Return_Pkg_ExteriorDeck_.doc
DOC document 104 KB Posted
- Attached to
- Redesign & Reconstruct Exterior Deck for Rim Visitor Center Federal contract opportunity
- Solicitation number
- AG-8173-S-08-0013
About this file
Return Package
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_Amend_No1_Rim_Vis_Ctr.doc | DOC document | |
| RFQ_RimVisCtr_Redesign_Reconst_Deck2008.doc | DOC document | |
| AG-8173-S-08-0013_EXHIBIT2.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION RFQ
SOL NO: AG-8173-S-08-0013
UNIT: APACHE-SITGREAVES N.F.
PROJ NAME: RIM VISITOR CENTER EXTERIOR DECK
REQUEST FOR QUOTATION
PAGE OF PAGES
| (THIS IS NOT AN ORDER) |
| THIS RFQ |
| FORMCHECKBOX |
| IS |
| FORMCHECKBOX |
| IS NOT A SMALL BUSINESS SET- ASIDE |
| 1 |
| 2 |
| 1. REQUEST NO. |
| 2. DATE ISSUED |
| 3. REQUISITION/PURCHASE REQUEST NO. |
| 4. CERT. FOR NAT.DEF. |
| RATING |
| 05/05/2008 |
| AG-8173-S-08-0013 |
| UNDER BDSA REG. 2 |
AND/OR DMS REG. 1
| 5a. ISSUED BY |
| 6. DELIVER BY (Date) |
AQM APACHE-SITGREAVES N.F., PO BOX 640 30 S. CHIRICAHUA DR, SPRINGERVILLE, AZ 85938
| 5b. FOR INFORMATION CALL (NO COLLECT CALLS) |
| 7. DELIVERY |
| FORMCHECKBOX |
FOB DESTINATION
| NAME |
| TELEPHONE NUMBER |
FORMCHECKBOX
OTHER (See Schedule)
| AREA CODE |
| NUMBER |
| 9. DESTINATION |
| WARREN ABBOTT |
| 928 |
| 333-6344 |
| a. NAME OF CONSIGNEE |
8. TO:
| a. NAME |
| b. COMPANY |
| b. STREET ADDRESS |
| c. STREET ADDRESS |
| c. CITY |
| d. CITY |
| e. STATE |
| f. ZIP CODE |
| d. STATE |
| e. ZIP CODE |
| 10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS |
| IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the |
| JUNE 5, 2008 4:30 PM |
| submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter. |
11. SCHEDULE (Include applicable Federal, State and local taxes)
| ITEM NO. |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| (a) |
| (b) |
| (c) |
| (d) |
| (e) |
| (f) |
SEE SCHEDULE OF ITEMS
| a. 10 CALENDAR DAYS (%) |
| b. 20 CALENDAR DAYS (%) |
| c. 30 CALENDAR DAYS (%) |
| d. CALENDAR DAYS |
12. DISCOUNT FOR PROMPT PAYMENT
| NUMBER |
| PERCENTAGE |
| NOTE: Additional provisions and representations |
| FORMCHECKBOX |
| are |
| FORMCHECKBOX |
are not attached.
| 13. NAME AND ADDRESS OF QUOTER |
| 14. SIGNATURE OF PERSON AUTHORIZED TO |
| 15. DATE OF |
| a. NAME OF QUOTER |
| SIGN QUOTATION |
| QUOTATION |
| b. STREET ADDRESS |
| 16. SIGNER |
| a. NAME (Type or print) |
| b. TELEPHONE |
c. COUNTY
AREA CODE
| d. CITY |
| e. STATE |
| f. ZIP CODE |
| c. TITLE (Type or Print) |
| NUMBER |
NSN 7540-01-152-8084
Previous edition not usable
| 18-121 |
| STANDARD FORM 18 (Rev. 6-95) |
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
RIM VISITOR CENTER BUILDING -- REDESIGN, RECONSTRUCT, VIEWING DECK
BASE ITEMS
| ITEM NO. |
| DESCRIPTION |
| TYPE |
MEAS.
| UNIT OF ISSUE |
| EST. |
QTY.
UNIT
PRICE
TOTAL
AMOUNT
B.1.1 Structural Report/ LSQ L.S. 1 $_______ $_________
Calculations and Plans
B.2.1 Railing System AQ L.F. 155 $_______ $________
B.3.1 Deck (including AQ S.F. 1052 $_______ $________
Entrances ramp
And stairs
| GRAND TOTAL( |
| $__________ |
Contractor proposed time to complete work (calendar days):___________________
Include with your offer the information and documents:
· Professional Arizona Registered Engineer stamped plans and structural calculations
· Materials to be used including cut sheets referencing warranties and maintenance requirements, including any finishes
· Contractor’s experience performing this type of construction
· Time to perform all work, including clean up
File details come from the government source that posted it. Updated .