AG-82B1-S-09-0010 1 .rtf
RTF text file 1 MB Posted
- Attached to
- Kalispell Bay Boat Launch Federal contract opportunity
- Solicitation number
- AG-82B1-S-09-0010
About this file
AG-82B1-S-09-0010 Solicitation Package
Text of this file
PART I – THE SCHEDULE …………………………………………………………………………...….3
Section B – Supplies or Services and Prices/Costs Schedule of Items…………………………………...3 Section C – Description/specifications/Statements of Work………………………………………...……8
| HYPERLINK \l "_Toc235517853" Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work in accordance with the contract specifications and drawings. | 8 |
| HYPERLINK \l "_Toc235517854" Section D - Packaging and Marking | 13 |
| HYPERLINK \l "_Toc235517855" Section E - Inspection and Acceptance | 13 |
| HYPERLINK \l "_Toc235517856" 52.252-2 Clauses Incorporated by Reference. (FEB 1998) | 13 |
| HYPERLINK \l "_Toc235517857" Section F - Deliveries or Performance | 13 |
| HYPERLINK \l "_Toc235517858" 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) - Alternate I (APR 1984) | 13 |
| HYPERLINK \l "_Toc235517859" 52.252-2 Clauses Incorporated by Reference. (FEB 1998) | 13 |
| HYPERLINK \l "_Toc235517860" Section G - Contract Administration Data | 13 |
| HYPERLINK \l "_Toc235517861" Section H - Special Contract Requirements | 14 |
| HYPERLINK \l "_Toc235517862" FIRE CONTROL | 14 |
| HYPERLINK \l "_Toc235517863" 52.252-2 Clauses Incorporated by Reference. (FEB 1998) | 17 |
| HYPERLINK \l "_Toc235517864" PART II - Contract Clauses | 18 |
| HYPERLINK \l "_Toc235517865" 52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009. (MAR 2009) | 19 |
| HYPERLINK \l "_Toc235517866" 52.204-7 Central Contractor Registration. (APR 2008) | 19 |
| HYPERLINK \l "_Toc235517867" 52.204-11 American Recovery and Reinvestment Act--Reporting Requirements. (MAR 2009) | 22 |
| HYPERLINK \l "_Toc235517868" 52.217-7 Option for Increased Quantity - Separately Priced Line Item. (MAR 1989) | 25 |
| HYPERLINK \l "_Toc235517869" 52.222-39 Notification of Employee Rights Concerning Payment of Union Dues or Fees. (DEC 2004) | 25 |
| HYPERLINK \l "_Toc235517870" 52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials. (MAR 2009) | 27 |
| HYPERLINK \l "_Toc235517871" 52.236-8 Other Contracts. (APR 1984) | 30 |
| HYPERLINK \l "_Toc235517872" 52.244-6 Subcontracts for Commercial Items. (MAR 2009) | 30 |
| HYPERLINK \l "_Toc235517873" 452.228-70 Alternative Forms of Security. (NOV 1996) | 31 |
| HYPERLINK \l "_Toc235517874" Part III – List of Documents, Exhibits, and Other Attachments | 31 |
| HYPERLINK \l "_Toc235517875" Part IV - Representations, Certifications, and Other Statements of Offerors or Respondents | 39 |
| HYPERLINK \l "_Toc235517876" 52.209-5 Certification Regarding Responsibility Matters. (DEC 2008) | 39 |
| HYPERLINK \l "_Toc235517877" 52.219-28 Post-Award Small Business Program Rerepresentation. (APR 2009) | 41 |
| HYPERLINK \l "_Toc235517878" 52.223-1 Biobased Product Certification. (DEC 2007) | 42 |
| HYPERLINK \l "_Toc235517879" 52.223-13 Certification of Toxic Chemical Release Reporting. (AUG 2003) | 42 |
| HYPERLINK \l "_Toc235517880" 452.219-70 Size Standard and NAICS Code Information. (SEP 2001) | 43 |
| HYPERLINK \l "_Toc235517881" Section L - Instructions, Conditions, and Notices to Offerors or Respondents | 51 |
| HYPERLINK \l "_Toc235517882" 52.216-1 Type of Contract. (APR 1984) | 51 |
| HYPERLINK \l "_Toc235517883" 52.222-5 Davis-Bacon Act--Secondary Site of the Work. (JUL 2005) | 51 |
| HYPERLINK \l "_Toc235517884" 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999) | 51 |
| HYPERLINK \l "_Toc235517885" 52.225-22 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials. (MAR 2009) | 52 |
| HYPERLINK \l "_Toc235517886" 52.233-2 Service of Protest. (SEP 2006) | 53 |
| HYPERLINK \l "_Toc235517887" 52.236-27 Site Visit (Construction). (FEB 1995) | 53 |
| HYPERLINK \l "_Toc235517888" 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) | 54 |
| HYPERLINK \l "_Toc235517889" 452.237-71 Pre-Bid/Pre-Proposal Conference. (FEB 1988) | 57 |
| HYPERLINK \l "_Toc235517890" Section M - Evaluation Factors for Award | 58 |
| HYPERLINK \l "_Toc235517891" 52.217-5 Evaluation of Options. (JUL 1990) | 60 |
PART I – THE SCHEDULE
SECTION B – SERVICES AND PRICES
Kalispell Bay Boat Launch Facility Priest Lake Ranger District Idaho Panhandle National Forests Bonner County, Idaho
B- 1 - SCHEDULE OF ITEMS –
BASE BID - SCHEDULE A, ACCESS ROAD
ITEM
NO.
