SOL.docx
DOCX document 193 KB Posted
- Attached to
- HERITAGE RESOURCES IDIQ Federal contract opportunity
- Solicitation number
- AG-82X9-S-12-0107
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend. 3 SF-30.doc | DOC document | |
| Amend. 2 SF-30.doc | DOC document | |
| SF-30.doc | DOC document | |
| Sched. Revised.docx | DOCX document | |
| Instruction Sheet.doc | DOC document | |
| SF-1449.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-82X9-S-12-0107 Heritage Resources IDIQ Black Hills/Nebraska Nat. Forest
BLACK HILLS NATIONAL FOREST
SCHEDULE OF ITEMS
| Item |
| Description |
| Qty. |
| Unit |
| Maximum Unit Price |
| Amount |
Base Period Award Date – 08/12/2013
| 1 |
| Level/Class III Large Survey |
| 14,824 |
| AC |
Opt. Period. 1 – 08/13/2013 TO 08/12/2014
| 2 |
| Level/Class III Survey |
| 855 |
| AC |
| 3 |
| Linear Survey Site Evaluations (non-survey) |
MI
| 4 |
| Site Monitoring (non –survey) |
| 10 |
| EA |
| 5 |
| Site Evaluations (non-survey) |
| 30 |
| EA |
Opt. Period 2 – 08/13/2014 TO 08/12/2015
| 6 |
| Level/Class II Sample Survey |
| 100 |
| AC |
| 7 |
| Level/Class III Survey |
| 1,770 |
| AC |
| 8 |
| Post-Fire Damage Assessment (survey) |
| 100 |
| AC |
| 9 |
| Site Monitoring (non –survey) |
| 5 |
| EA |
| 10 |
| Site Evaluations (non-survey) |
| 20 |
| EA |
BLACK HILLS NATIONAL FOREST
TOTAL COST
· Proposals shall be valid for 60 days after the date of receipt for the solicitation. If additional time is needed, an extension will be requested.
· The amounts shown on the schedule of items are estimated.
· Provide Total Cost Pricing on each schedule.
· Unit Price Prevails
NEBRASKA NATIONAL FOREST & GRASSLANDS
SCHEDULE OF ITEMS
| Item |
| Description |
| Qty. |
| Unit |
| Maximum Unit Price |
| Amount |
Base Period Award Date – 08/12/2013
| 1 |
| Level/Class III Survey |
| 150 |
| AC |
| 2 |
| Level/Class II Survey |
| 50 |
| AC |
Linear Survey Site Evaluations (existing trails, roads, ect.)
| 4 |
| Site Monitoring (non –survey) |
| 5 |
| EA |
| 5 |
| Site Evaluations (non-survey) |
| 5 |
| EA |
Opt. Period 1 – 08/13/2013 TO 8/12/2014
| 6 |
| Level/Class III Survey |
| 150 |
| AC |
| 7 |
| Level/Class II Survey |
| 50 |
| AC |
Linear Survey Site Evaluations (existing trails, roads, ect.)
| 9 |
| Site Monitoring (non –survey) |
| 5 |
| EA |
| Site Evaluations (non-survey) |
| 5 |
| EA |
Opt. Period 2 – 08/13/2014 TO 08/12/2015
| 10 |
| Level/Class III Survey |
| 150 |
| AC |
| 11 |
| Level/Class II Survey |
| 50 |
| AC |
Linear Survey Site Evaluations (existing trails, roads, ect.)
| 13 |
| Site Monitoring (non –survey) |
| 5 |
| EA |
| 14 |
| Site Evaluations (non-survey) |
| 5 |
| EA |
| 15 |
| Post-Fire Damage Assessment (survey) |
| 20 |
| AC |
NEBRASKA NATIONAL FOREST
TOTAL COST
| Vendor Name: |
| Phone: |
| Signature: |
| Fax: |
| Address: |
| Email: |
| City,State, Zip |
| TIN # |
DUNNS #
Non Discrimination Statement The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual’s income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means of communication of program information (Braille, large print, audiotape, ect.) should contact USDA’s TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C 20250-9410, or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.
