Amendment 3 List of Changes.pdf
PDF 62 KB Posted
- Attached to
- WEST FORK TRAIL BRIDGE CONSTRUCTION Federal contract opportunity
- Solicitation number
- AG-91T5-S-12-0008
About this file
Amd 3 List of Changes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specifications for Reducing Potential Resource Impacts.pdf | ||
| Schedule of Items Rev01.pdf | ||
| WFTB DWGs Amendment 03.pdf | ||
| Pre-Bid Meeting Questions and Responses.pdf | ||
| AG-91T5-S-12-0008 - West Fork Trail | — | |
| 1632-06 | — | |
| DB Wage Determination.pdf | ||
| 1632-01 | — | |
| Section 557 - Timber Structures.pdf | ||
| 1632-05 | — | |
| 1632-03 | — | |
| AG-91T5-S-12-0008 - West Fork Trail.pdf | ||
| Section 571 - Prefabricated Bridges.pdf | ||
| Attachment 5 Fire Plan.pdf | ||
| 1632-02 | — | |
| 1632-04 | — |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-91T5-S-12-0008
West Fork Trail Bridge
AMENDMENT 03
LIST OF CHANGES (Revised 06/26/2012)
AMENDED DRAWING REVISIONS:
SHEET 01 – Modified Elevation View to reflect changes to rip rap at North and South abutments.
Modified “Estimated Bridge Quantities”, referencing Revised Schedule of Items. Modified Sheet Number.
SHEET 02 – Modified Sheet Number.
SHEET 03 – Modified Sheet Number.
SHEET 04 – Modified Sheet Number.
SHEET 05 – Modified Sheet Number.
SHEET 06 – Modified Elevation View & Rock Slope Protection Plan to reflect changes to rip rap at North and South abutments. Modified Sections B-B & C-C to reflect changes to rip rap at North and South abutments. Modified Sheet Number.
SHEET 07 – Added NEW Sheet detailing requirements for Options 2 & 3.
SHEET 08 – Added NEW Sheet “Storm Water Pollution Prevention Plan”, referencing USFS erosion control requirements and “Specifications for Reducing Potential Resource Impacts”.
Note addition of “Specifications for Reducing Potential Resource Impacts.pdf” document.
AMENDED SCHEDULE OF ITEMS:
ITEM 20418 – Changed the ESTIMATED QUANTITY for Drainage Excavation, Type A (from 800 cubic yards to 700 cubic yards) based on reduced work.
ITEM 25101 – Changed ESTIMATED QUANTITY for Placed Riprap, Class 6, Method A (from 600 cubic yards to 400 cubic yards) based on reduced work.
ITEM 25507 – Changed ESTIMATED QUANTITY for Mortared Riprap, Class 6 (from 175 cubic yards to 75 cubic yards) based on reduced work.