REVISED REQUEST FOR QUOTATIONS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No2_S-16-0015_Pinedale_water_line.pdf | ||
| Amendment_No1_S-16-0015.pdf | ||
| RETURN_PACKAGE_S-16-0015_version_2.pdf | ||
| Informational_-_Well55-642649.pdf | ||
| Exhibit4_Specifications(PinedaleWater).pdf | ||
| Exhibit5_AsBuilt.pdf | ||
| Exhibit3_Drawings.pdf | ||
| RETURN_PACKAGE_S-16-0015.pdf | ||
| S-16-0015_Pinedale_Water_Line_version_1.pdf | ||
| Exhibit6_SitePictures.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-8173-S-16-0015
REVISED
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFQ)
3. DATE ISSUED
03/25/2016
PAGE OF PAGES
1 51
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
787228
6. PROJECT NO.
7. ISSUED BY CODE 8173 8. ADDRESS OFFER TO
USDA FOREST SERVICE
APACHE SITGREAVES NATIONAL FOREST
PO BOX 640
30 S CHIRICAHUA DR
SPRINGERVILLE AZ 85938
USDA FOREST SERVICE
APACHE SITGREAVES NATIONAL FOREST
30 S CHIRICAHUA DR POB 640
SPRINGERVILLE AZ 85938
9. FOR INFORMATION
CALL:
A. NAME
WARREN ABBOTT
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
928-333-6344
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Construction: Pinedale Admin. New Water Line -- Lakeside Ranger District
NAICS: 237110 Size standard $36.5 Million – 100 percent Small Business set-aside
Davis-Bacon Wages applies.
Basis for award will be Best Value - Tradeoffs – See Section M for requirements.
Range: Between $25,000 and $100,000
11. The Contractor shall begin performance within 5 calendar days and complete it within 60 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 4:00pm (hour) local time April 20, 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)
CONSTRUCTION RFQ 1 | P a g e SOL NO. AG-8173-S-16-0015 APACHE-SITGREAVES NFs
PINEDALE ADMIN NEW WATER LINE
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 8173 27. PAYMENT WILL BE MADE BY
USDA FOREST SERVICE APACHE SITGREAVES
NATIONAL FOREST POB 640
30 S CHIRICAHUA DR SPRINGERVILLE AZ 85938
www.ipp.gov
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
WARREN ABBOTT
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
CONSTRUCTION RFQ 2 | P a g e SOL NO. AG-8173-S-16-0015
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
B.1 – SCHEDULE OF BASE ITEMS
Base Item Nos.
Description of Project Items Unit Quantity Unit Price Total
B1.1 Mobilization LS 1 $_______ $________________
B2.1 Cut and cap existing lines, remove backflow preventer and hydrants, where indicated
LS 1 $_______ $________________
B3.1 HDPE 3/4” water line trenching, backfill, etc. LF 40 $_______ $________________
B4.1 HDPE 1” water line trenching, backfill, connections, etc.
LF 320 $_______ $________________
B5.1 HDPE 2” water line trenching, backfill, connections, etc.
LF 280 $_______ $________________
B6.1 Curb stop valves, valve boxes, connections, excavation, etc.
EA 1 $_______ $________________
B7.1 Stop and waste valves, connections, excavation, etc. EA 4 $_______ $________________
B8.1 Check valves, connections, excavation, etc. EA 1 $_______ $________________
B9.1 Pre-cast concrete utility boxes, excavation, installation, backfill, stackables, etc.
EA 3 $_______ $________________
B10.1 Yard hydrant, including connections, excavation, backfill, concrete, etc.
EA 1 $_______ $________________
B11.1 Post-type hydrant, including connections, excavation, backfill, concrete, etc.
EA 1 $_______ $________________
B12.1 Pressure gauge EA 1 $_______ $________________
B13.1 Cap well, remove piping, fixtures, tanks, electrical, etc.;
See Option Item O1.1
LS 1 $_______ $________________
B14.1 Leak and pressure testing, disinfection, training, closeout, etc.
LS 1 $_______ $________________
Total of All Base Items – ______________________
CONTINUED ON NEXT PAGE
CONSTRUCTION RFQ 3 | P a g e SOL NO. AG-8173-S-16-0015
O.1 – SCHEDULE OF OPTIONAL ITEMS
Base Item Nos.
Description of Project Items Unit Qty Unit Price Total
O1.1
(Optional Item O1.1 affects the work on Base Line Item
13.1. If this option item is awarded, it must be completed
before performing work on B13.1.)
