Addendum_to_FAR_52(rev1).doc
DOC document 46 KB Posted
- Attached to
- Boise NF - Road Blading Federal contract opportunity
- Solicitation number
- AG-82B1-S-09-0061
About this file
ammendment 001 - Revised 52.212-1 addendum
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW(rev1).doc | DOC document | |
| Amend001_RSB.pdf | ||
| Addendum to FAR 52.doc | DOC document | |
| Exhibit A_sample_list_roads.doc | DOC document | |
| SOW.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum to FAR 52.212-1 Instructions to Offerors—Commercial A. Offerors are required to submit proposals in 3 volumes and shall be in the format provided in this addendum, failure to submit proposals in the required format may render the proposal “non-responsive” and may not be considered for award. Each Volume shall be separated within the proposal package and should not be a continuation of the previous Volume. Proposals can be issued on offeror’s letterhead and must include the solicitation number. Proposals that exceed page restrictions may not be considered for award; a cover page and summary may be included and do not count against page restrictions.
1. Volume I, Technical Approach (25 page maximum)
a. Volume I shall contain 2 sections; Section A – Technical Approach and Section B – Quality Control
b. Volume I - Section A, Technical Approach, shall contain the following information:
Technical Approach: Describe your proposed approach in meeting the objectives identified in the Statement of Work.
Contractor Operations
1. Equipment: Describe your equipment, including the make, model, year of manufacture, capabilities, accessories, and specifications. Include moldboard width, front blade, ripper, and other attachments. Describe any down time your equipment has experienced and the measures you take to get the equipment operational again.
2. Method of Performance: Briefly describe your method(s) of meeting the road blading requirements.
3. Describe your ability to be able to accomplish the potential large amount of road mileage.
4. Safety: Outline the precautions taken that will be utilized for the safety of the operator(s) and other users of the roadway and describe the safety features on the blading equipment.
5. Experience of Operator(s): Identify the equipment operator(s) and the percentage of time each will be assigned to perform this project, if there is more than one operator. Describe their experience related specifically to this type of work.
c. Volume I - Section B, Quality Control Shall contain the following information:
Quality Control: Describe your method of self-inspection and means of insuring that all contract specifications are met without repeated rework and without reliance upon Government inspections.
CONTRACTOR QUALITY CONTROL PLAN. In accordance with FAR 52.246-4 Inspection of Services -- Fixed-Price (b), the Contractor shall identify the quality control inspection system it will use to ensure that contract performance specifications will be achieved. This Quality Control Plan shall be used by the contractor to monitor its performance and at no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.
QUALITY ASSURANCE PLAN/REQUIREMENTS and DISINCENTIVES: The Contractor shall provide a Quality Control Plan that will ensure that the work is being performed in a manner that will meet the objectives of the contract. The Government will, at its convenience, make periodic inspections of the work to assure itself of contract compliance.
(a) - Contractor Quality Control Inspection. The Contractor shall ensure that performance meets contract specifications in accordance with the Quality Control Plan, prior to requesting the Government to inspect for payment or acceptance.
(b) - Request for Government Inspection: Upon completion of a road, or segment of road not less than 5 miles in length, the Contractor shall contact the Contracting Officer's Representative (COR) to set a mutually agreed upon date for inspection of completed work.
2. Volume II, Past Performance (15 Page maximum)
a. Volume II shall contain your record of past performance. List similar contracts performed in the last 5 years. Include details of the size and location of the contracts and provide names and phone numbers of the Contracting Officer for each. If problems were encountered on any of these contracts, you may identify them and the corrective measures taken to prevent a reoccurrence. Past performance information should demonstrate a history of quality work, timely completion, and the firm’s and proposed operator’s commitment to customer satisfaction.
b. Offerors are encouraged to submit at least 3 records of past performance and shall not submit more than 10. Past performance records must be recent (within the last 5 years) and relevant (similar to the proposed work to be performed).
3. Volume II, Price (1 page maximum)
a. Volume III shall contain your proposed price per mile. The USFS intends to award a single firm-fixed price requirements contract for road blading based upon an established price per mile. Offerors shall propose a set price per mile which will provide the basis for the price evaluation in determining the offeror whose proposal demonstrates the over best value. Upon contract award, individual orders for road blading will be issued at the fixed price proposed by the winning offer.
b. Method of Measurement: Roadside blading will be measured in miles and nearest tenths of miles along the road centerline of the roadway, and shall include only those sections of the roads which are included in the contract and completed in accordance with the specifications. Parking areas, turnouts, and approach road connections are considered as adjuncts to the main roads and shall not be measured separately.
c. The ordering period for the resulting contract will be from the date of award through 30 September 2010. The period of performance of this contract will be based upon the work being ordered and will be stated in each task order. It is anticipated that blading will occur between June and November. Contract time will be allowed on the basis of five miles per calendar day.
d. Price proposals shall be submitted as a fixed price per mile in the following format inclusive of all costs, profit, overhead, etc. associated with the effort:
| CLIN |
| DESCRIPTION |
| UNIT of MEASURE |
| UNIT |
PRICE
(Price per mile)
| 0001 |
| Road Blading without water |
| Mile |
| $_____________ |
| Road Blading with water |
| Mile |
File details come from the government source that posted it. Updated .