DESCRIPTION
METHOD OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101A Mobilization
LSQ
LS
15220A Construction Survey & Staking
LSQ
LS
15713A
Soil Erosion & Pollution Control
LSQ
LS
20101A Clearing & Grubbing
LSQ
LS
20303 Removal of Existing CMP Culvert
AQ
EA
20401A Roadway Excavation
DQ
CY
30101A Aggregate Base, Grading D Roadway (Commercial)
DQ
CY
40403A Minor Hot Asphalt Concrete, 2” Thickness, Roadway
AQ
SY
60201A 18 Inch Pipe Culvert
AQ
LF
60401 Sediment Basin w/Granular Backfill
AQ
EA
62528A Seeding, Fertilizing , and Mulching, Hydraulic Method
LSQ
LS
63303A Signs, Aluminum, with Posts
AQ
EA
TOTAL $_____________
*Designated Method of Measurement: DQ – Designed Quantities; AQ – Actual Quantities;
LSQ – Lump Sum Quantities; SQ – Staked Quantities
BASE BID - SCHEDULE B, DOCK IMPROVEMENTS
ITEM
NO.
DESCRIPTION
METHOD OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
15101B
LSQ
LS
15713B
Soil Erosion & Pollution Control
LSQ
LS
20304 Removal of Existing Dock System
LSQ
LS
30101B Aggregate Base, Grading D (Commercial)
DQ
CY
55206 Structural Concrete, Class A(AE) for Concrete Abutment
LSQ
LS
553A01A
Precast Concrete Member, Ramp Plank
AQ
EA
553A01B
Precast Concrete Member, Erosion Block
AQ
EA
61501 6” Concrete Sidewalk
DQ
SY
61504 6” Drive Pad
DQ
SY
63603 Electrical Installation
LSQ
LS
64501 Prefabricated Gangway
AQ
EA
64601A Floatable Steel Truss Dock (110 Lineal Feet)
LSQ
LS
64701 Permanent Steel Truss pier (35 Lineal Feet)
LSQ
LS
BASE BID - SCHEDULE C, LAUNCH AREA SITE IMPROVEMENTS
ITEM
NO.
DESCRIPTION
METHOD OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
15101C
LSQ
LS
15220B Construction Survey & Staking
LSQ
LS
ITEM
NO.
DESCRIPTION
METHOD OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
15713C
Soil Erosion & Pollution Control
LSQ
LS
20101B Clearing & Grubbing
LSQ
LS
20402 Roadway Embankment, ADA Trail
DQ
CY
25701 Landscape Block Wall
AQ
SF
30101C Aggregate Base, Grading D, Launch
DQ
CY
30101D Aggregate Base, Grading D, Trail
DQ
CY
40403B Minor Hot Asphalt Concrete, 2” Thickness, Launch Area
AQ
SY
40403C Minor Hot Asphalt Concrete, 2” Thickness, ADA Trail
AQ
SY
40404 Paved Ditch
AQ
LF
60110A Precast Concrete Pin-Down Curb
AQ
EA
60201B 24 Inch Pipe Culvert
AQ
LF
60211 18 Inch Slotted Drain
AQ
LF
60412A Precast Concrete Sump
AQ
EA
60413 Concrete Catch Basin
AQ
EA
62201
Hydraulic Excavator
AQ
HR
62202
Large Dump Truck
AQ
HR
62528B Seeding, Fertilizing , and Mulching, Hydraulic Method
LSQ
LS
63303B Signs, Aluminum, with Posts
AQ
EA
63305
Plastic Yellow Speed Bump
AQ
LF
BASE BID - SCHEDULE D, PARKING LOT IMPROVEMENTS
ITEM
NO.
DESCRIPTION
METHOD OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
15101D
LSQ
LS
15220C Construction Survey & Staking
LSQ
LS
15713D
Soil Erosion & Pollution Control
LSQ
LS
20101C Clearing & Grubbing
LSQ
LS
20401B Roadway Excavation
DQ
CY
30101E Aggregate Base, Grading D, Parking Lot (Commercial Source)
DQ
CY
40403D Minor Hot Asphalt Concrete, 2” Thickness, Launch Area
AQ
SY
60110B Precast Concrete Pin-Down Curb
AQ
EA
60412B Precast Concrete Sump
AQ
EA
62528C Seeding, Fertilizing , and Mulching, Hydraulic Method
LSQ
LS
63303C Signs, Aluminum, with Posts
AQ
EA
63401A
Pavement Markings Type A, Color White
AQ
LF
63402
Pavement Markings Type A, Color White, Handicap Parking
LSQ
LS
OPTIONAL ITEM 1, ADDITIONAL DOCK
NO.
DESCRIPTION
METHOD OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
64601B Floatable Steel Truss Dock (40 Lineal Feet)
LSQ
LS
OPTIONAL ITEM 2, OVERFLOW PARKING
NO.
DESCRIPTION
METHOD OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
15101E
LSQ
LS
15220D Construction Survey & Staking
LSQ
LS
15713E
Soil Erosion & Pollution Control
LSQ
LS
20101D Clearing & Grubbing
LSQ
LS
20401C Roadway Excavation
DQ
CY
25101A
Class 1 Riprap
DQ
CY
25101B
Class 3 Riprap
DQ
CY
30101F Aggregate Base, Grading D, Overflow Parking
DQ
CY
40403E Minor Hot Asphalt Concrete, 2” Thickness, Launch Area
AQ
SY
60110C Precast Concrete Pin-Down Curb
AQ
EA
60202 28 Inch Span X 20” Rise CSP Pipe-Arch
AQ
LF
60412C Precast Concrete Sump
AQ
EA
62203
Grader
AQ
HR
ITEM
NO.
DESCRIPTION
METHOD OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
62528D Seeding, Fertilizing , and Mulching, Hydraulic Method
LSQ
LS
63303D Signs, Aluminum, with Posts
AQ
EA
63401B
Pavement Markings Type A, Color White
AQ
LF
63403
Pavement Markings Type A, Color Yellow
AQ
LF
OPTIONAL ITEM 3, ASPHALT OVERLAY
NO.
DESCRIPTION
METHOD OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
40405 Minor Hot Asphalt Concrete Overlay 1-1/2 Inch Thickness with Tack Coat
AQ
TON
Offerors must submit a price proposal for Base Bid Items and all Optional Bid Items. One award will be made based upon the best overall value to the Government for Base Bid Items or Base Bid Item and Optional Bid Item(s). Proposals will be evaluated in accordance with Section L and M.
PART I - THE SCHEDULE
SECTION C - DESCRIPTION AND SPECIFICATIONS
C- 1 - PROJECT DESCRIPTION AND LOCATION
- Description of Work. This project is for the removal and disposal of an existing dock system and replacing it with a new steel truss dock system, and to make improvements to the dock/pier system, launch area, access roads and parking areas. Project includes designing, furnishing, and installing floatable and permanent steel truss dock systems, furnishing and installing piling, forming and placing concrete for sidewalks, drive pad and dock abutment, furnishing and installing precast boat ramp planks, excavation, embankment, crushed aggregate surfacing, asphalt paving, surface drainage improvements and all other incidental work items necessary to complete the project in accordance with the plans and specifications.
Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work in accordance with the contract specifications and drawings.
(b) - Project Location. The Kalispell Bay Boat Launch Facility can be reached by taking SH57 north from Priest River, Idaho 31.4 miles to Kalispell Bay Road (County Road No. 170). Turn right off SH57 onto Kalispell Bay Road and continue east for another 0.97 miles to junction with West Lakeshore Road (County Road No. 35). Turn right on West Lakeshore Road and continue south along Priest Lake approximately 0.43 miles to the Kalispell Point Boat Launch located just beyond the Kalispell Bay Marina. This project is located in Section 12, Township 60 North, Range 5 West, in Bonner County, Idaho.
- Pre-Bid Tour. A pre-bid tour is scheduled for July 27, 2009. The pre-bid tour is scheduled for 10:00 a.m., meeting at the Priest Lake Ranger District Office for a pre-bid conference and then proceeding to the project site.
- Pre-Bid Conference: To be conducted in conjunction with the pre-bid tour scheduled for July 27, 2009. Interested bidders may obtain additional information by contacting William M. Pfeifer or Larry Shepherd at:
| Contracting Questions: | Technical Questions: | |||
| William M. Pfeifer | Larry Shepherd | |||
| USDA Forest Service | USDA Forest Service | |||
| Supervisor’s Office | Supervisor’s Office | |||
| PO Box 130 | 3815 Schreiber Way | |||
| Bozeman, MT 59771 | Coeur d’Alene, Idaho 83815 | |||
| Telephone: (303) 908-3120 | Telephone: (208) 765-7408 |
- Start Work. It is estimated that the notice to proceed under this contract will be issued by approximately September 1, 2009.
- Period of Performance. See Part 1, Section F, Clause 53.211-10. All work under this contract has a completion date of October 30, 2010. Asphalt work will be allowed to be completed in June of 2011 with Contracting Officer approval should weather conditions prevent late fall 2010 asphalt work from being completed in accordance with specifications.
- Restrictions. On site work is anticipated for May 1, 2010 through October 30, 2010 as follows:
| May 1, 2010 – Anticipated start work depending on site conditions (snow melt). Facility may be closed to public use from May 1 through June 30, 2010 for construction under this contract. |
| July 1, 2010 through September 6, 2010 – The facility will be open to public use during the period of July 1 through September 6, 2010. The only contract work allowed on site during this public use period will be construction associated with the Optional Bid Item 2 – Overflow Parking. On July 1st when the facility is open for public use, the Contractor will have the facility in a functional condition for safe public use including boat launch, docks, parking and access roads. This does not mean that these facilities must be completed but instead requires construction progress to a completion level for safe public use from July 1, 2010 through September 6, 2010. |
| September 7, 2010 to October 30, 2010 – Facility may be closed to public use from September 7, 2010 through October 30, 2010 for completion of project work items. |
| June 2011 – Facility may be closed to public use for a 10 day period for completion of asphalt work should fall temperatures/weather prevent completion in 2010. |
See Supplemental Project Specification Section 156 for facility closure period and construction site signing requirements.
C- 2 - GOVERNMENT-FURNISHED PROPERTY. None
C-3 - STANDARD SPECIFICATIONS. "FHWA FP-03 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS” are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this Solicitation and any resultant contract.
Copies of the "FHWA FP-03 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS" are available for download at the following URL:
http://www.wfl.fha.dot.gov/design/specs/fp03.htm.
The following “FHWA FP-03 Standard Specifications FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS” is included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract.
Section Title Date
| Preface | 2003 | ||||||||
| Section 101 | Terms, Format, and Definitions | 2003 | |||||||
| Section 102 | Bid, Award, and Execution of Contract | 2003 | |||||||
| Section 103 | Scope of Work | 2003 | |||||||
| Section 104 | Control of Work | 2003 | |||||||
| Section 105 | Control of Material | 2003 | |||||||
| Section 106 | Acceptance of Work | 2003 | |||||||
| Section 107 | Legal Relations and Responsibility To the Public | 2003 | |||||||
| Section 108 | Prosecution and Progress | 2003 | |||||||
| Section 109 | Measurement and Payment | 2003 | |||||||
| Section 151 | Mobilization | 2003 | |||||||
| Section 152 | Construction Survey and Staking | 2003 | |||||||
| Section 153 | Contractor Quality Control | 2003 | |||||||
| Section 154 | Contractor Sampling and Testing | 2003 | |||||||
| Section 156 | Public Traffic | 2003 | |||||||
| Section 157 | Soil Erosion Control | 2003 | |||||||
| Section 201 | Clearing and Grubbing | 2003 | |||||||
| Section 203 | Removal of Structures and Obstructions | 2003 | |||||||
| Section 204 | Excavation and Embankment | 2003 | |||||||
| Section 209 | Structure Excavation and Backfill | 2003 | |||||||
| Section 301 | Untreated Aggregate Courses | 2003 | |||||||
| Section 404 | Minor Hot Asphalt Concrete | 2003 | |||||||
| Section 412 | Asphalt Tack Coat | 2003 | |||||||
| Section 551 | Driven Pile | 2003 | |||||||
| Section 552 | Structural Concrete | 2003 | |||||||
| Section 554 | Reinforcing Steel | 2003 | |||||||
| Section 555 | Steel Structures | 2003 | |||||||
| Section 562 | Temporary Works | 2003 | |||||||
| Section 601 | Minor Concrete Structures | 2003 | |||||||
| Section 602 | Culverts and Drains | 2003 | |||||||
| Section 604 | Manholes, Inlets, and Catch Basins | 2003 | |||||||
| Section 622 | Rental Equipment | 2003 | |||||||
| Section 625 | Turf Establishment | 2003 | |||||||
| Section 633 | Permanent Traffic Control | 2003 | |||||||
| Section 634 | Permanent Pavement Markings | 2003 | |||||||
| Section 635 | Temporary Traffic Control | 2003 | |||||||
| Section 636 | Signal, Lighting, and Electrical Systems | 2003 | |||||||
| Section 701 | Cement | 2003 | |||||||
| Section 702 | Asphalt Material | 2003 | |||||||
| Section 703 | Aggregate | 2003 | |||||||
| Section 704 | Soil | 2003 | |||||||
| Section 707 | Metal Pipe | 2003 | |||||||
| Section 709 | Reinforcing Steel and Wire Rope | 2003 | |||||||
| Section 711 | Concrete Curing Material and Admixtures | 2003 | |||||||
| Section 712 | Joint Material | 2003 | |||||||
| Section 713 | Roadside Improvement Material | 2003 | |||||||
| Section 715 | Piling | 2003 | |||||||
| Section 717 | Structural Metal | 2003 | |||||||
| Section 718 | Traffic Signing and Marking Material | 2003 | |||||||
| Section 721 | Electrical and Illumination Material | 2003 | |||||||
| Section 725 | Miscellaneous Materials | 2003 |
C-4 – SUPPLEMENTAL SPECIFICATIONS. The following Forest Service Supplemental Specifications are applicable to this contract and are physically included in this section:
Section Title Pages
| Preface | 1 | ||||||||
| 101 | Terms, Format, and Definitions | 3 | |||||||
| 102 | Bid, Award, and Execution of Contract | 1 | |||||||
| 103 | Scope of Work | 1 | |||||||
| 104 | Control of Work | 2 | |||||||
| 105 | Control of Materials | 1 | |||||||
| 106 | Acceptance of Work | 3 | |||||||
| 107 | Legal Relations and Responsibility to the Public | 3 | |||||||
| 108 | Prosecution and Progress | 1 | |||||||
| 109 | Measurement and Payment | 2 | |||||||
| 151 | Mobilization | 3 | |||||||
| 152 | Construction Survey & Staking | 1 | |||||||
| 153 | Contractor Quality Control | 1 | |||||||
| 154 | Contractor Sampling and Testing | 2 | |||||||
| 155 | Schedules for Construction Contracts | 1 | |||||||
| 156 | Public Traffic | 2 | |||||||
| 157 | Soil Erosion Control | 3 | |||||||
| 201 | Clearing and Grubbing | 1 | |||||||
| 203 | Removal of Structures and Obstructions | 2 | |||||||
| 204 | Excavation and Embankment | 3 | |||||||
| 209 | Structure Excavation and Backfill | 1 | |||||||
| 301 | Untreated Aggregate Courses | 1 | |||||||
| 404 | Minor Hot Asphalt Concrete | 3 | |||||||
| 412 | Asphalt Tack Coat | 1 | |||||||
| 551 | Driven Pile | 2 | |||||||
| 552 | Structural Concrete | 4 | |||||||
| 553A | Precast Concrete Structures | 3 | |||||||
| 554 | Reinforcing Steel | 1 | |||||||
| 601 | Minor Concrete | 5 | |||||||
| 604 | Manholes, Inlets, and Catch Basins | 1 | |||||||
| 622 | Rental Equipment | 1 | |||||||
| 625 | Turf Establishment | 3 | |||||||
| 636 | Signal, Lighting and Electrical Systems | 1 | |||||||
| 645 | Prefabricated Dock Gangway | 2 | |||||||
| 646 | Prefabricated Floatable Steel Truss Dock | 3 | |||||||
| 647 | Prefabricated Permanent Steel Truss Dock | 3 | |||||||
| 703 | Aggregate | 1 | |||||||
| 713 | Roadside Improvement Material | 1 | |||||||
| 718 | Traffic Signing and Marking Material | 1 | |||||||
| 725 | Miscellaneous Material | 1 |
C- 5 – DRAWINGS
Description Page No.
