Project_Specifications.doc

DOC document 1 MB Posted

Attached to
RECOVERY - Smith & Condon Culvert Replacements - Flathead NF Federal contract opportunity
Solicitation number
AG-82B1-S-09-0036
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

project specifications

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - Smith & Condon Culvert Replacements - Flathead NF, newest first.
File Type Posted
SF 30 Amendment 1.pdf PDF
Smith Bridge Sheet Page 9.pdf PDF
Condon Bridge Sheet 9.pdf PDF
SF1442.PDF PDF
Condon Final_6-12-09signed.dwf DWF file
food_order.doc DOC document
Smith FINAL_6-12-09.dwf DWF file
Wage Determination.doc DOC document
AG-82B1-S-09-0036.pdf PDF
Condon Final_6-12-09.dwf DWF file
Smith FINAL_6-12-09signed.dwf DWF file
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Smith & Condon Creek Culvert Replacements

Project Specifications for Construction of Roads

Smith & Condon Creek Culvert Replacements Project Specifications for Construction of Roads

Table of Contents

2Section 101—Abbreviations, Acronyms, & Terms

7Section 102—Definitions

13Section 103—Intent of Contract

14Section 104—Maintenance for Traffic

15Section 105—Control of Materials

17Section 106—Measurement & Payment

21Section 161—Certification for Quality & Quantity

22Section 201—Clearing & Grubbing

23Section 202—Removal of Structures & Obstructions

25Section 203—Excavation, Embankment, & Haul

33Section 204—Soil Erosion & Water Pollution Control

36Section 206—Structural Excavation for Major Structures

40Section 251—Riprap

42Section 260—Cellular Confinement System

44Section 304—Aggregate Base or Surface Course

46Section 552—Structural Concrete

69Section 553—Prestressed Concrete

79Section 553A—Precast Concrete Structures

81Section 554—Reinforcing Steel

84Section 601—Mobilization

85Section 603—Metal Pipe

88Section 625—Seeding and Mulching

91Section 633—Signs

92Section 637—Equipment Rental

93Section 701—Cement, Grout, & Mortar

96Section 703—Aggregate

97Section 704—Soil

98Section 705—Rock

100Section 707—Metal Pipe

102Section 709—Reinforcing Steel & Wire Rope

104Section 711—Concrete Curing Material & Admixtures

105Section 713—Roadside Improvement Material

108Section 714—Geotextile, Geocomposite Drain Material, & Geogrids

113Section 717—Structural Metal

115Section 718—Traffic Signing & Marking Material

117Section 725—Miscellaneous Material

119Section 726—Geocell

(July, 2009)

Section 101—Abbreviations, Acronyms, & Terms

101.01 Terms, Organizations, & Standards

These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject, “the Contractor,” is implied. Also implied in this language is “shall,” “shall be,” or similar words and phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project.

Wherever “directed,” “required,” “prescribed,” or similar words are used, the “direction,” “requirement,” or “order” of the Contracting Officer (CO) is intended. Similarly, wherever “approved,” “acceptable,” “suitable,” “satisfactory,” or similar words are used, they mean “approved by,” “acceptable to,” or “satisfactory to” the CO.

The word “will” generally pertains to decisions or actions of the CO.

Whenever in these specifications, or in other contract documents, the following terms (or pronouns in place of them) are used, the intent and meaning shall be interpreted as follows: reference to a specific standard, test, testing method, or specification shall mean the latest published edition or amendment that is in effect at the solicitation issue date for Public Works Contracts or the sale advertisement date for Timber Sale Contracts.

These specifications are divided into the following divisions:

· Division 100 consists of general specifications for which no direct payment is made.

· Division 150 consists of engineering requirements. Work under this division is paid for directly when there is a PAY ITEM IN THE SCHEDULE OF ITEMS. When there is no PAY ITEM IN THE SCHEDULE OF ITEMS, no direct payment is made.

· Divisions 200–600 consist of construction contract requirements for specific items of work. Work under these divisions is paid for directly or indirectly according to Section 106 and the section for ordering the work when there is a PAY ITEM IN THE SCHEDULE OF ITEMS.

· Division 700 contains the material requirements for Divisions 200–600. No direct payment is made under Division 700. Payment for material is included as part of the work required in Divisions 200–600.

(a) Acronyms. The following acronyms are used in these specifications:

