AG-82B1-S-09-0036.pdf

PDF 296 KB Posted

Attached to
RECOVERY - Smith & Condon Culvert Replacements - Flathead NF Federal contract opportunity
Solicitation number
AG-82B1-S-09-0036
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - Smith & Condon Culvert Replacements - Flathead NF, newest first.
File Type Posted
Smith Bridge Sheet Page 9.pdf PDF
SF 30 Amendment 1.pdf PDF
Condon Bridge Sheet 9.pdf PDF
SF1442.PDF PDF
Condon Final_6-12-09signed.dwf DWF file
food_order.doc DOC document
Smith FINAL_6-12-09.dwf DWF file
Wage Determination.doc DOC document
Condon Final_6-12-09.dwf DWF file
Smith FINAL_6-12-09signed.dwf DWF file
Project_Specifications.doc DOC document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. AG-82B1-S-09-0036

SECTION B - Supplies or Services and Prices/Costs Schedule of Items SECTION C - Description/specifications/Statement of Work 452.211-72 Statement of Work/Specifications. (FEB 1988) 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) SECTION D – Packaging and Marking SECTION E - Inspection and Acceptance 52.246-12 Inspection of Construction. (APR 1996) SECTION F - Deliveries or Performance 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) SECTION G - Contract Administration Data 452.215-73 Postaward Conference. (NOV 1996) SECTION H - Special Contract Requirements "ROAD CLOSED AHEAD Condon Creek - 3.8 Miles" "ROAD CLOSED AHEAD Condon Creek – 1.3 Miles"

"ROAD CONSTRUCTION AHEAD"

"ROAD CLOSED AHEAD Smith Creek - 1.7 Miles"

"ROAD CONSTRUCTION AHEAD"

52.204-11 American Recovery and Reinvestment Act--Reporting Requirements. (MAR 2009) 52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American

Act--Construction Materials. (MAR 2009) 52.225-23 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American

Act--Construction Materials under Trade Agreements. (MAR 2009) SECTION I - Contract Clauses 52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009.

(MAR 2009)

52.204-7 Central Contractor Registration. (APR 2008) 52.211-18 Variation in Estimated Quantity. (APR 1984) 52.214-29 Order of Precedence - Sealed Bidding. (JAN 1986) 52.222-5 Davis-Bacon Act--Secondary Site of the Work. (JUL 2005) 52.222-39 Notification of Employee Rights Concerning Payment of Union Dues or Fees. (DEC 2004)

52.225-9 Buy American Act - Construction Materials. (FEB 2009) 52.228-1 Bid Guarantee. (SEP 1996) 52.228-15 Performance and Payment Bonds - Construction. (NOV 2006) 52.236-1 Performance of Work by the Contractor. (SEP 2006) 52.236-8 Other Contracts. (APR 1984) 52.244-6 Subcontracts for Commercial Items. (MAR 2009) 52.252-2 Clauses Incorporated by Reference. (FEB 1998) 452.228-70 Alternative Forms of Security. (NOV 1996) SECTION J - List of Documents, Exhibits, and Other Attachments

NOTE: THIS PROJECT IS LOCATED IN ZONE 3

SECTION K - Representations, Certifications, and Other Statements of Offerors or Respondents.. 46 52.204-8 Annual Representations and Certifications. (FEB 2009) 52.209-5 Certification Regarding Responsibility Matters. (DEC 2008) 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns. (JUL 2005)

52.219-28 Post-Award Small Business Program Rerepresentation. (APR 2009) 52.223-1 Biobased Product Certification. (DEC 2007) 52.223-13 Certification of Toxic Chemical Release Reporting. (AUG 2003) 452.219-70 Size Standard and NAICS Code Information. (SEP 2001) SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents

28.102 Performance and payment bonds and alternative payment protections for construction contracts 52.216-1 Type of Contract. (APR 1984)..................................................... Error! Bookmark not defined.

52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999) ..................................................................... Error! Bookmark not defined.

52.225-10 Notice of Buy American Act Requirement - Construction Materials. (FEB 2009) 52.233-2 Service of Protest. (SEP 2006) 52.236-28 Preparation of Proposals - Construction. (OCT 1997)............ Error! Bookmark not defined.

SECTION L - Evaluation Factors for Award

14.101 Elements of sealed bidding

52.214-19 Contract Award - Sealed Bidding - Construction. (AUG 1996)

SECTION B - Supplies or Services and Prices/Costs Schedule of Items

Smith & Condon Creek Culvert Replacements

Swan Lake Ranger District

Flathead National Forest

Missoula County, Montana

B- 1 Schedule of Items

Smith Creek

ITEM NO. DESCRIPTION

METHOD

OF

MEAS.*

PAY

UNIT

EST.

QTY.

UNIT PRICE

AMOUNT

OFFERED

202(05)A Removal of Existing 54” Dia.

Culvert

LSQ L.S. 1 XXXXXXXXX $____________

204(19)A Soil Erosion and Pollution

Control

206(07)A Structural Excavation LSQ L.S. 1 XXXXXXXXX $____________

251(01)A Placed Riprap, Class 5, Method A, Machine Placed (Government Source)

DQ C.Y. 110 $___________ $____________

251(14)A Rock Weir / Step Pool AQ EA. 4 $___________ $____________

251(15)A Individual Habitat Rock AQ EA. 9 $___________ $____________

260(01)A Geocell Abutment

Stabilization, 6” Depth

DQ S.Y. 32

304(23)A Hauling and Placing Crushed

Aggregate Surfacing, Compaction A (Government Source)

DQ C.Y. 20

553(01)A Precast, Prestressed Concrete

Structural Member, Trideck Beam

AQ EA. 3 $___________ $____________

553A(01)A Precast Concrete Member, Wingwall

AQ EA. 4 $___________ $____________

553A(01)B Precast Concrete Member, Grade Beam

AQ EA. 2 $___________ $____________

601(01)A Mobilization LSQ L.S. 1 XXXXXXXXX $____________

Smith Creek

ITEM NO. DESCRIPTION

METHOD

OF

MEAS.*

PAY

UNIT

EST.

QTY.

UNIT PRICE

603(05)18 18" Corrugated Steel Pipe, 0.064” Thickness, Method C

AQ L.F. 42

625(08)A Seeding, Dry Method (With

Mulch)

633(01)A Wood Posts AQ L.F. 36 $___________ $____________

633(17)A Object Markers AQ EA. 4

637(01)A Hydraulic Excavator with

Thumb

AQ HR 8 $___________ $____________

SUBTOTAL AMOUNT $__________________________

Condon Creek

ITEM NO. DESCRIPTION

METHOD

OF

MEAS.*

PAY

UNIT

EST.

QTY.

UNIT PRICE

202(05)B Removal of Existing 48” Dia.

Culvert

204(19)B Soil Erosion and Pollution

Control

206(03) Structural Backfill DQ C.Y. 7 $___________ $____________

206(07)B Structural Excavation LSQ L.S. 1 XXXXXXXXX $____________

251(01)B Placed Riprap, Class 5, Method A, Machine Placed (Government Source)

DQ C.Y. 100 $___________ $____________

251(14)B Rock Weir AQ EA. 7 $___________ $____________

251(15)B Individual Habitat Rock AQ EA. 10 $___________ $____________

260(01)B Geocell Abutment

Stabilization, 6” Depth

DQ S.Y. 33 $___________ $____________

304(23)B Hauling and Placing Crushed

Aggregate Surfacing, Compaction A (Government Source)

DQ C.Y. 16 $___________ $____________

553(01)B Precast, Prestressed

Concrete Structural Member, Trideck Beam

AQ EA. 3 $___________ $____________

553A(01)C Precast Concrete Member, Wingwall

AQ EA. 4 $___________ $____________

553A(01)D Precast Concrete Member, Grade Beam

AQ EA. 2 $___________ $____________

601(01)B Mobilization LSQ L.S. 1 XXXXXXXXX $____________

603(05)24 24" Corrugated Steel Pipe, 0.064” Thickness, Method C

AQ L.F. 44 $___________ $____________

625(08)B Seeding, Dry Method (With

Mulch)

633(01)B Wood Posts AQ L.F. 36 $___________ $____________

Condon Creek

ITEM NO. DESCRIPTION

METHOD

OF

MEAS.*

PAY

UNIT

EST.