| Title Sheet | 1 | |
| Summary of Quantities | 2 | |
| Project General Layout | 3 | |
| General Notes | 4 |
| Base Bid – Schedule A | |
| Access Road Improvements – Roadway Plan and Profile | 5 |
| Access Road Improvements – Typical Section & Details | 6 |
| Base Bid – Schedule B & Optional Bid Item No. 1 | ||
| Dock Improvements – Demolition and Site Plan | 7 | |
| Dock Improvements – Typical Dock Sections | 8 | |
| Dock Improvements – East Dock Details | 9 | |
| Dock Improvements – West Dock Details | 10 | |
| Dock Improvements – Boat Ramp Details | 11 |
| Base Bid – Schedule C | |||
| Launch Area Site Improvements | 12 | ||
| Launch Area Sections & Details | 13 | ||
| Launch Area Details | 14 | ||
| Launch Area Catch Basin Details | 15 | ||
| Launch Area Site Improvements – ADA Trail | 16 |
| Base Bid – Schedule D | |
| Parking Lot Improvements – Main Parking Area | 17 |
| Parking Lot Improvements – Upper Parking Area | 18 |
| Optional Bid Item 2 | ||
| New Overflow Parking – General Layout | 19 | |
| New Overflow Parking – Sections | 20 |
Roadway Cross Sections SX1 – SX3
Section D - Packaging and Marking
Section E - Inspection and Acceptance
52.246-12 Inspection of Construction. (APR 1996)
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.arnet.gov/far/
(End of clause)
Section F - Deliveries or Performance
52.242-14 Suspension of Work. (APR 1984)
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) - Alternate I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 October 2010. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 1 September 2009. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of clause)
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.arnet.gov/far/
(End of clause)
Section G - Contract Administration Data
Section H - Special Contract Requirements
Noxious Weed Control. Prior to moving of the equipment to the worksite, the Contractor shall be required to clean all equipment prior to entry on to the project area. This cleaning shall remove all dirt and plant parts and material that could carry noxious weed seeds into the project area. Failure to provide clean equipment may result in the rejection of equipment.
FIRE CONTROL
(a) - Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.
(b) - Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.
Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.
An equitable adjustment in contract time may be made for this period.
(c) - Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract.
(1) - Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.
(2) - Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:
| One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating. |
| One - shovel, round point #0 lady or equal. |
| One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski. |
| One - water container (at least 1-gallon capacity), not required with stationary equipment. |
(3) - Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.
(4) - Powersaws. For each powersaw used in connection with this contract, the following will be provided:
One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.
One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.
Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.
(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.
(6) - Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.
(7) - Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.
(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.
(9) - Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.
All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.
(10) - Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.
(11) - Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.
| When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed: | |
| (i) All high fire risk operations could be terminated at 1300 local time. | |
| (ii) All burning could be stopped, including debris burning fires. | |
| (iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman. |
(12) - Pump and Trailer will generally be required when the Contracting Officer determines that fuel moisture and weather conditions warrant this additional protective measure. The Contractor shall provide at a location satisfactory to the Contracting Officer, a serviceable truck or trailer, equipped with a fire fighting tanker unit to be kept ready for instant use for suppressing forest fires. The unit shall consist of a tank of not less than 100-gallon capacity upon which shall be mounted a live hose reel or live hose basket with 250 feet of at least 3/4-inch I.D. heavy-duty rubber hose; a portable or power takeoff pump with discharge capacity of at least 10 gallons per minute at 150 P.S.I. pressure. Gear type pumps shall be provided with a bypass or pressure relief valve so that the hose nozzle may be shut while the pump is operating. Each tanker unit shall have a hose nozzle of the shut-off type, adjustable for straight stream, spray or fog, at least 12 feet of 1-inch suction hose with an intake screen, an additional 250 feet of 3/4-inch heavy-duty rubber hose or 1-inch cotton jacket rubber-lined or linen hose to be carried on the unit for use as needed. Tools, adapters, accessories and fuel necessary to operate the pump and truck or trailer shall be provided. If a trailer is used, a serviceable vehicle with the proper trailer tow hitch shall be located at a point satisfactory to the Contracting Officer. Where water is available, a supply sufficient for rapidly filling the water tank shall be provided at one or more accessible points along or adjacent to the main truck roads.