AA
Aluminum Association
AASHTO
American Association of State Highway and Transportation Officials
ACI
American Concrete Institute
ADA
Americans With Disabilities Act
AGC
Associated General Contractors of America
AI
Asphalt Institute
AISC
American Institute of Steel Construction
AITC
American Institute of Timber Construction
ALSC
American Lumber Standards Committee
ANSI
American National Standards Institute
APA
American Plywood Association
ARTBA
American Road and Transportation Builders Association
ASTM
American Society for Testing and Material
AWPA
American Wood Preservers Association
AWS
American Welding Society
AWWA
American Water Works Association
CFR
Code of Federal Regulations
CRSI
Concrete Reinforcing Steel Institute
DEMA
Diesel Engine Manufacturers Association
DOT
U.S. Department of Transportation
EPA
Environmental Protection Agency
FAR
Federal Acquisition Regulation
FHWA
Federal Highway Administration
FLH
Federal Lands Highway (Federal Highway Administration)
FPL
Forest Products Laboratory
FSS
Federal Specifications and Standards
ICRI
International Concrete Repair Institute
ISSA
International Slurry Surfacing Association
MIL
Military Specification(s)
MSHA
Mine Safety and Health Administration
MUTCD
Manual on Uniform Traffic Control Devices
NBS
National Bureau of Standards
OSHA
Occupational Safety and Health Administration
PCI
Prestressed Concrete Institute
PTI
Post-Tensioning Institute
SI
International System of Units
SSPC
Steel Structures Painting Council
SSPC
Steel Structures Painting Council
USN
United States Navy
WCLIB
West Coast Lumber Inspection Bureau
WWPA
Western Wood Products Association
WWPI
Western Wood Preservation Institute

(b) System of International Units (SI) Symbols.

(c) SI Prefix Symbols.

(d) Slope Notation (horizontal : vertical). Express the slope as the ratio of a number of units horizontal to one unit vertical.

101.02 Abbreviations & Symbols

ABS
Acrylonitrile-butadiene-styrene
ACA
Ammoniacal copper arsenate
ACZA
Ammoniacal copper zinc arsenate
Agg
Aggregate
Al
Aluminum
AOS
Apparent opening size
AQ
Actual quantities
AQL
Acceptable Quality Level
BMP
Best Management Practice
CAPWAP
Case pile wave analysis program
CCA
Chromated copper arsenate
CMP
Corrugated metal pipe
CMPA
Corrugated metal pipe arch
CO
Contracting Officer
CPF
Composite pay factor
CSP
Corrugated steel pipe
CSPA
Corrugated steel pipe arch
CTB
Cement-treated base
CY
Cubic Yard

Cubic

CY MI
Cubic Yard Mile
DAR
Durability Absorption Ratio
Dia
Diameter
DQ
Designed quantities
DTI
Direct tension indicator
Dwgs
Drawings
EA
Each
FM
Fineness modulus
Ft
Foot
GAL
Gallon
GFM
Government-furnished materials
Gr
Grade
Ht
Height
ha
Hectare
HDO
High-density overlay
HDPE
High-density polyethylene
hr
Hour
Hor
Horizontal
HSLA
High-strength low-alloy
In
Inch
kg
Kilogram
kL
Kiloliter
kL km
Kiloliter kilometer
km
Kilometer
L
Length
l
Liter
Lbs
pounds
LF
Linear Foot
LS
Lump Sum
LSL
Lower specification limit
m
Meter
m2
Square meter
m3
Cubic Yard
m3 km
Cubic Yard kilometer
Matl
Material
max.
Maximum
Mbf
Thousand board feet
Mi
Mile
MFBM
One thousand feet board measure
M Gals
One thousand gallons
M Gals Mi
One thousand gallons mile
min.
Minimum
Misc
Miscellaneous
mm
Millimeter
MSF
One thousand square feet
N/C
Numerically controlled
PG
Performance-graded
PI
Plasticity index
ppm
Parts per million
PS
Product Standard (issued by the U.S. Department of Commerce)
psi
Pounds per square inch
PVC
Polyvinylchloride
Sec
Section
SF
Square Feet
SQ
Staked quantities
STA
Station
STA YD
Station Yard
SY
Square Yard
t
Ton (1,000 kg)
t km
Ton kilometer
T
Temperature
T&L
Tops and limbs
TFE
Tetraflouroethylene
Th
Thickness
TM
Ton mile
TV
Target value
USL
Upper specification limit
Vert
Vertical
VMA
Voids in Mineral Aggregate
VOC
Volatile organic compound
Yd
Yard
W
Width
W/
With
W/O
Without
WW
Woven wire
WWF
Welded wire fabric

Inches

Feet

Section 102—Definitions

Wherever the following terms, or pronouns in place of them, are used in these specifications or in other contract documents, the intent and meaning are as follows:

Adjustment in Contract Price. “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Arch. A culvert section, usually formed of bolted structural plates, that is an arc of a circle (usually one-half or less); that is, a bottomless culvert.

Base Course. The layer or layers of specified or selected material of designed thickness placed on a subbase or subgrade to support a surface course. (See figure 102-1.)

Bearings. The portion of a beam, girder, or truss that transmits the bridge superstructure load to the substructure.

Berm. Curb or dike constructed to control roadway runoff water. (See figure 102-1.)

Best Management Practice. A series of water quality protection practices and procedures approved or certified by the State water quality agency under the provisions of sections 319 and 402 of the Clean Water Act, as amended.

Bridge. A structure, including supports, erected over a depression or an obstruction, such as water, a road, a trail, or a railway, and having a floor for carrying traffic or other moving loads.

Bridge Length. The overall length measured along the centerline of road to the back of abutment backwalls, if present; otherwise, end to end of the bridge floor, but in no case less than the total clear opening of the structure.