QTY.

UNIT PRICE

633(17)B Object Markers AQ EA. 4

637(01)B Hydraulic Excavator with

Thumb

AQ HR 8 $___________ $____________

SUBTOTAL AMOUNT $__________________________

TOTAL AMOUNT OFFERED (All Items) $__________________________

* Designated Method of Measurement:

AQ - Actual Quantities, DQ - Designed Quantities; LSQ - Lump Sum Quantities

Note: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payment Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

SECTION C - Description/specifications/Statement of Work

C.1 Scope of Contract

This project is for the removal of existing corrugated steel culverts on Smith and Condon Creeks and replacing each with new prestressed precast concrete single span bridges. The work includes but is not limited to clearing and grubbing, erosion control measures, structural excavation, roadway embankment, removing and disposing of existing culverts, compaction, riprap, roadway surfacing, furnishing and erecting prestressed concrete beams, and all other incidental items necessary to complete the project in accordance with the plans and specifications.

C- 2 Project Location

This project is located on Roads 9762 and 901 on the Swan Lake Ranger District in Sections 28 and 17, Township 21 North, Range 16 West, in Missoula County, Montana. The project can be reached by taking U.S. Highway No. 83 between Swan Lake and Seeley Lake, Montana. At the southern edge of USFS Condon Work Center, turn east on Falls Creek Road No. 901. Follow this approx. 3.8 miles to the crossing of Condon Creek (Lat. 47°34’45”N, Long. 113°41’14”W, NAD83). From its intersection on Road 901, follow Smith Creek Road No. 9762 approx. 1.7 miles to the crossing of Smith Creek (Lat. 47°33’10”N, Long. 113°40’03”W, NAD83).

C- 3 Price Range

The Government cost estimate is between $250,000 and $500,000. This is the anticipated price range of this project per FAR 36.204.

C- 4 Government-Furnished Materials

(a) Items 251(14) Rock Weir and 251(15) Individual Habitat Rock - Conserve individual rocks of the specified diameter from the structural excavation for use in constructing the rock weirs. If rocks are not available, the CO will take individual rocks from the riprap quantity or designate rocks from along the creek bank or along the road within 1 mile of the project site.

(b) Item 304(23) Crushed Aggregate Surfacing- Government Source - The designated source for crushed surfacing material is the Government stockpile in the Owl Creek Pit located in Section 1, T.19 N., R. 16 W.

(c) Borrow Source - No borrow source has been designated or is required. Embankment material is to be conserved from the quantity of material removed as Structural Excavation.

(d) Waste Area - Government Provided. The designated waste area for excess and unsuitable material is at the worksite AS SHOWN ON THE PLANS.

(e) Construction staking for the project will be completed by the Government by July 15, 2010.

C- 5 Standard Specifications

Smith and Condon Creek Culvert Replacements Project Specifications for Construction of Roads (July, 2009) are included in this solicitation in its entirety. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract.

C- 6 Supplemental Specifications

No Special Project Specifications are incorporated into this solicitation and any resultant contract.

C- 7 Drawings

See Section J for the listing of Drawings that are incorporated into this solicitation and any resultant contract.

452.211-72 Statement of Work/Specifications. (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

(End of Clause)

452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

(End of Clause)

SECTION D – Packaging and Marking

(FOR THIS SOLICITATION PACKAGE THERE ARE NO CLAUSES IN THIS SECTION)

SECTION E - Inspection and Acceptance

Periodic field inspections will be made by the Contracting Officer’s Representative (COR) or the COR’s designated Inspector. Work not completed to contract standards shall be rejected and reworked without additional compensation to the Contractor.

52.246-12 Inspection of Construction. (APR 1996)

(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not -

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may -

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(End of clause)

SECTION F - Deliveries or Performance

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 September 2010.

