AG-82B1-S-10-0468 Amend 1 pages 1-3.pdf

PDF 117 KB Posted

Attached to
RECOVERY: Kelly Forks Work Center Federal contract opportunity
Solicitation number
AG-82B1-S-10-0468
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

SF 30 - Amendment 0001 (3pages)

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: Kelly Forks Work Center, newest first.
File Type Posted
Amend 1 utility2.pdf PDF
Amend 1 utility3.pdf PDF
Amend 1 Demolition Plan.pdf PDF
Amend 1 utility1.pdf PDF
Special Specs.docx DOCX document
Sheet5_MusselshellWC.pdf PDF
Sheet3_A101.pdf PDF
Sheet4_C102.pdf PDF
sheet1_C100.pdf PDF
Special Specs.docm DOCM document
Solicitation.doc DOC document
Sheet2_A100.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT CONTRACT ID CODE PAGE OF PAGES

1 of 7 pages

2. AMENDMENT/MODIFICATION NO.

Amendment No. 1

3. EFFECTIVE DATE

8/31/2010

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE |_________________

Clearwater National Forest

12730 Hwy 12

Orofino, ID 83544

7. ADMINISTERED BY (If other than Item 6) CODE |___________________

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State, and ZIP

Code)

9A. AMENDMENT OF SOLICITATION NO.

AG-82B1-S-10-0468

XX

9B. DATED (SEE ITEM 11)

8/10/2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ XX] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO

BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION

OF YOUR OFFER. If by virture of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _____ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AG-82B1-S-10-0468, Kelly Forks Work Center Housing, is amended as described on the attached pages.

The date and time for receipt of offers remains at 9/10/2010, 4:00 p.m. local time.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY: ____________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

AG-82B1-S-10-0468 Amendment #1

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

RECOVERY Kelly Forks Work Center

Clearwater NF

B- 1 - SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

TOTAL

PRICE

Base 1

Base 2

Kelly Forks: Demolish and remove trailers, snow roofs, propane tanks and appurtenances in accordance with the Demolition Plan.

Kelly Forks: Install three (3)

1144 SF modular housing units A, B, and C, three (3) propane tanks, utilities, furniture, and parking

LS

Option 1

Kelly Forks: Provide and install one (1) 1144 SF modular housing unit including all sitework, parking, utilties, furniture and appurtenances

Option 2

Musselshell: Provide and modular housing unit including all sitework, Option 3

Musselshell: Provide and modular housing unit including all sitework, TOTAL ALL ITEMS BASE

PLUS OPTIONS

AG-82B1-S-10-0468 Amendment #1

KELLY FORKS WORK CENTER HOUSING

SOLICITATION AMENDMENT # 1

1) A new line item is added to schedule B. (see attached) This line item will be demolition and will include the following scope work. This work will include the removal of trailers 1336, 1350, 1368, and 1354 along with the associated snow roofs and propane tanks. This work will also include moving trailer

1339 to the location of trailer 1350, which will require the snow roof to be disassembled and reassembled. The propane tank for trailer 1339 will have to be moved as well. For temporary housing needs, trailer 1338 will be moved to the trailer 1336 location. This will require disassembly and reassembly of the snow roof as well. Upon completion of the bunkhouses, trailer 1338 will be removed as well. Removal of the trailers will require the trailers to be removed off USFS land in a legal manner. Refer to the attached demolition plan. Trailer numbers to be used are not in parentheses.

2) For the purposes of a site grading plan, an engineered drawing will not be required. However, the contractor will be required to provide a site grading plan, which at the very least provides the following.

a. Finish floor elevations.

b. Bottom of footing elevation.

c. Estimated excavation and embankment quantities.

d. Storm water retention swales.

The contractor shall balance the quantities to the best of their abilities.

3) Drawings depicting the existing utilities are attached. See attached pages

Utility 1, 2, and 3.

4) Change all of the propane refrigerators and freezers to similar sized energy start electrical appliances.

5) If Optional item number 2 or 3, Musselshell Bunkhouse, are awarded, the demolition of the existing cookhouse will not be required under this contract.

File details come from the government source that posted it. Updated .