Bridge Traveled Way Width. The clear width measured at right angles to the longitudinal centerline of the bridge between the bottom of curbs or, if curbs are not used, between the inner faces of parapet or railing.

Certificate of Compliance. A signed statement by a person with legal authority to bind a company or supplier to its product. The certificate states that the material or assemblies furnished fully comply with the requirements of the contract.

Change. “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Clearing Limits. The limits of clearing as designated on the ground or on the drawings. (See figure 102-1.)

Cofferdam. A cofferdam is an enclosed single or double wall braced structure with walls sheeted with timber, concrete, or steel, and extending well below the bottom of excavation, when practical. Earthen or rockfill dikes, dams, or embankments are not considered cribs or cofferdams for this purpose.

Conduit. A natural or artificial channel for carrying fluids, such as water pipe, canal, or aqueduct.

Construction Slash. All vegetative material not meeting Utilization Standards, such as tops and limbs, timber, brush, and grubbed stumps associated with construction or reconstruction of a facility.

Contracting Officer (CO). The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the CO. Authorized representatives include the Forest Service Representative, Engineering Representative, Contracting Officer’s Representative, and Inspector.

Contractor. The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through agents, employees, or subcontractors. As used in specifications and drawings for specified roads (Timber Sale Contracts), “Contractor” is “purchaser.”

Controlled Felling. Directing the placement of trees in felling by using wedges, jacks, cable tension, or distribution of holding wood, or any combinations of these, to ensure that trees are dropped into previously cleared areas, or clear of any objects that are to remain.

Culvert. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually constructed entirely below the elevation of the traveled way.

Curve Widening. Additional width added to curves to allow for vehicle offtracking.

Cushion Material. Native or imported material generally placed over rocky sections of unsurfaced roads to provide a usable and maintainable traveled way.

Defect. A failure to meet a requirement with respect to a single quality characteristic.

Drawings. The documents, including plan and profile sheets, plans, cross sections, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials showing details for construction of a facility.

Embankment. A structure of soil, aggregate, or rock material placed on the prepared ground surface and constructed to subgrade.

Engineer. The Contracting Officer’s Representative (COR) responsible for onsite administration of the contract.

Equipment. All machinery and equipment, together with the necessary supplies for upkeep and maintenance, as well as tools and apparatus necessary for the proper construction and acceptable completion of the work.

Excess Excavation. Material from the roadway in excess of that needed for construction of designed roadways.

Falsework. Any temporary construction work used to support the permanent structure until it becomes self-supporting. Falsework includes steel or timber beams, girders, columns, piles, foundations, and any proprietary equipment including modular shoring frames, post shores, and adjustable horizontal shoring.

Forest Service. The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Government Land. National Forest System lands, and other lands controlled or administered by the Forest Service or other Federal agencies.

Inspector. The Government-authorized representative designated in writing by the Contracting Officer, Contracting Officer’s Representative, or Engineering Representative responsible for detailed inspection.

Invert. The lowest point of the internal cross section of culvert or pipe arch.

Job-Mix Formula. The percentage of each material in a mixture intended for a particular use.

Laboratory. A testing laboratory of the Government, or any other testing laboratory approved by the Contracting Officer.

Live Stream. A defined streambed with flowing water.

Lot. An isolated quantity of material from a single source; a measured amount of construction assumed to be produced by the same process.

Materials. Any substance specified for use in the construction of the project and its appurtenances.

Maximum Density. The highest density that can be obtained for a specific material using the stated test procedure.

Measurement. Determining and expressing the quantities of work or materials.

Multibeam Girder. A precast, prestressed concrete member where the concrete deck is precast as an integral part of the member.

Neat Line. A line defining the proposed or specified limits of an excavation or structure.

Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifications as measurements of material to be used in the construction.

Nominal Maximum Particle Size. The largest sieve size listed in the applicable specification upon which any material is permitted to be retained.

Noxious Weeds or Weeds. Any exotic plant species established or that may be introduced in the State which may render land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by the State's Department of Agriculture, or by the County's weed management district, or by other appropriate agencies having jurisdiction, or as listed on the current ‘All States Noxious Weed List.’

Overbreak. Material beyond the neat line of an excavation that is removed in the process of excavation, usually by blasting.

Pass. A pass shall consist of one complete coverage of the surface.

Pavement Structure. Subbase, base, or surface course, or combination thereof, placed on a subgrade to support the traffic load and distribute it to the roadbed.

Pioneer Road. Temporary construction access built along the route of the project.

Pipe. A culvert that is circular (round) in cross section.

Pipe Arch. A pipe that has been factory-deformed from a circular shape such that the width (or span) is larger than the vertical dimension (or rise).

Profile Grade. The trace of a vertical plane, as shown on the drawings, intersecting the top surface at the centerline of the proposed facility construction.

Project Specifications. The specifications that detail the conditions and requirements specific to the individual project.

Purchaser. The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Random Sampling. A sample of material chosen such that each increment of a population of material has an equal probability of being selected.

Reasonably Close Conformity. Compliance with reasonable and customary manufacturing and construction tolerances, performing all work and furnishing all materials in “reasonably close conformity” with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground.

Right-of-Way. A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) land, appurtenances thereto, or interest therein, usually in a strip, acquired for public or private passageway. (See figure 102-1.)

Road Order. An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Road Template. The shape and cross-sectional dimensions of the roadway to be constructed, as defined by the construction staking notes and the characteristics of the typical sections.

Roadbed. The graded portion of a road between the intersection of subgrade and side slopes, excluding that portion of the ditch below subgrade. (See figure 102-1.)

Roadside. A general term denoting the area adjoining the outer edge of the roadway. (See figure 102-1.)

Roadway. The portion of the road within the limits of excavation and embankment, including slope rounding. (See figure 102-1.)

Schedule of Items. A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.

Second Samples. A sample taken when the initial sample indicates that the material is defective.

Shop Drawings. Incidental design sheets and/or drawings which the Contractor is required to submit to the Forest Service. Shop drawings shall conform to the contract requirements, but they are not part of the contract drawings. They may be drawings, diagrams, schedules, performance charts, brochures, and similar data prepared by the Contractor, subcontractor, manufacturer, suppliers, or distributors that illustrate how specific portions of the work are to be fabricated or installed.

Shoulder. The portion of the roadway contiguous to the traveled way for accommodation of stopped vehicles, emergency use, and lateral support of pavement structure. (See figure 102-1.)

Sidewalk. The portion of the roadway constructed primarily for pedestrian use.

Specifications. A description of the technical requirements for a material, product, or service that includes criteria for determining whether these requirements are met.

Spring Line. The point of contact between arch and footing.

Standard Specifications. Specifications approved for general application and repetitive use.

Station. (1) A measure of distance used for highways and railroads equal to 100 feet. (2) A precise location along a survey line.

Subbase. The layers of specified or selected material of designed thickness placed on a subgrade to support a base course.

Subgrade Treatment. Modification of roadbed material by stabilization.

Subgrade. The prepared surface, including widening for curves, turnouts, and other areas upon which a subbase, base, or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface. (See figure 102-1.)

Substructure (Bridge). All of that part of the structure below the bearings of simple and continuous spans, skewbacks of arches, and tops of footings of rigid frames, together with the backwalls, wingwalls, and wing protection railings.

Superstructure (Bridge). The entire structure, except the substructure.

Surface Course. The top layer of a pavement structure, sometimes called the wearing course, usually designed to resist skidding, traffic abrasion, and the disintegrating effects of climate. (See figure 102-1.)

Tackifier. Binder for vegetative mulch.

Target Value. Values that are established according to contract, and from which allowable variations are measured.

Timber Sale Contract. A written contract for the removal of national forest timber.

Tops and Limbs. All woody material including bushes, vines, and portions of trees smaller than the dimensions for timber shown in Subsection 201.03.

Traveled Way. The portion of the roadway for the movement of vehicles, exclusive of shoulders and auxiliary lanes. (See figure 102-1.)

Turnout. A short auxiliary lane on a one-lane road provided for the passage of meeting vehicles.

Unit of Measurement. The unit and fractions of units DESIGNATED IN THE SCHEDULE OF ITEMS.

Unsuitable Material. The material excavated during roadway construction that is not usable in embankment and must be disposed of, or that can be used only in certain locations or for limited purposes.

Utilization Standards. The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Weed Management District. A weed management district is any area of land identified for the purpose of weed management or control. Such an identified land area may be, but is not limited to one of the following: a project or job site, a County, two or more Counties, or a National Forest.

Figure 102-1.—Illustration of road structure terms.

Section 103—Intent of Contract

The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, furnish all labor, materials, equipment, tools, transportation, and supplies, and perform all work required to complete the project in reasonably close conformity with drawings and specifications, and in accordance with provisions of the contract.

SMITH CREEK NO. 9762-1.668

This project is for the removal of an existing corrugated steel culvert on Smith Creek and replacing it with a new prestressed precast concrete single span bridge. This project is located on Road 9762 in the Swan Lake Ranger District in Section 28, Township 21 North, Range 16 West, in Missoula County, Montana.

The work includes but is not limited to clearing and grubbing, erosion control measures, structural excavation, roadway embankment, removing and disposing an existing culvert, compaction, riprap, roadway surfacing, furnishing and erecting prestressed concrete beams, and all other incidental items necessary to complete the project in accordance with the plans and specifications.

CONDON CREEK NO. 901-3.88

This project is for the removal of an existing corrugated steel culvert on Condon Creek and replacing it with a new prestressed precast concrete single span bridge. This project is located on Road 901 in the Swan Lake Ranger District in Section 17, Township 21 North, Range 16 West, in Missoula County, Montana.

The work includes but is not limited to clearing and grubbing, erosion control measures, structural excavation, roadway embankment, removing and disposing an existing culvert, compaction, riprap, roadway surfacing, furnishing and erecting prestressed concrete beams, and all other incidental items necessary to complete the project in accordance with the plans and specifications.

Section 104—Maintenance for Traffic

104.01 Roads To Be Constructed

Unless otherwise SHOWN ON THE DRAWINGS or described in the PROJECT SPECIFICATIONS, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a plan for the satisfactory handling of traffic has been approved. Specific requirements for temporary closures, detours, part-width construction, and access to adjacent or intersecting facilities will be SHOWN ON THE DRAWINGS or described in the PROJECT SPECIFICATIONS. Post construction signs and traffic control devices in conformance with the “Manual on Uniform Traffic Control Devices” (MUTCD). Do not proceed with work on the project until all required signs are in place and approved.

Before shutting down any operations, take all necessary precautions to prevent damage to the project, such as temporary detours, approaches, crossings, or intersections; and provide for normal drainage and minimization of erosion. Leave all travelways in a condition suitable for traffic.

The Government may permit use of portions of the project during periods when operations have shut down. All maintenance attributable to permitted use during periods of work suspension will be provided by the Government, except for maintenance needed through the fault or negligence of the Contractor. The Contractor shall be responsible for any maintenance not attributable to use, or that is necessary during suspensions through the fault or negligence of the Contractor.

The Contractor will be allowed to close Road No. 9762 and Road 901 to public taffic during bridge construction work under this contract. Provide at least 14 days advance written notice to the CO prior to any road closure period, to allow public notice of the closure period by the Forest Service.

Develop a construction sign plan identifying the type and location of all advanced warning signs necessary to safely restrict or pass public traffic. Install construction signs conforming to the Manual on Uniform Traffic Control Devices (MUTCD) prior to proceeding with any construction work. Furnish, maintain and remove all barricades and signs required for construction signing and road closures.

Furnish and install information signs at the junction of Highway 83 and Road 901, at the junction of Road 901 and Road 9762, and at the junction of Road 901 and Road 124A to notify the public of bridge construction and road closure.

104.02 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations SHOWN ON THE DRAWINGS, designated in the Road Order, or described in the PROJECT SPECIFICATIONS, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

104.03 Basis of Payment

No payment will be made for this item. Include all costs associated with erecting, maintaining and removing traffic control construction signing and commensurate road maintenace in the unit price bid for Mobilization.

Section 105—Control of Materials

105.01 Handling Materials

Transport and handle all materials to preserve their quality and fitness for the work. Stockpile, load, and transport aggregates in a manner that will preserve specified gradation and avoid contamination. Do not intermingle stockpiles of aggregate with different gradations.

105.02 Weighing Devices – Subsection Intentionally Deleted

105.03 Sampling & Testing of Aggregate – Subsection Intentionally Deleted

105.04 Certification & Sampling of Asphalt Materials – Subsection Intentionally Deleted

105.05 Rights in & Use of Materials Found or Produced on the Work

(a) With the written approval of the CO, suitable stone, gravel, sand, or other material found in the excavation can be used on the project. Payment will be made both for the excavation of such materials at the corresponding contract unit price and for the pay items for which the excavated material is used. Replace, without additional compensation, sufficient suitable materials to complete the portion of the work that was originally contemplated to be constructed with such material.

(b) Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

105.06 Material Sources

(a) Designated Sources. Sources of local materials designated in the PROJECT SPECIFICATIONS or SHOWN ON THE DRAWINGS are guaranteed by the Government for the quality and quantity of material in the source. Determine the equipment and work required to produce the specified product.

Utilize all suitable material in the source. The designation of a source includes the Contractor’s right to use areas SHOWN ON THE DRAWINGS for the purposes designated (that is, plant sites, stockpiles, and haul roads). Unless otherwise indicated or approved, no additional operating area shall be allowed. In this case, operate only in the confines of the area(s) designated.

The weight/volume relationship used for determining designed quantities (DQ) of material in designated sources subject to weight measurement is SHOWN ON THE DRAWINGS.

Should the designated source contain insufficient suitable material due to causes beyond the Contractor’s control, the Government will provide another source, with an adjustment in contract price, in accordance with applicable contract provisions.

Designated sources will be available for the Contractor’s use during the periods SHOWN ON THE DRAWINGS. Use at any other time will require an agreement with the party scheduled for that period, with the CO’s approval.

Riprap Source – Government Source - The designated source for riprap is the Government stockpile in the Kraft Creek Quarry located in Section 20, T.19 N., R.17 W. Material may require sorting and/or blending to meet the specified gradation.

Rock Weir/Step Pools - Conserve individual rocks of the specified diameter from the structural excavation for use in constructing the rock weirs. If rocks are not available the CO will take individual rocks from the riprap quantity or designate rocks from along the creek bank or along the road within 1 mile of the project site.

Crushed Aggregate Source- Government Source - The designated source for crushed surfacing material is the Government stockpile in the Owl Creek Pit located in Section 1, T.19 N., R. 16 W.

Borrow Source - No borrow source has been designated or is required. Embankment material is to be conserved from the quantity of material removed as Structural Excavation.