The following is added: When the Notice to Proceed is issued it will allow the Contractor to commence work by ordering materials in 2009. All other work will NOT be allowed to begin until the Summer of 2010.

Instream work will be limited to the Period of 15 July 2010 to 15 September 2015. The time stated for completion shall include final cleanup of the premises.

(End of clause)

452.236-75 Maximum Workweek - Construction Schedule. (NOV 1996)

Within 7 calendar days calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposes to carry out the work.

The maximum workweek that will be approved is All Week.

SECTION G - Contract Administration Data

452.215-73 Postaward Conference. (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled within 14 days after the date of contract award. The conference will be held at a mutually agreed upon place and time.

(End of Clause)

SECTION H - Special Contract Requirements

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.236-72 Use of Premises (NOV 1996)

H- 2 Use of Premises

The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform the contract in such a manner as not to interrupt or interfere with the conduct of Government business.

H- 3 AGAR 452.236-77 Emergency Response (NOV 1996)

(a) Contractor’s Responsibility for Fire Fighting.

(1) The Contractor, under the provisions of FAR clause 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work.

(2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor’s agents or employees.

(b) Contractor’s Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.

(c) Contractor’s Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the Changes Clause, FAR 52.243-4.

H- 4 Fire Control

(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.

(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or the Contractor’s employees, the Contractor when requested by the Contracting Officer shall place the employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.

Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.

An equitable adjustment in contract time may be made for this period.

(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by

State law, the Contractor shall comply with each of the following provisions to the extent applicable to the Contractor’s operation under the contract.

(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.

(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.

One - shovel, round point #0 lady or equal.

One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.

One - water container (at least 1-gallon capacity), not required with stationary equipment.

(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.

(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:

One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.

One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.

Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.

(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.

(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.

(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.

(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.

All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.

(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.

(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.

When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:

(i) All high fire risk operations could be terminated at 1300 local time.

(ii) All burning could be stopped, including debris burning fires.

(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.

(12) Burning. Before starting any open burning, the Contractor shall comply with the following:

(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.

(ii) Obtain a burning permit from the District Ranger.

(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.

(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.

(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.

(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his/her discretion, prohibit all open burning for definite periods within specific areas of the National Forest.

H- 5 Loss, Damage, or Destruction

(a) Equipment furnished with operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.

All claims arising under this clause will be submitted to the Contracting Officer.

H- 6 Incidental Payment Items

The intent of the contract is to provide for the complete construction of the project described in the contract.

Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

H- 7 Conformity With Drawings and Specifications

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.

H- 8 Local Material Sources

(a) Designated Sources--Sources of local materials will be designated on the drawings. The Government assumes responsibility for the quality and quantity of material in the source. The Contractor shall determine the equipment and work required to produce the specified product.

The Contractor shall utilize all suitable material in the source. The designation of source will include the rights of the Contractor to use certain area(s) for plant site, stockpiles, and haul roads. Any Contractor royalty payment requirements will be stated below.

When materials are subject to weight measurement, the weight/volume relationship used for determination of designed quantities will be shown on the Drawings.

Should the designated source, due to causes beyond the control of the Contractor, contain insufficient suitable material, the Government will provide another source with an equitable adjustment in accordance with the Differing Site Conditions and Changes clauses.

(b) Contractor-Furnished Sources--When the material sources are not designated as provided above or the Contractor elects not to use designated sources, the Contractor shall be responsible for providing the specified product with no adjustment in contract price, unless weight/volume relationship differences between designated source material and Contractor-furnished source material result in financial disadvantage to the Government. Quality testing shall be the responsibility of the Contractor. Test results shall be furnished to the Contracting Officer.

H- 9 Samples, Tests, Cited Specifications

Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.

H-10 Barricades, Warning Signs, and Other Devices

The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.

Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.

As a minimum, it is anticipated that the following type and number of signs will be required:

Location Designation Quantity

At intersection of Highway 83 & Road No.

At intersection of Road 124A & Road 901

On Road No. 901 approx. 500 ft both sides of Condon Creek construction site

(location agreed to)

Both sides of Condon Creek construction site during culvert removal and bridge construction

"ROAD CLOSED AHEAD

Condon Creek - 3.8 Miles"

Condon Creek – 1.3 Miles"

"ROAD CONSTRUCTION AHEAD"

“ROAD CLOSED”

(36” x 36”)

“Type III Barricades”

(8” rails x 72” length)

Alternate orange and white

Reflectorized stripes

On Road 9762 at intersection with Road

No. 901

On Road No. 9762 approx. 500 ft prior to

Smith Creek construction site (location agreed to)

Smith Creek - 1.7 Miles"

"ROAD CONSTRUCTION AHEAD"

Prior to Smith Creek construction site during culvert removal and bridge construction

“ROAD CLOSED”

(36” x 36”)

“Type III Barricade”

(8” rails x 72” length)

Alternate orange and white

Reflectorized stripes

H-11 Prework Conference

Prior to commencement of work, the Contracting Officer will arrange a meeting with the Contractor to discuss the contract terms and work performance requirements. Also at this meeting such things as work progress schedule and fire prevention and suppression plans shall be developed and established in writing.

H-12 Landscape Preservation

(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.

52.204-11 American Recovery and Reinvestment Act--Reporting Requirements. (MAR 2009)

(a) Definitions. As used in this clause--

"Contract," as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C.

6301, et seq. For discussion of various types of contracts, see FAR Part 16.

"First-tier subcontract" means a subcontract awarded directly by a Federal Government prime contractor whose contract is funded by the Recovery Act.

"Jobs created" means an estimate of those new positions created and filled, or previously existing unfilled positions that are filled, as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.

"Jobs retained" means an estimate of those previously existing filled positions that are retained as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.

"Total compensation" means the cash and noncash dollar value earned by the executive during the contractor's past fiscal year of the following (for more information see 17 CFR 229.402(c)(2)):

(1) Salary and bonus.

(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised 2004) (FAS 123R), Shared Based Payments.

(3) Earnings for services under non-equity incentive plans. Does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.

(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.

(5) Above-market earnings on deferred compensation which is not tax-qualified.

(6). Other compensation. For example, severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property if the value for the executive exceeds $10,000.

(b) This contract requires the contractor to provide products and/or services that are funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act). Section 1512(c) of the Recovery Act requires each contractor to report on its use of Recovery Act funds under this contract. These reports will be made available to the public.

(c) Reports from contractors for all work funded, in whole or in part, by the Recovery Act, and for which an invoice is submitted prior to June 30, 2009, are due no later than July 10, 2009.

Thereafter, reports shall be submitted no later than the 10th day after the end of each calendar quarter.

(d) The Contractor shall report the following information, using the online reporting tool available at http://www.FederalReporting.gov.

(1) The Government contract and order number, as applicable.

(2) The amount of Recovery Act funds invoiced by the contractor for the reporting period. A cumulative amount from all the reports submitted for this action will be maintained by the government's on-line reporting tool.

(3) A list of all significant services performed or supplies delivered, including construction, for which the contractor invoiced in this calendar quarter.

(4) Program or project title, if any.

(5) A description of the overall purpose and expected outcomes or results of the contract, including significant deliverables and, if appropriate, associated units of measure.

(6) An assessment of the contractor's progress towards the completion of the overall purpose and expected outcomes or results of the contract (i.e., not started, less than 50 percent completed, completed 50 percent or more, or fully completed). This covers the contract (or portion thereof) funded by the Recovery Act.

(7) A narrative description of the employment impact of work funded by the Recovery Act. This narrative should be cumulative for each calendar quarter and only address the impact on the contractor's workforce. At a minimum, the contractor shall provide--

(i) A brief description of the types of jobs created and jobs retained in the United States and outlying areas (see definition in FAR 2.101). This description may rely on job titles, broader labor categories, or the contractor's existing practice for describing jobs as long as the terms used are widely understood and describe the general nature of the work; and

(ii) An estimate of the number of jobs created and jobs retained by the prime contractor, in the United States and outlying areas. A job cannot be reported as both created and retained.

