SF-30-AMD 04.doc
DOC document 139 KB Posted
- Attached to
- Prefabricated Metal Warehouse Federal contract opportunity
- Solicitation number
- AG-7512-S-09-0014
About this file
AF-30 - Amd 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF-30-AMD 03.doc | DOC document | |
| SF-30-AMD 02.doc | DOC document | |
| SF-30-AMD 01.doc | DOC document | |
| Atch 8 -Amd 01 Geotechnical Report- Lost Lodge.pdf | ||
| Atch 3_Drawings Warehouse-Lost Lodge-1.pdf | ||
| Atch 4_Drawings Warehouse-Lost Lodge-2.pdf | ||
| Atch 7_Drawings Warehouse-Lost Lodge-5.pdf | ||
| Atch 6_Drawings Warehouse-Lost Lodge-4.pdf | ||
| Atch 2 WD General Decision 3-6-2009.doc | DOC document | |
| Atch 5 Drawings Warehouse-Lost Lodge-3.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 6 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 04 |
| 4/13/2009 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA Forest Service
Maria E. Borodko (505-434-7341)
3463 Las Palomas Drive Alamogordo, NM 88310-6992
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
| ALL OFFERORS |
| FORMCHECKBOX |
AG-7512-S-09-0014
9B. DATED (SEE ITEM 11)
3/23/2009
FORMCHECKBOX
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.
FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
FORMCHECKBOX
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return ___ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
See page 2 for purpose of modification, changes made.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
Continuation: SF-30, block 14
The purpose of this amendment is as follows:
A. Replace pages 1,17, 26 and 35 of 46 with the attached replacement pages, Changes are indicated by a “verticle black line in right hand margin” and are as indicated below:
- Page 16, FAR Clause 52.211-10 (Page 16)- Increase contract time to 110 days
- Page 17, FAR Clause 52.219-6, this is a total Small Business Set-Aside.
- Page 17, FAR Clauses 52-219-3 and 52.219-8 are deleted.
- Page 26, FAR Clause 52.228-1 Bid Guarantee, Bond information is filled in.
- Page 35, FAR Clause 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction
B. Specifications (Page 4), 1.04, A, 2- Delete the sentence regarding “…drainage to exterior for water… or condensation…” and on page 6, 2.03, A, 2, a any reference to capillary groove.
C. Specifications (Page 4), 1.06 Warranty- Delete the primary framing system from the 20 year finish warranty.
D. Specifications (Page 7), 2.03, A, 2 ,g and 2.03, B, 2 g- Consealed fasteners are not required.
E. Specifications (Page 11), 03300- Cast-in-place concrete, Part 2.09 D; Note- colored concrete is not required in this project.
F. Work trailers- Temporary work trailers for material storage or office functions at the project will be allowed. Camp trailers or overnight stays will not be allowed.
G. Sanitation- Contractors shall provide and maintain a portable toilet throughout the project.
H. There are no liquidated damages applicable on this project.
I. SF-1442, block 14, the closing date of this solicitation is changed from 4/23/2009 to
4/27/2009.
J. All other terms and conditions remain unchanged.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-7512-S-09-0014
2. TYPE OF SOLICITATION
FORMCHECKBOX
SEALED BID (IFB)
FORMCHECKBOX
NEGOTIATED (RFP)
3. DATE ISSUED
3/23/2009
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
USDA FOREST SERVICE
LINCOLN NATIONAL FOREST
3462 LAS PALOMAS ROAD
ALAMOGORDO, NEW MEXICO 88310
SAME AS BLOCK 7
| 9. FOR INFORMATION CALL: |
| A. NAME |
MICHAEL C. AGUIRRE
STEVE McCLOSKEY B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 575-434-7340
575-434-7371
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Price Range: The Government's estimate is: Between $100,000 and $250,000.
11. The Contractor shall begin performance within
FORMCHECKBOX
Award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If “YES,” indicate within how many calendar days after award in Item 12B.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A.
Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 4:30 (hour) local time 4/23/2009 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B.
