APGAR AND WILD GOOSE CAMPGROUNDS Federal contract opportunity
Solicitation number
AG-82B1-S-10-0420
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

Apgar 3-31-10 Drawings

View the file

Other files for this federal contract opportunity

Other files attached to APGAR AND WILD GOOSE CAMPGROUNDS, newest first.
File Type Posted
GENERAL DECISION ID20100012 06-04-2010 ID12.pdf PDF
APGAR AND Wild Goose CG specs 4-2-10.pdf PDF
Experience Questionnaire.pdf PDF
Wild Goose 3-31-10.pdf PDF
AG-82B1-S-10-0420 Body.pdf PDF
AG-82B1-S-10-0420 SF 18.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

W W

W

W

W W

W

W

W

W

W W

W

W

W

INCH, 0.047" WIRE DIAMETER

PLASTIC METER BOX

GALVANIZED WOVEN WIRE

CLOTH. 4X4 MESHES PER

TO OBTAIN MIN. COVER

PLASTIC METER

INSTALL AS MANY AS NECESSARY

REQUIRED OVER PIPE

PLASTIC METER BOX

WITH SNAP LOCK COVER

1" SCH 80 PVC

WATERLINE

ADAPT TO

EXCAVATE AND FILL WITH 10 CU. FT.

ROCK FOR DRAINAGE FILL

1 TO 1-1/2 INCH MINUS WASHED DRAIN

SCREENED OUTLET

CLOTH

FILTER

4'MIN.

2' MIN.

NO SCALE

1" SCH 80 PVC

CUT HOLES IN METER

BOX AS REQUIRED FOR PROPER

HEIGHT OF PIPE

PLASTIC METER BOX EXTENTIONS

INSTALL AS MANY AS NECESSARY

TO OBTAIN MIN. COVER OVER PIPE

BALL VALVE

SCREENED OUTLET

NO SCALE

BALL VALVE

BOX EXTENSIONS

RIPRAP AT

OR STAINLESS STEEL SCREEN

24 MESH BRASS, BRONZE,

STAINLESS STEEL CLAMP

NO SCALE

UNION

1" - 1 1/2"

PIPE INVERT

ROCK TO 6" BELOW

COMPACTED DRAIN

SLOPE

CUT HOLE IN METER

INSTALL AS MANY AS NECESSARY

PLASTIC METER BOX EXTENTIONS

TO OBTAIN MINIMUM COVER REQUIRED.

WITH BOLT DOWN LOCK COVER

PLASTIC METER BOX

BALL VALVE

1" SCH.80 PVC PIPE

PROPER HEIGHT OF PIPE

CLOTH. 4X4 MESHES PER

GALVANIZED WOVEN WIRE

INCH, 0.047" WIRE DIAMETER

2'MIN.

4'MIN.

BOX AS REQUIRED FOR

ADAPT TO 1" PVC PIPE 1" SCH.80 PVC PIPE

COUPLE

TO DRAIN

DAYLIGHT

DRAIN 6" - 12"

6"'MIN.

CRUSHED ROCK

3/4 x 1 ELBOW

COMPACTED SURFACE

CRUSHED ROCK1-2% SLOPE

4" CRUSHED ROCK

EXISTING GRADE

4" CONCRETE SLAB

SLOPE

18" O.C.E.W.

#4 REBAR

PLASTIC HYDRANT POST

CONCRETE FOOTING

(USE 2-16"X 8"X 8"

CONCRETE BLOCKS).

TIE BLOCKS TO THE

POST WITH STEEL

WIRE TO SECURE

WHILE BACKFILLING

AND COMPACTION.

6'

6'

3'

4'-6"

4'

6'

No Scale

No Scale

3' CURB STOP VALVE

3"

NO SCALE

SELECT EXCAVATED

BEDDING MATERIALWATER PIPE

GROUND SURFACE

MATERIAL

w/ TRACER

WIRE

(EXISTING TO BE REUSED)

EXISTING HYDRANT

(TO BE REINSTALLED)

ROCK BOULDER (TYP.)

Apgar 3-10-10-COVER
Apgar 3-10-10-EXISTING
Apgar 3-10-10-PROPOSED
Apgar 3-10-10-DRAINS
Apgar 3-10-10-HYDRANT