Waste Area – Government Provided - The designated waste area for excess and unsuitable material is AS SHOWN ON THE PLANS.

(b) Contractor-Furnished Sources. When the material sources are not designated as provided above, or when designated sources are not used, furnish material that produces an end product equivalent in performance to that originally designated. An adjustment in contract price shall be made where the weight/ volume relationship differences between designated source material and Contractor-furnished source material result in a financial disadvantage to the Government. When SHOWN ON THE DRAWINGS, complete any pit development specified for a designated source, even when material is not obtained from the source.

Test for quality in conformance with applicable requirements, to establish the equivalency of the end product. Furnish test results and a Certificate of Compliance.

Prior to any pit development or use of materials from contractor-furnished sources, have the pit site approved by the CO that it is free of noxious weeds as listed on the “All States Noxious Weeds List”.

Section 106—Measurement & Payment

106.01 Measurement & Payment

Compensation provided for in the contract is full payment for performing all contract work in a complete and acceptable manner. All risk, loss, damage, or expense arising out of the nature or prosecution of the work is included in the compensation provided by the contract.

Work required by the contract will not be paid for directly unless a PAY ITEM for the work is DESIGNATED IN THE SCHEDULE OF ITEMS.

Work referenced for measurement under another section will not be paid for directly unless a PAY ITEM for the work is DESIGNATED IN THE SCHEDULE OF ITEMS for the referenced section.

Work not paid for directly is considered to be included under the other contract PAY ITEMS.

Unless otherwise shown, work measured and paid for under one PAY ITEM will not be paid for under any other PAY ITEM.

The quantity to be paid for is the quantity DESIGNATED IN THE SCHEDULE OF ITEMS. No payment will be made for work performed in excess of that staked, ordered, or otherwise authorized.

When more than one class, size, or thickness is specified in the SCHEDULE OF ITEMS for any PAY ITEM, suffixes will be added to the item number to differentiate between the items.

All costs associated with the cleaning of construction equipment shall be considered subsidiary to other items in this contract and the Contractor will not be paid an additional amount for this work.

106.02 Determination of Quantities

The following measurements and calculations are used to determine contract quantities.

For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for seeding, mulching, geotextiles, netting, erosion control blankets, and sodding shall be along slope lines.

The average end area method shall be used to compute volumes of excavation or embankment. However, if in the judgment of the CO the average end area method is impractical, measurement shall be made by volume in hauling vehicles, or by other three-dimensional methods.

Structures shall be measured according to neat lines SHOWN ON THE DRAWINGS, or as altered by the CO in writing to fit field conditions.

For items that have linear measurements, such as pipe culverts, fencing, guardrails, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed. Pipe and pipe arch culverts shall be measured along center of invert, and arches shall be measured at spring line.

For aggregates weighed for payment, the tonnage weight shall not be adjusted for moisture content, unless otherwise provided in PROJECT SPECIFICATIONS.

For standard manufactured items—such as fence, wire, plates, rolled shapes, and pipe conduits—identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer’s tolerances shall be accepted.

106.03 Units of Measurement

Work required by the contract will be paid based on the PAY UNIT as DESIGNATED IN THE SCHEDULE OF ITEMS.

Payment will be by units defined and determined according to U.S. Standard English measure and by the following:

(a) Cubic Yard in Place. Measure solid volumes by the average end area method as follows:

1) Measure cross sections of the original ground and use with design or staked templates, or take other comparable measurements to determine the end area. Do not measure work outside of the established lines or slopes.

2) If any portion of the work is acceptable, but is not completed to the established lines and slopes, remeasure cross sections or comparable measurements of that portion of the work. Deduct any quantity outside the designated or staked limits. Use these measurements to calculate new end areas.

3) Compute the quantity using the average end areas multiplied by the horizontal distance along a centerline or reference line between the end areas. Deduct any quantity outside the designed or staked limits.

Where it is impractical to measure material by the average end area method, other approved methods involving three-dimensional measurements may be used.

Measure liquid volumes in accordance with SPS Subsection 106.03(h).

(b) Cubic Yard in the Hauling Vehicle. Measure the cubic yard volume in the hauling vehicle using three-dimensional measurements at the point of delivery. Use vehicles bearing a legible identification mark with the body shaped so the actual contents may be readily and accurately determined. Before use, mutually agree in writing upon the volume of material to be hauled by each vehicle. Vehicles carrying less than the agreed volume may be rejected or accepted at the reduced volume.

Level selected loads. If leveling reveals that the vehicle was hauling less than the approved volume, reduce the quantity of all material received since the last leveled load by the same ratio as the ratio of the current leveled load volume to the agreed volume. Payment will not be made for material in excess of the agreed volume.

Material measured in the hauling vehicle may be weighed and converted to cubic yards for payment purpose if the conversion factors are mutually agreed to in writing.

Compute measurement using measurements of material in the hauling vehicles at the point of delivery. Load vehicles to at least their water-level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

(c) Cubic Yard Mile. A combination of linear and volumetric measurement meaning the movement of a cubic yard of material one(1) mile.

(d) Hour. Measurement will be for the actual number of hours ordered and performed by the Contractor.

(e) Each. One complete unit, which may consist of one or more parts. The quantity is the actual number of units completed and accepted.

(f) Lump Sum. Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.

(g) MFBM. One thousand feet board measure based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminate timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

(h) Gallon. The quantity may be measured by any of the following methods:

1) Measured volume container.

2) Metered volume. Use an approved metering system.

3) Commercially packaged volumes.

(i) Station. One hundred linear feet measured horizontally.

(j) Station Yard. A combination of linear and volumetric measurement meaning the movement of a cubic yard of material one station.

(k) Square Yard. 9 square feet. Longitudinal and transverse measurements for area computation will be made horizontally.

(l) Thousand Gallons Mile. A combination of linear and volumetric measurement meaning the movement of 1,000 gallons of material one(1) mile.

(m) Ton. Short ton consisting of 2,000 pounds. Use net certified scale weights based on certified volumes.

(n) Ton Mile. A combination of linear and weight measurement meaning the movement of one(1) ton of material one(1) mile.”

106.04 Methods of Measurement

One of the following methods of measurement for determining final payment is DESIGNATED IN THE SCHEDULE OF ITEMS for each PAY ITEM:

(a) Designed Quantities (DQ). These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units DESIGNATED IN THE SCHEDULE OF ITEMS may be authorized under any of the following conditions:

1) Changes in the work authorized by the CO.

2) A determination by the CO that errors exist in the original design that cause a PAY ITEM quantity to change by 15 percent or more.

3) A written request submitted to the CO showing evidence of errors in the original design that cause the quantity of a PAY ITEM to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is in error.

(b) Staked Quantities (SQ). These quantities are determined from staked measurements prior to construction.

(c) Actual Quantities (AQ). These quantities are determined from measurements of completed work.

(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.

(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

106.05 Price Adjustment for Asphalt Materials – Subsection Intentionally Deleted

106.06 Earthwork Tolerances

Where tolerances are shown in the contract, they are intended to define “reasonably close conformity.” Make adjustments of horizontal or vertical alignment within the tolerances specified in this contract, or shifts of balance points up to 100 ft., as necessary to produce the designed roadway section and to balance earthwork. Such adjustments will not be considered “changes.”

Section 161—Certification for Quality & Quantity

Description

161.01 Work. Provide certification that the quality and quantity of construction conforms to the drawings, specifications, and requirements of the contract.

Construction

161.02 Certifications & Measurements. Meet the following requirements for offsite-produced materials and quantity measurements:

(a) Offsite-Produced Materials. Furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all materials produced offsite that are incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Make each certificate apply to a single commodity or invoice. Certify all incidental purchases needed to remedy minor shortages of material.

(b) Quantity Measurements. Make all measurements for computation of quantities for all work items, except those specified for payment by designed quantity or lump sum. Compute the quantities for periodic progress payments; the CO will compute the quantities for the final payment based on measurements taken. All Contractor measurements are subject to verification. Submit all field notes, calculation sheets, and other data used to determine quantities, and certify in writing as to the accuracy of the measurements and computations submitted.

The following format, or one containing the following information, will be acceptable to the Government:

Road No. ____________________
Contract No. ____________________
Pay Item No.
Date
Station
Quantity or Measurement
Measured By (Initials)

161.03 Records. Meet the following requirements for as-built drawings:

As-Built Drawings. Maintain a set of the contract drawings depicting as-built conditions. Maintain these drawings in current condition, and make them available for review. Indicate all variations from contract drawings in red on the drawings. Upon completion of the contract work, submit as-built drawings to the CO.

Measurement

161.04 Method. Make no separate measurements for this item.

Payment

161.05 Basis. Payment will be considered incidental to other pay items in this contract.

Section 201—Clearing & Grubbing

Description

201.01 Work. This work consists of removing all vegetative material including limbs, residual slash, live roadside brush, and small trees within the clearing limits SHOWN ON THE DRAWINGS.

Construction

201.02 Clearing & Grubbing. Cut and grub all brush and trees located on the roadbed and SHOWN ON THE DRAWINGS.

Cut all brush and small trees (6 inches diameter, or less, at the point of cut) outside the roadbed, but still inside the clearing limits, no higher than 4 inches above ground level (6 inches for machine brushing). If rocks or other obstructions are encountered, cut no higher than 6 inches above the obstruction. Limb live trees with a diameter larger than 6 inches a clear height of 10 feet above the road surface.

201.03 Windfalls. Limb windfalls lying within or across the clearing limits, cut off at the top of the existing cut slope or 5 feet from the shoulder on the fill slope. Dispose of windfall material as slash.

201.04 Road Junctions. Do not deposit clearing debris on the roadway of adjoining roads.

201.05 Slash Treatment. Slash is defined as any material that has a length greater than 36 inches or a diameter greater than 1 inch at any point. As directed by the CO, treat construction slash by (1) Constructing slash-filter windrows, (4) Scattering, or (12) Placing slash on embankment slopes. Do not deposit material in streams, streambeds, culvert inlets or outlets, drainage ways, or cattle guards.