(8) Names and total compensation of each of the five most highly compensated officers of the Contractor for the calendar year in which the contract is awarded if--

(i) In the Contractor's preceding fiscal year, the Contractor received--

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(ii) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.

(9) For subcontracts valued at less than $25,000 or any subcontracts awarded to an individual, or subcontracts awarded to a subcontractor that in the previous tax year had gross income under $300,000, the Contractor shall only report the aggregate number of such first tier subcontracts awarded in the quarter and their aggregate total dollar amount.

(10) For any first-tier subcontract funded in whole or in part under the Recovery Act, that is over $25,000 and not subject to reporting under paragraph 9, the contractor shall require the subcontractor to provide the information described in (i), (ix), (x), and (xi) below to the contractor for the purposes of the quarterly report. The contractor shall advise the subcontractor that the information will be made available to the public as required by section 1512 of the Recovery Act. The contractor shall provide detailed information on these first-tier subcontracts as follows:

(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor's parent company, if the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

(iv) Date of the subcontract award.

(v) The applicable North American Industry Classification System (NAICS) code.

(vi) Funding agency.

(vii) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(viii) Subcontract number (the contract number assigned by the prime contractor).

(ix) Subcontractor's physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.

(x) Subcontract primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.

(xi) Names and total compensation of each of the subcontractor's five most highly compensated officers, for the calendar year in which the subcontract is awarded if--

(A) In the subcontractor's preceding fiscal year, the subcontractor received--

(l) 80 percent or more of its annual gross revenues in Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements; and

(2) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements; and

(B) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.

52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American

Act--Construction Materials. (MAR 2009)

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

"Domestic construction material" means--

(1) An unmanufactured construction material mined or produced in the United States; or

(2) A construction material manufactured in the United States.

"Foreign construction material" means a construction material other than a domestic construction material.

"Manufactured construction material" means any construction material that is not unmanufactured construction material.

"Steel" means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

"Unmanufactured construction material" means raw material brought to the construction site for incorporation into the building or work that has not been--

(1) Processed into a specific form and shape; or

(2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials.

(b) Domestic preference. (1) This clause implements--

(i) Section 1605 of the American Recovery and Reinvestment Act of 2009 (Recovery Act) (Pub. L. 111-5), by requiring, unless an exception applies, that all iron, steel, and other manufactured goods used as construction material in the project are produced in the United States;

and

(ii) The Buy American Act (41 U.S.C. 10a-10d) by providing a preference for unmanufactured domestic construction material.

(2) The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraph (b)(3) and (b)(4) of this clause.

(3) This requirement does not apply to the construction material or components listed by the Government as follows:

NONE

(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--

(i) The cost of domestic construction material would be unreasonable.

(A) The cost of domestic iron, steel, or other manufactured goods used as construction material is unreasonable when the cumulative cost of such material will increase the cost of the contract by more than 25 percent;

(B) The cost of unmanufactured construction material is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or

(iii) The application of the restriction of section 1605 of the Recovery Act or the Buy American Act to a particular construction material would be inconsistent with the public interest.

(c) Request for determination of inapplicability of Section 1605 of the Recovery Act or the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Cost;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(4) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph (d) of this clause.

(iii) The cost of construction material shall include all delivery costs to the construction site and any applicable duty.

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to section 1605 of the Recovery Act or the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.

(3) Unless the Government determines that an exception to section 1605 of the Recovery Act or the Buy American Act applies, use of foreign construction material is noncompliant with section 1605 of the American Recovery and Reinvestment Act or the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Cost Comparison

Construction material description Quantity Unit of measure Cost (dollars)*

Item 1:

Foreign construction material [ ] Domestic construction material [ ]

Item 2:

Foreign construction material [ ] Domestic construction material [ ]

(List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.)

(Include other applicable supporting information.)

(* Include all delivery costs to the construction site.)

(End of clause)

52.225-22 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods--Buy

American Act--Construction Materials. (MAR 2009)

52.225-23…