SECTION_01010_-_SUMMARY_OF_WORK_EF_Office_RemodelV4.pdf
PDF 34 KB Posted
- Attached to
- Fraser Office Building Remodel Federal contract opportunity
- Solicitation number
- AG-82FT-S-14-0015
About this file
Section 01010 Modification
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_4_Asbestos_Reports.pdf | ||
| SF-30.pdf | ||
| AG-82FT-S-14-0015MOD000001.pdf | ||
| Attachment_2_Drawings_MOD000001.pdf | ||
| Attachment_2_Drawings.pdf | ||
| Attachment_1_Specifications.pdf | ||
| Attachment_3_Wage_Determination.pdf | ||
| Solicitation_AG-82FT-S-14-0015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01010
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Description: The renovation of the Office building will address both an interior and exterior issues. These include but are not limited to selective demolition, including removal of asbestos and/or lead containing materials, accessibility improvements, electrical improvements, mechanical systems improvements, window and door replacements, roof replacement, flooring, painting, and snow hazard mitigation.
An asbestos sample analysis was conducted previously, as shown in the attached report (Attachment 1), dated August 22, 1995. Testing was performed on floor tile, black mastic adhesive, drywall tape compound and ceiling material. Contractor shall verify the results of the attached report using a State-certified, independent testing contractor. The cost for verifying the report shall be considered incidental to Item 1 – Base Bid. All paint shall be assumed to contain lead.
1.2 LOCATION
A. This project is located at the Fraser Experimental Forest Headquarters approximately 5 miles Southwest of Fraser Colorado on St. Louis Creek Road.
1.3 GENERAL SITE CONDITIONS AND WEATHER
A. The elevation of the site is approximately 9,000 feet above mean sea level. The construction site is accessible year round but from November through May it is only accessible pending snow conditions and county plowing schedule.
B. In-depth soil surveys have not been performed; however, rocks at the ground surface are evident throughout the area. The Contractor should expect to encounter such rock during excavation and grubbing operations. Blasting of rocks will not be permitted without special permission.
1.4 USE OF PREMISES
A. General: Contractor shall have full use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by the Government's right to perform work or to retain other contractors on portions of Project.
B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees.
C. Confine storage of materials to areas as approved by the CO.
D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.
E. Preservation of Natural Features: Confines all operations to work limits of the project.
Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
1. Provide temporary barriers to protect existing trees and plants and root zones.
2. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with CO and remove agreed-on roots and branches that interfere with construction.
3. Do not fasten ropes, cables, or guys to existing trees.
4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
F. Existing Utilities: The electrical was provided by a generator but the service has been abandoned. This contract includes the removal of all abandoned electrical service line.
There are existing water lines, but services are not on for the facilities.
1. Contractor shall be responsible for locating and preventing damage to known utilities.
If damage occurs, repair utility at no additional expense to the Government.
2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities.
1.5 MEALS AND LODGING
A. Meals and lodging are commercially available in the City of Fraser, Colorado within 10 miles of the construction site. Meals or lodging will not be available at Forest Service facilities.
1.7 CONSTRUCTION SEQUENCE
A. There is no specified construction sequence or season for this project however it is recommended that exterior work be performed first.
B. Depending on conditions, normal fire restrictions may apply to activities associated with this project.
1.8 FIELD VERIFICATION
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
1.9 PERMITS
A. Any permits required by County, State, or Federal laws or regulations shall be obtained by the Contractor.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION 01100