Remove well pump, well cabling, and drop pipe, prior to well capping
LS 1 $_______ $________________
Total of All Base Items – ______________________
PRINTED NAME SIGNATURE OF PERSON AUTHORIZED TO MAKE OFFER DATE
CHECKLIST OF MINIMUM REQUIREMENTS
TO RESPOND TO THIS REQUEST FOR QUOTATIONS (RFQ)
_____ Respond with the complete RETURN PACKAGE (SEE SECTION M for Evaluation Criteria)
_____ Provide your DUNS number _______________________
_____ Provide business email address to facilitate communications__________________________
_____ Have active vendor record for the DUNS number above in the System for Award Management
(SAM) https://www.sam.gov https://www.sam.gov/
CONSTRUCTION RFQ 4 | P a g e SOL NO. AG-8173-S-16-0015
SECTION C – STATEMENT OF WORK/DESCRIPTIONS
C.1 – GENERAL DESCRIPTION OF WORK
The Contractor shall furnish all supervision, materials, equipment and vehicles, tools, parts, labor, transportation, lodging, and miscellaneous items to install new HDPE water lines, vales, hydrants, and all other required accessories and attachments, and cap the existing well, at the Pinedale Administrative Site located west of Show Low, AZ. All work shall be in accordance with the plans and specifications contained herein. No changes to the specifications, terms, or conditions of this Request For Quotations (RFQ) shall be made without the prior approval of the Contracting Officer in writing.
In order to remain in the competitive range, Offerors (Contractors) shall submit the Return Package with the requirements in Section M, Evaluation Factors.
Reference Section J for Exhibits:
Exhibit 1 – U.S. Department of Labor, Wage Determination Exhibit 2 – Bio-preferred Requirements Exhibit 3 – Drawings Exhibit 4 – Specifications Exhibit 5 – As-Built Exhibit 6 – Site Pictures
C.2 – LOCATION OF PROJECT
The project work is located in Pinedale, AZ. From the AZ77 and AZ260 intersection in Show Low, head west along AZ260 13 miles, and turn left at Pinedale Road. The site is located 1 mile along Pinedale Road, across the street from the Pinedale Fire Station / Library.
C.3 – SPECIFIC SCOPE OF WORK
C3.1 Base line items B1.1 Mobilization to the project site, including labor, equipment, and any required materials.
C3.2 Base line items B2.1 Cut and cap existing lines, remove and dispose of existing backflow preventer and three hydrants.
C3.3 Base line items B3.1 Install 3/4-inch HDPE water lines, to include trenching, utility bedding, backfill, and all required unions, bushings, connections, tees, bends, etc.
C3.4 Base line items B4.1 Install 1-inch HDPE water lines, to include trenching, utility bedding, backfill, and all required unions, bushings, connections, tees, bends, etc.
C3.5 Base line items B5.1 Install 2-inch HDPE water lines, to include trenching, utility bedding, backfill, and all required unions, bushings, connections, tees, bends, etc.
CONSTRUCTION RFQ 5 | P a g e SOL NO. AG-8173-S-16-0015
C3.6 Base line items B6.1 Install curb stop valves, including valve boxes, connections, excavation, backfill, etc.
C3.7 Base line items B7.1 Install stop and waste valves, including connections, excavation, drain rock, etc.
C3.8 Base line items B8.1 Install check valves, including connections, excavation, drain rock, etc.
C3.9 Base line items B9.1 Install pre-cast concrete utility boxes, to include excavation, backfill, any required punch-outs and stackable boxes, etc.
C3.10 Base line items B10.1 Install yard hydrants, including excavation, connections, backfill, etc.
C3.11 Base line items B11.1 Install post-type water hydrant, including connections, excavation, backfill, concrete base, etc.
C3.12 Base line items B12.1 Install pressure gauge, including all requirement connections.
C3.13 Base line items B13.1 Cap well, remove piping, fixtures, pressure tanks, electrical, etc. from the basement where the well is housed.
This does NOT include the well pump, cabling, drop pipe.
C3.14 Base line items B14.1 Provide leak pressure testing and disinfection for new water system.
C3.15 Optional line items O1.1 Remove and dispose of well pump, well cabling, and drop pipe prior to capping.
SECTION D – PACKAGING AND MARKING
THIS SECTION IS NOT APPLICABLE TO THIS CONTRACT
CONSTRUCTION RFQ 6 | P a g e SOL NO. AG-8173-S-16-0015
SECTION E – INSPECTION AND ACCEPTANCE
FAR 52.246-12 Inspection of Construction. (APR 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not --
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may --
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
CONSTRUCTION RFQ 7 | P a g e SOL NO. AG-8173-S-16-0015
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(End of Clause)
SECTION F – DELIVERIES OR PERFORMANCE
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar day after the date the Contractor receives notice-to-proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days from issuance of notice-to-proceed. The time stated for completion shall include final cleanup of the premises.
