NF_Appendix_A.doc

DOC document 221 KB Posted

Attached to
RECOVERY NORTH FORK REC SITE REHAB Federal contract opportunity
Solicitation number
AG-82B1-S-10-0396
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

Appendix A

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY NORTH FORK REC SITE REHAB, newest first.
File Type Posted
Amendment 02.pdf PDF
Schedule of Items.pdf PDF
North Fork Recreation Site Rehabilitation.docx DOCX document
01.pdf PDF
north_fork_drawings.pdf PDF
Solicitation S-10-0396.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A, Page 1

NORTH FORK RANGER DISTRICT

RECREATION SITE REHABILITATION

SPECIFICATION INDEX

PAGES

DIVISION 1 – GENERAL REQUIREMENTS

01010 – PROJECT LOCATION

01011 – SUMMARY OF WORK

3-4

01012 – START WORK

01013 – CONTRACT TIME

01015 – GOVERNMENT FURNISHED MATERIALS

01016 – CONTRACTOR USE OF PREMISES

4-5

01017 – SCHEDULES

01031 – GRADES, LINES AND LEVELS

01050 – COORDINATION

01300 – SUBMITTALS

01340 – SHOP DRAWINGS, PRODUCT DATA

5-6

01400 – QUALITY CONTROL AND QUANTITY MEASUREMENT

6-8

01500 – TEMPORARY FACILITIES AND CONTROLS

01511 – TEMPORARY ELECTRICITY

01515 – TEMPORARY WATER

01516 – TEMPORARY SANITARY FACILITIES

01530 – BARRIERS

01532 – TREE AND PLANT PROTECTION

01550 – ACCESS ROADS, PARKING AND CAMPING AREAS

01551 – STORAGE OF MATERIALS

9-10

01700 – PROJECT CLOSEOUT

01710 – CLEANING

01800 – MEASUREMENT AND PAYMENT

11-12

DIVISION 2 – SITE WORK

02000 – MOBILIZATION

02102 – CLEARING AND GRUBBING

02120 – REMOVAL & DISPOSAL OF EXIST. VAULT TOILET STRUC.

15-16

02130 – EARTHWORK FOR TOILET INSTALLATION.

17-20

02135 – WASTE MATERIAL DISPOSAL

02222 – STRUCTURAL EXCAVATION, BACKFILL, AND COMPACTION

22-23

02229 – PATH AND AGGREGATE APRONS

02540 – EROSION CONTROL

02611 – CRUSHED AGGREGATE

02762 – FIRE RING

02763 – BULLETIN BOARDS

02863 – HITCH RAIL

29-30

DIVISION 3 – CONCRETE

03313 – READY-MIX CONCRETE

31-33

03200 – CONCRETE REINFORCEMENT

DIVISION 5 – METALS

05500 – METAL FABRICATION

05503 – MISCELLANEOUS METALS AND FASTENERS

DIVISION 9 – FINISHES

09900 – PAINTING

09910 – EXTERIOR PAINTING

09920 – CONCRETE TOILET PAINTING

37-39

DIVISION 13 – SPECIALTY BUILDINGS

13800 – VAULT TOILET CONSTRUCTION

40-49

DIVISION 1 – GENERAL REQUIREMENTS

01010 – PROJECT LOCATION

The project work will be located at campgrounds and trailheads on the North Fork Ranger District. The following sites will be included in the work:

North Fork Ranger District

Washington Creek Campground – located at milepost 38.9 of Forest Road 247.

Noe Creek Campground – located at milepost 38.8 of Forest Road 250.

Kelly Forks Campground - located at milepost 46.4 of Forest Road 250.

Hidden Creek Campground - located at milepost 57.1 of Forest Road 250.

Cedars Campground – located at milepost 64.65 of Forest Road 250.

Flat Creek Campsite - located at milepost 45.8 of Forest Road 250.

Fawn Creek Campsite - located at milepost 39 of Forest Road 250.- Kelly Creek Trailhead - located at milepost 11 of Forest Road 255.

Fourth of July Trailhead - located at milepost 36.9 of Forest Road 250.

Smith Ridge Trailhead - located at milepost 11 of Forest Road 700.

Isabella Point Trailhead - turn at milepost 3.2 of Forest Road 700 to Forest Road 705. Go 3.5 miles on Forest Road 705.

01011 – SUMMARY OF WORK

Part 1 – General

1.1 Project work will vary by site, but the following work items will be included in the overall project: Install accessible campfire rings; install bulletin boards; install unit posts; rehabilitate aggregate pads around campfire rings and picnic tables; rehabilitate existing concrete toilet buildings including painting walls, doors and windows; install concrete entrance pads for toilet buildings; decommission existing wood-frame vault toilets; construct wood frame vault toilets; and install equestrian facilities including hitch rails.

North Fork Ranger District

Site
Decommission Toilet
Install Firering
Table Pad
Rehab Toilet
Install

Toilet Pad

Install Bulletin Board
Install Hitch

rail

Washington Creek Campground

25
25
5

Noe Creek Campground

7
7
1

Kelly Forks Campground

21
21
4

Hidden Creek Campground

13
13
3
Cedars Campground
2
2
2
Flat Creek Campsite
1
1
1
Fawn Creek Campsite
2
1
1
Kelly Creek Trailhead
1
1
2
2
Fourth of July Trailhead
1
1
2
2
Smith Ridge Trailhead
1
1
2
2
Isabella Point Trailhead
1
1
2
2
Totals
9
66
66
13
8
23
8

01012 – START WORK

It is estimated that work will begin approximately August 15, 2010.

