Plans-Little North Fork Stormproofing.pdf

PDF 698 KB Posted

Attached to
RECOVERY-Little North Fork Stormproofing Federal contract opportunity
Solicitation number
AG-9702-S-10-0010
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

Attachment 3 Project Plans

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY-Little North Fork Stormproofing, newest first.
File Type Posted
Schedule B.xls XLS spreadsheet
Amendment 00001.pdf PDF
Fire Plan.doc DOC document
PPQ.doc DOC document
Attachment 4 DBA Wage Det CA100009.pdf PDF
AG-9702-S-10-0010 Pages 1-3.pdf PDF
Special project specification.doc DOC document
AG-9702-S-10-0010 Pages 4-34.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL FOREST

VICINITY

Somes Bar

Dorris

Macdoel

Montague

Grenada

Weed

Mt hastaS

McCloud

YREKA

Fort Jones

Etna

Callahan

Happy Camp

Oregon

California

PROJECT LOCATION

Cecilville

APPROVED BY

STATE OF CALIFORNIA

INDEX MAP

SAN DIEGO

BLYTHE

NEEDLES

SAN BERNARDINO

PASADENA

LOS ANGELES

SANTA BARBARA

GOLETA

BAKERSFIELD

PORTERVILLE

FRESNO

BISHOP

STOCKTON

SONORA

PLACERVILLE

SACRAMENTO

MONTEREY

SAN

FRANCISCO

SANTA ROSA

TRUCKEE

NEVADA CITY

QUINCY

SUSANVILLE

REDDING

RED BLUFF

EUREKA

FORT BRAGG WILLOWS

WILLITS

UKIAH

ALTURAS

YREKA

CRESENT

CITY

MEXICO

NEVADA

OREGON

PACIFIC OCEAN

LEGEND

INTERSTATE HIGHWAYS

U.S. HIGHWAYS

STATE HIGHWAYS

FOREST HIGHWAYS

SCALE

0 50 100 150 200 MILES

DATE DATE

FOREST SUPERVISORDISTRICT RANGER

3 4 5 6

KLAMATH

DATE DATE

FOREST ENGINEER

Forks of

Salmon

N

W E

/S/ Ray Haupt /S/ Kenneth Stagg

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE - REGION FIVE

KLAMATH NATIONAL FOREST

SISKIYOU COUNTY, CALIFORNIA

PLANS FOR PROPOSEDPLANS FOR PROPOSED

SALMON RIVER RANGER DISTRICT

ROAD NO. MILES

40N51

DRAWING INDEX

TITLE

SHEET

No.

PROJECT ENGINEER

/S/ Michael Slette

LITTLE NORTH FORK STORMPROOF

02/18/09 02/18/0902/18/0902/18/09 /S/ Patricia Grantham

1 COVER SHEET/DRAWING INDEX

2 LOCALITY MAP

3 SUMMARY OF ESTIMATED QUANTITIES

4 DRAINAGE SUMMARY

5 HILFIKER WALL - GENERAL NOTES

6 UNDERDRAIN TYPICAL

7 CULVERT TYPICAL

8 DOWNDRAIN TYPICAL

9 TYPE I ROLLING DIP TYPICAL

10 TYPE IV ROLLING DIP TYPICAL

11 STRAIGHT LINE PLAN

12 REINFORCED EMBANKMENT TYPICAL

13-14 M.P. 1.30 ROCK FILL WITH CMPA

15 M.P. 4.02 REINFORCED EMBANKMENT

16 M.P. 4.22 REINFORCED EMBANKMENT

17-18 M.P. 4.41 REINFORCED SOIL RETAINING WALL

19 M.P. 4.48 RIPRAP RETAINING WALL

20-21 M.P. 4.60 REDUCE FILL

22-23 M.P. 4.77 REINFORCED SOIL RETAINING WALL

24-25 M.P. 5.10 REINFORCED SOIL RETAINING WALL

26 M.P. 5.63 LOWER GRADE

27-28 M.P. 6.97 REDUCE FILL NEW CMP

22.83

SHEET NO.PROJECT

SALMON RIVER RANGER DISTRICT

LOCALITY MAP

NO SCALE

Garden

G ulch

B

A 40N51 I

K CronanA J

Cr ee k

G ulchH

W indler

Boulder

O lsen

A

C re ek

N

N5

KanakaG

Gulch

G ul

F

40N41

Gulch D

Cre ek

C reekCrapo

A

B

Red Bank40N55Y e l l o w

G la sg ow

E Bi g

Shil tos

40N51 Jones

N2

Heiney Pollocks

G ulch Ri ve r

39N27

N

GulchSalmon

Gulch

AA

B

Fork 39N24 39N35

I B 39

N

39N

North

R12W

N1

40N51

Little North Fork

Sawyers Bar

N

EW

1C01

1C01

1C01Forks of Salmon

N5

40N51

40N51

M.P. 0.00

PROJECT

LIMIT

M.P. 22.83

PROJECT

LIMIT

T40N

EXISTING ROADS

WASTE AREA

STREAMS

LEGEND

ITEM

NO. DESCRIPTION

SUMMARY OF ESTIMATED QUANTITIES

KLAMATH NATIONAL FOREST

REVISED 4/81

METHOD

OF

MEASURE-

MENT

PAY

UNIT

ROAD NO. AND TOTALS

PROJECT SHEET NO.

AQ

AQ

EA.

EA.DRAINAGE EXCAVATION, TYPE I ROLLING DIP

SOIL EROSION AND POLUTION CONTROL LSQ L.S.

CRUSHED AGGREGATE, TYPE SURFACE COURSE,

GRADING C, COMPACTION B

MOBILIZATION LSQ L.S.

AQ

AQ

L.F.

L.F.

AQ

AQ

DQ

REINFORCED SOIL RETAINING WALL-FRONT FACE AQ S.F.

MACHINE-PLACED RIPRAP, CLASS V

DQ

DQ

S.Y.DQ

204(20)

304(10)

601A(01)

605A(01)

605A(27)

605A(28)

619(18)

DQ

DQ

DQ

C.Y.

C.Y.

L.F.

L.F.

S.F.

L.F.

L.F.

JOBJOBJOBJOBJOB JOB JOB JOB JOB JOB

JOBJOBJOBJOBJOB

JOBJOB

JOB JOB JOB JOB JOB

DQ C.Y.

203(02) EXCAVATION, PLACEMENT METHOD (2) DQ C.Y.

JOB

JOB

1 1

613A(01)*

6-INCH POLYETHYLENE (PE) DRAIN PIPE PERFORATED

6-INCH POLYETHYLENE (PE) DRAIN PIPE NON-PERFORATED

LITTLE NORTH FORK STORMPROOF

MACHINE-PLACED RIPRAP, CLASS III

621 (06)

619(03)A

619(03)B

ANCHORS FOR DOWNDRAINS FOR 36-INCH PIPE AQ

AQ

AQ

EA

621 (07) 36-INCH FULL CIRCLE OUTLET PIPE L.F.

621 (09) PIPE ELBOW 36-INCH EA

1 1

464 185

203(20)A

203(20)B DRAINAGE EXCAVATION, TYPE IV ROLLING DIP

110 160

** INCLUDES

QUANTITIES

FROM

M.P. 5.83 & M.P. 5.92

*** INCLUDES

QUANTITIES

FROM

M.P. 7.09

206(02) EXCAVATION FOR REINFORCED EMBANKMENT STRUCTURE LSQ L.S.

603(01)A

603(01)B

603(01)C 72-INCH CORRUGATED METAL PIPE, .138 INCH THICKNESS FOR STEEL,

OR .134 INCH THICKNESS FOR ALUMINUM, METHOD A

605(22) GRANULAR FILTER MATERIAL C.Y.

613D(01)* REINFORCED EMBANKMENT DQ

DQ

C.Y.

613D(03) GEOGRID S.Y.

625(07) SEEDING, DRY METHOD (WITH MULCH) DQ ACRE

625(19) EROSION CONTROL BLANKET, TYPE STRAW AND COCONUT DQ S.Y.