AGAR 452.236-75 MAXIMUM WORK WEEK – CONSTRUCTION SCHEDULE (NOV 1996)
Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work
The maximum workweek shall be 5 days per week, Monday through Friday, from 7:00 AM to 7:00 PM. Any change in the work schedule shall be approved in writing by the Contracting Officer prior to commencement. The Contractor shall phase the project into sections of the building that will least interrupt the working tenants, and shall be included in the Contractor’s proposed schedule.
SECTION G – CONTRACT ADMINISTRATIVE DATA
THIS SECTION IS NOT APPLICABLE TO THIS CONTRACT
SECTION H – SPECIAL CONTRACT REQUIREMENTS
Bio-Preferred
USDA’s website for Bio-Preferred: http://www.biopreferred.gov/
Product categories: http://www.biopreferred.gov/ProductCategories.aspx
Federal Purchasing Requirement: http://www.biopreferred.gov/PurchasingBiobased.aspx
Federal vendor/contractor reporting requirements: http://www.biopreferred.gov/FARReporting.aspx http://www.biopreferred.gov/ http://www.biopreferred.gov/ProductCategories.aspx http://www.biopreferred.gov/PurchasingBiobased.aspx http://www.biopreferred.gov/FARReporting.aspx
CONSTRUCTION RFQ 8 | P a g e SOL NO. AG-8173-S-16-0015
Apache-Sitgreaves National Forests: INDUSTRIAL FIRE PLAN
The following requirements are a part of this solicitation and any resultant contract or permit, and shall be provided at the Contractor’s expense:
1. Wildfire Prevention – During periods of contract/permit performance, fire prevention and immediate suppression actions shall be performed by the Contractor.
2. Execution of Industrial Fire Plan
a. Forest Service personnel involved will, in all cases, coordinate through the Contracting Officer’s Representative (COR) or Permit Administrator, except in cases of emergency, Red Flag Days, or Forest closure.
b. The Contractor shall designate a Fire Guard, fluent in English, who shall be responsible for executing and carrying out the Industrial Fire Plan requirements. The name of this representative will be provided to the COR at the pre-work meeting.
c. The Contractor shall include the Industrial Fire Plan requirements in all subcontracts.
d. The Contractor shall assure that all contract employees are informed of the existence and conditions of the Industrial
Fire Plan requirements.
3. Compliance Inspection
a. Inspection by the Forest Service will be made to insure compliance with the fire requirements.
b. Should any deficiencies appear during the inspection, the Contractor/Permit holder will be informed and the deficiencies shall be corrected within 24 hours. Activities with the potential to start fires shall be halted until the deficiencies are corrected and the corrections are approved by the COR.
c. The Contractor’s Fire Guard shall make daily inspections to insure that the terms of the Industrial Fire Plan requirements are met at all times, both on the job-site and in the Contractor’s camp.
4. Fire Prevention Requirements
a. Fire Toolbox - During contract performance, the Contractor shall furnish and maintain, at the Contractor’s expense, one mobile Fire Toolbox, within ¼ mile or less of the location where the Contractor is currently performing work and camping.
The fire toolbox is to be maintained with tools in good working condition, in such quantities and mix to provide at least one firefighting tool for each person in the Contractor’s workforce engaged in contract operations. This equipment is for the sole purpose of firefighting: a mix of three shovels, size 0 or larger, one axe, two fire rakes, two Pulaskis, and two 3-5 gallon hand pump garden sprayers or backpack pumps filled with water. Where appropriate, a chainsaw may be substituted for the axe; a McLeod tool or heavy duty garden rake for a fire rake, and a heavy duty garden wide hoe or other sturdy digging/scraping tool may be substituted for the Pulaski.
The fire toolbox shall be replenished with cleaned, re-sharpened, reconditioned, or new tools by the Contractor after each use.
b. Work Hours – The Contractor shall restrict operations in accordance with the following Industrial Fire Plan level unless the COR waives the requirement in writing.
Each day of operation when there is a predicted change in the Industrial Fire Plan level, the Forest Service will inform the Contractor between 3 and 6 pm MST (4 and 7 pm MDT). Notification will be made of which stage in the industrial fire precaution plan (Supplement 1) to be followed the next day within the local operating area.