An offer guarantee
FORMCHECKBOX
is, FORMCHECKBOX is not required.
C.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D.
Offers providing less than
Amendment 0004, Page Revised 4/13/2009
AG-7512-S-09-0014
Sacramento Ranger District
Pre-Fabricated Metal Bldg.
52.246-12 Inspection of Construction (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 110. The time stated for completion shall include final cleanup of the premises.
SECTION G--CONTRACT ADMINISTRATION DATA
GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
{For this Solicitation, there are NO clauses in this Section}
SECTION H--SPECIAL CONTRACT REQUIREMENTS
FAR 52.236-4 Physical Data (APR 1984) Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (a) The indications of physical conditions on the drawings and in the specifications are the result of SITE INVESTIAGTION MADE WITH A BACKHOE TEST PIT.
{For this Solicitation, there are NO clauses in this Section}
PART II--CONTRACT CLAUSES
Amendment 0004, Page Revised 4/13/2009
AG-7512-S-09-0014
Sacramento Ranger District
Pre-Fabricated Metal Bldg.
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es):
www.arnet.gov/far/
HYPERLINK "http://www.usda.gov/procurement/policy/agar.html" www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (JUL 2004)
52.203-3 Gratuities (APR 1984)
52.203-5 Covenant Against Contingent Fees (APR 1984)
52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)
52.203-7 Anti-Kickback Procedures (JUL 1995)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions (SEP 2007)
52.204-4 Printed or Copied Double-Sided on Recycled Paper (AUG 2000)
52.204-9 Personal Identity Verification of Contractor Personnel (SEP 2007)
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008)
52.211-18 Variation in Estimated Quantity (APR 1984)
52.215-2 Audit and Records -- Negotiation (JUN 1999)
52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JUL 2005)
52.219-6 Notice of Total Small Business Set-Aside (JUN 2003) 52.219-14 Limitations on Subcontracting (DEC 1996)
52.222-3 Convict Labor (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005)
52.222-6 Davis-Bacon Act (JUL 2005)
52.222-7 Withholding of Funds (FEB 1988)
52.222-8 Payrolls and Basic Records (FEB 1988)
52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (FEB 1988)
52.222-21 Prohibition of Segregated Facilities (FEB 1999)
52.222-26 Equal Opportunity (MAR 2007)
52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)
52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)
52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998)
52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)
52.222-50 Combating Trafficking in Persons (SEP 2007)
Amendment 0004, Page Revised 4/13/2009
AG-7512-S-09-0014
Sacramento Ranger District
Pre-Fabricated Metal Bldg.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
| Construction material description |
| Unit of measure |
| Quantity |
| Price (dollars) * |
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
FAR 52.228-1 Bid Guarantee (SEP 1996) (Applicable over $100,000)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds –
(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 % percent of the bid price or $3 Million, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
FAR 52.252-6 Authorized Deviations in Clause
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause Amendment 0004, Page Revised 4/13/2009
AG-7512-S-09-0014
Sacramento Ranger District
Pre-Fabricated Metal Bldg.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)
52.204-6 Data Universal Numbering System (DUNS) (APR 2008)
52.215-1 Instructions to Offerors--Competitive Acquisition (JAN 2004) Alternate I (OCT 1997) Alternate II (OCT 1997) 52.236-28 Preparation of Proposals – Construction (OCT 1997)
AGRICULTURE ACQUISITION REGULATIONS (48 CFR CHAPTER 4) CLAUSES
452.204-70 Inquiries (FEB 1988)
FAR 52.216-1 Type of Contract (APR 1984) The Government contemplates award of a FIRM FIXED PRICE contract resulting from this solicitation.
FAR 52.222-5 Davis-Bacon Act—Secondary Site of the Work (JUL 2005)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Davis-Bacon Act, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered are, are as follows:
Goals for minority participation for each trade Goals for female participation for each trade
___________45.9%__________
__________6.9 %____________
These goals are applicable to the entire Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are Amendment 0004, Page Revised 4/13/2009