01013 – CONTRACT TIME

It is anticipated that work will begin on August 15, 2010 and contract time will end June 30, 2011.

01015 – GOVERNMENT FURNISHED MATERIALS

Part 1 – General

1.1 Campfire rings.

1.2 Bulletin boards.

01016 – CONTRACTOR’S USE OF PREMISES

Part 1 - General

1.1 Contractor will be allowed to camp at or adjacent to project sites in designated camp areas. The Contractor will not be allowed to camp in fee campgrounds, but may camp at dispersed sites. The Contractor must have a camping permit from the District in order to camp near the project site.

01017 – SCHEDULES

Part 1 - General

1.1 Furnish one copy each of the following items after award of contract for review and/or approval pursuant to the contract:

a. Proposed progress schedule showing starting and completion dates of the various phases of work.

b. List of proposed subcontractors must have Contracting Officer’s written approval prior to work on the project.

01031 – GRADES, LINES AND LEVELS

Part 1 – General

1.1

Contractor shall verify all quantities, volumes and lengths.

1.2 Final location of picnic tables, campfire rings, bulletin boards, equestrian facilities and unit posts will be staked on the ground by the Forest Service.

01050 – COORDINATION

Part 1 – General

1.1 Recreation sites will not be closed during work activities. Limited portions of the site may be closed to the public during work, but the overall site must remain open for use.

01300 – SUBMITTALS

01340 – Shop Drawings, Product Data Part 1 - General

1.1 The Contractor shall provide the following submittals to the C.O.R. before final acceptance – three copies each where pertinent. Approvals must be obtained before starting work which involves the item.

1.2 Manufacturer’s literature shall be marked or otherwise designated to indicate the exact model, size, etc. which the Contractor proposes to use. Information shall be adequate to determine compliance with the specifications without additional research by the CO. One copy of approved submittals will be returned to the Contractor.

Provide manufacturer’s literature on the following:

1. Material Safety Data Sheets of all chemicals used.

2. Ready mix concrete.

3. Picnic table legs.

4. Paint used for toilet rehabilitation work.

01400 – QUALITY CONTROL AND QUANTITY MEASUREMENT

Part 1 – General

1.1 Description. This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.

Part 2 – Products – Not used

Part 3 – Execution

3.1 Quality control and Quantity measurement system. The Contractor shall provide and maintain a quality control system that will ensure that all services, supplies, and construction required under this contract conform to the contract requirements. The Contractor shall perform, or cause to be performed; the sampling, inspection, and testing required substantiating that all supplies, services, and construction conform to the contract requirements.

The Contractor shall also perform, or cause to be performed, all measurement of quantities of materials incorporated into the work or work processes that are to be measured under the provisions of the contract.

a. Quality Control Plan. The Contractor shall submit in writing the following:

1. Authorities and responsibilities of inspection and testing personnel.

2. Experience and qualifications of inspection and testing personnel to be assigned and name and location of any (for hire) testing will be used.

4. Random sampling and/or measurement plan prepared in accordance with requirements in Table 01401.1.

b. Approval of Quality Control Plan. The Contractor’s proposed quality control plan for all items requiring quality control shall be submitted to the CO for review prior to the Contractor commencing work. Within five days of receipt of plan, the CO shall notify the Contractor whether the plan adequately covers quality control requirements. Construction work shall not be performed prior to Contractor’s receipt of written approval of the proposed plan. The Contractor shall submit to the CO, in writing, any proposed changes in the approved quality control plan. Proposed changes shall not be put into effect until approved in writing by the CO.

3.2 Sampling, Testing, Inspection, and Measurement of Quantities. The Contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing and inspection in a timely manner. Tests, measurement, and certifications shall be made as required by the Drawings and Specifications. The Contractor shall take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract and make required measurements of work under this contract performed onsite or offsite. Sampling and testing frequency for specific items shall be shown in the Specifications.

Minimum sampling and testing frequency is defined in Measurement of Table 01401.1.

3.3 Records of Inspection and Measurements.

a. Inspection and Tests. The Contractor shall maintain current records of all inspections and tests performed. The following format or one containing the following information will be acceptable to the Government:

Project _________________________
Contract No. ________________
Bid Item No.
Date
Station
Standard
Results
Test By (Initials)

The Contractor shall certify in writing that all inspections and tests were performed in accordance with Specifications.

3.4 Certifications and Measurements.

a. Offsite Produced Materials. The Contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements shown on the Drawings or stated in the Specifications. Incidental purchases needed to remedy minor shortages of material shall be certified by the Contractor.

b. Quantity Measurements. The Contractor shall make all measurements for computations of quantities for all work items except those specified for payment by Designed Quantity (DQ). The Contractor shall compute the quantities for periodic progress payments; the CO will compute the quantities for the final payment based on measurements taken by the Contractor. All Contractor measurements are subject to verification. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.

The following format or one containing the following information will be acceptable to the Government:

Project _________________________
Contract No. ________________
Bid Item No.
Date
Station
Measurement
Quantity or Measured By

(Initials)

Part 4 – Measurement and Payment

4.1 Method. There will be no separate measurement for this section.

4.2 Basis. Quality control and quantity measurement shall be incidental to other specified work.

END OF SECTION

01500 – TEMPORARY FACILITIES AND CONTROLS

01511 – Temporary Electricity

1.1 Power is not available at any of the sites.

01515 – Temporary Water 1.1 There is potable water available at some sites, but not all. Contractor will be responsible for providing water at sites that do not have potable water available.