0.16

0.12

280 358

M.P. 4.02 M.P. 4.22 M.P. 4.41 M.P. 4.48 M.P. 4.60 M.P. 4.77 M.P. 5.10 M.P. 5.63 M.P. 6.97

18-INCH CORRUGATED METAL PIPE, .079 INCH THICKNESS FOR STEEL,

OR .075 INCH THICKNESS FOR ALUMINUM, METHOD A

PREFABRICATED DRAIN (INCLUDES GEOTEXTILE AND DRAIN CORE)

GEOTEXTILE WITHOUT GRAVEL CUSHION

(FUNCTION J, TYPE NON-WOVEN NEEDLE PUNCHED)

36-INCH CORRUGATED METAL PIPE, .079 INCH THICKNESS FOR STEEL,

OR .075 INCH THICKNESS FOR ALUMINUM, METHOD A

* INCLUDES QUALITY CONTROL AND TESTING

REF. GENERAL NOTES ITEM #8 ON 613A AND

GENERAL NOTES ITEM #14 ON 613D

M.P. 1.30 M.P.

16.34- 18.92

603(02) 80

306(01) RECONDITIONING OF ROADBED, COMPACTION A DQ MI 2.58

35-INCH SPAN, 24-INCH RISE, CORRUGATED MATAL PIPE ARCH, .079-INCH

THICKNESS FOR STEEL, OR .075- INCH THICKNESS FOR ALUMINUM, METHOD A

Al = ALUMINUM ALLOY Fe = GALVANIZED STEEL

C CORRUGATED METAL PIPE

S P.

S.

. P.

.M. P. =

. P. P. A. = STRUCTURAL PLATE PIPE ARCH

S. P. A. = STRUCTURAL PLATE ARCH

P. P. = PERFORATED PIPE

C. M. P. A.= CORRUGATED METAL PIPE ARCH

DENOTES 5% SHOP ELONGATION*

K. N. F. REVISED 5/81

SECTION

EL

BO

W

BR

AN

C H

C O

N N

EN

D

S

EC

TI

O

N

IN

LE

T R

IS

ER

D

EB

R

IS

R

AC

K

TY

PE PI

PE

IN

LE

T

Ty pe

604 621

CORR. METAL SPILLWAYS

Type

AS

SE

M

BL

Y

IN

LE

T

IN

C

H

IN

C

H

IN

C

H

AN

C

H O

R

FLUME OUTLET

PIPE

No. Type

CU. YDS.

RIPRAP

REMARKS

PROJECT SHEET NO.

O R

R U

G

AT

IO

N

S C

ABBREVIATION

C

LA

SS

STRUCTURAL PLATE PIPE

NOTES :

2.

3.

alloy culvert at certain locations on this project. The pipe schedule defines of galvanized steel culvert pipe.

All pipe 48" in diameter and over shall be elongated 5% unless otherwise specified. Culverts in smaller diameters shall be elongated 5% if noted.

Quantities on this sheet are based on design data only and are subject to adjustments before and during construction to suit field conditions.

alternate thickness where aluminum alloy culvert pipe may be installed in lieu

1. The contractor has the option of installing either galvanized steel or aluminum

DRAINAGE SUMMARY

C. . .S.B.C.= CORRUGATED STEEL BOX CULVERT

603 or 617 or 605

METAL PIPE, PIPE ARCHES OR ARCHES, POLYETHYLENE PIPE

Size III

C

LA

SS

V

G

EO

TE

XT

IL

E

S.

Y.

PREFABRICATED DRAIN

PR

EF

AB

RI

CA

TE

D D

R

AI

N

S .F

SizeG R

AN

U

LA

R

F

IL

LE

R

M

AT

ER

IA

L C

.Y

6" P

ER

FO

R

AT

ED

PO

LY

ET

HY

LE

NE

P

IP

E

-IN

C H

C M

P

-IN

C H

C M

P

72 30

64 30

104 30

-IN

C H

30 2 1

-IN

C H

E

LB

O W

LITTLE NORTH FORK STORMPROOF

6" N

O N

-P

ER

FO

R

AT

ED

PO

LY

ET

HY

LE

NE

P

IP

E

ROAD No 40N51

M.P. 4.02 M.P. 4.02

M.P. 4.22

77 60 1386

1080 70

G

EO

G R

ID

M.P. 4.41 M.P. 4.48 M.P. 4.60 M.P. 4.77 M.P. 5.10

M.P. 6.97

-IN

C H

C M

P

M.P. 5.92

M.P. 5.63 M.P. 5.83 40

195195

M.P. 7.09

" X

4"

C M

PA

80 320 160

NO SCALE

WALL

LENGTH

FOUNDATION:

COMPACT TO 95%

OF T-180

2' 2'

ROADBED

BACKFILL:BACKFILL:

SLOPE 2:1 SLOPE 1/2:1

SHEET NO.

PROJECT

TYPICAL EXCAVATION LIMITS FOR RETAINING WALLS

HILFIKER WELDED WIRE WALLS - GENERAL NOTES

1. WORK - Under the provisions of Specification 613A, the contractor has the option of selecting among a variety of wall systems, subject to the

Hilfiker Retaining Walls ). If the contractor elects to use a wall met. As designed herein, the work consists of a welded wire retaining wall constructed in accordance with these specifications and the "Welded lines, grades, design, and dimensions shown on the plans or established by the Engineer.

2. MATERIALS - The contractor shall make his own arrangements to purchase the welded wire retaining wall elements, and all necessary attachments for the complete wall. For information concerning purchase and delivery of such materals, contact Hilfiker Retaining Walls, P.O. Box 2012, Eureka, Ca. 95502-2012; Toll Free ( 800 ) 762-8962. It should be noted that the company provides free technical assistance to the project site.

3. METHOD OF MEASUREMENT AND BASIS OF PAYMENT - The welded wire retaining wall shall be measured by the number of square feet of facing in place and accepted. No separate measurement will be made for the structure excavation, backfill, or embedment lengths. Payment under item 613A(01), at the contract price, shall be full compensation for 1) excavation, 2) furnishing the welded wire and accessories, labor, tools, and the plans, and 7) other incidentals necessary to complete the work identified by the plans, specifications, and Engineer.

4. WALL EXCAVATION - Typical excavation limits shall be as shown in the plans. The excavation shall be sloped to provide safety for construction workers and inspection personnel. Boulders, logs, and any other unsuitable materials encountered shall be removed and disposed of in areas approved by the Engineer. All suitable excavation material shall be contained in the work areas or on the adjacent roadway and shall not enter adjacent streams.

system other than Hilfiker, the requirements of section 613A.02 shall be

Wire 24" Lifts Construction Guide" ( Hilfiker Retaining Walls Corp., 1st.

Edition - November 2003 ), and in reasonably close conformity with the equipment, 3) placing the welded wire material, 4) backfilling,

6) reconstructing the existing road within the construction limits to the dimensions, grade, and crosslope as shown in and 7 on 40N51 is based on the use of Welded Wire Mesh ( trademark -

5. FOUNDATION APPROVAL - Prior to wall placement the foundation shall be level and smooth and compacted to 95% of AASHTO T-180, Method C or D.

The foundation shall be approved by the Engineer before any retaining wall elements are installed.

6. WALL PLACEMENT - The welded wire elements shall be set to the lines and grades shown on the drawings or directed by the Engineer. Wall tiers shall be battered 1:48. Wall placement shall be in accordance with the "Welded Wire Construction Guide" referred to in note (1) above.

placement of the tiers. Each layer of the backfill material shall be shall be placed in layers not exceeding 10 inches ( loose ). The contractor shall decrease this lift thickness, if necessary to obtain the specified density. Organic material and rocks greater than 4 inches in diameter shall be removed from the backfill. The contractor shall compaction of the backfill. The Engineer may direct the contractor to replace wall elements damaged during the backfilling.

exercise care to avoid damaging the wire galvanizing during the approval of the Engineer. The design for little north fork ERFO sites 2, 5

8.

compacted to achieve a density of at least 95% of the maximum density, as determined by AASHTO T-99, Method C or D. The backfill material

COMPACT TO 95%

OF T-99

COMPACT TO 95%

OF T-99

LITTLE NORTH FORK STORMPROOF 5

CONTRACTOR SHALL BE REQUIRED TO PROVIDE A QUALITY CONTROL

SYSTEM THAT WILL ENSURE THAT ALL CONSTRUCTION REQUIRED UNDER

THIS CONTRACT CONFORM TO THE CONTRACT REQUIREMENTS. A QUALITY

CONTROL PLAN SHALL BE SUBMITTED IN WRITING TO DETAIL COMPACTION

TESTING ON THE FOUNDATION AND THE 1ST 6 FT. OF EMBANKMENT IN THE

HILFIKER WALL CONSTRUCTION. CONTRACTOR SHALL USE A STATE CERTIFIED

LABORATORY FOR ALL TESTING PROVIDED UNDER THIS CONTRACT. WORK IS

CONSIDERED INCIDENTAL TO ITEM 613A(01).

7. BACKFILLING - Backfilling shall progress simultaneously with the

9. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS DESIGNATED OUTSIDE OF ROAD

PRISM (BORROW, WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR APPROVAL

FROM THE HERITAGE PROGRAM MANAGER.

BACKFILL

COMPACTED

BACKFILL

COMPACTED

BACKFILL

PREFABRICATED

SYSTEM

PIPE CAP

10 GAGE WIRE, GALV.

OUTLET PIPE

PREFABRICATED UNDERDRAIN SYSTEM TYPICAL

1. PERFORATED AND NONPERFORATED PIPE SHALL BE

WILL BE INCLUDED IN THE LENGTH MEASURMENT

OF PIPE, SEE ITEM 605 (27 & 28).

2. FOR PAYMENT PURPOSES, ELBOWS, TEES AND CAPS

ASSEMBLIES ARE INCIDENTAL TO 605(28).

THE PREFABRICATED UNDERDRAIN DURING CONSTRUCTION.

OVERLAP OF FABRIC

SHALL NOT BE LESS

THAN 1 FOOT.

PERFORATED PIPE

PREFABRICATED SYSTEM

WITH FABRIC ON BOTH

SIDES.

OVERLAP OF FABRIC

SHALL NOT BE LESS

THAN 1 FOOT.

1/2" MESH, 19 GAGE

GALVANIZED HARDWARE

CLOTH 12" X 12"

FRONT VIEWSIDE VIEW

NOTES

FINISH ROAD GRADE

1' MIN.

VARIABLE

OUTLET SCREEN

CUT

10 GAGE

WIRE, GALV.

3' LONG

133 T POSTS

GROUND LINE

ANCHOR ASSEMBLY

6-INCH CORRUGATED POLYETHYLENE.

3. OUTLET PIPE SHALL BE ANCHORED EVERY 20 FEET. ANCHOR

4. LOCATION OF THE OUTLET SHALL BE DESIGNATED BY ENGINEER.

5. THE CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGING

PROJECT SHEET NO.

6LITTLE NORTH FORK STORMPROOF

B B

D

1'

4" m in

SECTION B-B

1/10D

2'

4'

Flow

2'R

7'

C

PROJECT SHEET NO.

LITTLE NORTH FORK STORMPROOF

CULVERT INSTALLATION DETAILS

Existing ground C.M.P.

4" m in

L L

L

C C

C

D

Bedding material

Minimum excavated limits

Selected granular .1

Minimum of d + 4

Dia or span + 2'

1' m in

Existing ground

1/10 D

4" m in . C.M.P.

D

Existing ground

D

1/10 D

D

4" M

IN

. C.M.P.

Bedding material

C.M.P.

1/10 D

Bedding material

Existing ground

Profile grade

Bedding material roadbed. 12" minimum for 18" miminum for unpaved paved roadbed.

Existing ground

Bedding material

Introduce camber under center of fill to provide for settlement.

Minimum camber 1% of pipe length.

Subgrade

C.M.P.

specified.

Install inlet and outlet protection when

Pipe invert at inlet and outlet of pipe shall be at stream grade, unless designated otherwise. CULVERT SECTION

Note:

TYPICAL BEDDING AND EXCAVATION DETAILS

A A

METHOD OF BACKFILLING PIPE

UNSTABLE FOUNDATION

ROCK FOUNDATION

SECTION A-A

Slope variable construct as staked

PLAN

C

Centerline of roadbedC.M.P.

15' Minimum Edge of road

Top of catch basin cut slope

Bottom of catch basin cut slope

Normal top of cut

Warp back for pipe inlet (catch basin)

Bottom width may vary when catch basin is constructed in natural drainage

Backfill material

C.M.P.

Existing ground

D or 12' max

C.M.P.

SECTION C-C

Slope ratio as staked

Slope ratio as staked

Existing ground

Width Ditch Roadbed

Subgrade

18" minimum for unpaved roadbed. 12" minimum for paved roadbed

2' beyond fill

EARTH CATCH BASIN DETAILS

SHEET NO.

ANCHOR ASSEMBLY SPACING

NOTES:

2. ALL BAND COUPLERS FOR PIPE GREATER THAN 8-INCH DIAMETER

3. MINIMUM THICKNESS OF FULL-CIRCLE OUTLET PIPE SHALL BE

4. NO FOLDED LOCKED-SEAM HELICAL CORRUGATED PIPE SHALL BE

USED FOR PIPE GREATER THAN 8-INCHES.

5. FOR PAYMENT PURPOSES, AN ANCHOR ASSEMBLY SHALL INCLUDE

TWO PIPE STAKES AND ALL NECESSARY HARDWARE.

6. ANCHOR ASSEMBLY COMPONENTS SHALL BE STEEL OR IRON AND

SHALL BE GALVANIZED AFTER FABRICATION.

7. ALL PIPE STAKES ARE TO BE DRIVEN FLUSH WITH ANCHOR

ASSEMBLY, OR TO THE POINT OF REFUSAL.

CONTACT AREAS SHALL BE PROTECTED AGAINST ELECTRO-CHEMICAL

CORROSION.

CLAMP

6- 5/

8"

4"

PLATE DETAIL

ANCHOR ASSEMBLY

ANCHOR ASSEMBLY .064-INCH FOR STEEL AND .060-INCH FOR ALUMINUM.

8. WHERE ALUMINUM IS TO BE IN CONTACT WITH STEEL OR IRON,

DOWNDRAIN

TYPE "F"

LITTLE NORTH FORK STORMPROOF

PROJECT

LOCATION AND

SPACING OF

ANCHOR ASSEMBLIES

NUMBER OF

ANCHOR

ASSEMBLIES

LENGTH OF

DOWNDRAIN

2' FROM OUTLETONE20' OR LESS

1 - 2' FROM OUTLET

1 - AT MIDPOINT

TWO22' - 42'

1 - 2' FROM OUTLET

REMAINDER SHALL

BE EQUALLY SPACED

THREE44' - 62'

1 - 2' FROM OUTLET

REMAINDER SHALL

BE EQUALLY SPACED

FOUR64' - 82'

FIVE84' TO 102'

20' MAXIMUM SPACING104' AND OVER

SHALL 24-INCHES LONG.

NO SCALE

1. UNIVERSAL COUPLER (DIMPLED) BANDS SHALL NOT BE USED.

1 - 2' FROM OUTLET

REMAINDER SHALL

BE EQUALLY SPACED

CROSSDRAIN CMP

BAND COUPLERS

FULL-CIRCLE

OUTLET PIPE

TRAVELED WAY

PIPE ELBOW TYPE F

30 BEND

ANCHOR ASSEMBLIES)

(SEE TABLE FOR NUMBER AND SPACING OF

20'-0" MAX. TO FIRST ANCHOR ASSEMBLY

2'FINISHED

FILL SLOPE

ANCHOR

ASSEMBLY

2" DIA.

COLLAR OF

2" PIPE

1"

WELD

1/2" R.

D + 9"

WELD 3-1/4"

D + 2-1/2"

U-BOLT

D

1-1/2" DIA. X 6'-0" LONG PIPE STAKES

(ONE EACH SIDE OF OUTLET PIPE)

3/4" ROUND IRON

SHARPEN OR FLATTEN

TYPE "A"

BAND COUPLER

HOLE SIZE AND SPACING SHALL ALIGN WITH

BOLT SPACING FOR 24-INCH BAND COUPLER.

(SEE PLATE DETAIL)

PIPE STAKE

(SAME AS ABOVE)

1/4" PLATE

TYPE "B"

FOR TYPE "B"

3"

1" R

1"

12" 3/4"

12" MIN.

60'

1. ENTIRE LENGTH OF DIP SHALL BE

2. DIP SHALL BE CONSTRUCTED TO THE

4. RIPRAP SHALL BE CLASS III. SEE

5. RIPRAP SLOPES SHALL BE THE SAME AS

3. ROLLING DIP STATIONS SHOWN ARE

TYPE I ROLLING DIP

A A

A

RIPRAP

A

10' MIN.

10' MIN.