Measurement

201.06 Method. Make no separate measurements for this item.

Payment

201.07 Basis. Payment will be considered incidental to other pay items in this contract.

Section 202—Removal of Structures & Obstructions

Description

202.01 Work. Salvage, remove, and/or dispose of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions as SHOWN ON THE DRAWINGS. Salvage designated materials and backfill the resulting trenches, holes, pits, or as SHOWN ON THE DRAWINGS.

Construction

202.02 Salvaging Material. – Subsection Intentionally Deleted

202.03 Removing Material.

Existing 18 inch or smaller culverts may be left in an embankment, provided that no portion of the culvert is within 24 inches of the subgrade, the embankment slope, or a new culvert or structure. Crush culvert ends. Culverts removed and not designated for salvage shall become the property of the Contractor and will be removed from National Forest lands.

Remove structures and obstructions in the roadbed to 12 inches below subgrade elevation. Remove structures and obstructions outside the roadbed to 12 inches below finished ground or to the natural stream bottom.

Prior to removal, place rock and soil material located on or around the bridge deck or the structure so that it does not enter a stream.

Remove the substructures of existing structures down to the natural stream bottom, and remove the parts outside of a stream down to at least 12 inches below natural ground surface or finished groundline, whichever is lower. Remove portions of existing structures that lie wholly or in part within the limits for a new structure to accommodate construction of the proposed structure.

Except in excavation areas, fill cavities left by structure removal with material to the level of the finished ground, and compact. Place and compact the type of backfill material that is SHOWN ON THE DRAWINGS, designated in the PROJECT SPECIFICATIONS, or approved by the CO.

202.04 Disposing of Material or Structures Not Designated for Salvage. Dispose of all materials designated for removal off of National Forest System Lands in an environmentally safe manner in accordance with all State and Federal requirements.

Measurement

202.05 Method. Use the method of measurement that is DESIGNATED IN THE SCHEDULE OF ITEMS.

Payment

202.06 Basis. The accepted quantities will be paid for at the contract unit price for each PAY ITEM DESIGNATED IN THE SCHEDULE OF ITEMS.

In addition to removal of the existing 48” dia. culvert, PAY ITEM includes all other culverts SHOWN ON THE DRAWINGS for removal and disposal.

Payment will be made under:

Pay Item
Pay Unit
202(05)A
Removal of existing 54” dia. Culvert

Each

202(05)B
Removal of existing 48” dia. Culvert

Each

Section 203—Excavation, Embankment, & Haul

Description

203.01 Work. Excavate material and construct embankments. Furnish, haul, stockpile, place, dispose of, slope, shape, compact, and/or finish earthen and rocky material.

203.02 Excavation. Excavation consists of the excavation and placement of all excavated material that is not included under other PAY ITEMS listed in the SCHEDULE OF ITEMS.

203.03 Borrow Excavation. The Contractor shall conserve suitable material from bridge structural excavation under Section 206 to complete any approach roadway construction as SHOWN ON THE DRAWINGS.. Additional sources of borrow excavation will be subject to advance approval by the CO.

Construction

203.04 Clearing & Grubbing. Clear and grub in accordance with Section 201 before work under Section 203 begins. Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation when approved by the CO. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated in the roadway unless specifically included in the slash treatment method.

203.05 Pioneering. During pioneering operations, prevent undercutting of the final excavation slope. Avoid any restriction of drainages while pioneering the road. Keep all materials within the roadway limits unless otherwise SHOWN ON THE DRAWINGS.

203.06 Utilization of Excavated Materials. Use all suitable excavated material in the construction of embankments, subgrades, shoulders, slopes, bedding, and backfill for structures and other purposes, as SHOWN ON THE DRAWINGS.

(a) Excess Excavation. Transport and deposit excess material to the designated waste site as specified in Section 105 of these PROJECT SPECIFICATIONS and AS SHOWN ON THE DRAWINGS. Spread the material and shape to drain as directed by the CO.

(b) Rock for Slope Protection. Conserve and use suitable excavated rock for protecting embankments.

(c) Conserving Material. Excavated material suitable for cushion, road finishing, or other purposes may be conserved and utilized instead of materials from designated sources. Field drain and dry excessively wet material that is otherwise suitable for embankment before placement.

(d) Excavation of Unsuitable Material & Backfill. Transport and deposit unsuitable material to the designated waste site as specified in Section 105 of these PROJECT SPECIFICATIONS and AS SHOWN ON THE DRAWINGS. Spread the material and shape to drain as directed by the CO.

Break up rocks that are too large to be incorporated into the embankment or move them to locations approved by the CO. Broken pieces of rock may be placed on the face of the embankment and embedded so they will not roll or obstruct the use and maintenance of the roadbed. Immediately remove any excavated material that inadvertently reaches a stream course.

(e) Conservation of Topsoil. When SHOWN ON THE DRAWINGS, remove, transport, and deposit suitable topsoil in…