01516 – Temporary Sanitary Facilities

1.1 Contractor shall provide approved temporary sanitation facilities for workers on project site.

01530 – BARRIERS

Contractor will erect adequate barriers around all excavation sites for the protection of visitors who may be in the area.

01532 – TREE AND PLANT PROTECTION

Contractor shall make every effort to protect trees outside the construction limits as well as those identified as save trees. Construct protective barriers around save trees where necessary. Trees that are damaged shall be painted with tree wound dressing on all cuts and wounds.

01550 – ACCESS ROAD AND PARKING AREA

1.1

Access

Contractor shall be responsible for constructing, maintaining, and restoring access ways to and at the work site. If damage occurs to the existing roadways, as a result of the Contractor’s actions, the Contractor shall restore the roadways to the condition prior to the start of work.

1.2

Parking

Parking is available at the construction site at designated areas.

1.3

Camping

Industrial camping is allowed within the local area.

01551 – STORAGE OF MATERIALS

1.1 The Contractor will be allowed to store materials at the project site under construction. Coordinate the location of the storage area with the C.O.R. Materials subject to damage from the weather shall be adequately protected by the Contractor. The Contractor will be solely responsible for the loss of or damage to materials stored at the job site.

01700 – PROJECT CLOSEOUT

01710 – Cleaning 1.1 In addition to keeping trash around the work areas picked up daily, Contractor(s) shall pick up and remove all trash from in and around the work areas before final acceptance.

END OF SECTION

01800 – MEASUREMENT AND PAYMENT

Part 1 – General

1.1 Description – Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered incidental to and included in the payment of the pay items in the Schedule of Items.

When more than one class, size, or thickness is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the items to be bid.

1.2 Method of Measurement – The following methods of measurement are used to determine contract quantities for payment.

For individual construction items, longitudinal and lateral measurements for area computations will be made horizontally or corrected to horizontal measurement unless otherwise specified.

Structures will be measured according to neat lines shown on the Drawings or as altered by the Contracting Officer (CO) in writing to fit field conditions.

For items that are measured by the linear foot, such as water lines, etc., measurements will be made through the centerline of the pipes and fittings, unless otherwise shown on the Drawings.

1.3 Units of Measurements – Payment will be units defined and determined according to US Standard Measure and by the following:

a. Cubic Yard – A measurement computed by one of the following methods.

1. Excavation or Embankment – The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

2. Material in the Delivery Vehicle – The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

b. Each – One complete unit which may consist of one or more parts.

1.4 Payment – One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item.

a. Designed Quantities (DQ) – These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data includes the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units of the originally contemplated work will not be made unless authorized under one or more of the following conditions.

1. As a result of changes authorized by the Contracting Officer in the originally contemplated work. Minor changes to adjust balance points, etc. will not be considered changes in quantities.

2. As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities that cause a pay item to change by 10 percent or more.

3. As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine quantities that cause a pay item to change by 10 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

Final payment will be made for the designed quantities at the unit price shown in the Schedule of Items, subject to the Variation in Quantities Provision.

b. Actual Quantities (AQ) – These quantities are determined from measurements of completed work.

c. Vehicle Quantities (VQ) – These quantities are measured in hauling vehicles.

d. Lump Sum Quantities (LSQ) – These quantities denote one complete unit of work as required by or described in the contract, including, necessary materials, equipment, and labor to complete the job. They will not be measured.

END OF SECTION

DIVISION 2 – SITE WORK

02000 – Mobilization Part 1 – General

1.1 Description – This work shall consist of preparatory work and operations for the movement of personnel, equipment, supplies, and incidentals to the project sites, and all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project sites.

Part 2 – Products – Not used.

Part 3 – Execution – Not used.

Part 4 – Measurement and Payment

4.1 Method – The method of measurement, as described in Section 01800, will be designated in the Schedule of Items.

4.2 Basis – Mobilization will be paid for at the contract unit price for the item as shown in the Schedule of Items.

Progress payment will be made as follows:

a. When 5 percent of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.

b. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.

c. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.

The total of all payments, including bonding, shall not exceed the original contract amount for this item.

Payment will be made under:

Pay Item

Pay Unit 02000 Mobilization L.S.

END OF SECTION

02102 – Clearing and Grubbing

Part 1 – General

1.1 Contractor shall provide all labor, tools, and equipment necessary for removal of vegetation within the designated construction limits, as shown on the drawings or specified herein.

1.2 All excess excavation and clearing debris will be disposed in accordance with Section 02135.

Part 2 – Materials

None

Part 3 – Execution

3.1 This work shall consist of clearing, grubbing, trimming, removing, and disposing of or treatment construction slash and debris. This work shall also include preservation of vegetation and objects designated to remain from injury or defacement. See Section 01532 for Tree Protection.

a. Trees that are damaged outside the clearing shall be painted with tree wound dressing on all cuts and wounds.

3.2 All brush, roots, rotten wood, and other refuse from clearing and grubbing operation shall be disposed of in locations mentioned above.

Part 4 – Measurement and Payment

4.1 Measurement – There shall be no separate payment for work required under this section. Payment is incidental to and included in the payment of other items of work.

END OF SECTION

02120 - Removal and Disposal of Existing Vault Toilet Structure Part 1 - General

1.01 summary

1. This item shall consist of removal and disposal of all members and materials comprising an existing vault toilet structure at the locations designated in accordance with these specifications.