60'

30'

ORIGINAL

GRADIENT

GRADIENT

A

0 % - 10 %

10 % - 20 %

+ 2 %

- 5 %

ORIGINAL GRADE LINE

RAISE GRADE WITH

EXCAVATED MATERIAL

BOTTOM OF DIP

NO SCALE

NOTES:

K.N.F. REVISED 4/94

TOE OF FILL

A

FINISHED GRADE LINE

TOP OF CUT

OR TO STAKED TOE OF

8 FEET FROM ROAD EDGE

RIPRAP SHALL EXTEND

GREATER.

FILL, WHICHEVER IS

PROJECT SHEET

LITTLE NORTH FORK STORMPROOF 9

OUTSLOPED 5 TO 7 PERCENT.

DIMENSIONS SHOWN PRIOR TO PLACEMENT

OF AGGREGATE COURSE.

APPROXIMATE. FINAL STATION TO BE

DESIGNATED BY THE ENGINEER

BEFORE CONSTRUCTION.

DRAINAGE SUMMARY FOR RIPRAP QUANTITY.

CONSTRUCTED FILL SLOPE.

6. GEOTEXRILE SHALL BE PLACE UNDER RIPRAP

TYPE IV ROLLING DIP

1. ENTIRE LENGTH OF DIP SHALL BE OUTSLOPED

2. ROLLING DIP STATIONS SHOWN ARE APPROXIMATE.

3. DIP SHALL BE CONSTRUCTED TO THE DIMENSIONS

4. RIPRAP SHALL BE CLASS III. SEE DRAINAGE

5. RIPRAP SLOPES SHALL BE THE SAME ASORIGINAL

GRADIENT

GRADIENT

A

0 % - 10 %

10 % - 20 %

+ 2 %

- 5 %

ORIGINAL GRADE LINE

RAISE GRADE WITH

EXCAVATED MATERIAL

BOTTOM OF DIP

NO SCALE

NOTES:

K.N.F. REVISED 4/94

TOE OF FILL

A

FINISHED GRADE LINE

60'

60'

30'

TOP OF CUT

10'

6''

25'

RIPRAP

A

A

A A

RIPRAP SHALL EXTEND

OR TO STAKED TOE OF

FILL, WHICHEVER IS

GREATER.

25'

10'

10' MIN.

12" MIN.

10' MIN.

PROJECT SHEET

LITTLE NORTH FORK STORMPROOF 10

8 FEET FROM ROAD EDGE

5 TO 7 PERCENT.

FINAL STATION TO BE DESIGNATED BY THE

ENGINEER BEFORE CONSTRUCTION.

SHOWN PRIOR TO PLACEMENT OF AGGREGATE

COURSE.

SUMMARY FOR RIPRAP QUANTITY.

CONSTRUCTED FILL SLOPE.

6. GEOTEXTILE SHALL BE PLACE UNDER RIPRAP

LITTLE NORTH FORK STORMPROOF 11

40N51

LITTLE NORTH FORK STORMPROOF SALMON RIVER RANGER DISTRICT

1C01

1C01

N

M.P. 0.00

RP - SWITHBACK LT JUNCTION 40N33 RT

M.P. 3.81

N

N

M.P. 7.37

M.P. 5.63

M.P. 5.92

M.P. 6.97

M.P. 5.83 EXISTING 24" CMP

CLEAN INLET

RIPRAP OUTLET SIDE OF FILL

(40 CY OF RIPRAP AND 100 SY OF

GEOTEXTILE WILL BE INCLUDED

IN QUANTITIES AT MP 5.63)

M.P. 7.09

M.P. 4.77

M.P. 5.10

M.P.4.60

M.P. 4.63 RP - SWITHBACK LT

M.P. 4.48

M.P. 4.41

M.P. 4.02

M.P. 4.22

M.P. 2.67

CONSTRUCT HILFIKER OR EQUIVALENT

WALL SEE PAGE 22-23 FOR PLANS

EXISTING 18-INCH CMP. CLEAN INLET

CONSTRUCT TYPE IV ROLLING DIP 50 FT

BACK (COST WILL BE INCLUDED IN

QUANTITIES AT M.P. 6.97)

SWITHBACK RT

WASTE AREA LT

M.P. 16.34

M.P. 18.17 RP - JUCTION 10N30

RT

M.P. 18.92 SWITCHBACK LT.

END ROCKING

M.P. 22.83 JUNCTION COUNTH RD

# 1C01 AND FOREST

SERVICE RD 40N51

PROJECT LIMIT

JUNCTION COUNTH RD # 1C01 AND

FOREST SERVICE RD 40N51

PROJECT LIMIT

M.P. 1.30

SWITHBACK RT

EXISTING 30" CMP

CONSTRUCT TYPE IV ROLLING DIP

50 FT BACK (COST WILL BE

INCLUDED IN QUANTITIES AT

M.P. 5.63)

TO SAWYERS BAR

TO FORKS OF SALMON

GARDEN GULCH

INSTALL (2) CMPA

SEE PAGE 13-14 FOR

PLANS

CONSTRUCT REINFORCED EMBANKMENT

SEE PAGE 15 FOR PLANS

CONSTRUCT REINFORCED EMBANKMENT

SEE PAGE 16 FOR PLANS

CONSTRUCT HILFIKER OR EQUIVALENT

WALL SEE PAGE 17-18 FOR PLANS

CONSTRUCT RIPRAP WALL SEE PAGE19

FOR PLANS

REMOVE FILL MATERIAL, PLACE RIPRAP

WITH GEOTEXTILE

INSTALL 36 INCH CMP WITH OSD

SEE PAGE 20-21 FOR PLANS

CONSTRUCT HILFIKER OR EQUIVALENT

WALL SEE PAGE 22-23 FOR PLANS

LOWER GRADE, RIPRAP FILL SLOPE

WITH GEOTEXTILE

SEE PAGE 26 FOR PLANS

EXISTING 24" CMP AND 36" CMP

SEE PAGE 27-28 FOR PLANS

JUCTION 11N10 LT

BEGIN ROCKING

6" DEPTH, AVERAGE

WIDTH 16'

SHEET NO.PROJECTLITTLE NORTH FORK STORMPROOF

-2%

SEED,MULCH AND EROSION

CONTROL BLANKET ON ALL

BENCHES AND EXCAVATED AREAS

GROUND LINE

GROUND LINE

HORIZONIAL BLANKET

DRAIN 1' DEPTH

PL

CL

6" CRUSHED AGGREGATE

TRAVELED WAY

DRAIN CORE

REINFORCED EMBANKMENT TYPICAL

CONTRACTOR SHALL BE REQUIRED TO PROVIDE A QUALITY CONTROL

SYSTEM THAT WILL ENSURE THAT ALL CONSTRUCTION REQUIRED UNDER

THIS CONTRACT CONFORM TO THE CONTRACT REQUIREMENTS. A QUALITY

CONTROL PLAN SHALL BE SUBMITTED IN WRITING TO DETAIL COMPACTION

TESTING ON THE FOUNDATION AND THE 1ST 6 FT. OF EMBANKMENT IN THE

REINFORCED EMBANKMENT. CONTRACTOR SHALL USE A STATE CERTIFIED

LABORATORY FOR ALL TESTING PROVIDED UNDER THIS CONTRACT. WORK IS

CONSIDERED INCIDENTAL TO ITEM 613(D)01.

35--7090--100 0--15100

3" 2 1/2" 2" 11/2"

PERCENTAGE BY WEIGHT PASSING SQUARE MESH SIEVE SIZE

NOTES

40N51

40N51 - MP 4.02 & M.P. 4.22

NO SCALE

SLOPE 3/4

12'

GEOGRID, 28' LENGTH

GEOGRID, 20' LENGTH

GEOGRID 5' LENGTH PLACE AT 1' INTERVALS

GEOGRID 5' LENGTH PLACE AT

1' INTERVALS BETWEEN 20' GEOGRID

1 1/4:1 REINFORCEDFILL SLOPE,SEED AND MULCH SLOPE FACE

AND EROSION CONTROL BLANKET

20'

-+END OF GEOGRID SHALL BE WITH 3" FILL SLOPE

10. GEOGRID SHALL MEET THE REQUIREMENTS OF ITEM 613D AND BE INSTALLED

IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

11. BACKFILLING SHALL PROGRESS SIMULTANEOUSLY WITH THE PLACEMENT OF GEOGRID.

EACH LAYER OF BACKFILL SHALL BE COMPACTED ACCORDING TO THE SPECIFICATION. THE

CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGING THE GEOGRID DURING THE COMPACTION OF THE BACKFILL. THE ENGINEER MAY DIRECT THE CONTRACTOR TO REPLACE GEOGRID DAMAGED

DURING THE BACKFILL OPERATION.

12. CONSTRUCTION TOLERANCE CLASS D.

13. SEED, MULCH, AND EROSION CONTROL BLANKET THE EMBANKMENT SLOPE FACE,

BENCHES AND ALL EXCAVATED AREAS. EROSIONS CONTROL BLANKET SHALL BE

INSTALLED AFTER THE SEEDING AND MULCHING ARE COMPLETED, AND PER THE

MANUFACTURER'S RECOMMENDATIONS.

14.

15. IN ACCORDANCE WITH SECTION 204 AN EROSION CONTROL PLAN

SHALL BE SUBMITTED TO THE ENGINEER AND APPROVED PRIOR TO

COMMENCEMENT OF WORK. EROSION CONTROL PLAN SHALL BE

CONSIDERED INCIDENTAL TO SPEC. 204(20).

16. A LIMITED OPERATING SEASON WILL BE REQUIRED TO PROTECT

THREATENED SPECIES. UNLESS OTHERWISE AGREED, NO WORK

SHALL BE PERFORMED ON THIS PROJECT BETWEEN OCTOBER 15

AND APRIL 15.

1. TRAVELED WAY SHALL BE 16 FEET MINIMUM. PLACE CRUSHED AGGREGATE FULL

ROAD WIDTH.

2. REMOVE DEBRIS AND CLEAR VEGETATION, DISPOSE IN AREA

DESIGNATED BY THE ENGINEER.

3. CLEARING SHALL BE CONSIDERED INCIDENTAL TO ITEM 206(02).

4. UNSUITABLE EXCAVATION SHALL BE LAYER PLACED IN WASTE AREA LOCATED

AT M.P. 7.37.

5. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS DESIGNATED OUTSIDE OF

ROAD PRISM (BORROW, WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR

APPROVAL FROM THE HERITAGE PROGRAM MANAGER

6. MATERIAL EXCAVATED UNDER ITEM 206(02) SHALL BE USED FOR REINFORCED

EMBANKMENT.

7. PRIOR TO BEGINNING REINFORCED EMBANKMENT AND THE HORIZONTAL BLANKET

DRAIN, THE FOUNDATION SHALL BE GRADED AND SMOOTHED AS SHOWN ON THE

DRAWINGS AND COMPACTED TO SPECIFICATIONS UNDER ITEM 613D.

8. HORIZONTAL BLANKET DRAIN SHALL BE COMPLETELY ENCASED IN GEOTEXTILE WITH

NO OPEN SEAMS.

9. GRADATION OF GRANULAR FILTER MATERIAL SHALL BE AS FOLLOWS:

WASTE MATERIAL TO BE HAUL TO WASTE AREA

HAPPY CAMP RANGER DISTRICT

N

W E

NO SCALE

EDGE OF

ROAD

P - LINE

TOE OF FILL

TOE OF FILL

CENTERLINE

GRADE LINE

GROUND LINE

PLAN VIEW

PROFILE VIEW

NOTES

SLOPE STAKES NOTES:

4. A LIMITED OPERATING SEASON WILL BE REQUIRED

TO PROTECT THREATENED SPECIES UNLESS OTHERWISE

AGREED, NO WORK SHALL BE PERFORMED ON THIS

PROJECT BETWEEN OCT 15 AND APRIL 15.

5. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS

DESIGNATED OUTSIDE OF ROAD PRISM (BORROW,

WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR

APPROVAL FROM THE HERITAGE PROGRAM MANAGER.

0+00 BEGIN

CRUSHED

AGGREGATE

(6" DEPTH)

0+64 BEGIN ROCK

FILL (CLASS III

RIPRAP)

1+72 END

ROCKING

1 2 3 4

6 7

1+47 END

ROCK FILL

+8%

+2%

-6%

0% +2%

SECTION STATION CATCH "P" CATCH

LEFT RIGHT

10 0+00 F0.0/8.0 0.0 C0.1/7.1 1.25:1 C0.0 .5:1

WLT=7.0 0.0 RT WRT=7.0

20 0+25 F0.2/9.3 8% F2.2/9.7 1.25:1 F2.0 1.25:1

WLT=9.0 0.8 LT WRT=7.0

30 0+49 F0.4/11.5 8% F4.7/12.8 1.25:1 F4.3 1.25:1

WLT=11.0 1.0 LT WRT=7.0

40 0+64 F2.0/14.5 2% F4.8/16.0 1.25:1 F4.4 1.25:1

WLT=12.0 1.7 LT WRT=10.0

50 0+90 F3.3/17.1 -7% F5.7/18.1 1.25:1 F3.6 1.25:1

WLT=13.0 0.0 RT WRT=11.0

60 1+00 F3.3/17.1 -7% F4.1/16.2 1.25:1 F3.8 1.25:1

WLT=13.0 0.0 RT WRT=11.0

70 1+22 F3.5/17.3 0% F3.6/15.5 1.25:1 F3.8 1.25:1

WLT=13.0 0.0 RT WRT=11.0

80 1+47 F1.1/9.4 2% F1.5/8.8 1.25:1 F1.3 1.25:1

WLT=8.0 0.0 RT WRT=7.0

90 1+72 F0.1/8.1 -2% C 0.1/7.1 1.25:1 F0.0 .5:1

WLT=8.0 0.0 RT WRT=7.0

ROCK

FILL (CLASS III

RIPRAP)

INSTALL (2)

35" X 24" X 40'

CMPA

INSTALL (2)

35" X 24" X 40'

CMPA

ROCK

ACCESS ROAD

TO WATER

SOURCE

LITTLE NORTH FORK STORMPROOF

40N51 M.P. 1.30 LITTLE NORTH FORK STORMPROOF

40N51 M.P. 1.30

1. RIPRAP AND CRUSHED AGGREGATE WILL COME

FROM COMMERCIAL SOURCE.

2. LOCATION OF DECKING, DISPOSAL, AND WASTE

AREAS SHALL BE AS DIRECTED BY THE ENGINEER.

3. TRAVELED WAY SHALL BE AS SHOWN ON PLANS.

LITTLE NORTH FORK STORMPROOF

40N51- MP 1.30

CROSS SECTION

40N51 M.P. 1.30

0+25 ( 2 )

0+00 ( 1 )

0+49 ( 3 )

0+64 ( 4 )

0+90 ( 5 )

1+00 ( 6 )

1+22 ( 7 )

1+47 ( 8 )

1+72 ( 9 )

8' 7'

13' 11'

13' 11'

13' 11'

12' 10'

11' 7'

9' 7'

7' 7' C

C

C

C

C

C

C

C

C

L

L

L

L

L

L

L

L

L

CRUSHED

AGGREGATE

6" DEPTH

GEOTEXTILE

CLASS III

RIPRAP

SLOPE

1.25:1

INSTALL

35" X 24" X 40'

CMPA

INSTALL

35" X 24" X 40'

CMPA

BEGIN ROCK

FILL

END ROCK

FILL

0 5' 10' 20'

W E

NO SCALE

LITTLE NORTH FORK STORMPROOF LITTLE NORTH FORK STORMPROOF

40N51 - MP 4.02

M.P. 4.02

18'

0+80 END

CRUSHED

AGGREGATE

0+70 END REINFORCED

EMBANKMENT

0.00 BEGIN CRUSHED

AGGREGATE

0+15 BEGIN

REINFORCED

EMBANKMENT

L - LINE

P - LINE

RIPRAP OUTLET

REMOVE OLD CMP

REMOVE OLD CMP

CONSTRUCT

RIPRAP

OUTLET

DRAIN CORE

INSTALL

NEW

CMP

UNSUITABLE EXCAVATION

1 1/4:1

P

P

P

P

P

L

L

L

L

L

C

C

C

L

L

L

20'

BEGIN CRUSHED AGGREGATE

END CRUSHED AGGREGATE

PLAN VIEW

CROSS SECTION

HORIZONIAL

BLANKET

DRAIN 1' DEPTH

REINFORCED

EMBANKMENT

AREADRAIN CORE

OUTLET PIPE

0+00 ( 1 )

0+80 ( 5 )

0+30 ( 2 )

0+45 ( 3 )

0+60 ( 4 )

EOR

EOR

3/4:1

0+45 REMOVE OLD 18" CMP

INSTALL 18" x 50' CMP

PLACE CLASS V RIPRAP

AT OUTLET OF CMP

(10 WIDE, 10' LONG, 3' DEPTH)

SECTION P-LINE TO P-LINE TO

CENTERLINE TOP OF CUT

10 0+00 0

20 0+30 5' LT 13' LT

30 0+45 6' LT 17' LT

40 0+60 3' LT 13' LT

50 0+80 0

REMOVE OLD CMP

INSTALL NEW CMP

W E

NO SCALE

LITTLE NORTH FORK STORMPROOF LITTLE NORTH FORK STORMPROOF

0.00 BEGIN CRUSHED

AGGREGATE

0+70 REINFORCED

EMBANKMENT

AREA

L - LINE

P - LINE DRAIN CORE

1 1/4:1

P

P

P

P

P

L

L

L

L

L

C

C

C

L

L

L

BEGIN CRUSHED AGGREGATE

END CRUSHED AGGREGATE

PLAN VIEW

CROSS SECTION

40N51 - MP 4.22

M.P. 4.22

3 4

0+19 BEGIN

REINFORCED

EMBANKMENT

0+96 END REINFORCED

EMBANKMENT

1+11 END

CRUSHED

AGGREGATE

E0R

EOR

0+59 ( 3 )

0+81 ( 4)

1+11 ( 5 )

HORIZONIAL

BLANKET

DRAIN 1' DEPTH

UNSUITABLE

EXCAVATION

OUTLET PIPE

0+00 ( 1 )

0+37 ( 2 )

0+59 ( 3 )

0+81 ( 4)

1+11 ( 5 )

3/4:1

DRAIN CORE

SECTION P-LINE TO P-LINE TO

CENTERLINE TOP OF CUT

10 0+00 0

20 0+37 12' LT 18' LT

30 0+59 14' LT 20' LT

40 0+81 7' LT 15' LT

50 1+11 0

PROFILE VIEW

NO SCALE

CROSS SECTION TYPICAL

NO SCALE

PREFABRICATED

UNDERDRAIN

7' 11'

BATTER

1:48

2'

4'

CLEARING LIMIT

EARTH BERM

INSLOPE

3-5%

DRAIN CORE

OUTLET DRAIN PIPE

N

W E

EDGE OF ROAD

NO SCALE

Wall Height

5'

MIN

Embedment Length

1 1/2:1 SLOPE

ON 1.5 FT FILL

LITTLE NORTH FORK STORMPROOF

OUTLET DRAIN CORE

6" CRUSHED

AGGREGATE

M.P. 4.41

6 7

9 10

0+00

2+75

10'6"

0+63

BEGIN WALL

1+35

END WALL

1+84

END CRUSHED

AGGREGATE

END INSLOPE

TBM ELEV 3400.0

0+260+00

ELEV 3401.9

+12%

0+63

BEGIN WALL

EL 3396.2

1+35

END WALL

EL 3405.2

2+75

ELEV 3419.8

10' 8' 6'

+7%

+5%

40N51 - MP 4.41

HILFIKER WALL OR

EQUIVALENT

0+26

BEGIN INSLOPE

CONSTRUCT TYPE I

ROLLING DIP

0+00

BEGIN CRUSHED

AGGREGATE

6" DEPTH

SECTION P-LINE TO P-LINE TO

CENTERLINE FRONT FACE

30 0+63 0 13.9 RT

40 0+71 0 16.6' RT

50 0+89 0 17.3' RT

60 1+04 0 20.0' RT

70 1+11 0 21.5' RT

80 1+32 0 15.5' RT

LITTLE NORTH FORK STORMPROOF

1. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS

DESIGNATED OUTSIDE OF ROAD PRISM (BORROW,

WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR

APPROVAL FROM THE HERITAGE PROGRAM MANAGER.

2. TRAVELED WAY SHALL BE 18 FEET MINIMUM.

3. EARTH BERM SHALL BE CONSTRUCTED 25 FEET

BEYOND EACH END OF WALL. THE BERM SHALL

BE 3 FEET WIDE AND 1.5 FOOT HIGH.

4. ALL BENCH SHALL BE DAYLIGHT AN A MINIMUM

OF 5 FT IN WIDTH.

5. CLEARING SHALL BE CONSIDERED INCIDENTAL

TO PAY ITEM 613A(01).

6. EMBEDMENT LENGTH OF THE RETAINING WALL

SHALL BE AS SHOWN ON THE PLANS.

7. BORROW AREA FOR BACKFILL SHALL BE

DIRECTED BY THE ENGINEER

8. RIPRAP AND CRUSHED AGGREGATE WILL COME

FROM COMMERCIAL SOURCE.

9. IN ACCORDANCE WITH SECTION 204 AN EROSION

CONTROL PLAN WHICH INCLUDES A COMPREHENSIVE

DE-WATERING PLAN SHALL BE SUBMITTED TO THE

ENGINEER AND APPROVED PRIOR TO COMMENCEMENT

OF WORK.

10. A LIMITED OPERATING SEASON WILL BE REQUIRED TO

PROTECT THREATENED SPECIES UNLESS OTHERWISE

AGREED, NO WORK SHALL BE PERFORMED ON THIS

PROJECT BETWEEN OCT 15 AND APRIL 15.

NOTES:

LITTLE NORTH FORK STORMPROOF

CL

1 1/4:1

DAYLIGHT

EARTH BERM

40N51- MP 4.41

CROSS SECTION

40N51 M.P. 4.41

0+00 ( 1 )

10'

10'

0+26 ( 2 )

0+63 ( 3 )

0+71 ( 4 )

0+89 ( 5 )

1+04 ( 6 )

1+11 ( 7 )

1+32 ( 8 )

1+60 ( 9 )

2+39 ( 12 )

2+75 ( 13 )

1+84 ( 10 )

2+14 ( 11 )

DAYLIGHT

8'

6'

LITTLE NORTH FORK STORMPROOF 18

CROSS SECTIONS

NO SCALE

NOTES

W

E

0+00

2 3 4 5 6 7

CL

CL

CL

CL

CL

CL

CL

LITTLE NORTH FORK STORMPROOF

1+85

0+00 ( 1 )

0+46 ( 2 )

0+62 ( 3 )

0+75 ( 4 )

0+87 ( 5 )

1+00 ( 6 )

1+35 ( 7 )

10' 10'

3 - 5% OUTSLOPE

CLEARING LIMIT

6" CRUSHED

AGGREGATE

GEOTEXTILE

CONSTRUCT 5'

BENCH

SLOPE 1.25 : 1

10'

10'

PLAN VIEW

CLASS IV RIPRAP

15'

0+46 BEGIN RIPRAP

CLASS III

BEGIN GEOTEXTILE

1+35 END CRUSHED

AGGREGATE

1+00 END RIPRAP CLASS III

END GEOTEXTILE

0+00 BEGIN CRUSHED

AGGREGATE

6" DEPTH

40N51 - MP 4.48

RIPRAP WALL

LITTLE NORTH FORK STORMPROOF

4. A LIMITED OPERATING SEASON WILL BE REQUIRED

TO PROTECT THREATENED SPECIES UNLESS OTHERWISE

AGREED, NO WORK SHALL BE PERFORMED ON THIS

PROJECT BETWEEN OCT 15 AND APRIL 15.

5. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS

DESIGNATED OUTSIDE OF ROAD PRISM (BORROW,

WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR

APPROVAL FROM THE HERITAGE PROGRAM MANAGER.

1. RIPRAP AND CRUSHED AGGREGATE WILL COME

FROM COMMERCIAL SOURCE.

2. LOCATION OF DECKING, DISPOSAL, AND WASTE

AREAS SHALL BE AS DIRECTED BY THE ENGINEER.

3. TRAVELED WAY SHALL BE AS SHOWN ON PLANS.

WE

NO SCALE

LITTLE NORTH FORK STORMPROOF

40N51 - MP 4.60

M.P. 4.60

4 5

80+00

252627

8+55

EXISTING 36" CMP

2+52

INSTALL 36" X 92' CMP WITH

ELBOW AND 30 ' OSD

REMOVE 34' OF

36" CMP

6+97

EXISTING 18" CMP

CLEAN INLET

7+15

END RIPRAP

7+62

EXISTING 30" CMP

7+80

END RIPRAP

7+90

END CRUSHED

AGGREGATE

1+66

BEGIN CRUSHED

AGGREGATE

6" DEPTH

6+56

BEGIN CRUSHED

AGGREGATE

6" DEPTH

3+12

END RIPRAP

END GEOTEXTILE

END CRUSHED AGGREGATE

2+01

BEGIN RIPRAP CLASS III

BEGIN GEOTEXTILE

6+87

BEGIN RIPRAP

CLASS III

7+43

BEGIN RIPRAP

CLASS III

LITTLE NORTH FORK STORMPROOF

NOTES:

1. TRAVELED WAY SHALL BE AS SHOWN ON PLANS

2. EXCAVATION WILL HAULED TO WASTE AREA

AT M.P. 7.37

3. PRIOR TO PROJECT IMPLENTATION ALL AREAS OUTSIDE

OF ROAD PRISM (BORROW,WASTE AND STOCKPILE AREAS)

WILL REQUIRE PRIOR APPROVAL FROM THE HERITAGE

PROGRAM MANAGER.

4. WASTE AREA WILL SEEDED COST ARE INCIDENTAL

TO PAY ITEM 203 EXCAVATION

5. CLEARING SHALL BE CONSIDERED INCIDENTAL

TO PAY ITEM 203

6. RIPRAP AND CRUSHED AGGREGATE WILL COME

FROM COMMERCIAL SOURCE.

7. IN ACCORDANCE WITH SECTION 204 AN EROSION

CONTROL PLAN WHICH INCLUDES A COMPREHENSIVE

DE-WATERING PLAN SHALL BE SUBMITTED TO THE

ENGINEER AND APPROVED PRIOR TO COMMENCEMENT

OF WORK.

8. A LIMITED OPERATING SEASON WILL BE REQUIRED TO

PROTECT THREATENED SPECIES UNLESS OTHERWISE

AGREED, NO WORK SHALL BE PERFORMED ON THIS

PROJECT BETWEEN OCT 15 AND APRIL 15.

LITTLE NORTH FORK STORMPROOF

40N51- MP 4.60

CROSS SECTION

40N51 M.P. 4.60

1160 CY

1+66 ( 4 )

2+01 ( 5 )

2+29 ( 6 )

2+52 ( 7 )

11' 15'

20'

30'

2+76 ( 8 )

3+12 ( 9 )

6+86 ( 18 )

6+97 ( 19 )

7+09 ( 20 )

7+29 ( 21 )

7+54 ( 22 )

7+62 ( 23 )

7+70 ( 24 )

EXISTING 36" CMP

INSTALL 36" X 92" CMP

INSTALL 36" ELBOW

INSTALL 36" X 30' OSD

SLOPE 1 1/4 : 1

REMOVE MATERIAL AND HAUL

TO WATE AREA AT M.P. 7.37

EXISTING ROAD

WIDTH

EXISTING ROAD

WIDTH

CLEAN INLET

CLEAN INLET

EXISTING 18" CMP

EXISTING 30" CMP

CUT AND REMOVE

34' OF CMP

LITTLE NORTH FORK STORMPROOF

PLACE CLASS III RIPRAP WITH GEOTEXTILE

PLACE CLASS III

RIPRAP WITH

GEOTEXTILE

PLACE CLASS III

RIPRAP WITH

GEOTEXTILE

NO SCALE

CROSS SECTION TYPICAL

NO SCALE

PREFABRICATED

UNDERDRAIN

7' 11'

BATTER

1:48

2'

4'

CLEARING LIMIT

EARTH BERM

INSLOPE

3-5%

DRAIN CORE

OUTLET DRAIN PIPE

N

W E

EDGE OF ROAD

NO SCALE

Wall Height

Embedment Length

1 1/2:1 SLOPE

ON 1.5 FT FILL

LITTLE NORTH FORK STORMPROOF

40N51 - MP 4.77

HILFIKER WALL OR

EQUIVALENT

+ 5%

1+50

EL 3581.1

OUTLET DRAIN CORE

12' 12'

+7%

2+37

END WALL

EL 3585.7

7 8

3+31

0+00

1+73

BEGIN WALL

10' 6"

M.P. 4.77

TBM ELEV 3600.0

1+73

BEGIN WALL

1+00

BEGIN INSLOPE

CONSTRUCT TYPE I

ROLLING DIP

1+00 0+00

ELEV 3585.8

3+31

ELEV 3605.7

2+37

END WALL

3+10

END CRUSHED

AGGREGATE

END INSLOPE

6" CRUSHED

AGGREGATE

0+75

BEGIN CRUSHED

AGGREGATE

6" DEPTH

LITTLE NORTH FORK STORMPROOF

5'

MIN

14' 14'

SECTION P-LINE TO P-LINE TO

CENTERLINE FRONT FACE

50 1+97 0 15.0' LT

60 2+04 0 15.0' LT

70 2+23 0 14.0' LT

1. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS

DESIGNATED OUTSIDE OF ROAD PRISM (BORROW,

WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR

APPROVAL FROM THE HERITAGE PROGRAM MANAGER.

2. TRAVELED WAY SHALL BE 18 FEET MINIMUM.

3. EARTH BERM SHALL BE CONSTRUCTED 25 FEET

BEYOND EACH END OF WALL. THE BERM SHALL

BE 3 FEET WIDE AND 1.5 FOOT HIGH.

4. ALL BENCH SHALL BE DAYLIGHT AN A MINIMUM

OF 5 FT IN WIDTH.

5. CLEARING SHALL BE CONSIDERED INCIDENTAL

TO PAY ITEM 613A(01).

6. EMBEDMENT LENGTH OF THE RETAINING WALL

SHALL BE AS SHOWN ON THE PLANS.

7. BORROW AREA FOR BACKFILL SHALL BE

DIRECTED BY THE ENGINEER

8. RIPRAP AND CRUSHED AGGREGATE WILL COME

FROM COMMERCIAL SOURCE.

9. IN ACCORDANCE WITH SECTION 204 AN EROSION

CONTROL PLAN WHICH INCLUDES A COMPREHENSIVE

DE-WATERING PLAN SHALL BE SUBMITTED TO THE

ENGINEER AND APPROVED PRIOR TO COMMENCEMENT

OF WORK.

10. A LIMITED OPERATING SEASON WILL BE REQUIRED TO

PROTECT THREATENED SPECIES UNLESS OTHERWISE

AGREED, NO WORK SHALL BE PERFORMED ON THIS

LITTLE NORTH FORK STORMPROOF

40N51- MP 4.77

CROSS SECTION

40N51 M.P. 4.77

0+00 ( 1 )

C

C

C

C

C

C

C

C

C

C

L

L

L

L

L

L

L

L

L

L

0+50 ( 2 )

1+00 ( 3 )

1+50 ( 4 )

1+97 ( 5 )

2+04 ( 6 )

12'

EARTH BERM

DAYLIGHT

DAYLIGHT

2+23 ( 7 )

2+47 ( 8 )

2+82 ( 9 )

3+31 ( 10 )

1 1/4:1

15'

10'6"

LITTLE NORTH FORK STORMPROOF

14'

14'

NO SCALE

CROSS SECTION TYPICAL

NO SCALE

7' 11'

BATTER

1:48

2'

4'

CLEARING LIMIT

EARTH BERM

INSLOPE

3-5%

6" CRUSHED

AGGREGATE

DRAIN CORE

N

W E

NO SCALE

Wall Height

Embedment Length

1 1/2:1 SLOPE

ON 1.5 FT FILL

LITTLE NORTH FORK STORMPROOF

OUTLET DRAIN CORE

40N51 - MP 5.10

HILFIKER WALL OR

EQUIVALENT

M.P. 5.10

3 4

2+52

0+75

BEGIN WALL

EDGE OF

ROAD

0+00

10' 6"

OUTLET

DRAIN

PIPE

0+00

ELEV 3634.6

+8 %

0+75

BEGIN

WALL

+6% +4 %

16'

EL 3624.1

2+52

ELEV 3650.0

TBM ELEV 3650.0

2+02

END CRUSHED

AGGREGATE

END INSLOPE

1+79

END

WALL

EL 3630.3

1+79

END WALL

ZAPREFABRICATED

UNDERDRAIN

0+50

BEGIN INSLOPE

CONSTRUCT TYPE I

ROLLING DIP

0+25

BEGIN CRUSHED

AGGREGATE

6" DEPTH

LITTLE NORTH FORK STORMPROOF

5'

MIN

SECTION P-LINE TO P-LINE TO

CENTERLINE FRONT FACE

30 1+00 0 15.0' LT

40 1+20 0 15.0' LT

50 1+41 0 15.0' LT

60 1+62 0 15.0' LT

1. PRIOR TO PROJECT IMPLEMENTATION ALL AREAS

DESIGNATED OUTSIDE OF ROAD PRISM (BORROW,

WASTE AND STOCKPILE AREAS) WILL REQUIRE PRIOR

APPROVAL FROM THE HERITAGE PROGRAM MANAGER.

2. TRAVELED WAY SHALL BE 18 FEET MINIMUM.

3. EARTH BERM SHALL BE CONSTRUCTED 25 FEET

BEYOND EACH END OF WALL. THE BERM SHALL

BE 3 FEET WIDE AND 1.5 FOOT HIGH.

4. ALL BENCH SHALL BE DAYLIGHT AN A MINIMUM

OF 5 FT IN WIDTH.

5. CLEARING SHALL BE CONSIDERED INCIDENTAL

TO PAY ITEM 613A(01).

6. EMBEDMENT LENGTH OF THE RETAINING WALL

SHALL BE AS SHOWN ON THE PLANS.

7. BORROW AREA FOR BACKFILL SHALL BE

DIRECTED BY THE ENGINEER

8. RIPRAP AND CRUSHED AGGREGATE WILL COME

FROM COMMERCIAL SOURCE.

9. IN ACCORDANCE WITH SECTION 204 AN EROSION

CONTROL PLAN WHICH INCLUDES A COMPREHENSIVE

DE-WATERING PLAN SHALL BE SUBMITTED TO THE

ENGINEER AND APPROVED PRIOR TO COMMENCEMENT

OF WORK.

10. A LIMITED OPERATING SEASON WILL BE REQUIRED TO

PROTECT THREATENED SPECIES UNLESS OTHERWISE

AGREED, NO WORK SHALL BE PERFORMED ON THIS

PROJECT BETWEEN OCT 15 AND APRIL 15.

LITTLE NORTH FORK STORMPROOF

C

C

C

C

C

C

C

C

L

L

L

L

L

L

L

L

1 1/4:1

DAYLIGHT

40N51- MP 5.10

CROSS SECTION

40N51 M.P. 5.10

0+00 ( 1 )

0+50 ( 2 )

16'

16'

16'

16'

1+00 ( 3 )

1+20 ( 4 )

1+41 ( 5 )

1+62 ( 6 )

2+02 ( 7 )

2+52 ( 8 )

EARTH BERM

15'

10'6"

LITTLE NORTH FORK STORMPROOF 25

W E

NO SCALE

LITTLE NORTH FORK STORMPROOF

M.P. 5.63

0+00

1+00

2+00

2 3 4 5 6

3+00

C

C

C

C

C

C

C

C

C

L

L

L

L

L

L

L

L

L

4 5

0+00

BEGIN CRUSHED

AGGREGATE

6" DEPTH

1+31

EXISTING 36" CMP

2+74

END CRUSHED

AGGREGATE

+1.2% -2.8% +0.4%

+5.0 %

+7.0 %

GROUND LINE

PROFILE

16 17

0+90 ( 3 )

0+00 ( 1 )

0+50 ( 2 )

14 16

1+13 ( 4 )

14 20

1+31 ( 5 )

1+49 ( 6 )

9 15

1+74 ( 7 )

2+24 ( 8 )

2+74 ( 9 )

SLOPE

1/2 : 1

DAYLIGHT

0+90

BEGIN RIPRAP

CLASS III

BEGIN GEOTEXTILE

1+74

END RIPRAP

END GEOTEXTILE

LITTLE NORTH FORK STORMPROOF

40N51 - MP 5.63

LOWER GRADE

EXISTING

36" CMP

NOTES:

SECTION CUT TO ROAD WIDTH

GRADE LT RT

10 0+00 0 9' 9' 20 0+50 2.3' 16' 17' 30 0+90 3.2' 17' 9' 40 1+13 3.2' 14' 16' 50 1+31 3.3' 14' 20' 60 1+49 2.7' 11' 11' 70 1+74 1.8' 9' 15' 80 2+24 0.9' 9' 9' 90 2+74 0 9' 9'

9 9

1. TRAVELED WAY SHALL BE AS SHOWN ON PLANS

2. EXCAVATION WILL HAULED TO WASTE AREA

AT M.P. 7.37

3. WASTE AREA WILL SEEDED COST ARE INCIDENTAL

TO PAY ITEM 203 EXCAVATION

4. CLEARING SHALL BE CONSIDERED INCIDENTAL

TO PAY ITEM 203

5. RIPRAP AND CRUSHED AGGREGATE WILL COME

FROM COMMERCIAL SOURCE.

6. IN ACCORDANCE WITH SECTION 204 AN EROSION

CONTROL PLAN WHICH INCLUDES A COMPREHENSIVE

DE-WATERING PLAN SHALL BE SUBMITTED TO THE

ENGINEER AND APPROVED PRIOR TO COMMENCEMENT

OF WORK.

7. A LIMITED OPERATING SEASON WILL BE REQUIRED TO

PROTECT THREATENED SPECIES UNLESS OTHERWISE

AGREED, NO WORK SHALL BE PERFORMED ON THIS

W E

NO SCALE

LITTLE NORTH FORK STORMPROOF

40N51 - MP 6.97

M.P. 6.97

4 5

6 7 8

10 11

4+17

END CRUSHED

AGGREGATE

0+00

1+00

2+00

3+00

4+00

4 5

5+000

PROFILE

-8% +13%

+11%

-4% +4%

+5%

+4%

+8%

2+94

BEGIN CLASS III

RIPRAP WITH

GEOTEXTILE

0+00

BEGIN CRUSHED

AGGREGATE 6" DEPTH

3+67

END RIPRAP

3+17

EXISTING 36 " CMP

LEAVE INPLACE

INSTALL 72" X 90 CMP

ON TOP OF CMP

REMOVE 12' OF

36" CMP

36" CMP

72" CMP

EXISTING 24" CMP

CLEAN INLET

CLEAN INLET

LITTLE NORTH FORK STORMPROOF

NOTES:

1. TRAVELED WAY SHALL BE AS SHOWN ON PLANS

2. EXCAVATION WILL HAULED TO WASTE AREA

AT M.P. 7.37

3. WASTE AREA WILL SEEDED COST ARE INCIDENTAL

TO PAY ITEM 203 EXCAVATION

4. CLEARING SHALL BE CONSIDERED INCIDENTAL

TO PAY ITEM 203

5. RIPRAP AND CRUSHED AGGREGATE WILL COME

FROM COMMERCIAL SOURCE.

6. IN ACCORDANCE WITH SECTION 204 AN EROSION

CONTROL PLAN WHICH INCLUDES A COMPREHENSIVE

DE-WATERING PLAN SHALL BE SUBMITTED TO THE

ENGINEER AND APPROVED PRIOR TO COMMENCEMENT

OF WORK.

7. A LIMITED OPERATING SEASON WILL BE REQUIRED TO

PROTECT THREATENED SPECIES UNLESS OTHERWISE

AGREED, NO WORK SHALL BE PERFORMED ON THIS

PROJECT BETWEEN OCT 15 AND APRIL 15.

0+79

BEGIN CLASS V

RIPRAP BOTH

FILL SLOPES

WITH GEOTEXTILE

1+23

END CLASS V

RIPRAP

M.P. 6.97

LITTLE NORTH FORK STORMPROOF

0 5' 10' 20'

LITTLE NORTH FORK STORMPROOF

40N51- MP 6.97

CROSS SECTION

0+00 ( 1 )

0+40 ( 2 )

0+63 ( 3 )

0+79 ( 4 )

0+98 ( 5 )

1+23 ( 6 )

1+72 ( 7 )

2+22 ( 8 )

2+72 ( 9 )

3+17 ( 10 )

3+67 ( 11 )

4+17 ( 12 )

EXISTING 24 " CMP

PLACE CLASS V RIPRAP

ON FILL SLOPES

SLOPE 1 1/4:1

PLACE CLASS III

RIPRAP WITH

GEOTEXTILE

INSTALL 72" X 90' CMP

EXISTING 36" CMP

LEAVE IN PLACE

CLEAN INLET

CUT 12' OF

36" CMP