CONTRACT CLAUSES
Block 27 of SF1449: The full text of a clause or provision may be accessed electronically at www.arnet.gov/far.
FAR 52.212-4 Contract Terms and Conditions—Commercial Items (FEB 2012)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g.,use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. 601-613). Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, contract line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g.,52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration, or 52.232-34, Payment by Electronic Funds Transfer—Other Than Central Contractor Registration), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall –
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the -
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidations errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected contract line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest. (i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in Section 611 of the Contract Disputes Act of 1978 (Public Law 95-563), which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-moth period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final Decisions. The Contracting Officer will issue a final decision as required by 33.211 if-
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence of amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer with the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(iv) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on -
(A) The date of which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge mad under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. 3701, et seq., Contract Work Hours and Safety Standards Act; 41 U.S.C. 51-58, Anti-Kickback Act of 1986; 41 U.S.C. 265 and 10 U.S.C. 2409 relating to whistleblower protections; Section 1553 of the American Recovery and Reinvestment Act of 2009 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. 423 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, and Compliance with Laws Unique to Government Contracts paragraphs of this clause.
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) Central Contractor Registration (CCR).
(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(2)(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to (A) change the name in the CCR database; (B) comply with the requirements of Subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at https://www.acquisition.gov or by calling 1-888-227-2423 or 269-961-5757.
ADDENDUM TO FAR 52.212-4
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual)
| 52.232-11 | Extras (APR 1984) | |
| 52.242-14 | Suspension of Work Order (APR 1984) | |
| 52.244-6 | Subcontracts for Commercial Items (DEC 2010) | |
| Alternate I (APR 2012) |
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.237-75 Restrictions against Disclosure (FEB 1988)
FOREST SERVICE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
| 4G52.222-705 | Camping Provisions for Labor Intensive Contracts (FEB 2007) |
| 4G52.222-706 | Privacy Basics Course Mandatory for Certain Contracts (FEB 2007) |
CONTRACTOR PERFORMANCE ASSESSMENT SYSTEM
(CPARS) PROGRAM
This contract may be subject to reporting in the Contractor Performance Assessment System (CPARS) program. After award, Contractors are encouraged to take training and register in this program. Information can be found at: http://www.cpars.csd.disa.disa.mil/allapps/cpartrng/webtrain/webtrain all.htm Contractor Overview (2 hours). View Schedule - This training will give the student an understanding of the Contractor Representative and Contractor Corporate Senior Management levels of access, the policies and regulations governing ACASS/CCASS and CPARS, and the electronic workflow with particular attention to the Contractor comment function.
· Target Audience: This session is specifically targeted to Contractor users who provide Past Performance Evaluation comments or who manage the ACASS/CCASS and CPARS process for their company.
TASK ORDER CONTRACT TIME
Contract time will be determined for each task order issued as stated in the task order.
ORDERING FOR THIS PROJECT
A. Services to be provided hereunder will be ordered by issuance of a written task order using form SF-1449 Solicitation/Contract/Order for Commercial Items or approved Contracting Officer form. Each task order will reference this contract and will be subject to all the terms and conditions herein.
B. Pricing shall be no higher than the maximum price as shown in the schedule unless the contractor offers a lower price. Lower prices are always considered to enhance chances of being awarded the task order.
C. Each task order will contain the following information.
| 1. | Task Order and Contract Number | |
| 2. | Date of Order | |
| 3. | Services, Quantity and Prices | |
| 4. | Delivery Date | |
| 5. | Unit Locations and Vicinity Map. | |
| 6. | Job Code |
| C. | The following individuals may place orders against this contract: | |
| NT-RMAST Contracting Officers |
AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified) to perform the Performance Statement of Work, Investigation plan and Quality Assurance Surveillance Plan referenced in the attachments.
AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 1988)
The period of performance of this contract is from the effective date of the Base Period through the end of Option Period 2 or when the ceiling amount is reached, whichever is first.
FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.
FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 3 years 6 months
AGAR 452.216-73 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (FEB 1988)
During the period specified in FAR clause 52.216-18, ORDERING, the Government shall place orders totaling a minimum of $3,000.00, but not in excess of $350,000.00 per year.
AGAR 452.216-74 CEILING PRICE (FEB 1988)
The ceiling price of this contract is $499,999.00. The Contractor shall not make expenditures or incur obligations in the performance of this contract which exceed the ceiling price specified herein, except at the Contractor’s own risk.
FAR 52.216-18 ORDERING (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from the date of award through the end of the contract period.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
FAR 52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 200 Acres the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under this contract.
(b) Maximum order. The Contractor is not obligated to honor--
(1) Any order for a single item in excess of 4,000 Acres;
(2) Any order for a combination of items in excess of 15,000 Acres; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractors shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
FAR 52.216-22 INDEFINITE QUANTITY (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, these supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."
(c) Except for any limitations on quantities in the Delivery-Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under the contract after expiration date of task orders issued prior to August 12, 2015.
52.222-42 -- Statement of Equivalent Rates for Federal Hires (May 1989)
In compliance with the Service Contract Act of 1965, as amended, and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
This Statement is for Information Only:
It is not a Wage Determination
| Employee Class |
| Monetary Wage -- Fringe Benefits |
| Archeologist Technician |
| $16.36 |
452.237-74 Key Personnel (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel: Principal Investigator.
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
452.228-71 Insurance Coverage (NOV 1996)
Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater
FAR 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR 1984)
Funds are not presently available for performance under this contract beyond September 30, 2012. The Government’s obligation for performance of this contract beyond that date is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond September 30, 2012, until funds are made available to the Contracting Officer for performance and until the Contractor receives notice of availability, to be confirmed in writing by the Contracting Officer.
NOTICE TO PROCEED
A Notice to Proceed will be issued in writing by the Contracting Officer or Contracting Officer's Representative (COR). No work shall begin until receipt of this notice. Contract time shall commence on the day indicated on the Notice to Proceed.
SUPPLEMENT TO SUSPENSION OF WORK
Whenever the Contracting Officer determines that the temperature, humidity, soil moisture, plant moisture stress, winds, or combination of these and other physical conditions have become unsuitable for project to continue in any area, the Contractor shall move the work force to another area(s) prescribed by the Contracting Officer. When no other area is available, the Contracting Officer will issue a suspend work order for the bid item and contract time will stop for that item. When conditions are again favorable, the Contracting Officer will issue a verbal resume work order and confirm the resumption in writing. Contract time will resume on the effective work resumption date. In all cases, the Contractor shall resume work within 3 calendar days after the effective work resumption date. It is the Contractor's responsibility to keep the Contracting Officer currently advised as to where the Contractor or the Contractor's Representative may be reached by telephone during periods of work suspension. If the Contractor cannot be reached at the telephone number provided, or if the Contractor fails to leave a number, a written resume work order will be mailed and contract time will resume on the date specified on the resume work order.
CONTRACTOR QUALITY CONTROL PLAN
A. Quality Control Plan. The Contractor shall provide a Quality Control Plan (QCP) after award. The Plan must demonstrate how the Contractor will assure that quality of performance meets the objectives and requirements of the contract. The QCP shall specify:
| 1. | How quality will be monitored to assure performance standards are met. |
| 2. | How the work will be supervised. |
| 3. | How results of the monitoring will result in quality performance. |
| 4. | Identify the personnel responsible for performing quality control. |
B. Contractor Quality Control Inspection. The Contractor shall assure themselves that performance meets contract specifications, in accordance with clause FAR 52.212-4, Contract Terms and Conditions – Commercial Items, paragraph (a), Inspection/Acceptance prior to requesting the Government to inspect for payment or acceptance. Upon completion of a task order, the Contractor shall contact the Contracting Officer to set a mutually agreed upon date for inspection of completed work.
