Blank Construction Cost Estimate.xls

XLS spreadsheet 24 KB Posted

Attached to
RECOVERY - Arcata Lab Buildout Federal contract opportunity
Solicitation number
AG-9702-S-09-0005
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

Blank Construction Cost Estimate

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - Arcata Lab Buildout, newest first.
File Type Posted
Section 07220.pdf PDF
Amendment 0003.pdf PDF
Section 07600.pdf PDF
Q A for Amendment 0003.pdf PDF
Section 07550.pdf PDF
Site Visit List of Attendees_9 Sep 09.pdf PDF
Q A for Amendment 0002.pdf PDF
RSL_Specification_Current without cover page.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Wage Determination.doc DOC document
Forest Service RSL 20080714_Mech.pdf PDF
Revised Power Signal RSL 20080714_Elec.pdf PDF
SF 1442 Cover Page.pdf PDF
Revised Pg 1 2 RSL 20080714_Arch.pdf PDF
Redwood Science Lab_Architectural.pdf PDF
Redwood Science Lab_Electrical.pdf PDF
Redwood Science Lab_Plumbing.pdf PDF
Forest Service RSL 20080714_Stru.pdf PDF
Arcata Lab RFP No. AG-9702-S-09-0005.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addition

PROJECT:REDWOOD SCIENCE LAB
USFS - ARCATA, CA.
Second Floor Addition
9-Jun-09
ITEMS.F.TOTAL
NO.SUMMARY BY TRADECOSTCOST
1.1Mobilization/Demobilation
2.1Demolition
2.2Hazmat Demolition
3.1Concrete
5.1Structural Steel
5.5Misc. Iron & Architectural Metals
6.1Carpentry, Rough
6.2Carpentry, Finish
7.2Thermal & Sound Insulation
7.3Roofing & Rigid Insulation
7.6Sheet Metal & Skylights
7.9Caulking & Sealants
8.1Doors and Hardware
8.5Glass, Glazing & Sash
9.2Gypsum Wallboard, Furring & Studs
9.5Acoustical Tile
9.7Carpet and Resilient Flooring
9.8Painting
10.4Toilet Accessories
10.5Building Accessories, Misc.
12.3Cabinets
12.35Laminate Plastics
15.1Plumbing
15.3Heating, Ventilating & Air Cond.
15.55Fire Protection
16.0Electrical Work
Subtotal
1.1General Conditions10%
Subtotal
17.4Bonds and Insurance3%
17.5Contractor's Fee10%
TOTAL