUCTED FILL SLOPE.
6. GEOTEXRILE SHALL BE PLACE UNDER RIPRAP
TYPE IV ROLLING DIP
1. ENTIRE LENGTH OF DIP SHALL BE OUTSLOPED
2. ROLLING DIP STATIONS SHOWN ARE APPROXIMATE.
3. DIP SHALL BE CONSTRUCTED TO THE DIMENSIONS
4. RIPRAP SHALL BE CLASS III. SEE DRAINAGE
5. RIPRAP SLOPES SHALL BE THE SAME ASORIGINAL
GRADIENT
GRADIENT
A
0 % - 10 %
10 % - 20 %
+ 2 %
- 5 %
ORIGINAL GRADE LINE
RAISE GRADE WITH
EXCAVATED MATERIAL
BOTTOM OF DIP
NO SCALE
NOTES:
K.N.F. REVISED 4/94
TOE OF FILL
A
FINISHED GRADE LINE
60'
60'
30'
TOP OF CUT
10'
6''
25'
RIPRAP
A
A
A A
RIPRAP SHALL EXTEND
OR TO STAKED TOE OF
FILL, WHICHEVER IS
GREATER.
25'
10'
10' MIN.
12" MIN.
10' MIN.
PROJECT SHEET
LITTLE NORTH FORK STORMPROOF 10
8 FEET FROM ROAD EDGE
5 TO 7 PERCENT.
FINAL STATION TO BE DESIGNATED BY THE
ENGINEER BEFORE CONSTRUCTION.
SHOWN PRIOR TO PLACEMENT OF AGGREGATE
COURSE.
SUMMARY FOR RIPRAP QUANTITY.
CONSTRUCTED FILL SLOPE.
6. GEOTEXTILE SHALL BE PLACE UNDER RIPRAP
LITTLE NORTH FORK STORMPROOF 11
40N51
LITTLE NORTH FORK STORMPROOF SALMON RIVER RANGER DISTRICT
1C01
1C01
N
M.P. 0.00
RP - SWITHBACK LT JUNCTION 40N33 RT
M.P. 3.81
N
N
M.P. 7.37
M.P. 5.63
M.P. 5.92
M.P. 6.97
M.P. 5.83 EXISTING 24" CMP
CLEAN INLET
RIPRAP OUTLET SIDE OF FILL
(40 CY OF RIPRAP AND 100 SY OF
GEOTEXTILE WILL BE INCLUDED
IN QUANTITIES AT MP 5.63)
M.P. 7.09
M.P. 4.77
M.P. 5.10
M.P.4.60
M.P. 4.63 RP - SWITHBACK LT
M.P. 4.48
M.P. 4.41
M.P. 4.02
M.P. 4.22
M.P. 2.67
CONSTRUCT HILFIKER OR EQUIVALENT
WALL SEE PAGE 22-23 FOR PLANS
EXISTING 18-INCH CMP. CLEAN INLET
CONSTRUCT TYPE IV ROLLING DIP 50 FT
BACK (COST WILL BE INCLUDED IN
QUANTITIES AT M.P. 6.97)
SWITHBACK RT
WASTE AREA LT
M.P. 16.34
M.P. 18.17 RP - JUCTION 10N30
RT
M.P. 18.92 SWITCHBACK LT.
END ROCKING
M.P. 22.83 JUNCTION COUNTH RD
# 1C01 AND FOREST
SERVICE RD 40N51
PROJECT LIMIT
JUNCTION COUNTH RD # 1C01 AND
FOREST SERVICE RD 40N51
PROJECT LIMIT
M.P. 1.30
SWITHBACK RT
EXISTING 30" CMP
CONSTRUCT TYPE IV ROLLING DIP
50 FT BACK (COST WILL BE
INCLUDED IN QUANTITIES AT
M.P. 5.63)
TO SAWYERS BAR
TO FORKS OF SALMON
GARDEN GULCH
INSTALL (2) CMPA
SEE PAGE 13-14 FOR
PLANS
CONSTRUCT REINFORCED EMBANKMENT
SEE PAGE 15 FOR PLANS
CONSTRUCT REINFORCED EMBANKMENT
SEE PAGE 16 FOR PLANS
CONSTRUCT HILFIKER OR EQUIVALENT
WALL SEE PAGE 17-18 FOR PLANS
CONSTRUCT RIPRAP WALL SEE PAGE19
FOR PLANS
REMOVE FILL MATERIAL, PLACE RIPRAP
WITH GEOTEXTILE
INSTALL 36 INCH CMP WITH OSD
SEE PAGE 20-21 FOR PLANS
CONSTRUCT HILFIKER OR EQUIVALENT
WALL SEE PAGE 22-23 FOR PLANS
LOWER GRADE, RIPRAP FILL SLOPE
WITH GEOTEXTILE
SEE PAGE 26 FOR PLANS
EXISTING 24" CMP AND 36" CMP
SEE PAGE 27-28 FOR PLANS
JUCTION 11N10 LT
BEGIN ROCKING
6" DEPTH, AVERAGE
WIDTH 16'
SHEET NO.PROJECTLITTLE NORTH FORK STORMPROOF
-2%
SEED,MULCH AND EROSION
CONTROL BLANKET ON ALL
BENCHES AND EXCAVATED AREAS
GROUND LINE
GROUND LINE
HORIZONIAL BLANKET
DRAIN 1' DEPTH
PL
CL
6" CRUSHED AGGREGATE
TRAVELED WAY
DRAIN CORE
REINFORCED EMBANKMENT TYPICAL
CONTRACTOR SHALL BE REQUIRED TO PROVIDE A QUALITY CONTROL
SYSTEM THAT WILL ENSURE THAT ALL CONSTRUCTION REQUIRED UNDER
THIS CONTRACT CONFORM TO THE CONTRACT REQUIREMENTS. A QUALITY
CONTROL PLAN SHALL BE SUBMITTED IN WRITING TO DETAIL COMPACTION
TESTING ON THE FOUNDATION AND THE 1ST 6 FT. OF EMBANKMENT IN THE
REINFORCED EMBANKMENT. CONTRACTOR SHALL USE A STATE CERTIFIED
LABORATORY FOR ALL TESTING PROVIDED UNDER THIS CONTRACT. WORK IS
CONSIDERED INCIDENTAL TO ITEM 613(D)01.
35--7090--100 0--15100
3" 2 1/2" 2" 11/2"
PERCENTAGE BY WEIGHT PASSING SQUARE MESH SIEVE SIZE
NOTES
40N51
40N51 - MP 4.02 & M.P. 4.22
NO SCALE
SLOPE 3/4
12'
GEOGRID, 28' LENGTH
GEOGRID, 20' LENGTH
GEOGRID 5' LENGTH PLACE AT 1' INTERVALS
GEOGRID 5' LENGTH PLACE AT
1' INTERVALS BETWEEN 20' GEOGRID
1 1/4:1 REINFORCEDFILL SLOPE,SEED AND MULCH SLOPE FACE
AND EROSION CONTROL BLANKET
20'
-+END OF GEOGRID SHALL BE WITH 3" FILL SLOPE
10. GEOGRID SHALL MEET THE REQUIREMENTS OF ITEM 613D AND BE INSTALLED
IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
11. BACKFILLING SHALL PROGRESS SIMULTANEOUSLY WITH THE PLACEMENT OF GEOGRID.
EACH LAYER OF BACKFILL SHALL BE COMPACTED ACCORDING TO THE SPECIFICATION. THE
CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGING THE GEOGRID DURING THE COMPACTION OF THE BACKFILL. THE ENGINEER MAY DIRECT THE CONTRACTOR TO REPLACE GEOGRID DAMAGED
DURING THE BACKFILL OPERATION.
12. CONSTRUCTION TOLERANCE CLASS D.
13. SEED, MULCH, AND EROSION CONTROL BLANKET THE EMBANKMENT SLOPE FACE,
BENCHES AND ALL EXCAVATED AREAS. EROSIONS CONTROL BLANKET SHALL BE
INSTALLED AFTER THE SEEDING AND MULCHING ARE COMPLETED, AND PER THE
MANUFACTURER'S RECOMMENDATIONS.
14.
15. IN ACCORDANCE WITH SECTION 204 AN EROSION CONTROL PLAN
SHALL BE SUBMITTED TO THE ENGINEER AND APPROVED PRIOR TO
COMMENCEMENT OF WORK. EROSION CONTROL PLAN SHALL BE
CONSIDERED INCIDENTAL TO SPEC. 204(20).
16. A LIMITED OPERATING SEASON WILL BE REQUIRED TO PROTECT
THREATENED SPECIES. UNLESS OTHERWISE AGREED, NO WORK
SHALL BE PERFORMED ON THIS PROJECT BETWEEN OCTOBER 15
AND APRIL 15.
1. TRAVELED WAY SHALL BE 16 FEET MINIMUM. PLACE CRUSHED AGGREGATE FULL
ROAD WIDTH.
2. REMOVE DEBRIS AND CLEAR VEGETATION, DISPOSE IN AREA
DESIGNATED BY THE ENGINEER.
3. CLEARING SHALL BE CONSIDERED INCIDENTAL TO ITEM 206(02).
4. UNSUITABLE EXCAVATION SHALL BE LAYER PLACED IN WASTE AREA LOCATED
AT M.P. 7.37.
5. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS DESIGNATED OUTSIDE OF
ROAD PRISM (BORROW, WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR
APPROVAL FROM THE HERITAGE PROGRAM MANAGER
6. MATERIAL EXCAVATED UNDER ITEM 206(02) SHALL BE USED FOR REINFORCED
EMBANKMENT.
7. PRIOR TO BEGINNING REINFORCED EMBANKMENT AND THE HORIZONTAL BLANKET
DRAIN, THE FOUNDATION SHALL BE GRADED AND SMOOTHED AS SHOWN ON THE
DRAWINGS AND COMPACTED TO SPECIFICATIONS UNDER ITEM 613D.
8. HORIZONTAL BLANKET DRAIN SHALL BE COMPLETELY ENCASED IN GEOTEXTILE WITH
NO OPEN SEAMS.