1.02 Method of Measurement

1. The quantity to be measured shall be the number of vault toilet structures removed and accepted. Measurement shall include native and/or imported select backfill.

Part 2 – Products

1.03 Select Backfill

1. Select backfill shall be native or imported soil, sand, or granular soil free of stones larger than 6 inches in greatest dimension.

PART 3 – EXECUTION

1.04 removal

1. The Contractor may use any means he may elect to remove the structure as long as he provides for the safety of the public and preservation of existing vegetation.

2. The concrete in existing vault foundation and floor shall be broken into sufficiently small pieces to enable handling and disposed of as directed.

1.05 Disposal

1. Unless specifically directed in writing, no attempt will be made to salvage for reuse any of the materials comprising the existing structure.

2. All wooden, concrete, and metal materials shall be removed from the site and disposed of at a State certified land fill.

3. The vault toilet waste shall be pumped by a commercial hauler with equipment for pumping and hauling human waste. Hauler shall have the necessary equipment to add water to the tank and break up solids in order to pump waste.

4. Disposal of vault waste shall be at any sewage treatment facility approved by the State Department of Health. The Contractor shall be responsible to obtain permission to dump the waste in the treatment facilities and pay any fees required.

1.06 Backfilling

1. After the elements of the existing toilet structure have been removed and disposed of, the remaining depression shall be backfilled. Backfilling shall not be done when the depression is saturated or flooded with water. Puddling methods of backfill consolidation will not be permitted.

2. Select backfill shall be placed within the remaining depression. The material shall be placed in layers not over six inches in depth and compacted by means of a vibratory compactor so as to minimize settlement. The area shall be backfilled in such a manner until the area is brought up to the level of the natural ground.

1.07 Finishing and Cleanup

1. After the area has been backfilled, the disturbed area shall be finish graded to present a natural appearance and cleaned up by removing all debris and materials left from the removal of the toilet structures.

Part 4 – Measurement and Payment

4.1 Measurement – The method of measurement described in Section 01800, will be designated in the Schedule of Items.

4.2 Payment – The accepted quantities will be paid for at the contract unit price for each pay item shown in the Schedule of Items.

02111 Removal and Disposal of Existing Vault Toilet Structure EA.

END OF SECTION

02130 – Earthwork for Toilet Installation Part 1 - General

1.1 RELATED WORK IN OTHER SECTIONS

A. Vault Toilet Construction and Installation Section 13000

1.2 CODES AND REGULATIONS

A. All work shall comply with the rules and regulations of Federal, State, and local agencies having jurisdiction.

1.3 REFERENCE POINTS

A. Maintain all bench marks, monuments, and other reference points. If disturbed or destroyed, replace as directed by the COR

1.4 DESCRIPTION OF WORK

A. Excavation and backfill required in conjunction with vault toilets, culverts, and minor structures is included as work of this section.

B. “Excavation” consists of removal of material encountered to subgrade elevations indicated and subsequent disposal of materials removed.

1.5 USE OF EXPLOSIVES

A. Do not bring explosives onto the site or use in work without prior written permission from COR.

B. Contractor is solely responsible for handling, storage, and use of explosive materials when their use is permitted.

PART 2 PRODUCTS

2.1 FILL MATERIAL

A. Common fill material shall consist of aggregates or soils free of rocks over 10 inches diameter, refuse, or decomposing materials (such as stumps or limbs, brush, etc.) which can be compacted effectively. All fill material should be approved by the COR prior to placement.

B. Bedding material shall consist of fine soil or sand without stone, dirt clods, or other material larger than 3/4” in any dimension, or commercially available crushed aggregate with all material passing a 3/4” sieve.

C. Backfill shall consist of any special materials shown on plans. If no special materials are designated, backfill shall consist of aggregates or soils free of rocks over 3” in diameter, refuse, or decomposing materials (such as stumps, limbs, brush, etc.) which can be compacted effectively. Backfill material shall be approved by COR prior to placement.

PART 3 EXECUTION

3.1 EXCAVATION

A. Earth excavation includes excavation of pavements and other obstructions visible on ground surface; underground structures, utilities and other items indicated to be demolished and removed; together with excavation to sub-grade elevation indicated, regardless of character of material or obstruction encountered.

B. Excavation for Structures:

1. Make excavation to dimensions and elevations indicated on drawings and extending a sufficient distance from footings and foundations to permit placing and removal of form work, installation of services, other construction, and for inspection.

2. While excavating for footings and foundations, take care not to disturb bottom of excavation.

3. Trim bottoms to required lines and grades to leave solid base to receive other work.

4. Excavation for on-grade slabs shall be sufficient to allow for fills and bases as indicated.

D. Excavation for culverts and other minor structures.

1. Excavate trench deep enough to accommodate culvert or structure plus any bedding materials and cover depth shown on plans.

2. Excavation shall be at least as wide as the culvert or structure plus 2 feet.

3. Excavation shall have smooth regular bottom graded to drain at slope and in direction shown on plans.

3.2 PLACEMENT OF COMMON FILLS

A. All areas to receive fills shall be scarified to a depth of 6 inches and moisture conditioned as required to obtain compaction.

B. Bring all fills to suitable elevations above grade to provide for anticipated settlement and shrinkage thereof.

C. Place materials in maximum 12” loose lifts and compact as specified in Section 3.5

3.3 PLACEMENT OF BACKFILL

A. Fill around culverts or minor structures shall be placed in maximum 8” loose lifts and compacted as specified in Section 3.5.

3.4 COMPACTION

A. Perform all compaction using compacting rollers, pneumatic or vibratory compactors, or other equipment and methods approved by the COR.