INSPECTION AND ACCEPTANCE
GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN AND ACCEPTANCE REQUIREMENTS
A. Government Quality Assurance Inspection. The Government will, at its convenience, make periodic inspections of the work to assure itself of contract compliance and to perform Quality Assurance Inspections to determine confirm that the Contractor is performing quality control in accordance with its QCP and that Contractor monitoring results in quality performance of contract objectives.
B. Acceptance. Acceptance of the work under the contract will be made after steps in (a) above have been taken and the Contracting Officer has made the determination of satisfactory compliance with the specifications. Acceptance will not be made for segments broken by unacceptable portions of work.
C. Rework and Reinspection after Rework. When inspections indicates that the performance objectives were not met, the work will be deemed unsatisfactory and payment will not be made until the Contractor has assured the Government that its Quality Control measures have corrected the deficiencies. Inspections after rework will be made in the same manner as the first inspection. The cost to the Government for inspections necessitated by the rework will be deducted from any payments to the Contractor.
AGAR 42.215-73 POST AWARD CONFERENCE (NOV 1996)
(a) A post award conference with the successful offeror is required. It will be scheduled within 15 days after the date of contract award. The conference will be held at the Mystic Ranger District Office, Rapid City, SD unless otherwise changed by mutual agreement.
Note: The Contractor designated representative or foreman (whomever the Contractor will have on the site) shall be present at the prework conference.
PRE-WORK CONFERENCE
The Contractor shall meet with the Government to discuss contract terms and work performance requirements,(reference clause AGAR 452.215-73. Post Award Conference.
The Contractor designated representative or foreman (whomever the Contractor will have on the site) shall be present at the prework conference.
DEFINITIONS - ADMINISTRATION TERMS
A. Contracting Officer (CO) - The person executing this contract on behalf of the Government, including any duly appointed successor and authorized representatives of the Contracting Officer acting within the limits of his/her authority.
B. Contracting Officer's Representative (COR) - The on-site contract administrator for the Contracting Officer. The duties and responsibilities of the COR are defined a letter (form) of designation issued by the Contracting Officer.
C. Inspector - The person(s) appointed in writing by the COR to conduct and document inspections according to contract specifications and provisions. The inspector's authorities are strictly limited, not to exceed the authority to issue to the contractor a Notice of Noncompliance.
D. Calendar Days - Every day shown on the calendar, Saturdays, Sundays and holidays included.
E. Change Order - An order issued to the Contractor by the Contracting Officer, pursuant to the “change” clause included in Section I of this contract, requiring work to be performed, within the general scope of the contract.
F. Work Order - An order written by the COR, which directs the Contractor to correct deficient performance. It may also be used to document acceptable completion of units and to approve starting on additional work units.
G. Notice of Noncompliance - A written notice from the CO or COR which documents, for the Contractor's attention, specific performance deficiencies.
H. Contract Item - A pay item designated on the bid schedule and described by a specification.
I. Labor Standards Provisions - Those statutory and regulatory requirements pertaining to the Contractor's employees and employment practices.
J. Specifications - That portion of the contract comprising a description of the general and technical requirements for materials, products or services to be furnished under the contract.
DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE (COR)
A. The Contracting Officer will designate an individual as Contracting Officer's Representative (COR) at time of award.
B. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the Contracting Officer prior to completion of the contract.
C. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)
D. On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
E. The COR's major duties and responsibilities are contained in the Forest Service Handbook of Contract Administration. The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:
| 1. | Approve Change Orders and Modifications |
| 2. | Take action to terminate the contract for default or Government convenience. |
| 3. | Make contract adjustments under the Differing Site Conditions clause. |
| 4. | Grant extensions of contract time. |
| 5. | Approve assignment of claims. |
| 6. | Make final decisions under the Disputes clause. |
| 7. | Make final acceptance under the contract. |
| 8. | Make final decisions under the Suspension of Work clause. |
| 9. | Make equitable adjustments. |
| 10. | Authorize change in amount of Payment Retention. |
| 11. | Approve subcontractors. |
| 12. | Approve payments with deductions or final payment. |
| 13. | Approve use and possession prior to completion. |
| 14. | Enforce the warranty provisions. |
NOTIFICATION OF SUBCONTRACTING
The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:
A. The name, address and telephone number of the subcontractor.
B. The date upon which the subcontract was entered into and its duration.
C. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
D. Documentation of the subcontractor's representative authority.
Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.
PUBLIC OFFICIALS NOT PERSONALLY LIABLE
There shall be no personal liability upon the Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.
FSAR 4G52.222-704 PERSONAL PROTECTIVE EQUIPMENT (FEB 2007) (MODIFIED)
The Contractor shall train workers in the safe operation and use of equipment that the worker may use before the worker begins using such equipment.
Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered which may cause injury or impairment in the function of any part of the body. Defective or damaged personal protective equipment shall not be used.
The Contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support.
In any area where the worker is exposed to the potential for flying or falling objects, the Contractor shall provide a hard hat, at no cost to the employee, and the Contractor shall assure that the employee wears the hard hat. The hard hat must meet the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
The Contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
JOB SPECIFIC SAFETY PLAN
After award, the Contractor shall provide a written job specific safety plan that recognizes the inherently hazardous conditions that will exist on this contract. Some of these hazardous conditions are, but not limited to: reptiles, animals, equipment operation, loading an unloading of materials, site security, and the use of personal protective equipment (PPE) in the work area. The plan shall be in accordance with OSHA Regulations. The plan shall include all tasks and related activities anticipated to successfully complete the work.
AGAR 452.209-71 ASSURANCE REGARDING FELONY CONVICTION OR TAX DELINQUENT STATUS FOR CORPORATE APPLICANTS (FEB 2012) ALTERNATE I (FEB 2012)
(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –
(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and
(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.
(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.
DAMAGES
If the Contractor does not complete the work within the designated contract time, actual excess costs will be assessed, such as - but not limited to, additional COR and Inspector time and travel.
CONTRACTOR'S REPRESENTATIVE
The Government may, at its option, suspend work with full count of contract time continuing, if the Contractor fails to provide a Contractor's Representative (1) conversant in the English language and (2) able to read and understand the contract.
END OF ADDENDUM TO 52.212-4
FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS-COMMERCIAL ITEMS (APR 2012)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
__ Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest after Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub L. 108-77, 108-78).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer must check as appropriate.]
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (SEPT 2006) with Alternate I (OCT 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUNE 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (FEB 2012) (Pub. L. 109-282) (31 U.S.C. 6101 note).
__ (5) 52.204-11, American Recovery and Reinvestment Act – Reporting Requirements (JUL 2010) (Pub. L. 111-5).
__ (6) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractor’s Debarred, Suspended, or Proposed for Debarment (DEC 2010) ((31 U.S.C 6101 note).
__ (7) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (FEB 2012) (41 U.S.C 2313).
__ (8) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (section 740 of Division C of Pub. L. 111-117, section 743 of Division D. of Pub. L. 111-8, and section 745 of Division D of Pub. L. 110-161).
__ (9) 52.219-3, Notice of Total HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
__ (10) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JAN 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.`S.C. 657a).
__ (11) [Reserved]
__ (12)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
__ (ii) Alternate I (NOV 2011).
__ (III) Alternate II (NOV 2011).
__ (13)(i) 52.219-7, Notice of Partial Small Business Set-Aside (JUN 2003) (15 U.S.C. 644).
__ (ii) Alternate I (OCT 1995) of 52.219-7.
__ (iii) Alternate II (MAR 2004) of 52.219-7.
_X_ (14) 52.219-8, Utilization of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .