Schedule of Items Rev01.pdf
PDF 17 KB Posted
- Attached to
- WEST FORK TRAIL BRIDGE CONSTRUCTION Federal contract opportunity
- Solicitation number
- AG-91T5-S-12-0008
About this file
Amd 3 Schedule of Items Rev01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 3 List of Changes.pdf | ||
| WFTB DWGs Amendment 03.pdf | ||
| Specifications for Reducing Potential Resource Impacts.pdf | ||
| Pre-Bid Meeting Questions and Responses.pdf | ||
| AG-91T5-S-12-0008 - West Fork Trail | — | |
| Section 557 - Timber Structures.pdf | ||
| 1632-05 | — | |
| 1632-03 | — | |
| AG-91T5-S-12-0008 - West Fork Trail.pdf | ||
| Section 571 - Prefabricated Bridges.pdf | ||
| Attachment 5 Fire Plan.pdf | ||
| 1632-02 | — | |
| 1632-04 | — | |
| 1632-06 | — | |
| DB Wage Determination.pdf | ||
| 1632-01 | — |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.: AG-91T5-S-12-0008 Page: 1 of 1
Project: West Fork Trail Bridge Construction Forest: Angeles N.F.
SECTION A-1
SCHEDULE OF ITEMS
ITEM NO.
DESCRIPTION METHOD
OF MEAS.
ESTD.
QTY.
UNIT UNIT
PRICE
AMOUNT
15101
20418
20801
20803
25101
25507
25116
55201
55401
56401
57101
Option 1
Option 2
Mobilization
Drainage Excavation, Type A
Structural Excavation
Structural Backfill
Placed Riprap, Class 6, Method A
Mortared Riprap, Class 6
Geotextile, Type IV-C
Structural Concrete, Class A (AE)
Reinforcing Steel
Elastomeric Bearing Device
Prefabricated Bridge Structure – Design, Fabricate, Deliver and Install
Design Access Path – from day use area to north abutment from south abutment to existing road
Construct Access Path – from day use area to north abuntment from south abutment to existing road
L.S.Q.
A.Q.
3,750
Job
CY
SY
Lb
Each
TOTAL
BASE
TOTAL
WITH
OPTIONS