No later than 9 am MST (10 am MDT) the following day, the Forest Service will inform the Contractor of any change in the fire precaution schedule. In the case of Red Flag Days, the Forest Service will inform the Contractor as soon as possible after the National Weather Service issues their high wind warning for that day, which often comes after 9 am MST.
c. Blasting – Use of fuses in blasting shall not be permitted. A Fire Guard must remain on the blasting site for a minimum of one hour after blasting operations have concluded. Required equipment shall consist of at least one 5 lb. fire extinguisher, one long-handled round-pointed shovel size 0 or larger and one 5-gallon hand pump garden sprayer or backpack pump filled with
CONSTRUCTION RFQ 9 | P a g e SOL NO. AG-8173-S-16-0015 water. Written permission must be obtained from the CO during fire precaution plan B and C days. Blasting hours are restricted under fire precaution plan C; and blasting is prohibited under fire precaution plan D and on Red Flag days.
d. Welding – An area of sufficient size but not less than a 10 foot radius shall be cleared down to bare mineral soil before welding operations are started. Prior to welding, authorized user shall have available a round-pointed long-handled shovel, at least 5-gallons of water, and a 5-pound fire ABC dry chemical extinguisher at each welding site. A Fire Guard must remain on the welding site for a minimum of one hour after welding operations have concluded. Written permission must be obtained from the COR during fire precaution plan B, C, and D days. Welding is prohibited on Red Flag days.
e. Slash Incineration – Operation of forced-air burners must comply with all state and federal open burning laws, regulations and policies. Forced air burners shall be operated with a minimum set back from combustibles of 100 feet. This activity is prohibited on fire precaution plan C, D and Red Flag days. This activity is restricted and only permitted under a specifically-designated contract.
f. Refuse Burning – No slash (such as that resulting from thinning, or clearing a right-of-way), or other debris shall be burned without advance written consent of the Forest Service. Waste such as broken tools, worn tarps, camp tables, etc. shall be disposed of properly off-Forest, rather than burning.
g. Ash disposal – Ash from cooking or warming fires shall be treated in such a manner as to not constitute a wildfire risk, and shall be disposed of in an approved manner designated by the COR.
h. Controlled Burning – All planned burns, including pile burns or use of air curtain burners, conducted by the Contractor under the terms and conditions of the contract are required to have a written Burn Plan that meets the requirements of Forest Service Manual 5140 for the project. The Burn Plan must be prepared, recommended and approved by the appropriate Forest Service Officers. The Contractor will notify the CO, COR, and District Fire Management Officer prior to implementation of a burning project. The Contractor will insure all appropriate Federal, State and local laws, regulations, and policies pertinent to the Burn Plan, are adhered to. Training and qualification standards for the Contractor’s employees conducting burning operations will be required according to the applicable regulations in NWCG 310-1, which can found at the National Wildfire Coordinating Group website, www.nwcg.gov/pms/docs/docs.htm.
i. Fire Guard – To prevent, detect, and suppress wildfires, the Contractor/Permit holder shall provide one or more trained Fire Guards at each operating area where internal combustion engines, power-driven equipment, incineration equipment, or camp/warming fires are used. Each Fire Guard is required to read, understand, and perform the Industrial Fire Plan duties. The Fire Guards may perform other contract work in conjunction with Fire Guard duties, provided such other work does not distract from Fire Guard responsibilities. A Fire Guard(s) assigned on one operating area shall satisfy the requirements on adjacent areas if the travel time with available transportation is not in excess of ten (10) minutes to any of the other areas, and provided the Fire Guard patrols all areas where operations have occurred.
Each Fire Guard shall be trained, vigilant, able and prepared, to prevent, detect, and report any wildfire; and to promptly and efficiently take suppression action with available required firefighting equipment and personnel on any wildfire that starts on the contract/project area. The Fire Guards shall constantly perform their duties during normal operating hours, with an added three (3) hour watch after work stops for the day when the Fire Precaution Plan is at Plan B, C, or D (see Supplement 1). If the Contractor has agreed to additional terms for operation under Fire Precaution Plan D (see Supplement 2), the Fire Guard will perform all requirements specified in the Plan D Authorization Letter issued by the CO.
Each Fire Guard shall be equipped with a vehicle and shall carry a minimum 5 lb. fire extinguisher and fire tools consisting of a cache box with one shovel, size 0 or larger, one cutting tool such as either an axe, Pulaski or chainsaw, one fire rake or heavy duty garden rake, two 5-gallon hand pump garden sprayers or backpack pumps, and 25 gallons of water for firefighting purposes. All equipment and tools shall be maintained in serviceable and operable condition. The tool cache for the Fire Guard will be in addition to the Fire Toolbox maintained for the work crews and available for use at both the work site and campsite.
j. Communications –The Contractor shall provide some form of prompt and reliable direct communication, such as a cell phone or two-way radio, between the Fire Guard(s) and the work crews, and between the contractor’s operations and the Forest Service.
The Contractor’s cell phone number, and Fire Guard’s cell number, or other form of prompt contact, will be reported to the COR at the pre-work meeting. All communications will be in English.
