WD.docx

DOCX document 16 KB Posted

Attached to
Lochsa Siding Replacements Federal contract opportunity
Solicitation number
AG-82B1-S-10-0401
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

Attachment C Wage Determination

View the file

Other files for this federal contract opportunity

Other files attached to Lochsa Siding Replacements, newest first.
File Type Posted
Letter of intent.pdf PDF
SF 18.pdf PDF
Expierence Questionnaire.doc DOC document
AG-82B1-S-10-0401.rtf RTF text file
Final SpecPackage_ClearwaterSiding.doc DOC document
Siding.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: ID100010 05/21/2010 ID10

Superseded General Decision Number: ID20080010

State: Idaho

Construction Type: Building

Counties: Adams, Bear Lake, Bingham, Blaine, Boise, Bonneville, Butte, Camas, Caribou, Cassia, Clark, Custer, Elmore, Franklin, Fremont, Gem, Gooding, Idaho, Jefferson, Jerome, Lemhi, Lincoln, Madison, Minidoka, Oneida, Owyhee, Payette, Power, Teton, Twin Falls, Valley and Washington Counties in Idaho.

* IDAHO COUNTY - SOUTH OF THE 46TH PARALLEL

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Superseeds General Decision ID020030004, ID020030005 and

ID020030014

Modification Number Publication Date 0 03/12/2010 1 04/16/2010 2 05/21/2010

BOIL0242-004 10/01/2006

ADAMS, BEAR LAKE, BINGHAM, BLAINE, BOISE, BONNEVILLE, BUTTE,

CAMAS, CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN,

FREMONT, GEM, GOODING, JEFFERSON, JEROME, LEMHI, LINCOLN,

MADISON, MINIDOKA, ONEDIA, OWYHEE, PAYETTE, POWER, TETON, TWIN

FALLS, VALLEY AND WASHINGTON COUNTIES

Rates Fringes

BOILERMAKER......................$ 25.22 18.52

BOIL0242-005 10/01/2008

IDAHO (SOUTH OF THE 46TH PARALLEL) COUNTY

Rates Fringes

BOILERMAKER......................$ 33.69 19.91

ELEC0073-007 01/01/2010

IDAHO (SOUTH OF THE 46TH PARALLEL) COUNTY

Rates Fringes

CABLE SPLICER....................$ 28.62 3%+12.98

ELECTRICIAN......................$ 28.37 13.98

ELEC0291-007 01/01/2009

ADAMS, BOISE, ELMORE, GEM, PAYETTE, VALLEY AND WASHINGTON

COUNTIES

CABLE SPLICER

Adams, Valley and Washington Counties.........$ 35.79 3%+$10.00 Boise, Elmore, Gem and Payette Counties............$ 32.50 3%+$10.00

ELECTRICIAN

Adams, Valley and Washington Counties.........$ 32.54 3%+$10.00 Boise, Elmore, Gem and Payette Counties............$ 29.54 3%+$10.00

ELEC0449-001 06/01/2009

BEAR LAKE, BINGHAM, BONNEVILLE, BUTTE, CARIBOU, CLARK, CUSTER,

FRANKLIN, FREMONT, JEFFERSON, LEMHI, MADISON, ONEIDA, POWER AND

TETON COUNTIES

ELECTRICIAN

All remaining counties......$ 27.00 5.5%+$10.00 Fremont and Teton Counties..$ 24.58 $9.10

ELEC0449-006 07/01/2009

BLAINE, CAMAS, CASSIA, GOODING, JEROME, LINCOLN, MINIDOKA AND

TWIN FALLS COUNTIES

ELECTRICIAN......................$ 23.00 5.5% + $8.90

IRON0014-007 07/01/2009

ADAMS (REMAINDER OF COUNTY), IDAHO (SOUTH OF THE 46TH

PARALLEL), LEMHI (NORTHWEST CORNER), VALLEY (NORTHEASTERN 1/3)

AND WASHINGTIN (NORTHWESTERN 1/2) COUNTIES

IRONWORKER

REBAR.......................$ 30.79 17.40

STRUCTURAL..................$ 30.79 17.40

IRON0732-004 06/01/2009

ADAMS (EAST CORNER), BEAR LAKE, BINGHAM, BLAINE, BOISE, BUTTE,

BONNEVILLE, CAMAS, CARIBOU, CASSIA, CLARK, CUSTER, ELMORE,

FRANKLIN, FREMONT, GEM, GOODING, JEFFERSON, JEROME, LINCOLN,

LEMHI (REMAINDER OF COUNTY), MADISON, MINIDOKA, ONEIDA, OWYHEE,

PAYETTE, POWER, TETON, TWIN FALLS, VALLEY (SOUTHEAST 2/3), AND

WASHINGTON (SOUTHEAST 1/2) COUNTIES

IRONWORKER

REBAR.......................$ 24.74 13.86

STRUCTURAL..................$ 24.74 13.86

PLUM0296-001 01/01/2009

ADAMS, BOISE, CAMAS, ELMORE, GEM, GOODLING, JEROME, LINCOLN,

OWYHEE, PAYETTE, TWIN FALLS, VALLEY, WASHINGTON, BLAINE(Except that portion which extends east and south from the southwest tri-county point of Butte County to the northwest corner of Minidoka County), IDAHO(Except that portion which lies north of an east-west line drawn through the middle of Main Street in the town of Grangeville and extending west to the Oregon State Line)

PIPEFITTER.......................$ 26.70 10.65

PLUM0648-001 01/01/2010

BEAR LAKE, BINGHAM(the portion of Blaine which extends east and south from southwest tri-county pointe of Butte County to the northwest corner of Minidoka County), BONNEVILLE, BUTTE, CARIBOU, CASSIA, CLARK, CUSTER, FRANKLIN, FREMONT, JEFFERSON, LEMHI, MADISON, MINIDOKA, ONEIDA, POWER AND TETON COUNTIES

PIPEFITTER

(All other work)............$ 25.30 12.00

PLUM0648-002 01/01/2010

BEAR LAKE, BINGHAM(the portion of Blaine which extends east and south from southwest tri-county pointe of Butte County to the northwest corner of Minidoka County), BONNEVILLE, BUTTE, CARIBOU, CASSIA, CLARK, CUSTER, FRANKLIN, FREMONT, JEFFERSON, LEMHI, MADISON, MINIDOKA, ONEIDA, POWER AND TETON COUNTIES

PIPEFITTER

New Construction Projects $10 Million Mechanical and Above:......................$ 30.03 12.00

* SUID2004-001 01/07/2004

Rates Fringes

CARPENTER

Including concrete form work and dry wall hanging...$ 14.29 3.09

Cement Mason/Finisher............$ 13.52 2.80

Drywall taper/finisher...........$ 14.74 1.38

Laborer-concrete worker..........$ 12.17 1.49

Laborer-General/Clean up.........$ 11.73 2.90

Laborer-Pipelayer................$ 12.00 0.00

Power equipment operator -tracthoe.........................$ 13.00 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .