Amendment_00001_Q A.pdf
PDF 171 KB Posted
- Attached to
- HVAC Replacement - Flatwoods Job Corps Center Federal contract opportunity
- Solicitation number
- AG-82A7-S-15-0073
About this file
Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_Amend_00002.pdf | ||
| SF-30_Amendment_00002_S-15-0073.pdf | ||
| FJCC_HVAC_Dwgs_rev20Aug2015.pdf | ||
| SF30_-_Amend_00001.pdf | ||
| DB_Wage_Determinations.pdf | ||
| SOW_and_TC_-_HVAC_Flatwoods.pdf | ||
| SF1442_-_AG-82A7-S-15-0073.pdf | ||
| QUOTE_SUBMISSION_QUESTIONAIRE.docx | DOCX document | |
| FJCC_HVAC_all_specs.pdf | ||
| FJCC_HVAC_Dwgs_rev15Apr2015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 00001 – AF-82A7-S-15-0073
Question #1: For Heat Pumps #1-#6 (Female Dorm) is a Trane product acceptable in lieu of York?
Answer: Another product is acceptable as long as it meets the salient characteristics shown on the Schedule on ME0.1 and listed in Specification Section 237433. We cannot guarantee approval at this time. The Gov’t will review submittals on all products after contract award.
Question #2: on ME0.1, why is the Tonnage for HVAC-1 and HVAC-2 listed as 27.5 Tons each, when the units specified have a capacity of 10 Tons each?
Answer: ME0.1 is in error. The “Ton” column should read “10”.
Question #3: Regarding the double wall ductwork specified in Paragraph 2.2 of Specification Section 230000, is a specific brand required, or can the product be field assembled?
Answer: Field assembled double wall ductwork is acceptable, as long as it meets the requirements of the specifications.