5. Wildfire Suppression
a. The Contractor shall take independent action immediately to suppress all fires originating within the contract boundary and camp location. The Contractor shall continue fighting the fire until released from the fire by the Forest Service. The Contractor will take appropriate action on a fire outside the contract area or campsite to the level of their firefighting experience, abilities http://www.nwcg.gov/pms/docs/docs.htm
CONSTRUCTION RFQ 10 | P a g e SOL NO. AG-8173-S-16-0015 and qualifications. The Contractor may be requested to assist the Forest Service with fighting a fire if the personnel have been trained and equipped with the proper personnel protective equipment (PPE). If contract operations are interrupted for firefighting purposes the Contractor shall notify the COR as soon as practical.
b. If the Contractor pursues fighting any wildfire which has moved from off the USFS contract land and crosses onto lands of other ownership, such as private property, the Contractor shall be aware that dangers may be present associated with urbanized areas. For example, the Contractor will need to become highly alert, and take extreme care to avoid dangers associated with open flames or operating heavy equipment near propane/butane tanks and underground gas lines, overhead/underground electric lines, underground septic tanks, and private outbuildings which may contain hazardous or flammable/explosive chemicals. Coordination as soon as possible with USFS and/or local municipal firefighters who are better trained for safe wildland/urban-interface fire suppression tactics is recommended when faced with fires on private lands.
c. All fires shall be reported immediately to the most available Forest Service office. The COR will insure that all fire reports are forwarded immediately to the Apache-Sitgreaves NF Fire Dispatcher’s Office. Even though the fire may have been suppressed by the Contractor’s crew, this report is still required. The office and telephone numbers to which fires shall be reported will be furnished to the Contractor at the contract pre-work meeting.
d. The Contractor shall not perform fire suppression activity, or provide reinforcement support, on any wildfires that originates and remains outside the contract boundary or Contractor’s camp location, without meeting the criteria below.
If the Contractor wishes to be available to assist the Forest Service with emergency wildfire suppression or support activities beyond the contract boundary, all the Contractor’s, and/or Subcontractor’s, equipment must first be signed up on an Equipment Rental Agreement, USDA/USDI Optional Form 294, issued by the Apache-Sitgreaves National Forests. (In cases of extreme emergency, the Forest Service can finalize this agreement at the fire location.) Emergency use of equipment manned with operators, such as dozers, skidders, tree shears, chainsaws and water trucks/trailers, would then be compensated to the Contractor at current Forest Service fire-fighting rental equipment rates common to the area. Equipment rented by the Forest Service under this agreement shall be operated only by physically able personnel supplied by the Contractor.
Likewise, all personnel employed or subcontracted by the Contractor who wish to work on wildfires as individuals must first be currently certified with the required fire training to be qualified as a wildland firefighter before being permitted to assist the Forest Service with fire suppression. Firefighters must also have completed the necessary forms to become temporary emergency Forest Service fire-fighting employees. Contract personnel temporarily released off this contract by the Contractor to fight off-contract fires, shall be paid by the Forest Service at current USFS standard emergency “administratively determined” (AD) fire-fighting rates.
The COR can direct you on how and where to make these preparations in advance. The contract COR must be notified as soon as possible in writing when the above conditions for fire rental equipment and personnel have been met. The Contractor must also notify the COR as soon as practical if contract operations are interrupted for emergency firefighting outside the contract area. If the Contractor does not wish to meet these criteria to help fight wildland fire outside the contract area, the Contractor is not required to do so.
6. Equipment Requirements
a. Passenger carrying vehicles, including light pickup trucks and all-terrain vehicles, shall be equipped with one (1) long-handled round pointed shovel and one (1) ABC dry chemical fire extinguisher not less than 2 ½ pounds capacity. Each internal combustion fuel-carrying piece of equipment (dump-truck, dozer, excavator, backhoe, fuel service truck, etc…) shall be equipped with one long-handled round-pointed shovel, and one 5-pound capacity ABC dry chemical fire extinguisher.
Shovels and fire extinguishers shall be so mounted as to be readily reached from the ground, and shall be maintained in good working condition at all times.
The work camp and fuel-storage area shall be equipped with a shovel, double bit axe, and class ADC pressurized chemical fire extinguisher of not less than 15 pounds capacity by weight, kept in good working condition.
These shovels and fire extinguishers are in addition to those required for the Fire Guard tool cache (4.a.) and the mobile crew fire tool box (4.e). These shall be furnished and maintained at the Contractor’s expense.
Authorized user will ensure that each internal combustion engine (both gasoline and diesel fueled) used on the project and in camp shall be equipped with a spark arrester qualified and rated under USDA Forest Service Standard (Spark Arrester Guide) 5100-1a or the latest revision of Society of Automotive Engineers "medium size engine, SAE recommended practice J350" unless it is:
CONSTRUCTION RFQ 11 | P a g e SOL NO. AG-8173-S-16-0015
(i) Equipped with a turbine-driven exhaust supercharger such as the turbocharger. There shall be no exhaust bypass.
(ii) A multi-position engine, such as on power saws purchased after 6/30/77 which must meet the performance levels set forth in the Society of Automotive Engineers "multi-positioned small engine exhaust fire ignition standard, SAE recommended practice J335B" as now or hereafter amended. Those purchased prior to the above date shall be equipped with an approved spark arrester/muffler containing a 0.023 inch mesh screen which all exhaust products must pass through. The effective exhaust area of the screen (total area of all screen openings) shall not be less than 200 percent of the engine exhaust port area at its smallest cross-section. Screen material will be heat and corrosion resistant, and shall provide at least 100 hours of service life.
(iii) A passenger carrying vehicle or light truck, or medium truck up to 40,000 GVW, used on roads and equipped with a factory designed muffler and an exhaust system in good working condition.
(iv) A heavy duty truck, such as a dump truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.
Exhaust equipment described here, including spark arresters and mufflers, shall be properly installed and constantly maintained in serviceable condition.
b. All internal combustion engines must be inspected before use in the job and periodically thereafter by the Forest Service. Equipment not passing inspection cannot be used until repairs are made, re-inspected, and passed by the Forest Service.
c. Care shall still be taken at all times to avoid parking all vehicles over tall grass, brush or flammable materials.
d. Equipment service areas, and gas and oil storage areas, shall be cleared of brush, litter, debris, and grass for a radius of at least 50 feet. Locations shall be pre-approved by the Forest Service.
e. All crawler tractors and rubber-tired equipment suitable for fire suppression work shall be equipped with lights for nighttime use. This includes two functioning headlights, and 1 to 2 backup lights.
f. Powered handtools (saws, augers, drills, jack hammers, pumps, etc.) shall be kept in a safe, serviceable condition at all times. Each power tool shall be equipped with an approved spark arrester screen muffler system as defined in this section.
(i) The refueling of powered tools shall be done in an area which is completely cleared of flammable materials (such as on bare mineral soil) and the tool shall be moved at least 10 feet from the point of refueling to another barren spot before being started.
(ii) Power tools with warm or hot spark arresters/screen mufflers—running or not—shall not be placed or rested on sawdust piles, litter duff, stumps, or spots that are easily ignited.
(iii) During periods of use, each powered handtool operator shall have readily available for use, one long-handled round-pointed shovel, one chemical-pressurized ABC dry chemical fire extinguisher of not less than 8-ounce capacity by weight, and a Factory Mutual (FM) approved fuel can. Muffler, extinguisher, shovel and fuel can shall be maintained in good working order at all times. The shovel is to be kept with the fuel supply can.
g. Forced Air Burners shall be kept in serviceable conditions at all times. Blower unit power supplies must comply with 6 b, c and d above.
7. Smoking and Fires
a. Smoking – When/where smoking is permitted, cigarette butts or other smoking materials shall be extinguished completely and disposed of responsibly.
i. No smoking shall be allowed while traveling, except on surfaced highways. A surfaced highway is any road that is oiled, graveled, or otherwise paved.
ii. Smoking is not permitted while working. Smoking is only permitted in camp or on breaks, and only in areas having a clearing of at least 3 feet in diameter to bare mineral soil or rock, or preferably inside an enclosed vehicle with an ash tray.
CONSTRUCTION RFQ 12 | P a g e SOL NO. AG-8173-S-16-0015
iii. Smoking is not permitted while refueling, or while in the fuel storage service area.
b. Fires – Warming fires, cooking fires, or burning of daily kitchen waste at camp or on the job-site, shall not be permitted during periods of high to extreme fire danger except in designated places by written consent of the Forest Service. All other fires (such as burning of debris resulting from clearing a camp or right-of-way) and ash disposal are covered under sections 4.e., 4.f., 4.g., and 4.h.
8. Red Flag Events –
A “Red Flag Event” by definition, is a combination of environmental factors that can lead to extreme wildland fire behavior. The criteria for a Red Flag Event include a combination of sustained high winds, low relative humidity, and dry fuels. The thresholds for Red Flag Events are established by the local National Weather Service office. Red Flag Events are categorized in the following order:
FIRE WEATHER WATCH is issued to alert the possibility of the development of conditions that would lead to a Red Flag Alert.
RED FLAG WARNING is issued to warn of a predicted, impending or ongoing event that will meet the criteria of a Red Flag Alert within the next 24 hour period. This warning will generally precede a full alert.
RED FLAG ALERT is the most critical stage and implemented when conditions are extreme
When a Red Flag Alert is issued by the National Weather Service, all contractor and permitee operations will adhere to Industrial Fire Precaution Plan “D” and will shut down operations until the Red Flag Alert is rescinded.
Red Flag categories are announced publicly on 24-hour radio broadcasts on National Oceanic and Atmospheric Administration (NOAA) weather radio channels for localized vicinities. The contract COR or Permit Administrator can provide operators the correct weather radio channel to use for a particular project area.
9. Fire Plan and Closure Order Violations
a. Contractor’s violation or deficiency in meeting fire plan requirements shall result in a state of non-compliance with the terms and conditions of the contract. Immediate suspension of contract operations will be enforced until the deficiency or violation is corrected.
b. The Contractor shall advise all employees of Forest campfire, smoking, power saw, and/or area closure orders (36 CFR
261.52 (a) (c) (d) (e) (h)). After notification to the Contractor by the Forest Service of such orders taking effect, the Contractor and their employees may be subject to criminal action under Federal Regulations separate from this contract should a violation occur.
10. Fire Suppression Costs – The USDA Forest Service reserves the right to participate in extinguishing any fires caused by the
Contractor’s operations. Contractor’s obligations for cost of fire suppression, and all suppression activities ordered or directed by the Forest Service, vary according to three classifications of fires as follow below:
a. Operations Fire. An “Operations Fire” is a fire caused by Contractor’s operations other than a Negligent Fire, when all requirements of this industrial fire safety plan have been met and consistently maintained by the Contractor. The Government (Forest Service) shall perform fire suppression activities on Operations Fires, under the authorities of 16 USC 572. Contractor agrees to reimburse the Forest Service for expenses incurred by the Forest Service for the cost of an Operations Fire, to a maximum of $10,000 dollars for each occurrence.
b. Negligent Fire. A “Negligent Fire” is a fire caused by negligence or fault of the Contractor’s deficient operations by failure to comply with all requirements of this industrial fire plan (ie. “Fire Plan Negligence”), which results in a wildfire starting or permitting a controlled fire to spread out of control. Damages and the cost of suppressing Negligent Fires shall be borne by the Contractor. The Contractor shall also be responsible for full or partial costs and damages to any property of the USDA Forest Service or third parties caused by escaped fires resulting from Contractor’s negligence.
c. Other Fires in Immediate Area. This situation is covered under section 5.d. of this industrial fire plan.
11. Historical Data –
CONSTRUCTION RFQ 13 | P a g e SOL NO. AG-8173-S-16-0015
The following data on the Forest area involved is provided for the Contractor’s information. The data are averaged from records for the past 10 years based on the Energy Release Component (ERC) for the appropriate Fuel Models, at various weather stations across the Forest.
Total operating year used for the following information is January 1 through December 31. (Most years lack some days of data collection during winter months when weather stations were not functional.)
Apache-Sitgreaves National Forest – Average # days/year by Industrial Plan for past 10 years:
A-S Industrial Plan SIG (Heber – Lakeside – Alpine) NFDRS Fuel Model J Approx. # Days per Year at Each Industrial Plan Level (5-day averaged ERC)
Industrial Fire Precautionary Plan Levels
AVG
A 85 150 110 55 75 140 175 50 15 60 15
B 204 145 200 215 220 190 145 220 210 270 220
C 24 35 20 15 10 10 30 70 0 15 30
D 32 20 10 20 55 25 10 20 50 15 95
Average number of Red Flag Days = 1 to 15 (highly variable by year).
The majority of Plan C, D, and Red Flag days generally occur between the periods of March 15th to September 25th.
Wildfire risk is usually at its greatest between mid-April through mid-July each year.
12. Emergency Fire Precaution Schedule – Supplement 1 to this fire plan shows and defines the levels of operational restrictions, in accordance with regionally-standardized restrictions and closures.
FIRE PLAN SUPPLEMENT 1
EMERGENCY FIRE PRECAUTIONS (2/13)
Contractor/permit holder will restrict operations in accordance with the Emergency Fire Precaution Schedule shown below. When there is a predicted change, Forest Service shall inform the Contractor by 6:00 pm, Mountain Standard Time (7:00 pm MDT), of the predicted change in the Industrial Fire Precaution Plan. The procedure for the Forest Service to notify the Contractor of a change in the Fire Precaution Plan stage in the following table is stated in section 4.b.“Work Hours” of this Industrial Fire Plan, and shall also be reviewed at the pre-work meeting.