B. Compact soil to not less than the following percentages of maximum density for soils which exhibit a well-defined moisture density relationship (cohesive soils) determined in accordance with ASTM D 1557; and not less than the following percentages of relative density determined in accordance with ASTM D 2049, for soils which will not exhibit a well-defined moisture-density relationship.

1. Building Slabs and Steps, Pavements, Culverts, & Minor Structures

a. Compact top 12” of subgrade and each layer of back fill or fill material at 90 percent maximum density for cohesive material or 95 percent relative density for cohesion-less material.

2. Vegetated Areas

a. Compact top 6” of sub-grade and each layer of backfill or fill material at 85 percent maximum density for cohesive soils and 90 percent relative density or cohesion-less soils.

3. Walkways and Roadbeds

a. Compact top 6” of sub-grade and each layer of backfill or fill material to at least

90 percent of maximum density for cohesive material or 95 percent of relative density for cohesion-less material.

4. Trench

a. Machine or hand compacting will be allowed except where hand compaction is specifically noted.

b. Place bedding material and other select material in 6-inch loose lifts. Other material shall be placed in maximum 8 inch loose lifts.

c. Machine compaction: Minimum of two passes with a whacker-type mechanical compactor or equivalent approved by COR.

d. Hand compaction: One pass over entire area with the following or equivalent approved by the COR.

1. Hand tamper weighing minimum of 8 pounds.

2. Maximum area of tamping foot-40 square inches.

3. Minimum gravity free-fall of tamper – 12 inches.

e. Maintain adequate moisture content in backfill and bedding material to ensure optimum densities of compacted material.

C. Where sub-grade or layer of soil material must be moisture conditioned before compaction, uniformly apply water to surface of sub-grade, or layer of soil material, to prevent free water appearing on surface during or subsequent to compaction operations.

3.6 GRADING

A. All areas covered by the project, including excavated and filled areas and adjacent transition areas, shall be reasonably smooth, compacted, and free from irregular surface drainage.

B. Deviations from elevations shown on plans shall be uniform in the direction of change for a distance of 201 feet and shall not exceed 0.30 foot.

C. Ditches, gutters, and swales shall be finished to provide surface drainage as shown on the Plans.

D. Slope grade away from structures 4 inches in 10 feet unless otherwise indicated.

3.7 TESTING

A. Field testing to determine in-place densities will be performed by the COR in accordance with AASHTO T205-64 or T238-76I and T239-76I.

B. Each compacted layer of backfill must be inspected by COR.

Part 4 – Measurement and Payment

4.1 There shall be no separate payment for work required under this section. Payment is incidental to and included in the payment of other items of work.

END OF SECTION

02135 – Waste Material Disposal Part 1 – General

1.1 This item shall consist of the loading, handling, transporting, and placing of excess excavation material and clearing debris. The waste disposal area shall be designated by the Contracting Officer. Disposal sites will be designated for each site.

Part 2 – Products (Not Applicable)

Part 3 – Execution

3.1 All excavated material not used in the construction of embankments, backfilling of trenches, or other specified areas within the project limits, along with clearing debris and other refuse generated, shall be hauled to the designated disposal area. After this material has been hauled to the disposal area, the piled material shall be buried and covered with soil to a uniform depth of 18 inches minimum and sloped to 2:1 or flatter. The size and shape of the piled waste material shall be designated by the C.O.R. The disposal area shall be seeded in accordance with Item 02801 - Seeding.

Part 4 – Measurement and Payment

4.1 There shall be no separate payment for work required under this section. Payment is incidental to and included in the payment of other items of work.

END OF SECTION

02222 – Structural Excavation, Backfill, and Compaction

Part 1 - General

1.1 Contractor shall provide all labor, tools, and equipment necessary to excavate for the backfill and compaction under slabs.

1.2 All surplus excavation shall be disposed of in accordance with Section 02135 or as designated by the C.O.R.

1.3 Contractor shall remove all unsuitable material under the slab including materials not meeting compaction requirements below and backfill with suitable material.

1.4 Contractor shall supply any additional suitable backfill and/or topsoil necessary.

Borrow material will be conserved from campground excavation or from sites designated by the C.O.R.

Part 2 – Materials

2.1 Remove the upper four to eight inches of topsoil from the area to be occupied by the buildings and stockpile in location approved by the C.O.R.

2.2 Fill Material

a. The material for the interior and exterior fills shall consist of a mixture of soil, gravel, disintegrated granite, or other suitable material.

b. The material shall be free from organic vegetative matter.

c. The maximum size of any particle shall not be greater than three inches in diameter.

d. Oversize material may either be removed or broken down to the specified dimensions by any method which accomplishes reduction to that size.

e. The removal or the breakdown of oversize material to the specified size shall be done at the material source.

f. Contractor shall furnish any additional suitable material to backfill under the slab and shape around the finished structure and the stockpiled topsoil can be reused.

g. Crushed aggregate, 3/4-inch minus.

Part 3 – Execution

3.1 Strip all vegetation and deposit large material as specified in Section 02102. The upper four to eight inches of the topsoil from the area to be occupied by the building shall be stockpiled near the construction site for use in final grading.

3.2 The Contractor shall supply all additional fill material suitable for backfill under the slab and to shape around the finished structure as shown on the drawings.

3.3 Excavation shall produce surfaces to line and grade shown on drawings. All excavated areas shall drain when weather is such that water may collect in holes and ditches.