9. GRADATION OF GRANULAR FILTER MATERIAL SHALL BE AS FOLLOWS:
WASTE MATERIAL TO BE HAUL TO WASTE AREA
HAPPY CAMP RANGER DISTRICT
N
W E
NO SCALE
EDGE OF
ROAD
P - LINE
TOE OF FILL
TOE OF FILL
CENTERLINE
GRADE LINE
GROUND LINE
PLAN VIEW
PROFILE VIEW
NOTES
SLOPE STAKES NOTES:
4. A LIMITED OPERATING SEASON WILL BE REQUIRED
TO PROTECT THREATENED SPECIES UNLESS OTHERWISE
AGREED, NO WORK SHALL BE PERFORMED ON THIS
PROJECT BETWEEN OCT 15 AND APRIL 15.
5. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS
DESIGNATED OUTSIDE OF ROAD PRISM (BORROW,
WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR
APPROVAL FROM THE HERITAGE PROGRAM MANAGER.
0+00 BEGIN
CRUSHED
AGGREGATE
(6" DEPTH)
0+64 BEGIN ROCK
FILL (CLASS III
RIPRAP)
1+72 END
ROCKING
1 2 3 4
6 7
1+47 END
ROCK FILL
+8%
+2%
-6%
0% +2%
SECTION STATION CATCH "P" CATCH
LEFT RIGHT
10 0+00 F0.0/8.0 0.0 C0.1/7.1 1.25:1 C0.0 .5:1
WLT=7.0 0.0 RT WRT=7.0
20 0+25 F0.2/9.3 8% F2.2/9.7 1.25:1 F2.0 1.25:1
WLT=9.0 0.8 LT WRT=7.0
30 0+49 F0.4/11.5 8% F4.7/12.8 1.25:1 F4.3 1.25:1
WLT=11.0 1.0 LT WRT=7.0
40 0+64 F2.0/14.5 2% F4.8/16.0 1.25:1 F4.4 1.25:1
WLT=12.0 1.7 LT WRT=10.0
50 0+90 F3.3/17.1 -7% F5.7/18.1 1.25:1 F3.6 1.25:1
WLT=13.0 0.0 RT WRT=11.0
60 1+00 F3.3/17.1 -7% F4.1/16.2 1.25:1 F3.8 1.25:1
WLT=13.0 0.0 RT WRT=11.0
70 1+22 F3.5/17.3 0% F3.6/15.5 1.25:1 F3.8 1.25:1
WLT=13.0 0.0 RT WRT=11.0
80 1+47 F1.1/9.4 2% F1.5/8.8 1.25:1 F1.3 1.25:1
WLT=8.0 0.0 RT WRT=7.0
90 1+72 F0.1/8.1 -2% C 0.1/7.1 1.25:1 F0.0 .5:1
WLT=8.0 0.0 RT WRT=7.0
ROCK
FILL (CLASS III
RIPRAP)
INSTALL (2)
35" X 24" X 40'
CMPA
INSTALL (2)
35" X 24" X 40'
CMPA
ROCK
ACCESS ROAD
TO WATER
SOURCE
LITTLE NORTH FORK STORMPROOF
40N51 M.P. 1.30 LITTLE NORTH FORK STORMPROOF
40N51 M.P. 1.30
1. RIPRAP AND CRUSHED AGGREGATE WILL COME
FROM COMMERCIAL SOURCE.
2. LOCATION OF DECKING, DISPOSAL, AND WASTE
AREAS SHALL BE AS DIRECTED BY THE ENGINEER.
3. TRAVELED WAY SHALL BE AS SHOWN ON PLANS.
LITTLE NORTH FORK STORMPROOF
40N51- MP 1.30
CROSS SECTION
40N51 M.P. 1.30
0+25 ( 2 )
0+00 ( 1 )
0+49 ( 3 )
0+64 ( 4 )
0+90 ( 5 )
1+00 ( 6 )
1+22 ( 7 )
1+47 ( 8 )
1+72 ( 9 )
8' 7'
13' 11'
13' 11'
13' 11'
12' 10'
11' 7'
9' 7'
7' 7' C
C
C
C
C
C
C
C
C
L
L
L
L
L
L
L
L
L
CRUSHED
AGGREGATE
6" DEPTH
GEOTEXTILE
CLASS III
RIPRAP
SLOPE
1.25:1
INSTALL
35" X 24" X 40'
CMPA
INSTALL
35" X 24" X 40'
CMPA
BEGIN ROCK
FILL
END ROCK
FILL
0 5' 10' 20'
W E
NO SCALE
LITTLE NORTH FORK STORMPROOF LITTLE NORTH FORK STORMPROOF
40N51 - MP 4.02
M.P. 4.02
18'
0+80 END
CRUSHED
AGGREGATE
0+70 END REINFORCED
EMBANKMENT
0.00 BEGIN CRUSHED
AGGREGATE
0+15 BEGIN
REINFORCED
EMBANKMENT
L - LINE
P - LINE
RIPRAP OUTLET
REMOVE OLD CMP
REMOVE OLD CMP
CONSTRUCT
RIPRAP
OUTLET
DRAIN CORE
INSTALL
NEW
CMP
UNSUITABLE EXCAVATION
1 1/4:1
P
P
P
P
P
L
L
L
L
L
C
C
C
L
L
L
20'
BEGIN CRUSHED AGGREGATE
END CRUSHED AGGREGATE
PLAN VIEW
CROSS SECTION
HORIZONIAL
BLANKET
DRAIN 1' DEPTH
REINFORCED
EMBANKMENT
AREADRAIN CORE
OUTLET PIPE
0+00 ( 1 )
0+80 ( 5 )
0+30 ( 2 )
0+45 ( 3 )
0+60 ( 4 )
EOR
EOR
3/4:1
0+45 REMOVE OLD 18" CMP
INSTALL 18" x 50' CMP
PLACE CLASS V RIPRAP
AT OUTLET OF CMP
(10 WIDE, 10' LONG, 3' DEPTH)
SECTION P-LINE TO P-LINE TO
CENTERLINE TOP OF CUT
10 0+00 0
20 0+30 5' LT 13' LT
30 0+45 6' LT 17' LT
40 0+60 3' LT 13' LT
50 0+80 0
REMOVE OLD CMP
INSTALL NEW CMP
W E
NO SCALE
LITTLE NORTH FORK STORMPROOF LITTLE NORTH FORK STORMPROOF
0.00 BEGIN CRUSHED
AGGREGATE
0+70 REINFORCED
EMBANKMENT
AREA
L - LINE
P - LINE DRAIN CORE
1 1/4:1
P
P
P
P
P
L
L
L
L
L
C
C
C
L
L
L
BEGIN CRUSHED AGGREGATE
END CRUSHED AGGREGATE
PLAN VIEW
CROSS SECTION
40N51 - MP 4.22
M.P. 4.22
3 4
0+19 BEGIN
REINFORCED
EMBANKMENT
0+96 END REINFORCED
EMBANKMENT
1+11 END
CRUSHED
AGGREGATE
E0R
EOR
0+59 ( 3 )
0+81 ( 4)
1+11 ( 5 )
HORIZONIAL
BLANKET
DRAIN 1' DEPTH
UNSUITABLE
EXCAVATION
OUTLET PIPE
0+00 ( 1 )
0+37 ( 2 )
0+59 ( 3 )
0+81 ( 4)
1+11 ( 5 )
3/4:1
DRAIN CORE
SECTION P-LINE TO P-LINE TO
CENTERLINE TOP OF CUT
10 0+00 0
20 0+37 12' LT 18' LT
30 0+59 14' LT 20' LT
40 0+81 7' LT 15' LT
50 1+11 0
PROFILE VIEW
NO SCALE
CROSS SECTION TYPICAL
NO SCALE
PREFABRICATED
UNDERDRAIN
7' 11'
BATTER
1:48
2'
4'
CLEARING LIMIT
EARTH BERM
INSLOPE
3-5%
DRAIN CORE
OUTLET DRAIN PIPE
N
W E
EDGE OF ROAD
NO SCALE
Wall Height
5'
MIN
Embedment Length
1 1/2:1 SLOPE
ON 1.5 FT FILL
LITTLE NORTH FORK STORMPROOF
OUTLET DRAIN CORE
6" CRUSHED
AGGREGATE
M.P. 4.41
6 7
9 10
0+00
2+75
10'6"
0+63
BEGIN WALL
1+35
END WALL
1+84
END CRUSHED
AGGREGATE
END INSLOPE
TBM ELEV 3400.0
0+260+00
ELEV 3401.9
+12%
0+63
BEGIN WALL
EL 3396.2
1+35
END WALL
EL 3405.2
2+75
ELEV 3419.8
10' 8' 6'
+7%
+5%
40N51 - MP 4.41
HILFIKER WALL OR
EQUIVALENT
0+26
BEGIN INSLOPE
CONSTRUCT TYPE I
ROLLING DIP
0+00
BEGIN CRUSHED
AGGREGATE
6" DEPTH
SECTION P-LINE TO P-LINE TO
CENTERLINE FRONT FACE
30 0+63 0 13.9 RT
40 0+71 0 16.6' RT
50 0+89 0 17.3' RT
60 1+04 0 20.0' RT
70 1+11 0 21.5' RT
80 1+32 0 15.5' RT
LITTLE NORTH FORK STORMPROOF
1. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS
DESIGNATED OUTSIDE OF ROAD PRISM (BORROW,
WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR
APPROVAL FROM THE HERITAGE PROGRAM MANAGER.
2. TRAVELED WAY SHALL BE 18 FEET MINIMUM.
3. EARTH BERM SHALL BE CONSTRUCTED 25 FEET
BEYOND EACH END OF WALL. THE BERM SHALL
BE 3 FEET WIDE AND 1.5 FOOT HIGH.
4. ALL BENCH SHALL BE DAYLIGHT AN A MINIMUM
OF 5 FT IN WIDTH.
5. CLEARING SHALL BE CONSIDERED INCIDENTAL
TO PAY ITEM 613A(01).
6. EMBEDMENT LENGTH OF THE RETAINING WALL
SHALL BE AS SHOWN ON THE PLANS.
7. BORROW AREA FOR BACKFILL SHALL BE
DIRECTED BY THE ENGINEER
8. RIPRAP AND CRUSHED AGGREGATE WILL COME
FROM COMMERCIAL SOURCE.
9. IN ACCORDANCE WITH SECTION 204 AN EROSION
CONTROL PLAN WHICH INCLUDES A COMPREHENSIVE
DE-WATERING PLAN SHALL BE SUBMITTED TO THE
ENGINEER AND APPROVED PRIOR TO COMMENCEMENT
OF WORK.
10. A LIMITED OPERATING SEASON WILL BE REQUIRED TO
PROTECT THREATENED SPECIES UNLESS OTHERWISE
AGREED, NO WORK SHALL BE PERFORMED ON THIS
PROJECT BETWEEN OCT 15 AND APRIL 15.
NOTES:
LITTLE NORTH FORK STORMPROOF
CL
1 1/4:1
DAYLIGHT
EARTH BERM
40N51- MP 4.41
CROSS SECTION
40N51 M.P. 4.41
0+00 ( 1 )
10'
10'
0+26 ( 2 )
0+63 ( 3 )
0+71 ( 4 )
0+89 ( 5 )
1+04 ( 6 )
1+11 ( 7 )
1+32 ( 8 )
1+60 ( 9 )
2+39 ( 12 )
2+75 ( 13 )
1+84 ( 10 )
2+14 ( 11 )
DAYLIGHT
8'
6'
LITTLE NORTH FORK STORMPROOF 18
CROSS SECTIONS
NO SCALE
NOTES
W
E
0+00
2 3 4 5 6 7
CL
CL
CL
CL
CL
CL
CL
LITTLE NORTH FORK STORMPROOF
1+85
0+00 ( 1 )
0+46 ( 2 )
0+62 ( 3 )
0+75 ( 4 )
0+87 ( 5 )
1+00 ( 6 )
1+35 ( 7 )
10' 10'
3 - 5% OUTSLOPE
CLEARING LIMIT
6" CRUSHED
AGGREGATE
GEOTEXTILE
CONSTRUCT 5'
BENCH
SLOPE 1.25 : 1
10'
10'
PLAN VIEW
CLASS IV RIPRAP
15'
0+46 BEGIN RIPRAP
CLASS III
BEGIN GEOTEXTILE
1+35 END CRUSHED
AGGREGATE
1+00 END RIPRAP CLASS III
END GEOTEXTILE
0+00 BEGIN CRUSHED
AGGREGATE
6" DEPTH
40N51 - MP 4.48
RIPRAP WALL
LITTLE NORTH FORK STORMPROOF
4. A LIMITED OPERATING SEASON WILL BE REQUIRED
TO PROTECT THREATENED SPECIES UNLESS OTHERWISE
AGREED, NO WORK SHALL BE PERFORMED ON THIS
PROJECT BETWEEN OCT 15 AND APRIL 15.
5. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS
DESIGNATED OUTSIDE OF ROAD PRISM (BORROW,
WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR
APPROVAL FROM THE HERITAGE PROGRAM MANAGER.
1. RIPRAP AND CRUSHED AGGREGATE WILL COME
FROM COMMERCIAL SOURCE.
2. LOCATION OF DECKING, DISPOSAL, AND WASTE
AREAS SHALL BE AS DIRECTED BY THE ENGINEER.
3. TRAVELED WAY SHALL BE AS SHOWN ON PLANS.
WE
NO SCALE
LITTLE NORTH FORK STORMPROOF
40N51 - MP 4.60
M.P. 4.60
4 5
80+00
252627
8+55
EXISTING 36" CMP
2+52
INSTALL 36" X 92' CMP WITH
ELBOW AND 30 ' OSD
REMOVE 34' OF
36" CMP
6+97
EXISTING 18" CMP
CLEAN INLET
7+15
END RIPRAP
7+62
EXISTING 30" CMP
7+80
END RIPRAP
7+90
END CRUSHED
AGGREGATE
1+66
BEGIN CRUSHED
AGGREGATE
6" DEPTH
6+56
BEGIN CRUSHED
AGGREGATE
6" DEPTH
3+12
END RIPRAP
END GEOTEXTILE
END CRUSHED AGGREGATE
2+01
BEGIN RIPRAP CLASS III
BEGIN GEOTEXTILE
6+87
BEGIN RIPRAP
CLASS III
7+43
BEGIN RIPRAP
CLASS III
LITTLE NORTH FORK STORMPROOF
NOTES:
1. TRAVELED WAY SHALL BE AS SHOWN ON PLANS
2. EXCAVATION WILL HAULED TO WASTE AREA
AT M.P. 7.37
3. PRIOR TO PROJECT IMPLENTATION ALL AREAS OUTSIDE
OF ROAD PRISM (BORROW,WASTE AND STOCKPILE AREAS)
WILL REQUIRE PRIOR APPROVAL FROM THE HERITAGE
PROGRAM MANAGER.
4. WASTE AREA WILL SEEDED COST ARE INCIDENTAL
TO PAY ITEM 203 EXCAVATION
5. CLEARING SHALL BE CONSIDERED INCIDENTAL
TO PAY ITEM 203
6. RIPRAP AND CRUSHED AGGREGATE WILL COME
FROM COMMERCIAL SOURCE.
7. IN ACCORDANCE WITH SECTION 204 AN EROSION
CONTROL PLAN WHICH INCLUDES A COMPREHENSIVE
DE-WATERING PLAN SHALL BE SUBMITTED TO THE
ENGINEER AND APPROVED PRIOR TO COMMENCEMENT
OF WORK.
8. A LIMITED OPERATING SEASON WILL BE REQUIRED TO
PROTECT THREATENED SPECIES UNLESS OTHERWISE
AGREED, NO WORK SHALL BE PERFORMED ON THIS
PROJECT BETWEEN OCT 15 AND APRIL 15.
LITTLE NORTH FORK STORMPROOF
40N51- MP 4.60
CROSS SECTION
40N51 M.P. 4.60
1160 CY
1+66 ( 4 )
2+01 ( 5 )
2+29 ( 6 )
2+52 ( 7 )
11' 15'
20'
30'
2+76 ( 8 )
3+12 ( 9 )
6+86 ( 18 )
6+97 ( 19 )
7+09 ( 20 )
7+29 ( 21 )
7+54 ( 22 )
7+62 ( 23 )
7+70 ( 24 )
EXISTING 36" CMP
INSTALL 36" X 92" CMP
INSTALL 36" ELBOW
INSTALL 36" X 30' OSD
SLOPE 1 1/4 : 1
REMOVE MATERIAL AND HAUL
TO WATE AREA AT M.P. 7.37
EXISTING ROAD
WIDTH
EXISTING ROAD
WIDTH
CLEAN INLET
CLEAN INLET
EXISTING 18" CMP
EXISTING 30" CMP
CUT AND REMOVE
34' OF CMP
LITTLE NORTH FORK STORMPROOF
PLACE CLASS III RIPRAP WITH GEOTEXTILE
PLACE CLASS III
RIPRAP WITH
GEOTEXTILE
PLACE CLASS III
RIPRAP WITH
GEOTEXTILE
NO SCALE
CROSS SECTION TYPICAL
NO SCALE
PREFABRICATED
UNDERDRAIN
7' 11'
BATTER
1:48
2'
4'
CLEARING LIMIT
EARTH BERM
INSLOPE
3-5%
DRAIN CORE
OUTLET DRAIN PIPE
N
W E
EDGE OF ROAD
NO SCALE
Wall Height
Embedment Length
1 1/2:1 SLOPE
ON 1.5 FT FILL
LITTLE NORTH FORK STORMPROOF
40N51 - MP 4.77
HILFIKER WALL OR
EQUIVALENT
+ 5%
1+50
EL 3581.1
OUTLET DRAIN CORE
12' 12'
+7%
2+37
END WALL
EL 3585.7
7 8
3+31
0+00
1+73
BEGIN WALL
10' 6"
M.P. 4.77
TBM ELEV 3600.0
1+73
BEGIN WALL
1+00
BEGIN INSLOPE
CONSTRUCT TYPE I
ROLLING DIP
1+00 0+00
ELEV 3585.8
3+31
ELEV 3605.7
2+37
END WALL
3+10
END CRUSHED
AGGREGATE
END INSLOPE
6" CRUSHED
AGGREGATE
0+75
BEGIN CRUSHED
AGGREGATE
6" DEPTH
LITTLE NORTH FORK STORMPROOF
5'
MIN
14' 14'
SECTION P-LINE TO P-LINE TO
CENTERLINE FRONT FACE
50 1+97 0 15.0' LT
60 2+04 0 15.0' LT
70 2+23 0 14.0' LT
1. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS
DESIGNATED OUTSIDE OF ROAD PRISM (BORROW,
WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR
APPROVAL FROM THE HERITAGE PROGRAM MANAGER.
2. TRAVELED WAY SHALL BE 18 FEET MINIMUM.
3. EARTH BERM SHALL BE CONSTRUCTED 25 FEET
BEYOND EACH END OF WALL. THE BERM SHALL
BE 3 FEET WIDE AND 1.5 FOOT HIGH.
4. ALL BENCH SHALL BE DAYLIGHT AN A MINIMUM
OF 5 FT IN WIDTH.
5. CLEARING SHALL BE CONSIDERED INCIDENTAL
TO PAY ITEM 613A(01).
6. EMBEDMENT LENGTH OF THE RETAINING WALL
SHALL BE AS SHOWN ON THE PLANS.
7. BORROW AREA FOR BACKFILL SHALL BE
DIRECTED BY THE ENGINEER
8. RIPRAP AND CRUSHED AGGREGATE WILL COME
FROM COMMERCIAL SOURCE.
9. IN ACCORDANCE WITH SECTION 204 AN EROSION
CONTROL PLAN WHICH INCLUDES A COMPREHENSIVE
DE-WATERING PLAN SHALL BE SUBMITTED TO THE
ENGINEER AND APPROVED PRIOR TO COMMENCEMENT
OF WORK.
10. A LIMITED OPERATING SEASON WILL BE REQUIRED TO
PROTECT THREATENED SPECIES UNLESS OTHERWISE
AGREED, NO WORK SHALL BE PERFORMED ON THIS
LITTLE NORTH FORK STORMPROOF
40N51- MP 4.77
CROSS SECTION
40N51 M.P. 4.77
0+00 ( 1 )
C
C
C
C
C
C
C
C
C
C
L
L
L
L
L
L
L
L
L
L
0+50 ( 2 )
1+00 ( 3 )
1+50 ( 4 )
1+97 ( 5 )
2+04 ( 6 )
12'
EARTH BERM
DAYLIGHT
DAYLIGHT
2+23 ( 7 )
2+47 ( 8 )
2+82 ( 9 )
3+31 ( 10 )
1 1/4:1
15'
10'6"
LITTLE NORTH FORK STORMPROOF
14'
14'
NO SCALE
CROSS SECTION TYPICAL
NO SCALE
7' 11'
BATTER
1:48
2'
4'
CLEARING LIMIT
EARTH BERM
INSLOPE
3-5%
6" CRUSHED
AGGREGATE
DRAIN CORE
N
W E
NO SCALE
Wall Height
Embedment Length
1 1/2:1 SLOPE
ON 1.5 FT FILL
LITTLE NORTH FORK STORMPROOF
OUTLET DRAIN CORE
40N51 - MP 5.10
HILFIKER WALL OR
EQUIVALENT
M.P. 5.10
3 4
2+52
0+75
BEGIN WALL
EDGE OF
ROAD
0+00
10' 6"
OUTLET
DRAIN
PIPE
0+00
ELEV 3634.6
+8 %
0+75
BEGIN
WALL
+6% +4 %
16'
EL 3624.1
2+52
ELEV 3650.0
TBM ELEV 3650.0
2+02
END CRUSHED
AGGREGATE
END INSLOPE
1+79
END
WALL
EL 3630.3
1+79
END WALL
ZAPREFABRICATED
UNDERDRAIN
0+50
BEGIN INSLOPE
CONSTRUCT TYPE I
ROLLING DIP
0+25
BEGIN CRUSHED
AGGREGATE
6" DEPTH
LITTLE NORTH FORK STORMPROOF
5'
MIN
SECTION P-LINE TO P-LINE TO
CENTERLINE FRONT FACE
30 1+00 0 15.0' LT
40 1+20 0 15.0' LT
50 1+41 0 15.0' LT
60 1+62 0 15.0' LT
1. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS
DESIGNATED OUTSIDE OF ROAD PRISM (BORROW,
WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR
APPROVAL FROM THE HERITAGE PROGRAM MANAGER.
2. TRAVELED WAY SHALL BE 18 FEET MINIMUM.
3. EARTH BERM SHALL BE CONSTRUCTED 25 FEET
BEYOND EACH END OF WALL. THE BERM SHALL
BE 3 FEET WIDE AND 1.5 FOOT HIGH.
4. ALL BENCH SHALL BE DAYLIGHT AN A MINIMUM
OF 5 FT IN WIDTH.
5. CLEARING SHALL BE CONSIDERED INCIDENTAL
TO PAY ITEM 613A(01).
6. EMBEDMENT LENGTH OF THE RETAINING WALL
SHALL BE AS SHOWN ON THE PLANS.
7. BORROW AREA FOR BACKFILL SHALL BE
DIRECTED BY THE ENGINEER
8. RIPRAP AND CRUSHED AGGREGATE WILL COME
FROM COMMERCIAL SOURCE.
9. IN ACCORDANCE WITH SECTION 204 AN EROSION
CONTROL PLAN WHICH INCLUDES A COMPREHENSIVE
DE-WATERING PLAN SHALL BE SUBMITTED TO THE
ENGINEER AND APPROVED PRIOR TO COMMENCEMENT
OF WORK.
10. A LIMITED OPERATING SEASON WILL BE REQUIRED TO
PROTECT THREATENED SPECIES UNLESS OTHERWISE
AGREED, NO WORK SHALL BE PERFORMED ON THIS
PROJECT BETWEEN OCT 15 AND APRIL 15.
LITTLE NORTH FORK STORMPROOF
C
C
C
C
C
C
C
C
L
L
L
L
L
L
L
L
1 1/4:1
DAYLIGHT
40N51- MP 5.10
CROSS SECTION
40N51 M.P. 5.10
0+00 ( 1 )
0+50 ( 2 )
16'
16'
16'
16'
1+00 ( 3 )
1+20 ( 4 )
1+41 ( 5 )
1+62 ( 6 )
2+02 ( 7 )
2+52 ( 8 )
EARTH BERM
15'
10'6"
LITTLE NORTH FORK STORMPROOF 25
W E
NO SCALE
LITTLE NORTH FORK STORMPROOF
M.P. 5.63
0+00
1+00
2+00
2 3 4 5 6
3+00
C
C
C
C
C
C
C
C
C
L
L
L
L
L
L
L
L
L
4 5
0+00
BEGIN CRUSHED
AGGREGATE
6" DEPTH
1+31
EXISTING 36" CMP
2+74
END CRUSHED
AGGREGATE
+1.2% -2.8% +0.4%
+5.0 %
+7.0 %
GROUND LINE
PROFILE
16 17
0+90 ( 3 )
0+00 ( 1 )
0+50 ( 2 )
14 16
1+13 ( 4 )
14 20
1+31 ( 5 )
1+49 ( 6 )
9 15
1+74 ( 7 )
2+24 ( 8 )
2+74 ( 9 )
SLOPE
1/2 : 1
DAYLIGHT
0+90
BEGIN RIPRAP
CLASS III
BEGIN GEOTEXTILE
1+74
END RIPRAP
END GEOTEXTILE
LITTLE NORTH FORK STORMPROOF
40N51 - MP 5.63
LOWER GRADE
EXISTING
36" CMP
NOTES:
SECTION CUT TO ROAD WIDTH
GRADE LT RT
10 0+00 0 9' 9' 20 0+50 2.3' 16' 17' 30 0+90 3.2' 17' 9' 40 1+13 3.2' 14' 16' 50 1+31 3.3' 14' 20' 60 1+49 2.7' 11' 11' 70 1+74 1.8' 9' 15' 80 2+24 0.9' 9' 9' 90 2+74 0 9' 9'
9 9
1. TRAVELED WAY SHALL BE AS SHOWN ON PLANS
2. EXCAVATION WILL HAULED TO WASTE AREA
AT M.P. 7.37
3. WASTE AREA WILL SEEDED COST ARE INCIDENTAL
TO PAY ITEM 203 EXCAVATION
4. CLEARING SHALL BE CONSIDERED INCIDENTAL
TO PAY ITEM 203
5. RIPRAP AND CRUSHED AGGREGATE WILL COME
FROM COMMERCIAL SOURCE.
6. IN ACCORDANCE WITH SECTION 204 AN EROSION
CONTROL PLAN WHICH INCLUDES A COMPREHENSIVE
DE-WATERING PLAN SHALL BE SUBMITTED TO THE
ENGINEER AND APPROVED PRIOR TO COMMENCEMENT
OF WORK.
7. A LIMITED OPERATING SEASON WILL BE REQUIRED TO
PROTECT THREATENED SPECIES UNLESS OTHERWISE
AGREED, NO WORK SHALL BE PERFORMED ON THIS
W E
NO SCALE
LITTLE NORTH FORK STORMPROOF
40N51 - MP 6.97
M.P. 6.97
4 5
6 7 8
10 11
4+17
END CRUSHED
AGGREGATE
0+00
1+00
2+00
3+00
4+00
4 5
5+000
PROFILE
-8% +13%
+11%
-4% +4%
+5%
+4%
+8%
2+94
BEGIN CLASS III
RIPRAP WITH
GEOTEXTILE
0+00
BEGIN CRUSHED
AGGREGATE 6" DEPTH
3+67
END RIPRAP
3+17
EXISTING 36 " CMP
LEAVE INPLACE
INSTALL 72" X 90 CMP
ON TOP OF CMP
REMOVE 12' OF
36" CMP
36" CMP
72" CMP
EXISTING 24" CMP
CLEAN INLET
CLEAN INLET
LITTLE NORTH FORK STORMPROOF
NOTES:
1. TRAVELED WAY SHALL BE AS SHOWN ON PLANS
2. EXCAVATION WILL HAULED TO WASTE AREA
AT M.P. 7.37
3. WASTE AREA WILL SEEDED COST ARE INCIDENTAL
TO PAY ITEM 203 EXCAVATION
4. CLEARING SHALL BE CONSIDERED INCIDENTAL
TO PAY ITEM 203
5. RIPRAP AND CRUSHED AGGREGATE WILL COME
FROM COMMERCIAL SOURCE.
6. IN ACCORDANCE WITH SECTION 204 AN EROSION
CONTROL PLAN WHICH INCLUDES A COMPREHENSIVE
DE-WATERING PLAN SHALL BE SUBMITTED TO THE
ENGINEER AND APPROVED PRIOR TO COMMENCEMENT
OF WORK.
7. A LIMITED OPERATING SEASON WILL BE REQUIRED TO
PROTECT THREATENED SPECIES UNLESS OTHERWISE
AGREED, NO WORK SHALL BE PERFORMED ON THIS
PROJECT BETWEEN OCT 15 AND APRIL 15.
0+79
BEGIN CLASS V
RIPRAP BOTH
FILL SLOPES
WITH GEOTEXTILE
1+23
END CLASS V
RIPRAP
M.P. 6.97
LITTLE NORTH FORK STORMPROOF
0 5' 10' 20'
LITTLE NORTH FORK STORMPROOF
40N51- MP 6.97
CROSS SECTION
0+00 ( 1 )
0+40 ( 2 )
0+63 ( 3 )
0+79 ( 4 )
0+98 ( 5 )
1+23 ( 6 )
1+72 ( 7 )
2+22 ( 8 )
2+72 ( 9 )
3+17 ( 10 )
3+67 ( 11 )
4+17 ( 12 )
EXISTING 24 " CMP
PLACE CLASS V RIPRAP
ON FILL SLOPES
SLOPE 1 1/4:1
PLACE CLASS III
RIPRAP WITH
GEOTEXTILE
INSTALL 72" X 90' CMP
EXISTING 36" CMP
LEAVE IN PLACE
CLEAN INLET
CUT 12' OF
36" CMP
File details come from the government source that posted it. Updated .