Amendment 3 List of Changes.pdf

PDF 62 KB Posted

Attached to
WEST FORK TRAIL BRIDGE CONSTRUCTION Federal contract opportunity
Solicitation number
AG-91T5-S-12-0008
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Amd 3 List of Changes

View the file

Other files for this federal contract opportunity

Other files attached to WEST FORK TRAIL BRIDGE CONSTRUCTION, newest first.
File Type Posted
Specifications for Reducing Potential Resource Impacts.pdf PDF
Schedule of Items Rev01.pdf PDF
WFTB DWGs Amendment 03.pdf PDF
Pre-Bid Meeting Questions and Responses.pdf PDF
AG-91T5-S-12-0008 - West Fork Trail —
1632-06 —
DB Wage Determination.pdf PDF
1632-01 —
Section 557 - Timber Structures.pdf PDF
1632-05 —
1632-03 —
AG-91T5-S-12-0008 - West Fork Trail.pdf PDF
Section 571 - Prefabricated Bridges.pdf PDF
Attachment 5 Fire Plan.pdf PDF
1632-02 —
1632-04 —
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-91T5-S-12-0008

West Fork Trail Bridge

AMENDMENT 03

LIST OF CHANGES (Revised 06/26/2012)

AMENDED DRAWING REVISIONS:

SHEET 01 – Modified Elevation View to reflect changes to rip rap at North and South abutments.

Modified “Estimated Bridge Quantities”, referencing Revised Schedule of Items. Modified Sheet Number.

SHEET 02 – Modified Sheet Number.

SHEET 03 – Modified Sheet Number.

SHEET 04 – Modified Sheet Number.

SHEET 05 – Modified Sheet Number.

SHEET 06 – Modified Elevation View & Rock Slope Protection Plan to reflect changes to rip rap at North and South abutments. Modified Sections B-B & C-C to reflect changes to rip rap at North and South abutments. Modified Sheet Number.

SHEET 07 – Added NEW Sheet detailing requirements for Options 2 & 3.

SHEET 08 – Added NEW Sheet “Storm Water Pollution Prevention Plan”, referencing USFS erosion control requirements and “Specifications for Reducing Potential Resource Impacts”.

Note addition of “Specifications for Reducing Potential Resource Impacts.pdf” document.

AMENDED SCHEDULE OF ITEMS:

ITEM 20418 – Changed the ESTIMATED QUANTITY for Drainage Excavation, Type A (from 800 cubic yards to 700 cubic yards) based on reduced work.

ITEM 25101 – Changed ESTIMATED QUANTITY for Placed Riprap, Class 6, Method A (from 600 cubic yards to 400 cubic yards) based on reduced work.

ITEM 25507 – Changed ESTIMATED QUANTITY for Mortared Riprap, Class 6 (from 175 cubic yards to 75 cubic yards) based on reduced work.