Blank Construction Cost Estimate.xls
XLS spreadsheet 24 KB Posted
- Attached to
- RECOVERY - Arcata Lab Buildout Federal contract opportunity
- Solicitation number
- AG-9702-S-09-0005
About this file
Blank Construction Cost Estimate
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Section 07220.pdf | ||
| Amendment 0003.pdf | ||
| Section 07600.pdf | ||
| Q A for Amendment 0003.pdf | ||
| Section 07550.pdf | ||
| Site Visit List of Attendees_9 Sep 09.pdf | ||
| Q A for Amendment 0002.pdf | ||
| RSL_Specification_Current without cover page.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Wage Determination.doc | DOC document | |
| Forest Service RSL 20080714_Mech.pdf | ||
| Revised Power Signal RSL 20080714_Elec.pdf | ||
| SF 1442 Cover Page.pdf | ||
| Revised Pg 1 2 RSL 20080714_Arch.pdf | ||
| Redwood Science Lab_Architectural.pdf | ||
| Redwood Science Lab_Electrical.pdf | ||
| Redwood Science Lab_Plumbing.pdf | ||
| Forest Service RSL 20080714_Stru.pdf | ||
| Arcata Lab RFP No. AG-9702-S-09-0005.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addition
| PROJECT: | REDWOOD SCIENCE LAB | |||
| USFS - ARCATA, CA. | ||||
| Second Floor Addition | ||||
| 9-Jun-09 | ||||
| ITEM | S.F. | TOTAL | ||
| NO. | SUMMARY BY TRADE | COST | COST | |
| 1.1 | Mobilization/Demobilation | |||
| 2.1 | Demolition | |||
| 2.2 | Hazmat Demolition | |||
| 3.1 | Concrete | |||
| 5.1 | Structural Steel | |||
| 5.5 | Misc. Iron & Architectural Metals | |||
| 6.1 | Carpentry, Rough | |||
| 6.2 | Carpentry, Finish | |||
| 7.2 | Thermal & Sound Insulation | |||
| 7.3 | Roofing & Rigid Insulation | |||
| 7.6 | Sheet Metal & Skylights | |||
| 7.9 | Caulking & Sealants | |||
| 8.1 | Doors and Hardware | |||
| 8.5 | Glass, Glazing & Sash | |||
| 9.2 | Gypsum Wallboard, Furring & Studs | |||
| 9.5 | Acoustical Tile | |||
| 9.7 | Carpet and Resilient Flooring | |||
| 9.8 | Painting | |||
| 10.4 | Toilet Accessories | |||
| 10.5 | Building Accessories, Misc. | |||
| 12.3 | Cabinets | |||
| 12.35 | Laminate Plastics | |||
| 15.1 | Plumbing | |||
| 15.3 | Heating, Ventilating & Air Cond. | |||
| 15.55 | Fire Protection | |||
| 16.0 | Electrical Work | |||
| Subtotal | ||||
| 1.1 | General Conditions | 10% | ||
| Subtotal | ||||
| 17.4 | Bonds and Insurance | 3% | ||
| 17.5 | Contractor's Fee | 10% | ||
| TOTAL |