3.4 The root structure of all existing trees that are to remain shall not be disturbed. No excavated or fill material shall be piled under the drip line of any trees.

3.5 Exterior fills shall be constructed to sections and elevations indicated or as stated in paragraph 2.2 above. Exterior fills shall drain.

3.6 Compacted earth fills under concrete slabs and footings, shall be placed in approximately six-inch lifts, and be compacted to a uniform density of not less than 95 percent of maximum determined by ASTM D-698. (Recommend use of one-inch minus crushed aggregate around tanks and up under slab for ease of compaction.)

3.7 Backfill around structures and supports shall be done in eight-inch lifts and compacted to 90 percent of maximum density as determined by AASHTO T99, Method C or D.

3.8 Density tests of compacted material will be in accordance with ASTM D-1556 or ASTM D-2922.

3.9 When all exterior earthwork is completed, the Contractor shall give the entire site a final dressing to assure that all surfaces are in accordance with the elevations indicated on the drawings.

a. Finish grades adjacent to the building shall be sloped to provide surface drainage away from the building walls in all directions.

b. Use the topsoil previously stripped from the site for the upper layer of fill for finish grades.

c. Rake and shape the backfill and prepare site for seeding.

Part 4 – Measurement and Payment

4.1 There shall be no separate payment for work required under this section. Payment is incidental to and included in the payment of other items of work.

END OF SECTION

02229 – Path and Aggregate Aprons

Part 1 – General

1.1 Construction of all paths, aggregate pad and aggregate aprons shall be as shown on drawings, staked on the ground, and described in the Specifications. Aggregate aprons include aprons around tables, firerings and toilet buildings. Includes furnishing all labor, equipment, tools and services necessary for the completion of this work.

1.2 Related Specifications – Section 02611 Crushed Aggregate.

Part 2 – Products

2.1 Aggregate for path construction ¾ - inch minus from a commercial source.

Part 3 – Execution

3.1 Clearing and Grubbing – Clearing and grubbing shall be in accordance with Section 02102 and in addition, all organic materials over ½ inch shall be removed. Care shall be taken to remain within clearing limits so as not to damage or destroy vegetation outside the clearing limits.

Measurement – The method of measurement, described in Section 01800, will be designated in the Schedule of Items.

4.2 Payment – The accepted quantities will be paid for at the contract unit price for each pay item shown in the Schedule of Items.

02229

Path Construction . . . . . . . . . . . . . L.F.

END OF SECTION

02540 – Erosion Control Part 1 – General

1.1 The Contractor shall provide all labor, equipment, and materials necessary to comply with State and local laws for the prevention of soil erosion and water pollution.

Part 2 – Materials

2.1 Silt Fence

Part 3 – Execution

3.1 Before excavation can proceed, the Contractor shall install silt fence as needed in a “U” shape along the low side of the site and up the sides of the site to prevent material from washing across any service loops and into drainages.

a. Silt fencing shall be installed according to the manufacturer’s recommendations.

b. All ditches shall have silt fences staked in place as ditch checks to prevent siltation of undisturbed areas and the creek.

3.2 All cut banks and fill slopes shall be prepared and seeded upon their completion. Notify C.O.R. when areas are prepared for seeding.

3.3 At the completion of the contract, if the area has not stabilized, the silt barriers may be left in place or a portion of it. Contractor shall make any needed repairs or alterations to the barrier before final acceptance.

Part 4 – Measurement and Payment

4.1 There shall be no separate payment for work required under this section. Payment is incidental to and included in the payment of other items of work.

END OF SECTION

02611 – Crushed Aggregate Part 1 – General

1.1 Contractor shall provide labor, materials, and equipment necessary for hauling and placement of crushed aggregate around picnic tables, campfire rings, around existing vault toilets and paths.

Part 2 – Materials

2.2 Contractor shall provide ¾ - inch crushed aggregate material from a commercial source.

Part 3 – Execution

3.1 Aggregate shall be moistened or dried to uniform moisture content suitable for compaction.

3.2 The aggregate shall be spread in a uniform layer, with no segregation of size, and to a loose depth that shall have the required thickness when compacted.

3.3 Aggregate shall compacted using a hand held compactor for pathways and adjacent to vault toilets, campfire rings and picnic tables. Compaction equipment shall be operated over the full width of each layer until visual displacement ceases, but not less than three complete passes.

Part 4 – Measurement and Payment

4.1 There shall be no separate payment for work required under this section. Payment is incidental to and included in the payment of other items of work.

END OF SECTION

02762 – Campfire Rings

Part 1 – General

1.1 Contractor shall supply all labor, materials, tools and equipment to remove and dispose of existing fire rings and install the new campfire rings.

Part 2 – Materials

2.1 Metal Fire Ring, as manufactured by Pilot Rock Model No. FS/DW-30/18/TB will be provided by the Government. The contractor will be responsible for transporting the firerings from Cummings Lot in Orofino, Idaho to the job site.

2.2 Aggregate for gravel pad.

2.3 Concrete for footing. Concrete shall be prepackaged concrete mix or job mix subject to approval by the COR. Proportion job mix dry ingredients by volume in the following ration:

1. Cement:

3 parts.

2. Sand:

5 parts.

3. Coarse aggregate:

7 parts.

Add water to obtain a slump of 3 to 6 inches.

Part 3 – Execution

3.1 Locations where fire rings shall be placed will be staked by the C.O.R.

3.2 Install as shown on the drawings and recommended by the manufacturer.

Part 4 – Measurement and Payment

4.1 Measurement – The method of measurement, described in Section 01800, will be designated in the Schedule of Items.

4.2 Payment – The accepted quantities will be paid for at the contract unit price for each pay item shown in the Schedule of Items.

02762

Fire Ring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA

END OF SECTION

02763 – Bulletin Board

Part 1 – General

1.1 Contractor shall supply all labor, materials, tools and equipment to remove and dispose of existing bulletin boards and install new bulletin boards. The contractor will be responsible for transporting the bulletin boards, hardware and posts from Cummings Lot in Orofino, Idaho to the job site.

Part 2 – Materials

2.1 Bulletin boards furnished by the government.

2.2 6” x 6” pressure treated posts furnished by the government.

2.2 Lag bolts and screws furnished by the government.

2.3 Miscellaneous fasteners and wooden trim to complete the bulletin board installation.

Part 3 – Execution

3.1 Locations where bulletin boards shall be placed will be staked by the C.O.R.

1.2 Complete clearing and grubbing in accordance with section 02102.

1.3 Install post and bulletin boards members plumb and level.

Part 4 – Measurement and Payment

4.1 Measurement – The method of measurement, described in Section 01800, will be designated in the Schedule of Items.

4.2 Payment – The accepted quantities will be paid for at the contract unit price for each pay item shown in the Schedule of Items.

02763

Bulletin Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA

END OF SECTION

02873 – Hitch Rails

Part 1 – General

1.1 Contractor shall supply all labor, materials, tools and equipment to remove and dispose of existing hitch rails and construct new hitch rails.

Part 2 – Materials

2.1 8” x 8” x 8’ pressure treated post. Wood posts shall be coastal region Doublas-fir, WWPA No. 1 or better, full sawn. After fabrication, all timber shall be incised and pressure treated with water borne preservative in accordance with AWPA C-2 for soil contact. See drawings for chamfering and pre-drilled holes required.

2.2 3” black iron pipe.

2.2 Aggregate for surfacing. See section 02229.

2.3 Concrete for anchoring around post. Concrete shall be prepackaged concrete mix or job mix subject to approval by the COR. Proportion job mix dry ingredients by volume in the following ration:

2. Cement:

3 parts.

3. Sand:

5 parts.

4. Coarse aggregate:

7 parts.

Add water to obtain a slump of 3 to 6 inches.

Part 3 – Execution

3.1 Locations where hitch rails shall be placed will be staked by the C.O.R.

4.2 Complete clearing and grubbing in accordance with section 02102.

4.3 Gravel surfacing shall be compacted by three passes with a mechanical compactor capable of delivering a compactive effort of at least 18,000 ft. – lb. per minute.

4.4 Grading: Finish grade to provide a uniform surface.

4.5 Drainage: Construct gravel pad with a 2 percent cross-slope for drainage.

4.6 Install post and pipe members plumb and level. Tighten all pipe connections.

Part 4 – Measurement and Payment

4.1 Measurement – The method of measurement, described in Section 01800, will be designated in the Schedule of Items.

4.2 Payment – The accepted quantities will be paid for at the contract unit price for each pay item shown in the Schedule of Items.

02873

Hitch Rail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA

END OF SECTION

DIVISION 3 – CONCRETE

03313 – READY-MIX CONCRETE

Description a.

This section specifies concrete to be used for construction of the thrust blocks and small slabs. This specification will apply to the toilet slabs developed at the entrances of designated toilets.

Suppliers

Ready-mix concrete shall be supplied by a firm regularly engaged in the business.

1.3 Mix Design

Proportion the cement, aggregate, and water to obtain concrete with good workability.

b.

Minimum cement content: 6.5 sacks per cubic yard.

c.

Maximum water-cement ratio: 5.5 gallons per sack.

d.

Slump: 2 to 4 inches by ASTM C143-74.

e.

Air content: 3.5 to 6.5 percent by ASTM C231-75.

f.

Cement content: Tolerance from mix design of + 0.3 sack per cubic yard by ASTM C138-75.

g.

Strength: 3,500 psi minimum.

1.4 Batch Certification

Furnish with each load of concrete, a batch certificate containing all of the information shown on the example included at the end of this section.

Part 2 – Products

2.1 Cement

ASTM C150-76A Type II or IIA.

2.2 Aggregate

ASTM C33-74a with designated size of coarse aggregate No. 67 (3/4 inch to No. 4).

2.3 Water

Potable.

2.4 Admixtures

Air-entraining, ASTM C260-74, such as but not limited to “Protex”, “Darex”, “MB-VR”, “Castle-VR”, or “ADZ-Air”.

Admixtures other than air-entraining not permitted.

Hot Weather Concrete

The temperature of the concrete shall not exceed 80ºF. at time of placement, and when the ambient temperature reaches 90ºF., the concrete shall be protected with moist covering or other methods approved by the C.O.R.

Water, aggregate, and cement shall be protected or cooled as necessary. Ice may be used as part of the mixing water; however, the ice shall be completely melted by the time mixing is completed.

3.2 Mixing and Delivery

ASTM C94-74a, Sections 10.6 through 10.9, with the following additions:

1.

Adjust the quantities of aggregate and water to compensate for differences from the saturated surface-dry condition.

2.

Discharge concrete within 1-1/2 hours or before 300 revolutions of the drum after introduction of the mixing water to the cement and aggregates or introduction of the cement to the aggregates. If the ambient air temperature is above 80ºF., the above limits shall be 1 hour or 200 revolutions.

3.

If long hauling distance dos not permit meeting the requirements above, add cement and water to the truck mixer at the construction site.