| (13) - Burning. Before starting any open burning, the Contractor shall comply with the following: | |
| (i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage. | |
| (ii) Obtain a burning permit from the District Ranger. | |
| (iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke. | |
| (iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires. | |
| (v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period. | |
| (vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his discretion, prohibit all open burning for definite periods within specific areas of the National Forest. |
452.236-77 Emergency Response. (NOV 1996)
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.arnet.gov/far/ or http://www,usda.gov/procurement/policy/agar.html
(End of clause)
PART II - Contract Clauses Section I – Contract Clauses
52.202-1 Definitions. (JUL 2004) 52.203-3 Gratuities. (APR 1984) 52.203-5 Covenant Against Contingent Fees. (APR 1984) 52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006) 52.203-7 Anti-Kickback Procedures. (JUL 1995) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (JAN 1997) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (JAN 1997) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (SEP 2007) 52.204-4 Printed or Copied Double-Sided on Recycled Paper. (AUG 2000) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (SEP 2006) 52.211-18 Variation in Estimated Quantity. (APR 1984) 52.215-2 Audit and Records - Negotiation. (MAR 2009) 52.219-3 Notice of Total HUBZone Set-Aside. (JAN 1999) 52.219-14 Limitations on Subcontracting. (DEC 1996) 52.222-3 Convict Labor. (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (JUL 2005) 52.222-6 Davis-Bacon Act. (JUL 2005) 52.222-7 Withholding of Funds. (FEB 1988) 52.222-8 Payrolls and Basic Records. (FEB 1988) 52.222-9 Apprentices and Trainees. (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) 52.222-11 Subcontracts (Labor Standards). (JUL 2005) 52.222-12 Contract Termination - Debarment. (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (FEB 1988) 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) 52.222-15 Certification of Eligibility. (FEB 1988) 52.222-21 Prohibition of Segregated Facilities. (FEB 1999) 52.222-26 Equal Opportunity. (MAR 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction. (FEB 1999) 52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans. (SEP 2006) 52.222-36 Affirmative Action for Workers with Disabilities. (JUN 1998) 52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans. (SEP 2006) 52.222-50 Combating Trafficking in Persons. (FEB 2009) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (DEC 2007) 52.223-6 Drug-Free Workplace. (MAY 2001) 52.223-14 Toxic Chemical Release Reporting. (AUG 2003) 52.223-15 Energy Efficiency in Energy-Consuming Products. (DEC 2007) 52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008) 52.227-1 Authorization and Consent. (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. (DEC 2007) 52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007) 52.228-2 Additional Bond Security. (OCT 1997) 52.228-11 Pledges of Assets. (FEB 1992) 52.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995) 52.228-14 Irrevocable Letter of Credit. (DEC 1999) 52.228-15 Performance and Payment Bonds - Construction. (NOV 2006) 52.229-3 Federal, State, and Local Taxes. (APR 2003) 52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002) 52.232-17 Interest. (OCT 2008) 52.232-23 Assignment of Claims. (JAN 1986) 52.232-27 Prompt Payment For Construction Contracts. (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (OCT 2003) 52.233-1 Disputes. (JUL 2002) 52.233-3 Protest after Award. (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) 52.236-2 Differing Site Conditions. (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-5 Material and Workmanship. (APR 1984) 52.236-6 Superintendence by the Contractor. (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) 52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984) 52.236-12 Cleaning Up. (APR 1984) 52.236-13 Accident Prevention. (NOV 1991) 52.236-15 Schedules for Construction Contracts. (APR 1984) 52.236-16 Quantity Surveys. (APR 1984) 52.236-17 Layout of Work. (APR 1984) 52.236-21 Specifications and Drawings for Construction. (FEB 1997) 52.236-26 Preconstruction Conference. (FEB 1995) 52.242-13 Bankruptcy. (JUL 1995) 52.243-4 Changes. (JUN 2007) 52.245-1 Government Property. (JUN 2007) 52.246-21 Warranty of Construction. (MAR 1994) 52.248-3 Value Engineering - Construction. (SEP 2006) 52.249-2 Termination for Convenience of the Government (Fixed-Price). (MAY 2004) 52.249-10 Default (Fixed-Price Construction). (APR 1984) 52.253-1 Computer Generated Forms. (JAN 1991)
452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996) 452.236-71 Prohibition Against the Use of Lead-Based Paint. (NOV 1996) 452.236-72 Use of Premises. (NOV 1996) 452.236-73 Archaeological or Historic Sites. (FEB 1988) 452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996) 452.236-76 Samples and Certificates. (FEB 1988)
52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009. (MAR 2009)
(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5).
(b) The Contractor shall include the substance of this clause including this paragraph (b) in all subcontracts.
(End of clause)
52.204-7 Central Contractor Registration. (APR 2008)
(a) Definitions. As used in this clause--
"Central Contractor Registration (CCR) database" means the primary Government repository for Contractor information required for the conduct of business with the Government.
"Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
"Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.
"Registered in the CCR database" means that--
(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and
(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record "Active". The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.
(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "DUNS" or "DUNS +4" followed by the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number--
(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company Physical Street Address, City, State, and Zip Code.
(iv) Company Mailing Address, City, State and Zip Code (if separate from physical).
(v) Company Telephone Number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(g)(1)(i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to (A) change the name in the CCR database; (B) comply with the requirements of Subpart 42.12 of the FAR; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor's CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of payment" paragraph of the EFT clause of this contract.
(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.
(End of clause)
52.204-11 American Recovery and Reinvestment Act--Reporting Requirements. (MAR 2009)
(a) Definitions. As used in this clause--
"Contract," as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C. 6301, et seq. For discussion of various types of contracts, see FAR Part 16.
"First-tier subcontract" means a subcontract awarded directly by a Federal Government prime contractor whose contract is funded by the Recovery Act.
"Jobs created" means an estimate of those new positions created and filled, or previously existing unfilled positions that are filled, as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.
"Jobs retained" means an estimate of those previously existing filled positions that are retained as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.
"Total compensation" means the cash and noncash dollar value earned by the executive during the contractor's past fiscal year of the following (for more information see 17 CFR 229.402(c)(2)):
(1) Salary and bonus.
(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised 2004) (FAS 123R), Shared Based Payments.
(3) Earnings for services under non-equity incentive plans. Does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.
(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.
(5) Above-market earnings on deferred compensation which is not tax-qualified.
(6). Other compensation. For example, severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property if the value for the executive exceeds $10,000.
(b) This contract requires the contractor to provide products and/or services that are funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act). Section 1512(c) of the Recovery Act requires each contractor to report on its use of Recovery Act funds under this contract. These reports will be made available to the public.
(c) Reports from contractors for all work funded, in whole or in part, by the Recovery Act, and for which an invoice is submitted prior to June 30, 2009, are due no later than July 10, 2009. Thereafter, reports shall be submitted no later than the 10th day after the end of each calendar quarter.
(d) The Contractor shall report the following information, using the online reporting tool available at http://www.FederalReporting.gov.
(1) The Government contract and order number, as applicable.
(2) The amount of Recovery Act funds invoiced by the contractor for the reporting period. A cumulative amount from all the reports submitted for this action will be maintained by the government's on-line reporting tool.
(3) A list of all significant services performed or supplies delivered, including construction, for which the contractor invoiced in this calendar quarter.
(4) Program or project title, if any.
(5) A description of the overall purpose and expected outcomes or results of the contract, including significant deliverables and, if appropriate, associated units of measure.
(6) An assessment of the contractor's progress towards the completion of the overall purpose and expected outcomes or results of the contract (i.e., not started, less than 50 percent completed, completed 50 percent or more, or fully completed). This covers the contract (or portion thereof) funded by the Recovery Act.
(7) A narrative description of the employment impact of work funded by the Recovery Act. This narrative should be cumulative for each calendar quarter and only address the impact on the contractor's workforce. At a minimum, the contractor shall provide--
(i) A brief description of the types of jobs created and jobs retained in the United States and outlying areas (see definition in FAR 2.101). This description may rely on job titles, broader labor categories, or the contractor's existing practice for describing jobs as long as the terms used are widely understood and describe the general nature of the work; and
(ii) An estimate of the number of jobs created and jobs retained by the prime contractor, in the United States and outlying areas. A job cannot be reported as both created and retained.
(8) Names and total compensation of each of the five…
This is the start of the file's text. The full file is on GovTribe.
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| sf_30 - 2.doc | DOC document | |
| Page 3 of 3.doc | DOC document | |
| sf_30.doc | DOC document | |
| Supplimental Specifications_Final.doc | DOC document | |
| Kalispell Boat Dock 6_13_09.pdf | ||
| SF 1442 Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .