Attachment A Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Lochsa Siding Replacements, newest first.
File Type Posted
Letter of intent.pdf PDF
SF 18.pdf PDF
AG-82B1-S-10-0401.rtf RTF text file
Expierence Questionnaire.doc DOC document
Siding.zip ZIP file
WD.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA FOREST SERVICE, R-1

LOCHSA SIDING

SECTION 00050 – LOCHSA SIDING

PART 1 - GENERAL

1.1 This item shall consist of installing new siding on a Warehouse, Bunkhouse, and Office on the Clearwater National Forest. Work includes but is not limited to removing and replacing siding, repairing exterior wall assemblies, installing weather proofing and vapor barriers.

The projects are located at Kooskia Ranger Station, and Mussellshell Work Center. The sites are accessible year around.

1.2 Measurement and Payment - Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered as incidental to the pay items shown.

1.3 All Submittals - It will be the Contractor's responsibility to submit information on all items required with such promptness as to cause no delay in the work. Approvals must be obtained before starting work on parts of the project which involves the submittal. Contractor shall allow 10 calendar days for processing of submittals by the Government.

A.

Submit four copies of submittals and shop drawings to the Contracting Officer for approval on the items required herein. Literature which is not marked or otherwise designated to show the exact model and size that the contractor proposes to use will be returned by the Contracting Officer "without action." Circle or check items to be used on submittals. Highlighter pens may print black writing or may not show up at all when copied and should not be used. One copy of all submittals and shop drawings will be returned to the contractor. Information must be adequate to determine compliance with specifications.

B.

Substitution - Materials in the specifications may be followed by the words "or approved equal." In these cases, wherever the name or brand of a manufacturer's article is specified, it is used as a measure of quality and utility or a standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 10 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution and his decision shall be final. Unless substitutions are requested within the time stated above and as provided below, no deviation from the specifications will be allowed.

Requests for substitutions will only be considered if contractor submits the following:

1.

Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.

2.

Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

3.

A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws; and that the Contractor takes on the responsiblity for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

1.4 Related Work - The work shall be in accordance with these specifications. The following is a list of the specifications that are included with this package.

SECTION 00050 – Lochsa Siding Section 00190 - Mobilization

SECTION 02135 - WASTE MATERIAL DISPOSAL (LANDFILL)

SECTION 06203 - CARPENTRY

SECTION 06220 - EXTERIOR FINISH AND SIDING

SECTION 011250 - MEASUREMENT AND PAYMENT

END OF SECTION

April 2010

USDA FOREST SERVICE, R-1

LOCHSA SIDING

SECTION 00190 - MOBILIZATION

PART I - GENERAL

1.1 Mobilization - This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

1.2 Method of Measurement - The measurement shall be lump sum for mobilization.

1.3 Basis of Payment - The lump sum price shall include full compensation for mobilization. Progress payments for mobilization will be made as follows:

A.

Bond premiums will be reimbursed after receipt of the evidence of payment.

B.

50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

C.

Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

D.

Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

Progress payments for mobilization and preparatory work shall be subject to retainage.

PART II - PRODUCTS (Not Applicable)

PART III - EXECUTION (Not Applicable)

END OF SECTION

USDA FOREST SERVICE, R-1

LOCHSA SIDING

SECTION 02135 - WASTE MATERIAL DISPOSAL (LANDFILL)

PART 2 - GENERAL

1.1 This item shall consist of loading, handling, hauling, and disposal of excess materials and trash resulting from construction activities. The waste disposal site shall be off National Forest lands at the county landfill or other legal means. The Contractor shall be responsible for all costs, royalties, arrangements, procurement, cleanup, and work associated with a waste disposal area.

1.2 Measurement of Payment - No separate measurement or payment will be made for disposal of waste material disposal, rather payment will be considered to be incidental to other items of work.

PART 3 - PRODUCTS (Not Applicable)

PART 4 - EXECUTION

3.1 All trash and construction debris resulting from installation, demolition, and construction are the responsibility of the Contractor and shall be removed and disposed of legally at the county Landfill.

END OF SECTION

April 2006

USDA FOREST SERVICE, R-1

LOCHSA SIDING

SECTION 06203 - CARPENTRY

PART 5 - GENERAL

5.1 Description of Work - Perform all work necessary or required for the construction of the project, as indicated on the drawings. Such work includes, but is not necessarily limited to, the finishing and installing of all rough and finish carpentry work, as shown and noted on the drawings and specified herein.

5.2 Grade Marks - All lumber and plywood shall be grade stamped.

5.3 Measurement and Payment - No separate payment will be made for work included under this section. Payment for this work will be included in the contract unit price for Replacing Existing Siding.

PART 6 - PRODUCTS

6.1 Materials - All lumber shall be seasoned, surfaced four sides (S4S), except where shown rough-sawn on drawings, shall not exceed a moisture content of 19 percent for (A), (B), and (C) below and 15 percent for all others, and shall not be less than the following grades:

A. Sill Plates - Sill plates and any other framing in contact with concrete or masonry shall be foundation grade (Pressure Treated) lumber.

B. Joists and Planks, Beams and Stringers, Posts and Timbers - Douglas Fir No. 2 and better grade, as graded by the Western Wood Products Association or West Coast Lumber Inspection Bureau, or equal, unless otherwise SHOWN OTHERWISE ON THE DRAWINGS.

C. Light Framing - Douglas Fir, Standard and better grade, as graded by Western Wood Products Association or West Coast Lumber Inspection Bureau, or equal.

D. Pressure Treated Framing - FDN grade Douglas Fir as designated by American Wood Preservers Association or American Wood Preservers Bureau.

E. Roof Sheathing and Exterior Wall Sheathing - APA Rated sheathing of the span rating and panel thickness shown on the drawings and as graded by The Engineered Wood Association (formerly American Plywood Association). Use of the term "plywood" on the drawings does not exclude the use of other panels with equivalent span ratings.

F. Interior Plywood Wall Sheathing - CDX fir, interior type, with exterior glue, as graded by the American Plywood Association.

G. Trim and Moldings - Interior - C select pine, as graded by the Western Wood Products Association.

H. Fiber-Cement Siding, Trim, Soffit, and Fascia – Siding, trim, soffit, and fascia made from fiber-cement board that does not contain asbestos fibers; complies with ASTM C 1186, Type A, Grade II; is classified as noncombustible when tested according to ASTM E 136; and has a flame-spread index of 25 or less when tested according to ASTM E 84. Material shall be pre-primed and painted with standard exterior alkyd primer and paint.

1. Product Data: For each type of product indicated. Obtain type, color, texture, and pattern of siding, including related accessories, through one source from a single manufacturer and submit to Contracting Officer for approval.

2. Siding Panel Pattern: 8-inch wide by 12-foot lengths with wood-grain texture.

3. Trim: minimum 4-inch wide wood-grained

4. Soffit Panel Pattern: wood-grained, vented, and non-vented soffit panels.

5. Elastomeric Joint Sealant: Single-component neutral-curing silicone joint sealant complying with requirements in Section 07900 "Joint Sealants" for Use NT (nontraffic) and for Uses M, G, A, and, as applicable to joint substrates indicated, O joint substrates.

6. Fasteners:

a. For fastening fiber-cement siding, use hot-dip galvanized fasteners.

I. Building Wrap - Air-retarder sheeting made from polyolefins; cross-laminated films, woven strands, or spun-bonded fibers; coated or uncoated; with or without perforations; and complying with ASTM E 1677, Type I.

1. Thickness: Not less than 3 mils (0.08 mm).

2. Permeance: Not less than 10 perms (575 ng/Pa x s x sq. m).

3. Flame-Spread Index: 25 or less per ASTM E 84.

4. Allowable Exposure Time: Not less than three months.

5. Building Wrap Tape: Pressure-sensitive plastic tape recommended by building wrap manufacturer for sealing joints and penetrations in building wrap.

PART 7 - EXECUTION

7.1 General

A. Nailing - Nailing shall conform with the requirements of the International Building Code, unless otherwise specified.

B. Building Wrap Application - Cover wall sheathing with building wrap as indicated.

1. Comply with manufacturer's written instructions.

2. Cover upstanding flashing with 4-inch (102-mm) overlap.

3. Seal seams, edges, and penetrations with tape.

4. Extend into jambs of openings and seal corners with tape.

7.2 Rough Carpentry

A. General - All framing shall be accurately cut and constructed plumb, straight, and true to lines and dimensions shown. No cutting and boring of joists and beams shall be done without permission from the Contracting Officer. Set joists and beams with crown edges up. Space studs 16" o.c., unless shown otherwise. Double studs at openings and triple studs at intersections of walls.

B. Blocking and Bracing - Blocking needed for bracing, edge support, and backing for miscellaneous accessories, grab bars, toilet paper dispensers, door stops, any needed to stabilize walls and other building elements, and other miscellaneous blocking shall be included as part of this work.

C. Treated Lumber - All lumber placed in contact with earth or concrete shall be treated lumber.

7.3 Finish Carpentry

A. General - Fabricate and exterior trim in accordance with the standard carpentry practices. Joints shall be closely fitted, butted, mitered, or housed, as required to provide substantial construction and a neat, finished appearance and to conceal shrinkage. Exposed wood surfaces shall be without surface imperfections which cannot be concealed readily by paint finishes. Were applicable, use finishing nails set for puttying.

B. Wood Trim - All wood trim shall be run from solid stock with housed joints. Trim shall be set plumb and securely nailed with all joints tightly fit with no gaps. No gaps in joints which would require putty or other fill will be allowed.

All trim shall be in single lengths. Running finish, such as base and moldings, shall be in commercial lengths and jointed only where solid fastenings can be made. Where end joints are required, miter joints shall be made.

C. Exterior siding, trim, soffit, and fascia - General: Comply with siding manufacturer's written installation instructions applicable to products and applications indicated unless more stringent requirements apply.

1. Seal butt joints at inside and outside corners and at trim locations.

Delete subparagraphs below if not required.

2. Install continuous metal flashing at horizontal panel joints with 3/16-inch (5-mm) expansion gap.

3. Apply battens and corner trim as indicated.

4. Conceal fasteners to greatest practical extent by countersinking and filling, by placing in grooves of siding pattern, or by concealing with applied trim or battens as detailed.

D. Interior Plywood Siding - Install panels with edges over framing or blocking. Nail at 6 inches (150 mm) o.c. at panel perimeter and 12 inches (300 mm) o.c. at intermediate supports. Leave 1/16-inch (1.5-mm) gap between adjacent panels and 1/8-inch (3-mm) gap at perimeter and openings.

1. Seal butt joints at inside and outside corners and at trim locations.

Delete subparagraphs below if not required.

2. Apply trim at corners and around openings.

3. Conceal fasteners to greatest practical extent by countersinking and filling, by placing in grooves of siding pattern, or by concealing with applied trim or battens as detailed. Do not nail through overlapping pieces.

Procedure below is recommended to prevent sun and weather damage to siding.

E. Finish: Apply finish within two weeks of installation.

END OF SECTION

April 2010

USDA FOREST SERVICE, R-1

LOCHSA SIDING

SECTION 06220 - EXTERIOR FINISH AND SIDING

SPEC. WRITER:

THIS SECTION SPECIFIES COMMONLY USED RESIDENTIAL SIDING MATERIALS. INCLUDED IN SECTION ARE WOOD CLAPBOARD, HARDBOARD CLAPBOARD, PLASTIC CLAPBOARD, ALUMINUM CLAPBOARD, PLYWOOD PANEL, AND HARDBOARD PANEL SIDING, TOGETHER WITH FASTENERS AND COMMONLY USED ACCESSORY ITEMS FOR EACH SIDING TYPE. COORDINATE WITH “FINISH CARPENTRY”.

PART 1 - GENERAL

1.1 TYPES OF WORK

A. Types of exterior finish carpentry in this section include:

SPEC. WRITER:

ADJUST LISTING BELOW TO PROJECT. INCLUDE MORE DETAILED ITEMIZATION WHERE REQUIRED TO DISTINGUISH WORK IN THIS SECTION FROM THAT SPECIFIED ELSEWHERE.

Exterior running and standing trim.

FiberCement clapboard siding.

Exterior Grade treated wood composite trim and soffit.

1.2 SUBMITTALS

A. Product Data: Submit manufacturer's specification and installation instructions for each item of factory-fabricated siding.

B. Samples: Contractor shall submit sample of siding styles and colors to Contracting Officer (CO) for approval, along with appropriate guarantees or warranties where required.

1.3 WOOD PRODUCT QUALITY STANDARDS

A. Softwood Lumber Standards: Comply with PS 20 and with applicable grading rules of the respective grading and inspecting agency for the species and product indicated.

B. Plywood Standard: Comply with PS 1/ANSI A199.1.

C. Cement Fiber Siding Standards: Siding, trim, soffit, and fascia made from fiber-cement board that does not contain asbestos fibers; complies with ASTM C 1186, Type A, Grade II; is classified as noncombustible when tested according to ASTM E 136; and has a flame-spread index of 25 or less when tested according to ASTM E 84. Material shall be pre-primed and painted with standard exterior alkyd primer and paint.

1.4 PRODUCT HANDLING

A. Do not deliver material of any kind to the job until the building is in proper condition and arrangements are made to properly handle, store, and protect such material.

B. All material shall be delivered to the site in undamaged condition and shall be stored in fully covered, well-ventilated areas.

PART 2 - PRODUCTS

2.1 MATERIALS – GENERAL

2.2 SPEC. WRITER:

IF ROUGH LUMBER IS REQUIRED FOR SELECTED ITEMS INDICATE EITHER ON DRAWINGS OR IN THIS SECTION UNDER TYPES OF FINISH CARPENTRY OR REVISE BELOW.

A. Nominal sizes are indicated, except as shown by detailed dimensions.

B. Provide dressed or worked and dressed lumber, as applicable, manufactured to the actual sizes as required by PS 20 or to actual sizes and patterns as shown, unless otherwise indicated.

C. Moisture content of Softwood Lumber: Provide seasoned (KD) lumber having moisture content from time of manufacture until time of installation not greater than values required by the applicable grading rules of the respective grading and inspecting agency for the species and product indicated.

2.1 SPEC. WRITER:

DELETE ABOVE IF NO LUMBER FOR TRANSPARENT FINISH OR DELETE AND REVISE BELOW TO INCLUDE LUMBER FOR TRANSPARENT FINISH AS WELL.

2.2 LUMBER FOR PAINTED FINISH

A. At Contractor's option, use pieces, which are either glued-up lumber or made of solid lumber stock.

B. For exterior finish carpentry work use glued-up lumber complying with PS 56 for "wet use" and certified so by respective grading and inspecting agency for species and product indicated.

C. SPEC. WRITER:

DISTINCTION BETWEEN "STANDING" AND "RUNNING" TRIM. STANDING TRIM ARE ITEMS OF FIXED LENGTH SUCH AS DOOR AND WINDOW CASING, STOPS OR SILLS, APRON, ETC. THESE CAN USUALLY BE ACCOMPLISHED WITH SINGLE LENGTH OF WOOD. RUNNING TRIM ARE ITEMS OF CONTINUING LENGTH SUCH AS CORNICES, FASCIAS, SOFFITS.

2.3 STANDING AND RUNNING TRIM FOR PAINTED FINISH

A. Any western softwood species graded and inspected by WWPA complying with following requirements:

1. Fascia: Cedar or Cementfiber

2.1 FIBERCEMENT CLAPBOARD SIDING

A. Embossed FiberCement Lap Siding:

1. Minimum 8" width with Prefinished Cedar Lap, 5/16" thick, 12 feet length.

2. Exterior side and four edges factory primed and painted or stained with color to match Kooskia Ranger Station Office. Color shall be submitted for approval in writing by CO.

3. Furnish written 25-year guarantee against buckling, warping, and 2 coat warrantee.

4. Mildew resistant.

5. Scuff and mar resistant.

6. 100% Acrylic Latex coating.

B. Underlayment: Provide building wrap as specified in section 06203.

C. SPEC. WRITER:

DELETE ABOVE IF MANUFACTURER DATA RECOMMENDS OMISSION.

D. Fasteners: Hot-dipped galvanized siding or stainless steel nails, 8d where siding attached directly to studs, 10d where applied over sheathing.

E. Prefinished Fasteners: At exposed locations, use stainless or hot-dipped galvanized nails prefinished to match siding.

F. SPEC. WRITER:

DELETE ABOVE AND BELOW IF NO PREFINISHED SIDING.

G. Accessories: Provide metal outside corners and other components required to finish siding work.

H. Flashing: Provide joint and window flashing.

I. Caulking: Caulking compound shall be a paintable/stainable siliconized-latex caulking with a minimum 20 year warranty. Caulking shall match color of the substrate to which it is applied (i.e. siding, trim, etc.).

J. SPEC. WRITER:

DELETE ARTICLE BELOW IF NOT SUITED FOR PROJECT.

SPEC. WRITER:

DELETE ARTICLE BELOW IF NOT SUITED FOR PROJECT.

2.4 PLYWOOD SOFFITS

A. Plywood soffit panel shall be APA 303-NR exterior conforming to the following requirements.

1. Style: Brushed

2. Reverse Board and Batten, 8" o.c.

3. Thickness: 3/8", 1/2", 5/8"

4. Species:

Douglas-fir

Cedar

Redwood

MDO/EXT-APA

2.2 Paint for trim and fascia

A. Coating shall be 100% Acrylic Latex paint or stain. Color is to be selected for a full range of colors available, trim, facia, and color sample shall be submitted to CO for approval.

SPEC. WRITER:

DELETE ARTICLE BELOW IF NOT SUITED FOR PROJECT. PRODUCT BELOW USED TO COVER USED INSULATION OVER FOUNDATION WALLS. ALSO USED ON WOOD FOUNDATIONS.

PART 3 - EXECUTION

3.1 GENERAL (SIDING)

A. Install the type of siding indicated by the manufacturer and in the patterns or methods indicated.

3.2 PREPARATION

A. Prime or finish cut edges and ends of siding materials to match balance of siding prior to installation.

3.3 FIBERCEMENT CLAPBOARDS

A. Hardboard Lap Siding:

1. Install in strict accordance with the manufacturer's recommendations.

2. Install Miratec trim on outside corners and 1-1/8 inch square wood pieces or specially formed metal pieces on inside corners.

3. Nail with minimum 6d galvanized box nails. Space nails maximum of 24 inches.

4. Caulk joints at interior corners, window and door trim, and elsewhere as necessary for watertight installation.

5. Fasten a starter strip 1/2-inch thick and 1-inch wide along the bottom edge of the sheathing. Place the first course of siding with its lower edge 1/8-inch below the starter strip.

6. Start nailing at one end of the siding and nail toward the other end. Do not nail from each end toward the center.

7. Avoid pulling siding out of line at nailing points by driving nails with excessive force.

8. Nail approximately 1/2 inch from the lower edge at studs so that nails penetrate both pieces of siding.

9. Space butt joints minimum of 1/8 inch and install butt joint covers. Nail top and bottom at each side of butt joint.

10. Do not force or spring siding into place.

11. After the first course of siding is in place, proceed with succeeding courses lapping at least 1" over the course below.

3.4 PLYWOOD SOFFITS

A. Nail with 6d (8d for 5/8") finish nails 6" o/c at edges, 12" o/c at intermediate supports.

B. Set nails and fill holes and butt joints with waterproof filler, sand smooth.

C. Back all joints and edges of 3/8" thick plywood with minimum 2" thick material. 5/8" thick plywood need not be backed at joints and edges.

3.5 RUNNING AND STANDING TRIM, ETC.

A. Cut to eliminate defects.

B. Use full-length trim pieces accurately, install as detailed on drawings.

C. Miter exterior corners; cope interior angles.

D. Cut end-to-end joints at 45 degree angle, glue and nail.

E. Use caulking compound at any joints subject to leaking.

F. Blind nail where practicable. Drive face nails flush with surface.

G. Nail adequately for solid, durable, warp-free, installation, H. All finish work shall be straight, plumb, and level, true to line, closely fitted, free from hammer marks or other flaws. Hammer marks or other defects visible after completion of painting will be cause for rejection.

I. Apply finish within two weeks of installation.

SPEC. WRITER:

DELETE ARTICLE BELOW IF NOT REQUIRED FOR PROJECT.

END OF SECTION 06220

USDA FOREST SERVICE, R-1

LOCHSA SIDING

SECTION 011250 - MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

1.2 DETERMINATION OF QUANTITIES

A. The following measurements and calculations shall be used to determine contract quantities for payment.

1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."

1.3 UNITS OF MEASUREMENT

A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

1. Acre: Make longitudinal and transverse measurements for area computations horizontally.

2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.

3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.

4. Cubic Yard (CY): A measurement computed by one of the following methods:

a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

5. Each (EA): One complete unit, which may consist of one or more parts.

6. Gallons (GAL): The quantity shall be measured by any of the following methods:

a. Measured volume in container.

b. Metered volume by approved metering system.

c. Commercially package volume.

7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.

8. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.

9. Lump Sum (LS): One complete unit.

10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.

11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

12. Square Foot (SF): Measured on a plane parallel to the surface being measured.

13. Square Yard (SY): Measured on a plane parallel to the surface being measured.

14. Ton: Measured as a short ton consisting of 2,000 pounds.

1.4 METHOD OF MEASUREMENT

A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

a. As a result of changes in the work authorized by the CO.

b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION (NOT APPLICABLE)

REVISION HISTORY:

PRIMARY AUTHOR: ???

5/11/2006 D. WEWER – Added 50# Bags to list of units.

END OF SECTION 011250

April 2010

PAGE

LOCHSA SIDING

00050-2 =-1+1