3.3 Placing

C.O.R. must inspect forms before any concrete is placed. Notify C.O.R. at least 24 hours before any placement to permit inspection.

Roughen existing concrete surfaces.

Forms shall be free of debris, and surface shall be clean, free of frost, ice mud, and water.

Avoid segregation. Place in layers and begin placing at corners of structure. Do not move concrete with vibrators or tampers.

e.

Thoroughly work the external surface of the concrete with tools approved by the C.O.R. to force coarse aggregate from the surface and to bring mortar against the forms to produce a smooth finish, substantially free from water or air pocket or honeycomb.

Vibrating

Consolidate the concrete with suitable mechanical vibrators operating within the concrete.

Supplement vibrating by hand spading with suitable tools.

Vibrators shall be of a type and design approved by the C.O.R. and shall be so manipulated as to work the concrete thoroughly around the reinforcement and embedded fixtures and into the corners and angles of the forms.

Vibrate at any point sufficiently to accomplish compaction, but do not prolong to a point where segregation occurs.

3.5 Finishing

Slabs – Strike flush to within 1/8-inch variation in 10 feet. Lightly broom exterior slabs.

3.6 Curing and Hardening

Keep all concrete surfaces wet for 7 days after being placed. Acceptable methods include ponding, wet burlap, wet straw or hay, curing paper, plastic sheets, and membrane curing compound. Other methods must be approved by the C.O.R.

If wood forms are allowed to remain in place during the curing period, they shall be kept moist at all times to prevent opening at joints.

03313

Toilet Pad …………. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA

END OF SECTION

03200 – CONCRETE REINFORCEMENT

Description

This section specifies furnishing and installing concrete reinforcement.

Related Work Specified Elsewhere

Ready-Mix Concrete – Section 03313

Part 2 – Materials

Steel Reinforcing

ASTM A615-75, grade 40, unless other grades are shown on the drawings.

All reinforcement shall be new, free from dirt, oil, paint, grease, loose mill scale, and loose or thick rust when placed.

Store on blocks or other supports to prevent bending, rusting, and accumulation of dirt or soil. Bundle and tag reinforcement with grades and suitable identification marks for checking, sorting, and placing. Tags and marks shall be waterproof, and left on the steel until it is placed.

Installation

Install reinforcement as shown on the drawings and specified herein.

Reinforcing details not shown on the drawings or specified, shall meet the requirements of the latest edition of the ACI Code.

Placing

Accurately place and adequately support reinforcement with concrete, metal or other chairs, spacers, or ties approved by the C.O.R. and secure against displacement within the permitted tolerances.

There shall be no separate payment for work required under this section. Payment is incidental to and included in the payment of other items of work.

END OF SECTION

DIVISION 5 - METALS

05500 - METAL FABRICATION

05503 - Miscellaneous Metals and Fasteners

Part 1 - General

Contractor shall supply all labor, materials, and equipment to fabricate structural steel angles, brackets and fasteners as shown on the drawings.

Part 2 -Materials

Fabricated metals shall be constructed using A-36 steel.

2.2

Anchor bolts and screws shall be as shown on the drawings.

Bolts shall comply with ASTM-A807 and include nuts and lock washers for the building.

2.4

Painting shall be as stated in Division 9 - shop coat, prime and finish.

Part 3 - Installation

All items shall be primed and receive two coats of paint before installation (see

Section 09910).

Install as shown on plans. Tighten all bolts so they cannot be removed by hand.

3.3

Bolts sticking beyond the nuts more than 1/4 inch into the traffic way shall be cut off and the ends filed smooth.

Contractor shall verify dimensions before fabricating any metals needed in this project.

Part 4 - Measurement and Payment

4.1

There shall be no separate payment for work required under this section. Payment is incidental to and included in the payment of other items of work.

END OF SECTION

DIVISION 9 - FINISHES

09900 - PAINTING

09910 - Exterior Painting

Part 1 - General

Contractor shall supply all labor, materials, tools and equipment to paint and stain fabricated metal and wood.

Part 2 - Materials

Galvanized metal and aluminum primer shall be Galvinoleum #3202 Undercoat, or equal, as manufactured by Rust-Oleum Corporation, 2302 Oakton Street, Evanston, IL 60204.

2.2

Prime all steel with two coats of #769 Damp-Proof Red Primer by Rust-Oleum, or equal.

Finish coat for all exterior metals.

2.4

Unit Post Stain.

2.5

Table Stain, color "Lodge Brown" or an approved equal by the C.O.R.

Part 3 - Installation

Remove all rust, dirt and oils from metals before priming.

3.2

Prime all fabricated metals before installation.

3.3

Apply two finish coats to all metals primed as above.

3.4

Follow all guidelines for paint application per manufacturer's recommendations.

3.5

All wood surfaces on unit posts and tables shall be stained with (2) two coats of exterior stain or approved equal. The color shall be "Lodge Brown" or an approved equal by the C.O.R.

There shall be no separate payment for work required under this section. Payment is incidental to and included in the payment of other items of work.

END OF SECTION

09910 – Concrete Toilet Rehabilitation Part I - General

1.1 Provide best quality grade of various types of coatings as regularly manufactured by accesptable paint materials manufacturers. Material not diplaying manufacturer’s identification as a standard, best-grade product will not be acceptable.

1.2 Concrete vaults were manufactured by Missoula Concrete Construction, P.O. Box 3326, Missoula, MT 59806, Phone 406-549-9682, or CXT Precast Products…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .