Solicitation.docx
DOCX document 63 KB Posted
- Attached to
- FOUR PEAKS PIPE RAIL FENCE INSTALL Federal contract opportunity
- Solicitation number
- AG-94TZ-S-12-0049
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FourPeaksPipeRailSpecs.pdf | ||
| Past Performance Form Questionaires.docx | DOCX document | |
| TONTO NF FIRE PLAN.docx | DOCX document | |
| Drawings.PDF | ||
| SF1442.pdf | ||
| Wage determination.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-94TZ-S-12-0049
| FOUR PEAKS PIPE RAIL |
| TONTO NF |
| PAGE 28 of 28 |
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
| Item Number |
| Description |
| Method of Measurement |
| Pay Unit |
| Estimated Quantity |
| Unit Price |
| Total |
| 01020(01) |
| Preparation and Submittal of SWPPP, NOI and NOT |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 01020(02) |
| Construction and Maintenance of Erosion Control Measures |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 01030(01) |
| Preparation and Submittal of Application and Closeout Materials |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 01030(02) |
| Construction and Maintenance of Dust Control Measures |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 01330(01) |
| Construction Surveying |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 01570(01) |
| Maintenance for Traffic |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 01601(01) |
| Mobilization (Including Bonding Costs) |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 02110(01) |
| Clearing and Grubbing |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 02224(01) |
| Excavation, Embankment and Backfill |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 02270(01) |
| Pipe Rail |
| AQ |
| LF |
| 1438 |
| $ |
| $ |
| TOTAL |
| $ |
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Statement of Work Four Peaks Pipe Rail Installment Project Tonto National Forest Mesa Ranger District
Objective and Background:
The Mesa Ranger District is one of the most heavily used recreation Forest Districts in the nation. With use, comes resource impact. The Four Peaks Pipe Rail Installment Project includes installation of pipe rail barriers to eliminate vehicle intrusion and reduce route proliferation on the northern portion of The Rolls area. The long term goal of this project includes the installation of gates to restrict access to The Rolls area to permitees only. The gates are not part of this contract, but will be installed at a future date on a separate project.
Location:
The project is located on the Mesa Ranger District, of the Tonto National Forest, T4N, R8E, Section 24, 25, 26, and T4N, R9E, Section 30, as shown on the location map included in the drawings. The site can be accessed via Arizona Hwy 87 and Four Peaks Rd. The Four Peaks Recreation Area is located 45 miles northeast of Phoenix, AZ.
Work Items:
Construction shall include installation of pipe rail barriers as well as site grading to provide a drivable surface that effectively drains. The future locations of gates will be noted with the pipe rail to accommodate installation.
Time Frame:
Upon notice to proceed, the project is anticipated to take approximately two months to complete.
Measurement and Payment:
Payment will be by units defined and determined according to the Schedule of Items for the project.
Contacts:
1. Terrin Lane – Civil Engineer Phone: (602) 225-5223 E-mail: tnlane@fs.fed.us
2. Lonny Rollins – Design Team Leader
| Phone: | (602) 225-5323 |
| Cell: | (602) 919-0115 |
E-mail: lrollins@fs.fed.us
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.211-72 Statement of Work/Specifications. (FEB 1988)
452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
| 52.246-1 | Contractor Inspection Requirements (APR 1984) |
| 52.246-12 | Inspection of Construction (AUG 1996) |
SECTION F--DELIVERIES OR PERFORMANCE
52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within __10__ calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days.
SECTION G--CONTRACT ADMINISTRATION DATA
SECTION H--SPECIAL CONTRACT REQUIREMENTS
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
52.204-7 Central Contractor Registration (FEB 2012) 52.209-6 Protecting the Government's Interest when Subcontracting
| with Contractors Debarred, Suspended, or Proposed for Debarment (DEC 2010) | |
| 52.211-18 | Variation in Estimated Quantity (APR 1984) |
52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011)
| 52.219-28 | Post-Award Small Business Program Rerepresentation. (APR 2012) |
| 52.222-6 | Davis-Bacon Act (JUL 2005) |
| 52.222-7 | Withholding of Funds (FEB 1988) |
| 52.222-8 | Payrolls and Basic Records (JUN 2010) |
| 52.222-9 | Apprentices and Trainees (JUL 2005) |
| 52.222-10 | Compliance with Copeland Act Requirements (FEB 1988) |
| 52.222-11 | Subcontracts (Labor Standards) (JUL 2005) |
| 52.222-12 | Contract Termination - Debarment (FEB 1988) |
| 52.222-13 | Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) |
| 52.222-14 | Disputes Concerning Labor Standards (FEB 1988) |
| 52.222-15 | Certification of Eligibility (FEB 1988) |
| 52.222-21 | Prohibition of Segregated Facilities (FEB 1999) |
| 52.222-26 | Equal Opportunity (MAR 2007) |
| 52.222-27 | Affirmative Action Compliance Requirements for Construction (FEB 1999) |
| 52.222-36 | Affirmative Action for Workers with Disabilities (OCT 2010) |
| 52.222-50 | Combating Trafficking in Persons (FEB 2009) |
| 52.223-2 | Affirmative Procurement of Biobased Products Under Service and Construction Contracts (MAY 2012) |
| 52.223-5 | Pollution Prevention and Right-to-Know Information (MAY 2011) |
| 52.223-6 | Drug-Free Workplace (MAY 2001) |
| 52.223-15 | Energy Efficiency in Energy-Consuming Products (DEC 2007) |
| 52.225-13 | Restrictions on Certain Foreign Purchases (JUN 2008) |
| 52.232-5 | Payments Under Fixed-Price Construction Contracts (SEP 2002) |
| 52.232-23 | Assignment of Claims (JAN 1986) |
| 52.232-27 | Prompt Payment for Construction Contracts (OCT 2008) |
| 52.232-33 | Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003) |
| 52.233-1 | Disputes (JUL 2002) |
| 52.233-3 | Protest After Award (AUG 1996) |
| 52.233-4 | Applicable Law for Breach of Contract Claim (OCT 2004) |
| 52.236-2 | Differing Site Conditions (APR 1984) |
| 52.236-3 | Site Investigation and Conditions Affecting the Work (APR 1984) |
| 52.236-5 | Material and Workmanship (APR 1984) |
| 52.236-6 | Superintendence by the Contractor (APR 1984) |
52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984)
| 52.236-13 | Accident Prevention (NOV 1991) |
| 52.236-14 | Availability and Use of Utility Services (APR 1984) |
| 52.236-15 | Schedules for Construction Contracts (APR 1984) |
| 52.236-17 | Layout of Work (APR 1984) |
| 52.236-21 | Specifications and Drawings for Construction (FEB 1997) |
Alternate I (APR 1984) Alternate II (APR 1984)
| 52.236-26 | Preconstruction Conference (FEB 1995) |
| 52.243-5 | Changes and Changed Conditions (APR 1984) |
| 52.244-6 | Subcontracts for Commercial Items (DEC 2010) |
| 52.245-1 | Property Records (JUN 2007) |
| 52.246-21 | Warranty of Construction (MAR 1994) |
| 52.249-1 | Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984) |
| 52.249-10 | Default (Fixed-Price Construction) (APR 1984) |
| 52.253-1 | Computer Generated Forms (JAN 1991) |
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
| 452.232-70 | Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) |
| 452.236-72 | Use of Premises (NOV 1996) |
| 452.236-73 | Archeological or Historic Sites (FEB 1988) |
| 452.236-74 | Control of Erosion, Sedimentation and Pollution (NOV 1996) |
| 452.236-76 | Samples and Certificates (FEB 1988) |
| 452.236-77 | Emergency Response (NOV 1996) |
FAR 52.225-9 Buy American Act-Construction Materials (SEP 2010)
(a) Definitions. As used in this clause-- “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: _none_____
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
| Construction material description |
| Unit of measure |
| Quantity |
| Price (dollars) * |
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
FAR 52.228-13 Alternative Payment Protections (JUL 2000) (Only required over 30K)
(a) The Contractor shall submit one of the following payment protections
__Payment Bond___________________________ __Irrevocable Letter of Credit_________________
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 calendar days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil www.usda.gov/procurement/policy/agar.html
Order of Precedence--Construction
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The Schedule (excluding the specifications)
(2) Representations and Other Instructions
(3) Contract Clauses
(4) Other Documents, Exhibits, and Attachments
(5) The Specifications
(6) Drawings
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
Past Performance Questionnaires 3 pages
Fire Plan 4 pages
Wage Determination AZ120010 05/25/2012 6 pages
Drawings 6 pages
Specifications 55 pages
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
52.223-1 Biobased Product Certification. (MAY 2012)
FAR 52.204-8 Annual Representations and Certifications. (MAY 2012)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238990.
(2) The small business size standard is $14 Million.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (d) applies.
[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in ORCA are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the clause at 52.204-7, Central Contractor Registration.
(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that--
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation. This provision applies to solicitations using funds appropriated in fiscal years 2008, 2009, 2010, or 2012.
(vi) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(vii) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xiii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.
(xvi) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xvii) 52.225-4, Buy American Act--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III) This provision applies to solicitations containing the clause at 52.225-3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $77,494, the provision with its Alternate II applies.
(D) If the acquisition value is $77,494 or more but is less than $100,000, the provision with its Alternate III applies.
(xviii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xix) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xx) 52.225-25, Prohibition on Contracting with Entities Engaging in Sanctioned Activities Relating to Iran--Representation and Certification. This provision applies to all solicitations.
(xxi) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to--
(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and
(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.
(2) The following certifications are applicable as indicated by the Contracting Officer:
(Contracting Officer check as appropriate.)
[ ](i) 52.219-22, Small Disadvantaged Business Status.
[ ](A) Basic.
[ ](B) Alternate I.
[ ](ii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
[ ](iii) 52.222-48, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification.
[ ](iv) 52.222-52 Exemption from Application of the Service Contract Act to Contracts for Certain Services--Certification.
[ ](v) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).
[ ](vi) 52.227-6, Royalty Information.
[ ](A) Basic.
[ ](B) Alternate I.
[ ](vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The offeror has completed the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website accessed through https://www.acquisition.gov. After reviewing the ORCA database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below (offeror to insert changes, identifying change by clause number, title, date). These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on ORCA.
(End of Provision)
"This is to notify you of recent award prohibitions contained In USDA Forest Service Fiscal Year 2012 Appropriations Act regarding corporate felony convictions and corporate tax delinquencies. Under the Appropriations Act, no awards can be made to any corporation (for profit or non-profit) that has a tax delinquency or felony conviction as defined in the Appropriations Act and described in the attached representation.
To comply with these provisions, all offerors are required to return the attached representation to;
USDA Forest Service Tonto NF Attn: Carl Henderson 2324 E McDowell Road Phoenix, AZ 85006
Or email to carlhenderson@fs.fed.us no later than July 31, 2012. Please note that if you have a tax delinquency or felony conviction, as defined in the Appropriations Act and described in the attached representation, you are not eligible for award. If you are ineligible for award because of these prohibitions it is possible that you can regain eligibility for award, but only if the USDA Forest Service suspension and debarring official considers your tax delinquency and/or felony conviction and determines that suspension or debarment is not necessary to protect the interests of the Government."
AGAR 452.209-70 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILITY OR A FELONY CONVICTION (DEVIATION 2012-01) ALTERNATE 1 (FEB 2012)
(a.) Awards made under this solicitation are subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. To comply with these provisions, all offerors must complete paragraph (1) of this representation, and all corporate offerors also must complete paragraphs (2) and (3) of this representation.
(b) The Offeror represents that –
(1) The Offeror is [ ], is not [ ] (check one) an entity that has filed articles of incorporation in one of the fifty states, the District of Columbia, or the various territories of the United States including American Samoa, Federated States of Micronesia, Guam, Midway Islands, Northern Mariana Islands, Puerto Rico, Republic of Palau, Republic of the Marshall Islands, U.S. Virgin Islands. (Note that this includes both for-profit and non-profit organizations.)
If the Offeror checked “is” above, the Offeror must complete paragraphs (2) and (3) of the representation. If Offeror checked “is not” above, Offeror may leave the remainder of the representation blank.
(2) (i) The Offeror has [ ], has not [ ] (check one) been convicted of a felony criminal violation under Federal or State law in the 24 months preceding the date of offer.
(ii) Offeror has [ ], has not [ ] (check one) had any officer or agent of Offeror convicted of a felony criminal violation for actions taken on behalf of Offeror under Federal law in the 24 months preceding the date of offer.
(3) The Offeror does [ ], does not [ ] (check one) have any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability.
AGAR 452.209 – 71 ASSURANCE REGARDING FELONY CONVICTION OR TAX DELINQUENT STATUS FOR CORPORATE APPLICANTS ALTERNATE 1 (FEB 2012)
(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –
(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and
(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.
(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.
| __________________________ | _____________ | |
| SIGNATURE OF OFFEROR/CONTRACTOR | DATE |
NAME AND TITLE OF SIGNER
SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)
52.215-1 Instructions to Offerors--Competitive Acquisition (JAN 2004) 52.236-28 Preparation of Proposals – Construction (OCT 1997)
AGRICULTURE ACQUISITION REGULATIONS (48 CFR CHAPTER 4) CLAUSES
452.204-70 Inquiries (FEB 1988)
FAR 52.215-5 Facsimile Proposals (OCT 1997)
(a) Definition. "Facsimile proposal," as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via facsimile machine.
(b) Offerors may submit facsimile proposals as responses to this solicitation. Facsimile proposals are subject to the same rules as paper proposals.
(c) The telephone number of receiving facsimile equipment is: 602-225-5204
(d) If any portion of a facsimile proposal received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document--
| (1) The Contracting Officer immediately shall notify the offeror and |
| permit the offeror to resubmit the proposal. |
| (2) The method and time for resubmission shall be prescribed by the |
| Contracting Officer after consultation with the offeror; and |
(3) The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timelines, provided the offeror complies with the time and format requirements for resubmission prescribed by the Contracting Officer.
(e) The Government reserves the right to make award solely on the facsimile proposal. However, if requested to do so by the Contracting Officer, the apparently successful offeror promptly shall submit the complete original signed proposal.
FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered are, are as follows:
Goals for minority participation for each trade Goals for female participation for each trade:
_15.8%___ __6.9%__
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative actions obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U. S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is AZ, Maricopa, Mesa
52.225-10 Notice of Buy American Act Requirement--Construction Materials (FEB 2009)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act--Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil www.usda.gov/procurement/policy/agar.html
SECTION M--EVALUATION FACTORS FOR AWARD
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
The following factors shall be used to evaluate offers:
Price Past Performance
Price
Proposals should be submitted initially on the most favorable terms the offeror can make to the Government. The Government reserves the right to reject any or all offers or to make award without conducting discussions. Award may not necessarily be made to the offeror submitting the lowest price. Also, award may not necessarily be made for technical capabilities that appear to exceed those needed for successful performance of the work.
1. The Government may reject any or all offers, make award to other than the lowest offer, and waive minor informalities or irregularities in offers received. If necessary, the Government may conduct discussions with any offeror;
2. The Government may issue a contract on the basis of offers as received without entering into discussions with any offerors. Therefore, each initial offer should contain the offerors best terms;
3. This Request for Proposal does not commit the Government to pay any cost incurred in the preparation of the submission of proposals;
4. Each offeror's price proposal will be evaluated for realism, completeness, and reasonableness. Proposals shall be evaluated, for award purposes, based upon the total price proposed for basic requirements. Unrealistically low or materially unbalanced offers, initially or subsequently, may be rejected or eliminated from competition either on the basis that the offeror does not understand the requirement or the offeror has made an unrealistic proposal.
Technical and past performances, when combined, are EQUAL TO PRICE.
Past Performance
The evaluation of past performance will include:
1. Quality of Services
2. Personnel
3. Subcontractor Management
4. Business Relations
5. Timeliness of Performance
6. Customer Satisfaction
7. Cost Control
Offeror(s) shall send past performance questionnaires (See attachment in Sec J) to their customers for completion and return directly to this office.
To help aid in the evaluation of past performance, the offeror must demonstrate performance of similar type, scope, and magnitude to that detailed in this RFP in the past three years. Documentation shall include contract numbers, current point of contact, telephone number, e-mail address if available, fax number, description and value of the work. Offeror is responsible to make their best attempt to assure that past performance information is current so verification can occur. Information containing contact names no longer at the location provided, disconnected or changed phone numbers, or any other inaccurate information that hinders verifying past performance information runs the risk of the information not being considered. For the Past Performance Evaluation the Government will utilize the listing of past projects provided under prior experience, review of past performance questionnaires and possibly include data obtained from other sources.
EVALUATION BASIS FOR AWARD
RESPONSIVE AND RESPONSIBLE: This is a best value competitive acquisition and is conducted in accordance with Federal Acquisition Regulation 15.101-1, Tradeoff Process. Award will be made to the offeror who is deemed responsible in accordance with the Federal Acquisition Regulation (FAR), whose proposal conforms to the RFP's requirements and is judged to represent the best value to the Government. The best value is represented by the most advantageous offer. To arrive at a best value decision, the Contracting Officer (CO) will use the specific criteria, Cost/Price Criteria and General Considerations described in Section M of the solicitation. The CO will strive for maximum objectivity. The selection process, by its nature, is subjective and therefore, professional judgment is implicit throughout the entire process. The Government intends to select one contractor for the subject solicitation. The Government reserves the right to award without discussions.
Offerors are instructed to complete an Experience Information Form (see sample below) to aid in the evaluation, but offerors are not limited to using this format as long as all areas are addressed. Offers submitted without providing information to perform an evaluation run the risk of not being considered for award.
1. First Contract:
(a) Contracting Agency/Company:
(b) Point of Contact: Name: Telephone No: ( ) _______________
(c) Contract Number:
(d) Amount of Award: $
(e) Brief Description of Work:
(f) Performance Period: (g) Scheduled Completion Date: ______
(h) Actual Completion Date: (i) Percent Completed:
(j) REMARKS, i.e., Problems encountered, modifications to contracts and reasons:
File details come from the government source that posted it. Updated .