EMERGENCY FIRE PRECAUTION SCHEDULE
FIRE RESTRICTION/CLOSURE “STAGE”
“STAGED” RESTRICTION LEVELS INDUSTRIAL FIRE PRECAUTION PLAN
NO RESTRICTIONS A
STAGE I B
STAGE II C or D
PARTIAL/ FOREST CLOSURE ** D
RED FLAG WARNING
(Issued by National Weather Service)
D
** Partial Forest Closure:
Contract/permit areas which are outside the boundaries of the partial forest closure may continue to operate under Industrial Fire Precaution Plan “C” operating criteria as agreed upon between the CO and Contractor in writing.
Contract/permit areas within the boundaries of the proclaimed partial forest closure area are to operate under Industrial Fire Precaution Plan “D”.
Staged Restriction levels are determined by the appropriate Forest Line Officer in consultation with Fire Management Officer(s) and Contracting Officer(s)/Permit Administrator(s). The Contracting Officer/Permit Administrator may, after consultation with the appropriate Forest Line Officer, adjust the predicted Industrial Fire Precaution Plan for local weather conditions on the contract/permit area.
Deviations from the predicted Industrial Fire Precaution Plan shall be agreed to in writing.
CONSTRUCTION RFQ 14 | P a g e SOL NO. AG-8173-S-16-0015
INDUSTRIAL FIRE PRECAUTION PLAN – DESCRIPTIONS
A - NO RESTRICTIONS -Normal Fire Precautions. No Fire Guard required, except for welding and blasting operations.
B - STAGE I - Normal Fire Precautions, except designated areas for smoking and warming or cooking fires require a written permit.
Contractor/permit holder will provide Fire Guard.
C - STAGE II -- All power saws and mechanical fellers except for mechanical fellers equipped with hydraulic shears will shut down from 9:00 am until 8:00 pm Mountain Standard Time (10:00 am to 9:00 pm MDT), except chainsaws may be used from 9:00 am until 2:00 pm Mountain Standard Time (10:00 am to 3:00 pm MDT), for limbing on landings cleared to mineral soil. Loading is authorized to continue from 12:00 noon until 2:00 pm, Mountain Standard Time (1:00 pm to 3:00 pm MDT), on landings cleared to mineral soil. Log hauling trucks must be out of the contract area to a surfaced road by 2:00 pm, Mountain Standard Time (3:00 pm MDT). Shutdown from 12:00 noon until 8:00 pm Mountain Standard Time (1:00 pm to 9:00 pm MDT); all machine treatment of slash; mechanical equipment used for shearing, bunching, or de-limbing; skidding; cable yarding; blasting; welding; metal cutting; and clearing. Operations on mineral soil involving road excavation, watering, grading, surfacing, rock crushing, and/or other equipment maintenance may continue. No smoking, warming or cooking fires are permitted at any time. Contractor/permit holder will provide Fire Guard.
D - STAGE II or RED FLAG-- Shutdown all operations; except operations on mineral soil involving road excavation, watering, grading, gravel surfacing, and rock crushing may continue with special Forest Service permit. Blasting and welding are prohibited.
Contractor/permit holder will provide Fire Guard.
13. Plan D Authorization Letter - Attached as Fire Plan Supplement 2, is a sample of the additional requirements the Contractor must agree to, only if he wishes to continue limited operations on Fire Plan “D” days. This authorization letter would only be issued by the Contracting Officer to contractors who already have a dozer or skidder available on that job to quickly dig fire line. Recommendation for such authorization would be determined by the District Fire Management Officer and the COR on an individual contract basis, taking into consideration such things as contract location, terrain, road access, hazardous fuels present, long-term fire weather forecasts, and other risk factors. Contractors who chose not to work on this limited basis during Plan “D” days may decline these additional terms, in which case normal shutdown and/or suspension of contract time would be likely until field conditions improve.
In select cases, acceptance and possession of such a letter may also serve as the special USFS permit required for legal operation during times of fire and power saw restriction orders. A separate Forest Entry Permit, issued by the designated ranger district at no cost, would still be required for work to continue within forest areas closed to the public by special order.
District permits to continue contract work involving heat or spark-causing activities during power saw restrictions and/or area closure orders will not be issued without very serious consideration beforehand by the District Fire Management Officer, District Ranger, COR and contract CO, and are not likely to be granted except in the most unique of circumstances.
CONSTRUCTION RFQ 15 | P a g e SOL NO. AG-8173-S-16-0015
PART II – SECTION I – CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vffara.htm http://farsite.hill.af.mil/vfagara.htm
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.204-4 Printed or Copied Double-Sided on Recycled Paper (MAY 2011) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2015) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-2 Audit and Records -- Negotiation (OCT 2010) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-8 Utilization of Small Business Concerns (OCT 2014) 52.219-14 Limitations on Subcontracting (NOV 2011) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (MAY 2014) 52.222-6 Construction Wage Rate Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2015) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (OCT 2015) 52.222-36 Equal Opportunity for Workers With…