AG-91U4-S-14-0002_Mod_0001_RFQ.pdf

PDF 135 KB Posted

Attached to
CNF Palomar Fuel Break System Fuels Reduction/Modification through Goat Grazing Federal contract opportunity
Solicitation number
AG-91U4-S-14-0002
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

RFQ Mod 0001

View the file

Other files for this federal contract opportunity

Other files attached to CNF Palomar Fuel Break System Fuels Reduction/Modification through Goat Grazing, newest first.
File Type Posted
AG-91U4-S-14-0002_RFQ.pdf PDF
Palomar_Fuelbreaks_FirePlan14Jan2014.pdf PDF
Cottonwood_Furel_Break_Goat_Map.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-91U4-S-14-0002

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

9AB5

ARCADIA CA 91006

701 N SANTA ANITA AVE

R5 AQM SOCAL SERVICE AREA

USDA FOREST SERVICE

02/20/2014000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/20/2014

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Cleveland National Forest. Palomar Fuel Break System Fuels Reduction/Modification through

GOAT GRAZING Project

This amendment changes is to remove Work Description Limitation that is part of the

Statement of Work/Description/Specificaiton Section. Attached documents replaces the pages from the main solicitation for Description/Specifications/Statement of Work (Page 4).

A revised offer in response to this amendment is due on March 6, 2014 at 17:00 PT.

PLEASE FILL OUT BLOCK 15 AND SUBMIT THIS PAGE WITH YOUR REVISED OFFER.

Period of Performance: 03/10/2014 to 09/30/2014

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

KATHLEEN CARVAJAL

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

SOLICITION #: AG-91U4-S-14-0002 Page 4 of 26 Modification #” 0001 Page 2 of 2 PROJECT: Palomar Fuel Break System Fuels Reduction/Modification through Goat Grazing

When the Contracting Officer (or Contracting Officer’s Representative) determines that continuing operations during adverse weather or ground conditions would cause unacceptable harm to natural resources.

All project related work shall cease immediately if any heritage resources are discovered and notification to COR initiated.

The attached Map shows the entire project boundary, the work locations on the ground take precedence over the locations on the Map. Exceptions of these locations could be large boulders, roads, creeks, steep ridges, and other ground features.

The Contractor shall furnish all technical expertise, labor, equipment, supervision, transportation, operating supplies, and incidentals necessary to complete the project, except for that which the contract clearly states is to be furnished by the government.

SITE VISIT/PRE-PROPOSAL MEETING

Date: March 3, 2014 @ 8:00 AM Location: Oak Grove Fire Station 37560 Hwy 79 Warner Springs CA 92086

COR: Tim Gray 619-209-1414 / tgray01@fs.fed.us

CONTRACT TIME

Estimated start work date is March 10, 2014. The Contractor shall have 180 days to complete the project following the issuance of the Notice to Proceed. Contract time includes delays for weather, all applicable wildlife limited operating periods, locating and transporting supplies and materials and final cleanup.

Quality Control

The Contractor shall conduct inspections in accordance with the Quality Control Plan provided to the Contracting Officer.

The Quality Control Plan shall be approved by the Contracting Officer prior to the start of work. The Contracting Officer may implement quality control measures in addition to those provided by the Contractor.

File details come from the government source that posted it. Updated .