RRSB_ScheduleOfItems.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- SOUTHBOUND POTAL ENTRY SIGN Federal contract opportunity
- Solicitation number
- AG-94TZ-S-12-0081
About this file
SCHEDULE OF ITEMS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_One_AG_94TZ_S_12_0081.pdf | ||
| Wage_Determination_Coconino.pdf | ||
| Maps_and_Drawings.pdf | ||
| CSI_Specifications.docx | DOCX document | |
| COCONINO FIRE PLAN.pdf | ||
| SF_1442.pdf | ||
| Solicitation.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of items
SCHEDULE OF ITEMS
| COCONINO NATIONAL FOREST |
| RED ROCK RANGER DISTRICT |
| RED ROCK SCENIC BYWAY IMPROVEMENTS |
| SOUTHBOUND PORTAL / COURTHOUSE BUTTE / YAVAPAI POINT |
| BASE BID | ||||||
| SOUTHBOUND PORTAL / COURTHOUSE BUTTE / YAVAPAI POINT | ||||||
| Method of | Estimated | |||||
| Pay Item | Description | Measurement | Unit | Quantity | Unit Cost | Total |
| 151(01) | Mobilization | LSQ | LS | 1 | ||
| 209(01) | Structure Excavation and Backfill - Southbound Portal | CQ | CY | 10 | ||
| 02110(01) | Clearing and Grubbing - Southbound Portal | LSQ | LS | 1 | ||
| 04850(01) | Rock Assemblies - Stone Veneer Pillar Yavapai Point | AQ | EA | 5 | ||
| 04850(02) | Rock Assemblies - Stone Veneer Pillar Courthouse Butte | AQ | EA | 4 | ||
| 05720(01) | Metal Railing for Stone Veneer Pillars - Yavapai Point | AQ | LF | 56 | ||
| 05720(02) | Metal Railing for Stone Veneer Pillars - Courthouse Butte | AQ | LF | 26 | ||
| 10431(01) | Southbound Portal Entry Sign | LSQ | LS | 1 |
SUBTOTAL FOR BASE BID = $ - 0
| ADDITIVE ITEM #1 | ||||||
| SOUTHBOUND PORTAL ENTRY SIGN | ||||||
| Method of | Estimated | |||||
| Pay Item | Description | Measurement | Unit | Quantity | Unit Cost | Total |
| 154(01) | Sampling & Testing Concrete - Yavapai Point Additive #1 | LSQ | LS | 1 | ||
| 04850 (03) | Tree Protection Rock placement - Yavapai Point Additive #1 | LS | LS | 1 | ||
| 02512(01) | Concrete Sidewalk, Slab - Yavapai Point, Section 1 ,Additive #1 | AQ | SY | 81 | ||
| 02512 (02) | Concrete Sidewalk, Slab - Yavapai Point , Section 2 , Additive #2 | AQ | SY | 81 | ||
| 05720(03) | Handrails - Yavapai Point - Additive #3 | AQ | LF | 70 |
| SUBTOTAL FOR ADDITIVE ITEM #1 = | $ - 0 |
| SUBTOTAL FOR ADDITIVE ITEM #2 = | |
| SUBTOTAL FOR ADDITIVE ITEM 3 = | |
| Total |